This document is a state and local contract pricing document for geohazard maintenance services, specifically for the Ohio Department of Transportation (ODOT). The contract is with GeoStabilization International LLC, a vendor located in Williamstown, Kentucky, with contact information for Todd Starkey. The document covers pricing and specifications for various geotechnical stabilization services across 12 ODOT districts.

The contract includes detailed pricing for five primary service categories: Launched Soil Nail, Drilled Soil Nail, Self-Drilling Soil Nail, Plate Piles, and Plug Piles/Drilled Shafts, with varying unit prices based on project scale. Pricing includes mobilization, traffic control, and additional incidental services such as excavation, grading, and seeding. Unit prices range from $37 to $950 per unit, with special provisions for travel between sites ($150 within county, $250 between counties) and mileage reimbursement. The contract also includes maintenance of traffic (MOT) pricing, temporary sediment and erosion control best management practices, and allows for reimbursement of locally purchased materials with proper invoicing. The contract appears to be effective for the period spanning 2025, with pricing structured to accommodate projects of different sizes and complexities across Ohio's transportation infrastructure.

View the file

Other files

File Type Posted
059-26.pdf PDF
1-2026_Affirmation_and_Disclosure__GSI_completed_.pdf PDF
Signature__38_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR INFORMATION

059-26 Pricing Geohazard Maintenance 10/29/25
Vendor Name:GeoStabilization International LLC

Vendor Location: Williamstown, KY

Contact Person: Todd Starkey

Telephone Number: 720-682-5846

Fax Number: 888-688-6454

Email Address: todd.starkey@gsi.us

Complete Vendor Information above

DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT.

DOING SO MAY RESULT IN REJECTION OF YOUR BID.

SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS

DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT

Do not submit previous versions (pricing pages) of the same contract.

Launched Soil Nail

059-26 Pricing Geohazard Maintenance 10/29/25ITEM A - Launched Soil Nail
Vendor NameGeoStabilization International LLC
NOTE
(1)The Launched soil nail shall meet the requirement of Section 6.
(2)Bid shall be the final in-place position of a Launched Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

UNIT OF MEASURE 50 Nails or Less 51 or more Nails FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION

TO THE RIGHT.EQUIVALENT OPTIONUNIT OF MEASURERange ARange B
ITEM ALaunched Soil NailEACH$763.00$491.000
Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing.
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HRUnit of Measure =For Instance: LF
District 1$11,778.00District 7$11,778.00Flagger$138.00
District 2$13,208.00District 8$10,500.00Range A =For Instance: 500 LF or less
District 3$13,208.00District 9$10,500.00Range B =For Instance: Greater than 500 LF
District 4$13,208.00District 10$11,778.00
District 5$11,778.00District 11$13,208.00
District 6$11,778.00District 12$13,208.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $3.00 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$251.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$218.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$33.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ANY ADDITION OF ITEMS BELOW WILL BE ADDRESSED PRIOR TO THE PROJECT START.

ITEMPriceUnit of MeasureDescription
Wire Mesh Surface Treatment$22.00SFFurnish and Install High Tension Slope Mesh
6 in Shotcrete$42.00SFFurnish and Install Reinforced Shotcrete with Nominal Thickness as Described
8 in Shotcrete$47.00SFFurnish and Install Reinforced Shotcrete with Nominal Thickness as Described
12 in Shotcrete$71.00SFFurnish and Install Reinforced Shotcrete with Nominal Thickness as Described
Horizontal Drains$46.00LFFurnish and install laser cut drains
Portable Traffic Signal Rental$7,500.00WKFurnish and Install MOT Item as described
Grout for Void Fill *$37.00CFFurnish and Install Ready Mix Portland Cement Grout or Flowfill for Void Filling
Sheet Piling: PZ 27 or Equiv. up to 30 ft long$76.00SFFurnish and Install Sheet Pile
* ODOT will allow this item to remain, so long as its use of the Item is limited to the wall vicinity.

Drilled Soil Nail

059-26 Pricing Geohazard Maintenance 10/29/25ITEM B - Drilled Soil Nail
Vendor NameGeoStabilization International LLC
NOTE
(1)The Drilled soil nail shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

750 LF or Less751 LF or more
ITEM BDrilled Soil NailLinear Feet$42.00$37.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$11,778.00District 7$11,778.00Flagger(s)$138.00
District 2$13,208.00District 8$10,500.00
District 3$13,208.00District 9$10,500.00
District 4$13,208.00District 10$11,778.00
District 5$11,778.00District 11$13,208.00
District 6$11,778.00District 12$13,208.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $3.00 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$251.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$218.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$33.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.
ITEMPriceUnit of MeasureDescription
Proof Testing$850.00EAProof testing per FHWA Circular No. 7
Verification Testing$1,200.00EAVerification testing per FHWA Circular No. 7
Lightweight Backfill$338.00CYFurnish and Install CLSM or cellular concrete 50pcf or equal
Formed Shoulder Buildout$250.00LFFurnish and Install formwork Up to 36" of additional shoulder to Accommodate Guardrail
20' Long Permanently Cased Soil Nail (50 or less)$625.00EAFurnish and Install permanently cased soil nails up to 20 LF
20' Long Permanently Cased Soil Nail (51 or more)$575.00EAFurnish and Install permanently cased soil nails up to 20 LF

