About this file
This document is a state and local contract pricing document for geohazard maintenance services, specifically for the Ohio Department of Transportation (ODOT). The contract is with GeoStabilization International LLC, a vendor located in Williamstown, Kentucky, with contact information for Todd Starkey. The document covers pricing and specifications for various geotechnical stabilization services across 12 ODOT districts.
The contract includes detailed pricing for five primary service categories: Launched Soil Nail, Drilled Soil Nail, Self-Drilling Soil Nail, Plate Piles, and Plug Piles/Drilled Shafts, with varying unit prices based on project scale. Pricing includes mobilization, traffic control, and additional incidental services such as excavation, grading, and seeding. Unit prices range from $37 to $950 per unit, with special provisions for travel between sites ($150 within county, $250 between counties) and mileage reimbursement. The contract also includes maintenance of traffic (MOT) pricing, temporary sediment and erosion control best management practices, and allows for reimbursement of locally purchased materials with proper invoicing. The contract appears to be effective for the period spanning 2025, with pricing structured to accommodate projects of different sizes and complexities across Ohio's transportation infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 059-26.pdf | ||
| 1-2026_Affirmation_and_Disclosure__GSI_completed_.pdf | ||
| Signature__38_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENDOR INFORMATION
| 059-26 Pricing Geohazard Maintenance 10/29/25 | |
| Vendor Name: | GeoStabilization International LLC |
Vendor Location: Williamstown, KY
Contact Person: Todd Starkey
Telephone Number: 720-682-5846
Fax Number: 888-688-6454
Email Address: todd.starkey@gsi.us
Complete Vendor Information above
DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT.
DOING SO MAY RESULT IN REJECTION OF YOUR BID.
SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS
DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT
Do not submit previous versions (pricing pages) of the same contract.
Launched Soil Nail
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM A - Launched Soil Nail | |
| Vendor Name | GeoStabilization International LLC |
| NOTE | |
| (1) | The Launched soil nail shall meet the requirement of Section 6. |
| (2) | Bid shall be the final in-place position of a Launched Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
UNIT OF MEASURE 50 Nails or Less 51 or more Nails FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION
| TO THE RIGHT. | EQUIVALENT OPTION | UNIT OF MEASURE | Range A | Range B | ||
| ITEM A | Launched Soil Nail | EACH | $763.00 | $491.00 | 0 |
| Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing. | ||||||||
| Mobilization | Traffic Control (When Necessary) | |||||||
| Lump Sum | Lump Sum | $ / HR | Unit of Measure = | For Instance: LF | ||||
| District 1 | $11,778.00 | District 7 | $11,778.00 | Flagger | $138.00 | |||
| District 2 | $13,208.00 | District 8 | $10,500.00 | Range A = | For Instance: 500 LF or less | |||
| District 3 | $13,208.00 | District 9 | $10,500.00 | Range B = | For Instance: Greater than 500 LF | |||
| District 4 | $13,208.00 | District 10 | $11,778.00 | |||||
| District 5 | $11,778.00 | District 11 | $13,208.00 | |||||
| District 6 | $11,778.00 | District 12 | $13,208.00 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | $600.00 | HR | Excludes hauling and wasting |
Grading $600.00 HR Restore site to stable grade
Seeding $3.00 SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | $251.00 | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | |||
| Hauling and Wasting | $218.00 | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | $33.00 | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ANY ADDITION OF ITEMS BELOW WILL BE ADDRESSED PRIOR TO THE PROJECT START.
