06 Bid Schedule RMA Lake Mary Paving(Public).pdf

PDF 97 KB Posted

Attached to
Lake Mary Parking Area and Trail Paving - RMA CO
Solicitation number
140F0621Q0039
Issued by

View the file

Other files

File Type Posted
Sol_140F0621Q0039_Amd_0004.pdf PDF
Sol_140F0621Q0039_Amd_0003.pdf PDF
Sol_140F0621Q0039_Amd_0002.pdf PDF
Sol_140F0621Q0039_Amd_0001.pdf PDF
PP_Questionaire Revised_0001.doc DOC document
03 Submittals.pdf PDF
PP_Questionaire.doc DOC document
09 Drawings 21-026 RMA Lake Mary Paving.pdf PDF
Sol_140F0621Q0039.pdf PDF
08 Specifications 21-026.pdf PDF
B03 - DOL Wage Determination.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

21‐026

ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE

COMMERCE CITY, COLORADO

Unit Total QTY Unit Cost Cost

ACCESSIBLE SPOTS

1 1 LS

2 1 LS

3 1 CY

4 Van Accessible Sign with Handicap Sign and Post 1 LS 5 Install Existing Parking Blocks 1 LS

6 14 CY

7 5 ST

Accessible Spots Total

EAST PIER

1 1 LS

2 1 LS

3 1 LS

4 7 CY

5 56 CY

6 East Pier Gravel Transition 0.25 CY

7 1 EA

8 Parking Area Gravel Transition 7 CY 9 Boardwalk Area Gravel Transition 0.25 CY

10 West Pier Area Gravel Transition 0.5 CY

East Pier Total

Total Base Bid

Project Description: Pave surfaces as described in the drawings and specifications at Rocky Mountain Arsenal NWR.

Transition Gravel

Furnish all labor, materials, and equipment to complete the following work in accordance with the attached specifications.

Accessible Spots Concrete Paint Accessible Spots Concrete

Entire Parking Area Site preparation

Accessible Spots Mobilization/Demobilization, Bonding, Overhead, & Profit

East Pier Mobilization/Demobilization, Bonding, Overhead, & Profit Remove Bridge Edging East Pier Site preparation

East Pier Concrete and Trail

East Pier Concrete Block at Pier, Excludes Physical Concrete

East Pier Gravel

BID SCHEDULE

21‐026

ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE

COMMERCE CITY, COLORADO

Unit Total QTY Unit Cost Cost

Alternate I PARKING AREA (PRIORITY #1)

1 1 LS

2 3 CY

3 50 CY

4 9 ST

Parking Area Total (Priority #1) Alternate II BOARDWALK (PRIORITY #2)

1 1 LS

2 1 LS

3 1 LS

4 Boardwalk Gravel 2 CY 5 Boardwalk Concrete and Trail 9 CY

Boardwalk Total (Priority #2) Alternate III WEST PIER (PRIORITY #3)

1 1 LS

2 1 LS

3 West Pier Gravel 5 CY

4 30 CY

5 1 EA

6 West Pier Gravel Transition 0.5 CY

West Pier Total (Priority #3)

ACCESSIBLE SPOTS & EAST PIER BASE PROJECT (BP)

BP + OPTION 1

BP + OPTION 1 + OPTION 2

BP + OPTION 1 + OPTION 2 + OPTION 3

Parking Area Mobilization/Demobilization, Bonding, Overhead, & Profit

Parking Area Asphalt Parking Area Asphalt Paint

Parking Area Gravel

West Pier Site preparation

West Pier Concrete and Trail West Pier Concrete Block at Pier, Excludes Physical Concrete

Boardwalk Mobilization/Demobilization, Bonding, Overhead, & Profit Remove Existing Concrete Slab Boardwalk Site Preperation

West Pier Mobilization/Demobilization, Bonding, Overhead, & Profit