This addendum and proposal document is issued by the Texas Department of Transportation (TxDOT) for a Federal-Aid construction project involving surfacing and roadway restoration work on FM 1416 in Newton County, Texas. The project, identified as Control 0627-04-070 and Project F 2027(229), extends 4.279 miles from FM 2460 south to SH 87. The scope of work includes seal coat application, asphalt planing and texturing, flexible pavement repairs, flexible base and superpave mixture placement, rumble strip milling, guardrail installation and removal, sign and delineator installation, pavement marking application, and various erosion control and traffic management measures. The project must be completed in 123 working days. The proposal includes 70 line items with quantities ranging from single units to over 86,000 linear feet for certain pavement marking operations. Bidders are required to acknowledge receipt of any addenda issued for the project; failure to do so will result in bids not being read. The project requires a proposal guaranty of $64,000.00 in the form of a cashier's check, teller's check, or bid bond.

Pricing for individual bid items must be submitted on the provided proposal forms, with unit prices written in words and dollars/cents. The contract will be awarded to the lowest responsive bidder and is subject to compliance with all Federal-Aid Highway Program requirements, including Davis-Bacon wage rates, nondiscrimination provisions, E-Verify employment eligibility verification, and certifications regarding debarment, lobbying, and boycott prohibitions. Contractors must submit audited financial statements and experience questionnaires at least ten days prior to the letting date. No disadvantaged business enterprise (DBE) goal has been established for this project (0%). The contract includes standard specifications and 23 special provisions covering items such as nondiscrimination, on-the-job training, cargo preference, and project-specific requirements for laboratory facilities, material handling, traffic control, and environmental controls. All work is subject to the Standard Specifications adopted by TxDOT as of September 1, 2024, and Federal-Aid construction contract provisions, including Form FHWA-1273 requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control 0627-04-070 Project F 2027(229) Highway FM 1416 County NEWTON

ADDENDUM ACKNOWLEDGMENT

Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This page is provided for the purpose of acknowledging an addendum.

FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT

BEING READ.

In order to properly acknowledge an addendum, place a mark in the box next to the respective addendum.

ADDENDUM NO. 1

ADDENDUM NO. 2

ADDENDUM NO. 3

ADDENDUM NO. 4

ADDENDUM NO. 5

In addition, the bidder by affixing their signature to the signature page of the proposal is acknowledging that they have taken the addendum(s) into consideration when preparing their bid and that the information contained in the addendum will be included in the contract, if awarded by the Commission or other designees.

1-1

This page intentionally left blank.

Highway FM 1416 County NEWTON

PROPOSAL TO THE TEXAS

TRANSPORTATION COMMISSION

2024 SPECIFICATIONS

Work Consisting of Surfacing/Roadway Restoration

NEWTON COUNTY, TEXAS

The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated.

This project is to be completed in 123 working days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.

Provide a proposal guaranty in the form of a Cashier’s Check, Teller’s Check (including an Official Check) or Bank Money Order on a State or National Bank or Savings and Loan Association, or State or Federally chartered Credit Union made payable to the Texas Transportation Commission in the following amount:

SIXTY FOUR THOUSAND AND 00/100 (Dollars) ( $64,000.00)

A bid bond may be used as the required proposal guaranty. The bond form may be detached from the proposal for completion. The proposal may not be disassembled to remove the bond form. The bond must be in accordance with Item 2 of the specifications.

Any addenda issued amending this proposal and/or the plans that have been acknowledged by the bidder, become part of this proposal.

By signing the proposal the bidder certifies:

1. the only persons or parties interested in this proposal are those named and the bidder has not directly or indirectly participated in collusion, entered into an agreement or otherwise taken any action in restraint of free competitive bidding in connection with the above captioned project.

2. in the event of the award of a contract, the organization represented will secure bonds for the full amount of the contract.

3. the signatory represents and warrants that they are an authorized signatory for the organization for which the bid is submitted and they have full and complete authority to submit this bid on behalf of their firm.

4. that the certifications and representations contained in the proposal are true and accurate and the bidder intends the proposal to be taken as a genuine government record.

• Signed: **

(1) (2) (3) Print Name:

(1) (2) (3) Title:

(1) (2) (3) Company:

(1) (2) (3)

• Signatures to comply with Item 2 of the specifications.

**Note: Complete (1) for single venture, through (2) for joint venture and through (3) for triple venture.

* When the working days field contains an asterisk (*) refer to the Special Provisions and General Notes.

NOTICE TO CONTRACTORS

ANY CONTRACTORS INTENDING TO BID ON ANY WORK TO BE AWARDED

BY THIS DEPARTMENT MUST SUBMIT A SATISFACTORY “AUDITED FINANCIAL

STATEMENT” AND “EXPERIENCE QUESTIONNAIRE” AT LEAST TEN DAYS

PRIOR TO THE LETTING DATE.

UNIT PRICES MUST BE SUBMITTED IN ACCORDANCE WITH ITEM 2 OF

THE STANDARD SPECIFICATIONS OR SPECIAL PROVISION TO ITEM 2 FOR

EACH ITEM LISTED IN THIS PROPOSAL.