| ITEM | Price | Unit of Measure | Description |
| Wire Mesh Surface Treatment | $22.00 | SF | Furnish and Install High Tension Slope Mesh |
| 6 in Shotcrete | $42.00 | SF | Furnish and Install Reinforced Shotcrete with Nominal Thickness as Described |
| 8 in Shotcrete | $47.00 | SF | Furnish and Install Reinforced Shotcrete with Nominal Thickness as Described |
| 12 in Shotcrete | $71.00 | SF | Furnish and Install Reinforced Shotcrete with Nominal Thickness as Described |
| Horizontal Drains | $46.00 | LF | Furnish and install laser cut drains |
| Portable Traffic Signal Rental | $7,500.00 | WK | Furnish and Install MOT Item as described |
| Grout for Void Fill * | $37.00 | CF | Furnish and Install Ready Mix Portland Cement Grout or Flowfill for Void Filling |
| Sheet Piling: PZ 27 or Equiv. up to 30 ft long | $76.00 | SF | Furnish and Install Sheet Pile |
| * ODOT will allow this item to remain, so long as its use of the Item is limited to the wall vicinity. |
Drilled Soil Nail
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM B - Drilled Soil Nail | |
| Vendor Name | GeoStabilization International LLC |
| NOTE | |
| (1) | The Drilled soil nail shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 750 LF or Less | 751 LF or more | |||
| ITEM B | Drilled Soil Nail | Linear Feet | $42.00 | $37.00 |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | $11,778.00 | District 7 | $11,778.00 | Flagger(s) | $138.00 |
| District 2 | $13,208.00 | District 8 | $10,500.00 | ||
| District 3 | $13,208.00 | District 9 | $10,500.00 | ||
| District 4 | $13,208.00 | District 10 | $11,778.00 | ||
| District 5 | $11,778.00 | District 11 | $13,208.00 | ||
| District 6 | $11,778.00 | District 12 | $13,208.00 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | $600.00 | HR | Excludes hauling and wasting |
Grading $600.00 HR Restore site to stable grade
Seeding $3.00 SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | $251.00 | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | |||
| Hauling and Wasting | $218.00 | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | $33.00 | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
| ITEM | Price | Unit of Measure | Description |
| Proof Testing | $850.00 | EA | Proof testing per FHWA Circular No. 7 |
| Verification Testing | $1,200.00 | EA | Verification testing per FHWA Circular No. 7 |
| Lightweight Backfill | $338.00 | CY | Furnish and Install CLSM or cellular concrete 50pcf or equal |
| Formed Shoulder Buildout | $250.00 | LF | Furnish and Install formwork Up to 36" of additional shoulder to Accommodate Guardrail |
| 20' Long Permanently Cased Soil Nail (50 or less) | $625.00 | EA | Furnish and Install permanently cased soil nails up to 20 LF |
| 20' Long Permanently Cased Soil Nail (51 or more) | $575.00 | EA | Furnish and Install permanently cased soil nails up to 20 LF |
SELF - Drilling Soil Nail
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM C - Self Drilling Soil Nail | |
| Vendor Name | GeoStabilization International LLC |
| NOTE | |
| (1) | The Drilled soil nail shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Self-Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 750 LF or Less | 751 LF or more | |||
| ITEM C | Self Drilling Soil Nail | Linear Feet | $50.00 | $45.00 |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | $11,778.00 | District 7 | $11,778.00 | Flagger(s) | $138.00 |
| District 2 | $13,208.00 | District 8 | $10,500.00 | ||
| District 3 | $13,208.00 | District 9 | $10,500.00 | ||
| District 4 | $13,208.00 | District 10 | $11,778.00 | ||
| District 5 | $11,778.00 | District 11 | $13,208.00 | ||
| District 6 | $11,778.00 | District 12 | $13,208.00 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | $600.00 | HR | Excludes hauling and wasting |
Grading $600.00 HR Restore site to stable grade
Seeding $3.00 SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | $251.00 | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | |||
| Hauling and Wasting | $218.00 | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | $33.00 | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
| Deep Large Diamater Horizontal Drains | $75.00 | LF | Instllation of Horizontal Drains L>30LF |
| Spider Excavator | $10,100.00 | DAY | Day rate includes Spider, Trained Operator, and spotter |
Plate Piles
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM D - Plate Piles | |
| Vendor Name | GeoStabilization International LLC |
| NOTE | |
