06_Exhibit_B-1_Rate_Sheet.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Bid Number C5612357-D Concrete Pumping Services, Construction Training Rehabilitation Program
Solicitation number
0000032332
Issued by
Lassen County, Stockton City, California

About this file

This document is an Exhibit B-1 Rate Sheet for a concrete pumping services contract between the California Department of Corrections and Rehabilitation (CDCR) and a contractor. The contract is for the CDCR's Construction Training Rehabilitation Program at the California Correctional Center (CCC) and High Desert State Prison (HDSP) locations in Lassen County, California. The contract requires the contractor to provide concrete pumping services using various boom sizes and pumping equipment on an as-needed basis. The rate sheet includes estimated quantities and unit pricing for the equipment and related services. Bidders must provide pricing for each line item, and the contract will be awarded to the lowest responsive and responsible bidder with the highest applicable discount offered for invoices paid within 30 days.

The contract has an estimated value of $100,000. The rate sheet includes pricing for equipment rental, hauling, and setup/cleanup for various concrete pumping services. Bidders must submit a response by the due date, and the contract term and any renewal options are not specified in this document.

View the file

Other files

File Type Posted
00_IFB_C5612357-D.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3-CCC-HDSP

CONCRETE PUMPING SERVICES
CONSTRUCTION TRAINING REHABILITATION PROGRAM
HIGH DESERT STATE PRISON (HDSP)

CALIFORNIA CORRECTIONAL CENTER (CCC)

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.
Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
NOTE: Bidder is required to bid each item, indicated in yellow. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection of the bid. Bidder will enter a zero dollar amount ($0.00) for items that they deem to be non-billable items. A zero dollar ($0.00 or $-) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
All prices and notations must be printed in ink or typewritten. All prices must be in U. S. currency and shall encompass every item of expense necessary to perform the services.
NOTE: The State makes no guarantee that the Institution listed in this bid package will request services.
HDSP, CCC
A. 85' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x48Hours=$ - 0
2. Rate per yard$ - 0x300Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x6Trips=$ - 0
Item A Subtotal (Sum of 1 + 2 + 3)=$ - 0
B. 100' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x130Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item B Subtotal (Sum of 1 + 2 + 3)=$ - 0
C. 120' Boom (or equivalent)RatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x130Yards=$ - 0
3. Total Fee for each trip Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item C Subtotal (Sum of 1 + 2 + 3)=$ - 0
D. Maximum 1" aggregate hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x140Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item D Subtotal (Sum of 1 + 2 + 3)=$ - 0
E. 3/8" Pea gravel line hose pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x40Hours=$ - 0
2. Rate per yard$ - 0x240Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x5Trips=$ - 0
Item E Subtotal (Sum of 1 + 2 + 3)=$ - 0
F. Grout pumpRatexEstimated Quantity=Total
1. Rate per hour for Equipment & Operator$ - 0x32Hours=$ - 0
2. Rate per yard$ - 0x240Yards=$ - 0
3. Total Fee for Setup/Cleanup & Round Trip Travel$ - 0x4Trips=$ - 0
Item F Subtotal (Sum of 1 + 2 + 3)=$ - 0
GRAND TOTAL (SUM OF ITEMS A, B, C, D, E, AND F)=$ - 0
BASIS OF AWARD

The Agreement shall be written for the State's Estimate of $100,000.00

Contractor may offer a discount on invoices in order for the invoices to be paid within 30 days of receipt Discount offered must be at least one (1) percent of the amount and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
In the event of a tie absent other determining factors, the lowest responsible bid with the highest discount shall prevail.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5612357-D Exhibit B-1

&"Arial,Regular"Page &P of &N

File details come from the government source that posted it. Updated .