TEXAS DEPARTMENT OF TRANSPORTATION

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,

That we, (Contractor Name)

Hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Texas Department of Transportation, hereinafter called the Obligee, in the sum of not less than two percent (2%) of the department’s engineer’s estimate, rounded to the nearest one thousand dollars, not to exceed one hundred thousand dollars ($100,000) as a proposal guaranty (amount displayed on the cover of the proposal), the payment of which sum will and truly be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the principal has submitted a bid for the following project identified as:

Control 0627-04-070

Project F 2027(229)

Highway FM 1416

County NEWTON

NOW, THEREFORE, if the Obligee shall award the Contract to the Principal and the Principal shall enter into the Contract in writing with the Obligee in accordance with the terms of such bid, then this bond shall be null and void. If in the event of failure of the Principal to execute such Contract in accordance with the terms of such bid, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not as a penalty but as liquidated damages.

Signed this Day of 20

By:

(Contractor/Principal Name)

(Signature and Title of Authorized Signatory for Contractor/Principal)

*By:

(Surety Name)

(Signature of Attorney-in-Fact) Impressed

*Attach Power of attorney (Surety) for Attorney-in-Fact Surety Seal Only

This form may be removed from the proposal

BIDDER’S CHECK RETURN

IMPORTANT

The space provided for the return address must be completed to facilitate the return of your bidder’s check. Care must be taken to provide a legible, accurate, and complete return address, including zip code. A copy of this sheet should be used for each different return address.

NOTE

Successful bidders will receive their guaranty checks with the executed contract.

RETURN BIDDERS CHECK TO (PLEASE PRINT):

Control 0627-04-070 Project F 2027(229) Highway FM 1416 County NEWTON

IMPORTANT

PLEASE RETURN THIS SHEET IN ITS ENTIRETY

Please acknowledge receipt of this check(s) at your earliest convenience by signing below in longhand, in ink, and returning this acknowledgement in the enclosed self-addressed envelope.

Check Received By: Date:

Title:

For (Contractor's Name):

Project: County:

NOTICE TO THE BIDDER

In the space provided below, please enter your total bid amount for this project. Only this figure will be read publicly by the Department at the public bid opening.

It is understood and agreed by the bidder in signing this proposal that the total bid amount entered below is not binding on either the bidder or the Department. It is further agreed that the official total bid amount for this proposal will be determined by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.

Total Bid Amount

Control Project Highway County

ALT ITEM DESC SP Bid Item Description Unit Quantity Bid Price Amount Seq

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Additional Signature for Joint Venture:

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Total Bid Amount _______$2,664.00________

EXAMPLE OF BID PRICES SUBMITTED BY COMPUTER PRINTOUT

0001-03-030

STP 2000(938)HES

SH 20

EL PASO

104 509 REMOV CONC (SDWLK) SY 266.400 $10.000 $2,664.00 1

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

EXAMPLES

BID PRICES SUBMITTED BY HAND WRITTEN FORMAT

Unit price for each plant in place

249 014 FLEX BASE(DEL)(DENSCOT)(TY A GR4 CL2) TON 56,787.00 14

ALT

ITEM-CODE

ITEM

NO

DESC

NO

S.P.

NO.

UNIT BID PRICE ONLY

WRITTEN IN WORDS UNIT

APPROX

QUANTITIES

DEPT

USE

ONLY

190 026 RED OAK 1 1/2” - 1 3/4” GAL BB EA 9.000 1

DLRS

CENTS

DLRS

CENTS

Unit price for each ton of Flexible Base

430 001 001 CL A CONC FOR EXT STR (CULV) CY 45.000 27

Unit price for each cubic yard of Concrete

DLRS

CENTS

610 007 001 RDWY ILL ASSEM(TY ST 50T-8-8)(.4 KW)S EA 13.000 7

Unit price of each Roadway Illumination Assembly

DLRS

CENTS

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

F 2027(229) Proposal Sheet

NEWTON FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

100 7002

PREPARING ROW

STA 4.000 1 DOLLARS

and CENTS

104 7003

REMOV CONC (MOWSTRIP)

SY 817.000 2 DOLLARS

and CENTS

134 7004

BACKFILL (TY A OR B)

STA 237.000 3 DOLLARS

and CENTS

158 7002

SPEC EXCAV WORK (HYD EXCAVATOR)

HR 16.000 4 DOLLARS

and CENTS

164 7017

HYDRO MULCH SEED

(PERM_RURAL_SANDY)

SY 30,400.000 5 DOLLARS

and CENTS

168 7001

VEGETATIVE WATERING

TGL 326.000 6 DOLLARS

and CENTS

316 7067

ASPH (AC-20-5TR OR AC-20XP)

GAL 24,016.000 7 DOLLARS

and CENTS

316 7258

AGGR (TY-PD OR PL, GR-4)

CY 515.000 8 DOLLARS

and CENTS

344 7001

SP MIXES SP-B PG64-22

TON 17.000 9 DOLLARS

and CENTS

344 7030

SP MIXES SP-C SAC-A PG76-22

TON 10,979.000 10 DOLLARS

and CENTS

344 7077

TACK COAT

GAL 3,992.000 11 DOLLARS

and CENTS

354 7033

PLANE ASPH CONC PAV(0" TO 3")

SY 867.000 12 DOLLARS

and CENTS

354 7052

PLANE ASPH CONC PAV(3")

SY 1,670.000 13 DOLLARS

and CENTS

1-6

NEWTON FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

400 7010

CEM STABIL BKFL

CY 34.000 14 DOLLARS

and CENTS

420 7070

CL E CONC (SEAL SLAB)(NON-REINF)

CY 19.000 15 DOLLARS

and CENTS

432 7013

RIPRAP (MOW STRIP)(4 IN)

CY 99.000 16 DOLLARS

and CENTS

432 7043

RIPRAP (STONE PROTECTION)(18 IN)