SELF - Drilling Soil Nail

059-26 Pricing Geohazard Maintenance 10/29/25ITEM C - Self Drilling Soil Nail
Vendor NameGeoStabilization International LLC
NOTE
(1)The Drilled soil nail shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Self-Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

750 LF or Less751 LF or more
ITEM CSelf Drilling Soil NailLinear Feet$50.00$45.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$11,778.00District 7$11,778.00Flagger(s)$138.00
District 2$13,208.00District 8$10,500.00
District 3$13,208.00District 9$10,500.00
District 4$13,208.00District 10$11,778.00
District 5$11,778.00District 11$13,208.00
District 6$11,778.00District 12$13,208.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $3.00 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$251.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$218.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$33.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Deep Large Diamater Horizontal Drains$75.00LFInstllation of Horizontal Drains L>30LF
Spider Excavator$10,100.00DAYDay rate includes Spider, Trained Operator, and spotter

Plate Piles

059-26 Pricing Geohazard Maintenance 10/29/25ITEM D - Plate Piles
Vendor NameGeoStabilization International LLC
NOTE
(1)The Plate Piles shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Plate Pile. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

250 SQYD or Less251 SQYD or Greater
ITEM DPlate PilesSQYD
FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION BELOW
EQUIVALENT OPTIONUNIT OF MEASURERange ARange B
0Unit of Measure =For Instance: SQFT
Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing.Range A =For Instance: 400 SQFT or less
Range B =For Instance: Greater than 400 SQFT
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1District 7Flagger(s)
District 2District 8
District 3District 9
District 4District 10
District 5District 11
District 6District 12

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $3.00 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$251.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$218.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$33.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Scaling

059-26 Pricing Geohazard Maintenance 10/29/25ITEM F - Scaling
Vendor NameGeoStabilization International LLC
NOTE
(1)The Scaling shall meet the requirements of Section 6
(2)Bid shall be provided for the time lines provided.
(3)Hauling and removal of all materials.
(4)Mobilization is to any location within a District.
(5)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

Hourly
ITEM FScalingTime$950.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$5,950.00District 7$5,950.00Flagger(s)$138.00
District 2$5,950.00District 8$5,950.00
District 3$5,950.00District 9$5,950.00
District 4$5,950.00District 10$5,950.00
District 5$5,950.00District 11$5,950.00
District 6$5,950.00District 12$5,950.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $3.00 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$251.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$218.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$33.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Temporary Rockfall Barrier $300.00 LF Furnish and Install Temporary Rockfall Protection Barrier

Plug Piles Drilled Shafts

059-26 Pricing Geohazard Maintenance 10/29/25ITEM E - Plug Piles/Drilled Shafts
Vendor NameGeoStabilization International LLC
NOTE
(1)The Plug Piles/Drilled Shafts shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Plug Piles/Drilled Shafts. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

WALL LENGTH
Less than 60 FT61 FT or Greater ** Upper Length of contract is approximately 100 FT
ITEM EPlug Piles/Drilled Shafts
Drilled Shafts, 24" Diameter, Above Bedroack, As per PlanLNFT$268.00$268.00
Drilled Shafts, 24" Diameter, Into Bedrock, As Per PlanLNFT$378.00$378.00
Drilled Shafts, Misc,: Plug Pile, 24” Diameter, UnreinforcedLNFT$252.00$252.00
Steel Piles, Misc.: W16x31 Steel BeamLNFT$45.00$45.00
Steel Piles, Misc.: W10x42 Steel BeamLNFT$60.00$60.00
Steel Piles, Misc.: W12x53 Steel BeamLNFT$75.00$75.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$11,778.00District 7$11,778.00Flagger(s)$138.00
District 2$13,208.00District 8$10,500.00
District 3$13,208.00District 9$10,500.00
District 4$13,208.00District 10$11,778.00
District 5$11,778.00District 11$13,208.00
District 6$11,778.00District 12$13,208.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$600.00HRExcludes hauling and wasting

Grading $600.00 HR Restore site to stable grade

Seeding $3.00 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$251.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$218.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$33.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Trim Blasting

059-26 Pricing Geohazard Maintenance 10/29/25ITEM G - Trim Blasting
Vendor NameGeoStabilization International LLC
NOTE
(1)The Scaling shall meet the requirements of Section 6
(2)Provide pricing for the time lines listed
(3)Hauling and removal of all materials.
(4)Mobilization is to any location within a District.
(5)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