| (1) | The Plate Piles shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Plate Pile. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 250 SQYD or Less | 251 SQYD or Greater | |||
| ITEM D | Plate Piles | SQYD | ||
| FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION BELOW |
| EQUIVALENT OPTION | UNIT OF MEASURE | Range A | Range B | ||
| 0 | Unit of Measure = | For Instance: SQFT |
| Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing. | Range A = | For Instance: 400 SQFT or less |
| Range B = | For Instance: Greater than 400 SQFT |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | District 7 | Flagger(s) | |||
| District 2 | District 8 | ||||
| District 3 | District 9 | ||||
| District 4 | District 10 | ||||
| District 5 | District 11 | ||||
| District 6 | District 12 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | $600.00 | HR | Excludes hauling and wasting |
Grading $600.00 HR Restore site to stable grade
Seeding $3.00 SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | $251.00 | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | |||
| Hauling and Wasting | $218.00 | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | $33.00 | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
Scaling
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM F - Scaling | |
| Vendor Name | GeoStabilization International LLC |
| NOTE | |
| (1) | The Scaling shall meet the requirements of Section 6 |
| (2) | Bid shall be provided for the time lines provided. |
| (3) | Hauling and removal of all materials. |
| (4) | Mobilization is to any location within a District. |
| (5) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| Hourly | ||||||
| ITEM F | Scaling | Time | $950.00 | |||
| Mobilization | Traffic Control (When Necessary) | |||||
| Lump Sum | Lump Sum | $ / HR | ||||
| District 1 | $5,950.00 | District 7 | $5,950.00 | Flagger(s) | $138.00 | |
| District 2 | $5,950.00 | District 8 | $5,950.00 | |||
| District 3 | $5,950.00 | District 9 | $5,950.00 | |||
| District 4 | $5,950.00 | District 10 | $5,950.00 | |||
| District 5 | $5,950.00 | District 11 | $5,950.00 | |||
| District 6 | $5,950.00 | District 12 | $5,950.00 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | $600.00 | HR | Excludes hauling and wasting |
Grading $600.00 HR Restore site to stable grade
Seeding $3.00 SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | $251.00 | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | |||
| Hauling and Wasting | $218.00 | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | $33.00 | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
Temporary Rockfall Barrier $300.00 LF Furnish and Install Temporary Rockfall Protection Barrier
Plug Piles Drilled Shafts
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM E - Plug Piles/Drilled Shafts | |
| Vendor Name | GeoStabilization International LLC |
| NOTE | |
| (1) | The Plug Piles/Drilled Shafts shall meet the requirement of Section 6 |
| (2) | Bid shall be the final in-place position of a Plug Piles/Drilled Shafts. Price shall include all labor, equipment and material. |
| (3) | Mobilization is to any location within a District. |
| (4) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| WALL LENGTH | |||||
| Less than 60 FT | 61 FT or Greater * | * Upper Length of contract is approximately 100 FT | |||
| ITEM E | Plug Piles/Drilled Shafts | ||||
| Drilled Shafts, 24" Diameter, Above Bedroack, As per Plan | LNFT | $268.00 | $268.00 | ||
| Drilled Shafts, 24" Diameter, Into Bedrock, As Per Plan | LNFT | $378.00 | $378.00 | ||
| Drilled Shafts, Misc,: Plug Pile, 24” Diameter, Unreinforced | LNFT | $252.00 | $252.00 | ||
| Steel Piles, Misc.: W16x31 Steel Beam | LNFT | $45.00 | $45.00 | ||
| Steel Piles, Misc.: W10x42 Steel Beam | LNFT | $60.00 | $60.00 | ||
| Steel Piles, Misc.: W12x53 Steel Beam | LNFT | $75.00 | $75.00 |
| Mobilization | Traffic Control (When Necessary) | ||||
| Lump Sum | Lump Sum | $ / HR | |||
| District 1 | $11,778.00 | District 7 | $11,778.00 | Flagger(s) | $138.00 |
| District 2 | $13,208.00 | District 8 | $10,500.00 | ||
| District 3 | $13,208.00 | District 9 | $10,500.00 | ||
| District 4 | $13,208.00 | District 10 | $11,778.00 | ||
| District 5 | $11,778.00 | District 11 | $13,208.00 | ||
| District 6 | $11,778.00 | District 12 | $13,208.00 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | $600.00 | HR | Excludes hauling and wasting |
Grading $600.00 HR Restore site to stable grade
Seeding $3.00 SY Seeding of restored (stable grade) site.