CY 45.000 17 DOLLARS

and CENTS

464 7005

RC PIPE (CL III)(24 IN)

LF 216.000 18 DOLLARS

and CENTS

467 7132

SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1)(C)

EA 10.000 19 DOLLARS

and CENTS

467 7301

SET (TY II) (18 IN) (CMP) (3: 1) (C)

EA 2.000 20 DOLLARS

and CENTS

467 7321

SET (TY II) (24 IN) (CMP) (3: 1) (C)

EA 8.000 21 DOLLARS

and CENTS

496 7005

REMOV STR (WINGWALL)

EA 2.000 22 DOLLARS

and CENTS

496 7007

REMOV STR (PIPE)

LF 216.000 23 DOLLARS

and CENTS

500 7001

MOBILIZATION

LS 1.000 24 DOLLARS

and CENTS

502 7001

BARRICADES, SIGNS AND TRAFFIC

HANDLING

MO 9.000 25 DOLLARS

and CENTS

505 7001

TMA (STATIONARY)

DAY 95.000 26 DOLLARS

2-6

NEWTON FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

505 7003

TMA (MOBILE OPERATION)

DAY 34.000 27 DOLLARS

and CENTS

506 7003

ROCK FILTER DAMS (INSTALL) (TY 3)

LF 54.000 28 DOLLARS

and CENTS

506 7011

ROCK FILTER DAMS (REMOVE)

LF 54.000 29 DOLLARS

and CENTS

506 7044

BIODEG EROSN CONT LOGS (INSTL) (12")

LF 300.000 30 DOLLARS

and CENTS

506 7046

BIODEG EROSN CONT LOGS (REMOVE)

LF 300.000 31 DOLLARS

and CENTS

508 7001

CONSTRUCTING DETOURS

SY 604.000 32 DOLLARS

and CENTS

530 7002

INTERSECTIONS (ACP)

SY 1,567.000 33 DOLLARS

and CENTS

530 7010

DRIVEWAYS (ACP)

SY 190.000 34 DOLLARS

and CENTS

530 7012

DRIVEWAYS (ACP) (TY 2)

SY 357.000 35 DOLLARS

and CENTS

530 7018

TURNOUTS (ACP)

SY 328.000 36 DOLLARS

and CENTS

533 7001

MILL RUMBLE STRIPS (ASPHALT) (SHLDR)

LF 45,408.000 37 DOLLARS

and CENTS

533 7002

MILL RUMBLE STRIPS (ASPH)

(CENTERLINE)

LF 22,704.000 38 DOLLARS

and CENTS

540 7001

MTL W-BEAM GD FEN (TIM POST)

LF 1,275.000 39 DOLLARS

3-6

NEWTON FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

540 7005

MTL BEAM GD FEN TRANS (THRIE-BEAM)

EA 4.000 40 DOLLARS

and CENTS

540 7015

DOWNSTREAM ANCHOR TERMINAL

SECTION

EA 2.000 41 DOLLARS

and CENTS

542 7001

REMOVE METAL BEAM GUARD FENCE

LF 1,275.000 42 DOLLARS

and CENTS

542 7003

REMOVE DOWNSTREAM ANCHOR

TERMINAL

EA 2.000 43 DOLLARS

and CENTS

542 7004

RM MTL BM GD FENCE TRANS (THRIE-

BEAM)

EA 4.000 44 DOLLARS

and CENTS

544 7001

GUARDRAIL END TREATMENT (INSTALL)

EA 2.000 45 DOLLARS

and CENTS

544 7003

GUARDRAIL END TREATMENT (REMOVE)

EA 2.000 46 DOLLARS

and CENTS

560 7001

MAILBOX INSTALL-M (TWG-POST) TY 1

EA 14.000 47 DOLLARS

and CENTS

644 7001

IN SM RD SN SUP&AM TY10BWG(1)SA(P)

EA 31.000 48 DOLLARS

and CENTS

644 7004

IN SM RD SN SUP&AM TY10BWG(1)SA(T)

EA 11.000 49 DOLLARS

and CENTS

644 7007

IN SM RD SN SUP&AM TY10BWG(1)SA(U)

EA 4.000 50 DOLLARS

and CENTS

644 7025

IN SM RD SN SUP&AM TYS80(1)SA(P)

EA 2.000 51 DOLLARS

and CENTS

644 7031

IN SM RD SN SUP&AM TYS80(1)SA(U)

EA 1.000 52 DOLLARS

4-6

NEWTON FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

644 7073

REMOVE SM RD SN SUP&AM

EA 49.000 53 DOLLARS

and CENTS

658 7018

INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2

EA 15.000 54 DOLLARS

and CENTS

658 7056

INSTL OM ASSM (OM-2Y)(WC)GND

EA 22.000 55 DOLLARS

and CENTS

658 7317

INSTL OM SM RD SIGN (1-OM-PW)Y

EA 44.000 56 DOLLARS

and CENTS

658 7318

INSTL OM SM RD SIGN (1-OM-PW)R

EA 5.000 57 DOLLARS

and CENTS

662 7033

WK ZN PAV MRK NON-REMOV (Y)4"(BRK)

LF 4,730.000 58 DOLLARS

and CENTS

662 7035

WK ZN PAV MRK NON-REMOV (Y)4"(SLD)