250 SQFT or Less251 SQFT or Greater
ITEM GTrim BlastingSQFT$190.00$170.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$5,950.00District 7$5,950.00Flagger(s)$138.00
District 2$5,950.00District 8$5,950.00
District 3$5,950.00District 9$5,950.00
District 4$5,950.00District 10$5,950.00
District 5$5,950.00District 11$5,950.00
District 6$5,950.00District 12$5,950.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation600HRExcludes hauling and wasting

Grading 600 HR Restore site to stable grade

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill251HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting218HRRemoval of excess from site and wasting it.
Hauling and Wasting33TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

MOT

059-26 Pricing Geohazard Maintenance 10/29/25MAINTENANCE OF TRAFFIC
Vendor NameGeoStabilization International LLC

MAINTENANCE OF TRAFFIC

PriceUnit of Measure
M.O.T. / No Lane Closure$6,500.00Lump Sum(When requested)Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone.
M.O.T. w/Single Lane Closure$10,500.00Lump Sum(When requested)Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone.
PCB (M.O.T.)$55.00Linear Ft.(When requested)A separate charge for approved temporary portable concrete barrier has been provided.
End Treatment (M.O.T)$4,000.00Each(When requested)A separate charge for an approved temporary portable concrete barrier end treatment for work zones has been provided.
Flagger$138.00$ / hr / flagger(When necessary)The number of flaggers may vary from project to project. (This number should match the individual tabs if completed in both sections)

SS832

059-26 Pricing Geohazard Maintenance 10/29/25SS832 Pricing
Temporary Sediment and Erosion Control Best Management Practices (BMP)

Unit Price Schedule, July 2025

Project Identified EDA (acres)Fixed PriceComment
<55 to 1010 to 1515 to 20>20($)
ItemUnitDescriptionPrice ($)
832Sq. Yd.Construction Seeding and
Mulching$1.21$1.11$1.00$0.91$0.86Based on

NOI acres

832FeetSlope Drains$14.50
832Cu. Yd.Sediment Basins and Dams$16.50[3]
832Cu. Yd.Excavated Drop Inlet Protection$16.50
832FeetPerimeter Filter Fabric Fence$4.89$3.75$3.44$3.08$2.78Based on

NOI acres

832FeetFilter Fabric Ditch Check$13.50
832FeetInlet Protection$13.75
832Cu. Yd.Earthen Dike/Berm$3.75
832Sq. Yd.Temporary Stabilization Matting$3.25
832Cu. Yd.Rock Ditch Check, Type C or D
without Filter$87.00[1]
832Cu. Yd.Rock Channel Protection, Type C
or D with Filter$92.00[1]
832Cu. Yd.Rock Channel Protection, Type C
or D without Filter$87.00[1]
832Cu. Yd.Basin Sediment Removal$12.00
832Cu. Yd.Miscellaneous Sediment Removal$19.00
832FeetConstruction Fence$3.25
832Sq. Yd.Construction Mulching$0.96$0.86$0.70$0.68$0.66Based on

NOI acres 832 Sq. Yd. Winter Seeding and Mulching $1.30 $1.21 $1.11 $1.02 $0.98 Based on NOI acres

832Cu. Yd.Construction Entrance$104.00
[1]Add the following amount per cubic yard for the cost of Type C or D Rock materials.
[3]Add the amount for the appropriately sized surface dewatering device for sediment basin outlet.

EXPERIENCE

059-26 Pricing Geohazard Maintenance 10/29/25 VENDOR EXPERIENCE

PROVIDE EXPERIENCE AS DESCRIBED IN SPECIFICATIONS FOR EACH EQUIVALENT OPTION SUBMITTED

If you uare not providing an "equivalent option", you are not be required to complete this page.

EQUIVALENT OPTION to Item 6.1a

A minimum of three projects are requried, within the last three calendar years (2023-2025). Providing additional projects may be beneficial if any quesitons arise with the first three, but are not required

Project Begin Date
(MM / YY)Project Timeline
(Months and/or Weeks)Project lengthMOT / Traffic Control
Yes or NoPolitical SubdivisionProject Location/Description
1 (Required)
2 (Required)
3 (Required)
4 (Optional)
5 (Optional)
6 (Optional)

EQUIVALENT OPTION to Item 6.1d

A minimum of four projects are requried. Providing additional projects may be beneficial if any quesitons arise with the first four, but are not required

Project Begin Date
(MM / YY)Project Timeline
(Months and/or Weeks)Project lengthMOT / Traffic Control
Yes or NoPolitical SubdivisionProject Location/Description
1 (Required)
2 (Required)
3 (Required)
4 (Optional)
5 (Optional)
6 (Optional)