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | $251.00 | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | |||
| Hauling and Wasting | $218.00 | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | $33.00 | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
Trim Blasting
| 059-26 Pricing Geohazard Maintenance 10/29/25 | ITEM G - Trim Blasting | |
| Vendor Name | GeoStabilization International LLC |
| NOTE | |
| (1) | The Scaling shall meet the requirements of Section 6 |
| (2) | Provide pricing for the time lines listed |
| (3) | Hauling and removal of all materials. |
| (4) | Mobilization is to any location within a District. |
| (5) | One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites. |
Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.
| 250 SQFT or Less | 251 SQFT or Greater | ||||||
| ITEM G | Trim Blasting | SQFT | $190.00 | $170.00 | |||
| Mobilization | Traffic Control (When Necessary) | ||||||
| Lump Sum | Lump Sum | $ / HR | |||||
| District 1 | $5,950.00 | District 7 | $5,950.00 | Flagger(s) | $138.00 | ||
| District 2 | $5,950.00 | District 8 | $5,950.00 | ||||
| District 3 | $5,950.00 | District 9 | $5,950.00 | ||||
| District 4 | $5,950.00 | District 10 | $5,950.00 | ||||
| District 5 | $5,950.00 | District 11 | $5,950.00 | ||||
| District 6 | $5,950.00 | District 12 | $5,950.00 |
In the event the following work is required for a given site, providing a unit cost for the various services to be performed.
The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.
| Unit Price | Unit of Measure | ||
| Excavation | 600 | HR | Excludes hauling and wasting |
Grading 600 HR Restore site to stable grade
601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.
| Placement of Dumped Rock Fill | 251 | HR | Time spent placing Fill. Dumped Rock material paid on line above. |
| Option ( U/M ) determined during site visit | |||
| Hauling and Wasting | 218 | HR | Removal of excess from site and wasting it. |
| Hauling and Wasting | 33 | TN | Removal of excess from site and wasting it. |
| INCIDENTALS |
| ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE. |
ITEM Price Unit of Measure Description
MOT
| 059-26 Pricing Geohazard Maintenance 10/29/25 | MAINTENANCE OF TRAFFIC | |
| Vendor Name | GeoStabilization International LLC |
MAINTENANCE OF TRAFFIC
| Price | Unit of Measure | |||
| M.O.T. / No Lane Closure | $6,500.00 | Lump Sum | (When requested) | Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone. |
| M.O.T. w/Single Lane Closure | $10,500.00 | Lump Sum | (When requested) | Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone. |
| PCB (M.O.T.) | $55.00 | Linear Ft. | (When requested) | A separate charge for approved temporary portable concrete barrier has been provided. |
| End Treatment (M.O.T) | $4,000.00 | Each | (When requested) | A separate charge for an approved temporary portable concrete barrier end treatment for work zones has been provided. |
| Flagger | $138.00 | $ / hr / flagger | (When necessary) | The number of flaggers may vary from project to project. (This number should match the individual tabs if completed in both sections) |
SS832
| 059-26 Pricing Geohazard Maintenance 10/29/25 | SS832 Pricing |