LF 13,101.000 59 DOLLARS

and CENTS

662 7114

WK ZN PAV MRK SHT TERM (TAB)TY Y-2

EA 4,220.000 60 DOLLARS

and CENTS

666 7024

REFL PAV MRK TY I (W)8"(SLD)(100MIL)

LF 86.000 61 DOLLARS

and CENTS

666 7129

REFL PAV MRK TY I (Y)(ISLAND)(100MIL)

SF 603.000 62 DOLLARS

and CENTS

666 7408

REFL PAV MRK TY I (W)6"(BRK)(100MIL)

LF 44,374.000 63 DOLLARS

and CENTS

666 7411

REFL PAV MRK TY I (W)6"(SLD)(100MIL)

LF 4,730.000 64 DOLLARS

and CENTS

666 7423

REFL PAV MRK TY I (Y)6"(SLD)(100MIL)

LF 13,101.000 65 DOLLARS

5-6

NEWTON FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

668 7089

PREFAB PM TY C (W)(24")(SLD)

LF 57.000 66 DOLLARS

and CENTS

668 7111

PREFAB PM TY C (W)(36")(YLD TRI)

EA 8.000 67 DOLLARS

and CENTS

672 7002

REFL PAV MRKR TY I-C

EA 5.000 68 DOLLARS

and CENTS

672 7004

REFL PAV MRKR TY II-A-A

EA 416.000 69 DOLLARS

and CENTS

677 7002

ELIM EXT PM & MRKS (6")

LF 330.000 70 DOLLARS

6-6

CERTIFICATION OF INTEREST IN OTHER BID

PROPOSALS FOR THIS WORK

By signing this proposal, the bidding firm and the signer certify that the following information, as indicated by checking “Yes” or “No” below, is true, accurate, and complete.

A. Quotation(s) have been issued in this firm's name to other firm(s) interested in this work for consideration for performing a portion of this work.

________ YES

________ NO

B. If this proposal is the low bid, the bidder agrees to provide the following information prior to award of the contract.

1. Identify firms which bid as a prime contractor and from which the bidder received quotations for work on this project.

2. Identify all the firms which bid as a prime contractor to which the bidder gave quotations for work on this project.

DISCLOSURE OF LOBBYING ACTIVITIES

Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for public burden disclosure.)

1. Type of Federal Action:

a. contract

b. grant

c. cooperative agreement

d. loan

e. loan guarantee

f. loan insurance

2. Status of Federal Action:

a. bid/offer/application

b. initial award

c. post-award

3. Report Type:

a. initial filing

b. grant

For material change only:

year _______ quarter _____ date of last report ___________

4. Name and Address of Reporting Entity:

Prime Subawardee Tier __________, if known:

Congressional District, if known:

5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Congressional District, if known:

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable: _____________________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):

b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

11. Amount of Payment (check all that apply):

$ ___________________________ actual planned

13. Type of Payment (check all that apply):

a. retainer

b. one-time fee

c. commission

d. contingent fee

e. deferred

f. other; specify: _______________________________

12. Form of Payment (check all that apply)

a. cash

b. in-kind; specify: nature ____________________ value ____________________

14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment Indicated in Item 11:

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

15. Continuation Sheet(s) SF-LLL-A attached: Yes No

16. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required dis-closure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature: __________________________________________

Print Name: _________________________________________

Title: ______________________________________________

Telephone No: _____________________ Date: ___________

FEDERAL USE ONLY Authorized for Local Reproduction Standard Form - LLL

INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES

This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Use the SF-LLL-A Continuation Sheet for additional information if the space on the form is inadequate. Com-plete all items that apply for both the initial filing and material change report. Refer to the implementing guidance pub-lished by the Office of Management and Budget for additional information.

1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.

2. Identify the status of the covered Federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity or this covered Federal action.

4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.

5. If the organization filing the report in item 4 checks "Subawardee", then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.

6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.

8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number, the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."

9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.

10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.

(b) Enter the full names of the individual(s) performing services, and include full address if different from 10(a).

Enter Last Name, First Name, and Middle Initial (MI).

11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned).

Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.

12. Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.

13. Check the appropriate box(es). Check all boxes that apply. If other, specify nature.

14. Provide a specific and detailed description of the services that the lobbyist has performed, or will be expected to perform, and the date(s) of any services rendered. Include all preparatory and related activity, not just time spent in actual contact with Federal officials. Identify the Federal official(s) or employee(s) contacted or the officer(s), employee(s), or Member(s) of Congress that were contacted.

15. Check whether or not a SF-LLL-A Continuation Sheet(s) is attached.

16. The certifying official shall sign and date the form, print his/her name, title, and telephone number.

Public reporting burdon for this collection of infromation is estimated to average 30 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments reguarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burdon, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.

DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB 0348-0046

CONTINUATION SHEET

Authorized for Local Reproduction

Standard Form - LLL-A

Reporting Entity: ____________________________________ Page ______ of ______

12-26

CONTRACTOR’S ASSURANCE

(Subcontracts-Federal Aid Projects)

By signing this proposal, the contractor is giving assurances that each subcontract and further all lower tier subcontracts will incorporate the Standard Specification to Article 9.9, Payment

Provisions for Subcontractors and will also physically attach the following:

Form FHWA 1273

Wage Rates

Special Provision 000-001

Special Provision 000-002

Special Provision 000-004

Special Provision 000-007

Required Contract Provisions Federal-Aid Construction

Contracts. Only need to be referenced in the sub-contract.

All Construction Projects

Nondiscrimination, Sections 3.1-3.6 (include materials and leases of equipment)

Certificate of Nondiscrimination in Employment

On-the-Job Training Program

Cargo Preference Act Requirements in Federal-Aid

ENGINEER SEAL

Project F 2027(229)

Highway FM 1416 County NEWTON

The enclosed Texas Department of Transportation Specifications, Special Specifications, Special Provisions, General Notes and Specification Data in this document have been selected by me, or under my responsible supervision as being applicable to this project.

Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act.

The seal appearing on this document was authorized by:

Samantha Jo Harris P.E.

October 16, 2026

Seal Applies to CSJ(s):

All CSJs within the Contract

134616

Samantha Jo Harris

County: Newton Sheet ____

Highway: FM 1416 Control: 0627-04-070

General Notes Sheet A

GENERAL NOTES:

Contractor questions on this project are to be addressed to the following individual(s):

Name Richard Bradley Jr, P.E.

Email Richard.Bradley@txdot.gov

Name Jim Grissom, P.E.

Email Jim.Grissom@txdot.gov

Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address:

https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors

All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page.

The Letting Pre-Bid Q&A web page for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.

Item 4 Scope of Work

Remove all vegetation from pavement edges, intersections and driveways before planing or ACP operations. This work will not be paid for directly but will be subsidiary to the various bid items.

It is the Contractor’s responsibility to field verify all drainage structure’s shown in the plans.

It is the Contractor’s responsibility to mark the location of all existing striping and place proposed striping back in the same location or as shown in the plans.

Item 5 Control of the Work

Station the project before commencing work. Mark the stations every 100 feet. Maintain stationing throughout the duration of the project. Remove the station markings at the completion of the project. Consider this work to be subsidiary to the various bid items of the contract.

Item 6 Control of Materials

Flammable/combustible materials must be stored at a designated location as approved.

mailto:Jim.Grissom@txdot.gov https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors

General Notes Sheet B

Do not store flammable/combustible materials under or adjacent to Bridge class structures. Daily removal of these materials will be considered incidental work.

Item 7 Legal Relations and Responsibilities

Furnish all materials, labor and incidentals required to provide for traffic across the highway and for temporary ingress and egress to private property in accordance with article 7.2.4 of the standard specifications at no additional cost to the state. Maintain ingress and egress to the adjacent property at all times. Consider this work to be subsidiary to the various bid items of the contract.

The Contractor will be completely responsible for the immediate removal of any material that gets upon any vehicle as a result of their operation.

State contract mowers will mow the right of way during the growing season. The Contractor will be notified by the Engineer one week in advance of the anticipated time when mowers will be in the limits of the project. Clean the right of way to such a condition that allows the mowing contractors to safely mow.

Personal vehicles of the contractor’s employees will not be parked within the right of way at any time including any section closed to public traffic, unless the vehicle is being used for construction procedures. However, the Contractor’s employees may park on the right of way at sites where the contractor has their office, equipment and materials storage yard.

The Contractor will be familiar with the right of way map and the location of all the right of way monumentation. Care will be taken by the Contractor and its subcontractors to protect and avoid disturbance to the right of way monumentation. Any monument disturbed by the Contractor will be repaired and/or replaced to the satisfaction of the Engineer. This work will be corrected at the contractor’s expense.

No significant traffic generator events have been identified in the project limits.

Item 8 Prosecution and Progress

Compute and charge working days in accordance with Section 8.3.1.4. Standard Workweek.

Submit monthly progress scheduled in accordance with 8.5.5.2.3. Failure to supply updated project schedule may result in the Engineer withholding progress (monthly) payments.

Adjoining projects may be in progress during the construction of a portion of this project. Plan and prosecute the sequence of construction and the traffic control plan with adjacent construction projects, if applicable. Manage construction of all phases to minimize disruption to traffic.

Notify the Engineer 7 days in advance of any temporary or permanent lane, ramp or connector affected by closures, detours, or restrictions to lane widths, alterations to vertical clearances or

General Notes Sheet C modifications to alignment/radii. Any other modification to the roadway that may adversely affect the mobility of oversized/overweight trucks will also require 7 business day advance written notice to the Engineer.

Work requiring temporary lane, ramp, or connector closures will only be allowed during non- peak hours. Non-peak hours will be nighttime, or weekends. Nighttime hours will be defined as 9:00 PM until 5:00 AM, Sunday night thru Thursday night. Weekend hours will be defined as 9:00 PM on Friday night until 5:00 AM on Monday morning. One lane in each direction of each travel way is to remain open at all times. Placement of traffic control devices for night or weekend operations will not commence until after the start time and all devices will be removed from the roadway before the finish time.

No lane closure will be allowed on the National Holidays shown on the table below.

The contractor can work without a lane close if the task permits it.

EVENTS DATE LANE CLOSURE

RESTRICTIONS

Memorial Day Holiday Traffic

Friday, May 26, 2028 No Lane Closures After 5:00

PM

Saturday, May 27, 2028 No Lane Closures Sunday, May 28, 2028 No Lane Closures Monday, May 29, 2028 No Lane Closures Tuesday, May 30, 2028 Lane Closure Resume at 7:00

AM

Independence Day Holiday

Traffic

Monday, July 3, 2028 No Lane Closures After Noon

Tuesday, July 4, 2028 No Lane Closures Wednesday, July 5, 2028 Lane Closure Resume at 7:00

AM

Maintain one lane open to traffic during construction, unless otherwise approved.

Schedule work so that all travel lanes are open during non-working hours, nights and weekends, unless otherwise approved.