| Temporary Sediment and Erosion Control Best Management Practices (BMP) |
Unit Price Schedule, July 2025
| Project Identified EDA (acres) | Fixed Price | Comment | ||||||||
| <5 | 5 to 10 | 10 to 15 | 15 to 20 | >20 | ($) | |||||
| Item | Unit | Description | Price ($) | |||||||
| 832 | Sq. Yd. | Construction Seeding and | ||||||||
| Mulching | $1.21 | $1.11 | $1.00 | $0.91 | $0.86 | Based on |
NOI acres
| 832 | Feet | Slope Drains | $14.50 | ||||||
| 832 | Cu. Yd. | Sediment Basins and Dams | $16.50 | [3] | |||||
| 832 | Cu. Yd. | Excavated Drop Inlet Protection | $16.50 | ||||||
| 832 | Feet | Perimeter Filter Fabric Fence | $4.89 | $3.75 | $3.44 | $3.08 | $2.78 | Based on |
NOI acres
| 832 | Feet | Filter Fabric Ditch Check | $13.50 | |||||||
| 832 | Feet | Inlet Protection | $13.75 | |||||||
| 832 | Cu. Yd. | Earthen Dike/Berm | $3.75 | |||||||
| 832 | Sq. Yd. | Temporary Stabilization Matting | $3.25 | |||||||
| 832 | Cu. Yd. | Rock Ditch Check, Type C or D | ||||||||
| without Filter | $87.00 | [1] | ||||||||
| 832 | Cu. Yd. | Rock Channel Protection, Type C | ||||||||
| or D with Filter | $92.00 | [1] | ||||||||
| 832 | Cu. Yd. | Rock Channel Protection, Type C | ||||||||
| or D without Filter | $87.00 | [1] | ||||||||
| 832 | Cu. Yd. | Basin Sediment Removal | $12.00 | |||||||
| 832 | Cu. Yd. | Miscellaneous Sediment Removal | $19.00 | |||||||
| 832 | Feet | Construction Fence | $3.25 | |||||||
| 832 | Sq. Yd. | Construction Mulching | $0.96 | $0.86 | $0.70 | $0.68 | $0.66 | Based on |
NOI acres 832 Sq. Yd. Winter Seeding and Mulching $1.30 $1.21 $1.11 $1.02 $0.98 Based on NOI acres
| 832 | Cu. Yd. | Construction Entrance | $104.00 |
| [1] | Add the following amount per cubic yard for the cost of Type C or D Rock materials. | ||
| [3] | Add the amount for the appropriately sized surface dewatering device for sediment basin outlet. |
EXPERIENCE
059-26 Pricing Geohazard Maintenance 10/29/25 VENDOR EXPERIENCE
PROVIDE EXPERIENCE AS DESCRIBED IN SPECIFICATIONS FOR EACH EQUIVALENT OPTION SUBMITTED
If you uare not providing an "equivalent option", you are not be required to complete this page.
EQUIVALENT OPTION to Item 6.1a
A minimum of three projects are requried, within the last three calendar years (2023-2025). Providing additional projects may be beneficial if any quesitons arise with the first three, but are not required
| Project Begin Date | |||
| (MM / YY) | Project Timeline | ||
| (Months and/or Weeks) | Project length | MOT / Traffic Control | |
| Yes or No | Political Subdivision | Project Location/Description | |
| 1 (Required) | |||
| 2 (Required) | |||
| 3 (Required) | |||
| 4 (Optional) | |||
| 5 (Optional) | |||
| 6 (Optional) |
EQUIVALENT OPTION to Item 6.1d
A minimum of four projects are requried. Providing additional projects may be beneficial if any quesitons arise with the first four, but are not required
| Project Begin Date | |||
| (MM / YY) | Project Timeline | ||
| (Months and/or Weeks) | Project length | MOT / Traffic Control | |
| Yes or No | Political Subdivision | Project Location/Description | |
| 1 (Required) | |||
| 2 (Required) | |||
| 3 (Required) | |||
| 4 (Optional) | |||
| 5 (Optional) | |||
| 6 (Optional) |