Limit lane closures to 1 mile unless otherwise approved.

General Notes Sheet D

All edges must be backfilled by the end of the day with a 3:1 or flatter slope. No drop offs will be left overnight.

HURRICANE

In the event of the declaration of a hurricane watch, warning, other severe weather warning or national or state emergency that requires the roadways in the vicinity be used as evacuation routes, cease all work that requires the Contractor’s, sub-contractors’ or material suppliers’ vehicles to enter the stream of traffic on these primary or secondary evacuation routes. This work includes material hauling and delivery, and mobilization or demobilization of equipment.

Item 164 Seeding for Erosion Control

Final grading and stabilization (seeding) will be achieved as soon as possible and not scheduled only for the end of the project. Final grading and stabilization should be initiated as the overall work progresses.

Multiple mobilizations of the seeding crews will be expected to comply with the Construction General Permit of the Texas Pollution Elimination Discharge System requirements for re-vegetating disturbed soils.

Item 166 Fertilizer

Fertilize all the seeded or sodded areas of project.

Item 168 Vegetative Watering

Equip water trucks with sprinkler systems capable of covering the entire area to be seeded or sodded from the roadway.

Water all newly placed sod or seeded areas the same day of installation. Thereafter, maintain the sod or seeded areas in a well-watered condition and at no time allow the areas to dry to the condition that water stress is evident.

Mechanical watering may not be required during periods of adequate moisture as determined.

Furnish and apply water at a rate of 6.788 Thousand Gallons per acre per cycle or as directed on the plans.

Comply with stabilization requirements for 70% grass coverage; uniform vegetative coverage is required. During this period, meter and operate water equipment under pumping pressure capable

General Notes Sheet E of delivering the required quantities of water necessary. For Permanent seeding each cycle will be executed weekly for 12 weeks, unless directed otherwise. For Temporary seeding each cycle will be executed weekly for 6 weeks, unless directed otherwise.

Provide a log book showing daily water usage and receipts of water applied, in addition to metering the water equipment.

1. Wait 14 calendar days following application of the herbicide and then rough-cut mow the grass. Remove clippings after mowing.

2. Repeat herbicide application as described in item 2 above.

3. Wait 14 calendar days following second herbicide application and then scalp the grass.

4. Completely remove all clippings immediately after scalping and before seeding.

5. Broadcast wildflower seeding. Broadcast seeding will consist of four parts masonry sand and one part seed. Use a roller on seeded areas to ensure seed-to-ground contact.

6. Consider this work to be subsidiary to the various bid items of the contract.

Do not mow existing or newly planted wildflower areas from January through July unless directed otherwise.

Item 316 Seal Coat

Furnish medium pneumatic-tire rollers in accordance with Item 210, “Rolling.”

All trucks hauling materials to be paid for by truck measurement will be “struck off” before delivery to the project.

Remove vegetation and blade pavement edges, including curb and gutters. This work will not be paid for directly but will be considered subsidiary to Item 316/318.

Remove all vegetation from pavement edges, intersections, curbs and gutters and driveways before planing or ACP operations. This work will not be paid for directly but will be subsidiary to the various bid items.

The open season for the application of asphalt is May 1st through September 15th unless otherwise directed in writing.

Base bids on the following cure times for the One Course Surface Treatment (OCST) before subsequent overlays, and additional seal coats:

OCST placed June through September 15 – Three (3) Day Cure.

OCST placed all other times – Seven (7) Day Cure.

General Notes Sheet F

The Area Engineer may reduce the cure time based on atmospheric conditions such as consecutive high ambient temperature, less humidity, and low rain fall amounts.

Seal intersections and driveways before sealing the main lanes. Seal all existing roadway surfaces, including extra widths, crossovers, roadside parks, picnic areas, mailbox turnouts, public road intersections, and public drives, within the limits of each project. Do not seal intersections or driveways surfaced with ACP or constructed of concrete.

Sweep all roadways with a powered rotary broom before placement of the surface treatment to remove all loose or excess material or debris. After rolling, sweep as soon as aggregate has sufficiently bonded to remove excess. Use a vacuum broom on all roadway sections with curb and gutter and all roadway sections within the city limits of any city.

Station limits may be adjusted as directed to meet varying field conditions

Item 341 Dense Graded Hot Mix Asphalt (Exempt)

Prepare Mix Designs using the Superpave Gyratory compactor.

Item 344 Superpave Mixtures

Prepare Mix Designs and QC testing using the Superpave Gyratory compactor.

Provide a separate Laboratory space, building or testing area, large enough to accommodate TxDOT equipment and testing on site at the Hot Mix Plant near or within the area of Contractor’s testing equipment. The contractor will provide the SGC” Superpave Gyratory Compactor”. All other equipment must be provided by TxDOT. TxDOT will be responsible for maintaining state provided equipment. The Contractor will provide TxDOT with the Calibration paperwork on the shared equipment that they provide.

Laboratory area shall have a roof, floor, doors, and screened windows. Ensure the floor is strong enough to support testing equipment and has an impervious floor covering. Ensure that the Laboratory area is tied down, weatherproof, piped for water and fuel, and electrically wired by personnel meeting the requirements of Article 7.18., “Electrical Requirements.”

Furnish and install adequate equipment, outlets, lighting, air-conditioning, heating, and ventilation for the Laboratory area. Heating and Air Conditioning shall maintain the Laboratory working area temperature within a range of (68oF through 72oF).

Provide partitioned restroom furnished with restroom supplies, a lavatory, and a flush toilet connected to a sewer or septic tank within the Laboratory area.

Laboratory area will have the use of an internet service provider (ISP) that can provide more than

General Notes Sheet G one computer access to ISP account at one time. ISP provider must be able to supply a minimum 100 gigabyte download speed per account.

Required appurtenances within the Laboratory Area:

1.A 10lb ABC fire extinguisher with up-to-date inspection tag and a working smoke detector.

2.Additional workbench and tables at least 3 ft. wide, 6 ft. long, and 3 ft. high.

3.Minimum two chairs and one desk, filing cabinets, solar screen blinds or shades.

4.An operational telephone system.

5.Water fountain or bottled water fountain able to provide cold water and have cup dispenser and cups.

6.Water (for testing purposes) from an approved source 7.Adequately power ventilate the room for the ignition oven. Provide a NEMA 6-50R (208/240 volt, 50 amp) outlet within 2.25 ft. of the ignition oven location and an independent exhaust outlet to the outside located a maximum of 8 ft. from the oven. Provide a level, sturdy and 8.fireproof surface for the ignition oven with a minimum of 6 in. clearance between the furnace and other vertical surfaces. Vent the ignition oven to the outside.

9.A minimum of 20 ft. of total work counter length at least 3 ft. wide and 3 ft. above the floor and strong enough to support required testing equipment.

10.A laboratory sink measuring 24 × 30 in. and 12 in. deep 11.Door openings for the Laboratory area must be 48-inches minimum width. If steps are required to gain access to the facility’s then a landing dock will be provided with minimum dimensions of 60 inches wide by 60 inches deep. The strong floor and landing of the facility shall support the weight of all equipment and personnel providing a stable, essentially zero deflection during testing operations acceptable to the Engineer.

•Provide multifunction color printer/fax/scanner/copier capable of reproducing 11 X 17

For the Laboratory area the work performed, materials furnished, utilities, and utility services (including phone and internet), appurtenances including office equipment testing equipment, labor, tools, and incidentals will not be paid measured or paid for directly but will be subsidiary to pertinent items.

Use aggregate that meets the SAC requirement of class A for all surface mixes.

Aggregates used on shoulders and ramps are required to meet SAC requirements. Provide mix designs. Mix designs must be verified and approved.

Remove all vegetation from pavement edges, intersections, curbs and gutters and driveways before planning or ACP operations. This work will not be paid for directly but will be subsidiary

General Notes Sheet H to the various bid items.

Operate the spreading and finishing machine at a uniform forward speed consistent with the plant production rate, hauling capability, and roller train capacity to result in a continuous operation.

The speed will be slow enough, so that stopping between trucks is not ordinarily required. If the Engineer determines sporadic delivery of material is adversely affecting the HMA placement, the Engineer may require paving operations to cease until acceptable methods are employed to minimize starting and stopping of the paver.

A material transfer device (MTD) will be required for all surface courses of HMA on this project. An MTD is defined as a self-propelled, wheel-mounted vehicle capable of receiving HMA from the haul trucks separate from the paver. The MTD will have a minimum storage capacity of approximately 25 tons and will be equipped with a pivoting discharge conveyor and a means of completely remixing the HMA before placement. The Engineer may approve an alternative device on a trial basis for the surface course. This device will be capable of receiving HMA separate from the paver and must have remixing capabilities. For all other courses of HMA, other than the surface, an alternative device may be used as long as it is capable of receiving HMA separate from the paver.

Overlay across the ends of any curb ramps must not create a barrier to their use. Changes in level up to ¼” may be vertical; between ¼” and ½” must be beveled with a slope no greater than 1:2;

greater than ½” will require a “ramp”.

Station limits may be adjusted as directed to meet varying field conditions.

Item 351 Flexible Pavement Structure Repair

The repair areas will require full depth saw-cut when milling is not used. Consider this work to be subsidiary to the various bid items of the contract.

Provide Flexible Pavement Repair with Item 341, Type B (PG 64-22) Exempt unless approved otherwise. Place Hot Mix with a constant longitudinal surface grade and tie in flush with the existing surface at each end and both sides of the repair area.

Unless otherwise directed, place new D-G HMA TY B with maximum 4” lifts. The minimum patch sizes will be 6’ in width and 10’ in length.

Match the existing cross slope in the repair areas, unless directed otherwise.

All repair locations must be filled the same day they are excavated. No open cut areas will be allowed overnight.

All excavated materials will be removed from the project daily.

Ordinary compaction will be used on this project.

Station limits may be adjusted as directed to meet varying field conditions.

General Notes Sheet I

For repair locations located in areas to be planed, perform flexible pavement repairs after planing operations.

Seal the perimeter of the repair areas with hot poured rubber in accordance with Item 712.

Consider this work to be subsidiary to the various bid items of the contract.

Item 354 Planing and Texturing Pavement

Where the underlying flexible base is exposed during the planing operation, prime this area with an asphalt at a rate as directed and patch with an approved HMA material, at the end of the day’s operation in which it occurs. These items of work will not be paid for directly but will be subsidiary to Item 354.

Complete planing operations in adjacent lanes and shoulders to the same point at the end of each day.

Cut the existing shoulder pavement to allow for drainage of water away from travel lanes which have been planed. This work will be subsidiary to various bid items.

Retain ownership of planed materials.

Stockpile salvaged materials at FM 1416 just before FM 2460. 30°37'14.85"N 93°44'1.07"W.

Schedule the work so that a seal coat or HMA is placed no more than two weeks after milling has been performed on any pavement surface, unless otherwise approved. The Engineer may require the seal coat to be placed sooner than two weeks in cases when base materials are exposed or when the pavement structure is showing signs of distress.

Item 400 Excavation and Backfill for Structures

Cut and restore pavement to the depth and dimensions shown on the plans with: (Specify material to be used).

Item 432 Riprap

Item 432 Riprap

Payment for all necessary excavation below natural ground or bottom of proposed mow strip, and for material manipulation and shaping of slopes will be included in the unit price bid per cubic yard or linear foot of riprap mow strip. If additional embankment is required, beyond what is generated from the necessary excavation, this Item will be measured and paid for by the cubic yard of material, complete in place using Item 132 if included in the plans or by the extra work and force account method as shown under Item 9.7. The method used must be agreed to by both the contractor and the engineer.

General Notes Sheet J

Item 425 Precast Prestressed Concrete Structural Members

A precast concrete alternate may be submitted in accordance with the latest version of the Bridge Design Manual – LRFD. The Contractor must submit the alternate design for review and approval. Acceptance or denial of an alternate is at the sole discretion of the Engineer. All alternate designs must be signed and sealed by a Professional Engineer. Impacts to the project schedule and any additional costs resulting from the use of alternates are the sole responsibility of the Contractor.

Item 467 Safety End Treatment

At driveway locations where the contract requires modifying pipe installations, provide a 6:1 maximum embankment slope from the edge of the driveway to the top of the SET.

Grading required for shaping driveways and side road turnouts, including embankment for pipe culverts at these access locations, will be considered subsidiary to various bid items.

Item 502 Barricades, Signs, and Traffic Handling

Construct all work zone signs, sign supports, and barricades from material other than wood unless approved otherwise. Metal posts, if used, are to be galvanized. Aluminum signs, if used, will meet the following minimum thickness requirements:

Square Feet Minimum Thickness

Less than 7.5 0.080 inches

7.5 to 15 0.100 inches

Greater than 15 0.125 inches

The Contractor Force Account “Safety Contingency” that has been established for this project is intended to be used for work zone enhancements, to improve the effectiveness of the Traffic Control Plan, that could not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor’s Responsible Person based on weekly or more frequent traffic management reviews on the project. The Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.

If the Engineer approves placement of temporary stockpiles in the right of way, delineation of the stockpile must follow the detail shown on the BC(10) standard.

General Notes Sheet K

The following roadways have been determined to be high volume for the purpose identified in Note 4 of the “Typical Location of Crossroad Signs” on the BC(2) standard sheet: SH 82

The following roadways have been determined to be low volume for the purpose identified in Note 2 of the “Typical Location of Crossroad Signs” on the BC(2) standard sheet: CR 4096, CR 4098, CR 4065, CR 4099, CR 4710, and FM 2460.

Use drum as channelizing devices.

Remove all traffic control devices from the right of way when they are not in use. Devices scheduled to be used within 3 days may be placed along the shoulder of the roadway or along the right of way when not in use, or stored in other approved areas on the project. Cover any construction signs that are not in effect and are installed in a fashion that will not allow them to be removed from the right of way easily.

Provide construction fencing as approved at all work locations to protect pedestrian or bicycle traffic. This material and its placement will be considered subsidiary to Item 502.

Arrange construction operations to prevent the hauling of materials through the completed pavement sections unless otherwise approved.

Provide all flaggers and pilot vehicle drivers with two-way radio communication capability.

Provide flaggers at each side road intersection.

Item 505

Shadow vehicles with TMA and high intensity rotating, flashing, oscillating or strobe lights are required. Use one TMA preceding every stationary work zone and two TMA’s for mobile operations.

Therefore, 2 total shadow vehicles with TMA will be required for this type of work. The contractor will be responsible for determining if one or more of these operations will be ongoing at the same time to determine the total number of TMA’s needed for the project.

Item 506 Temporary Erosion, Sedimentation, and Environmental Controls

The Contractor Force Account “SW3P Contingency” that has been established for this project is intended to be used in the event that maintenance of such controls become necessary.

The Contractor is prohibited from removing grass vegetation throughout the entire project limits and then ceasing construction for long periods, typically over three weeks. The Contractor schedule will be developed based on staged vegetation removal, limiting disturbed soil to no more than 25 percent at one time, unless otherwise approved. Should the Contractor not be able to

General Notes Sheet L adequately control sediment and erosion for areas disturbed, the Department will substantially reduce the size of areas that the Contractor may disturb soil.

Should the project be evaluated to have sediment control problems as a result of the Contractor disturbing excessive amounts of soil, the Contractor will be required to immediately re-vegetate (seed and water) those disturbed areas at no cost to the Department.

The Contractor will designate a clean out area for concrete trucks. No other area will be allowed without approval of the Engineer.

Item 542 Removing Metal Beam Guard Fence Accept ownership of removed metal beam guard fence and terminal anchors.

Item 540 Metal Beam Guard Fence

Provide Type II galvanization metal beam rail elements.

Provide round timber posts.

Provide timber posts on all metal beam guard fence installations except where low-fill culvert posts are required in accordance with details shown on the Metal Beam Guard Fence GF(31) standard sheet.

Field fabricate low-fill culvert posts to insure proper metal beam guard fence height.

At the close of work each day, protect the ends of metal beam guard fence in an approved manner, so that no blunt ends are exposed to approaching traffic.

Item 560 Mailbox Assemblies