About this file

This is a state contract pricing document for geohazard maintenance services issued by the Ohio Department of Transportation (ODOT) for Guardian Fence and Construction doing business as GeoSpecialties, located in Lexington, Kentucky. The contract (059-26) covers pricing for various geotechnical and infrastructure stabilization services across 12 ODOT districts, with vendor contact information for Justin Anderson.

The contract provides detailed unit pricing for six primary service categories: Launched Soil Nail, Drilled Soil Nail, Self-Drilling Soil Nail, Plate Piles, Plug Piles/Drilled Shafts, Scaling, and Trim Blasting. Pricing varies based on project scale, with different rates for smaller and larger project quantities. Additional services include maintenance of traffic, temporary sediment and erosion control, and incidental work such as excavation, grading, and seeding. The contract includes provisions for travel compensation between project sites, with rates of $150 within a county and $250 between counties, plus mileage reimbursement. The contract appears valid through October 29, 2025, with unit prices established for various geotechnical and infrastructure stabilization services across Ohio's transportation districts.

View the file

Other files

File Type Posted
1-_059-26_Geo-Hazard_Maintenance__Affirmation_and_Disclosure.pdf PDF
Signature__38_.pdf PDF
059-26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR INFORMATION

059-26 Pricing Geohazard Maintenance 10/29/25
Vendor Name:Guardian Fence and Construction d/b/a GeoSpecialties

Vendor Location: 2025 Leestown Rd, Suite B, Lexington, KY 40511

Contact Person: Justin Anderson

Telephone Number: Office (859) 361-2465 Mobile (859) 583-0732

Fax Number:

Email Address: justin.anderson@geospecialties.com

Complete Vendor Information above

DO NOT PROVIDE CONDITIONAL INFORMATION THAT WILL CHANGE THE TERMS OF THE CONTRACT.

DOING SO MAY RESULT IN REJECTION OF YOUR BID.

SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS

DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT

Do not submit previous versions (pricing pages) of the same contract.

Launched Soil Nail

059-26 Pricing Geohazard Maintenance 10/29/25ITEM A - Launched Soil Nail
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties
NOTE
(1)The Launched soil nail shall meet the requirement of Section 6.
(2)Bid shall be the final in-place position of a Launched Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

UNIT OF MEASURE 50 Nails or Less 51 or more Nails FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION

TO THE RIGHT.EQUIVALENT OPTIONUNIT OF MEASURERange ARange B
ITEM ALaunched Soil NailEACH0
Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing.
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HRUnit of Measure =For Instance: LF
District 1District 7Flagger
District 2District 8Range A =For Instance: 500 LF or less
District 3District 9Range B =For Instance: Greater than 500 LF
District 4District 10
District 5District 11
District 6District 12

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
ExcavationHRExcludes hauling and wasting

Grading HR Restore site to stable grade

Seeding SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock FillHRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and WastingHRRemoval of excess from site and wasting it.
Hauling and WastingTNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ANY ADDITION OF ITEMS BELOW WILL BE ADDRESSED PRIOR TO THE PROJECT START.

ITEM Price Unit of Measure Description

Drilled Soil Nail

059-26 Pricing Geohazard Maintenance 10/29/25ITEM B - Drilled Soil Nail
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties
NOTE
(1)The Drilled soil nail shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

750 LF or Less751 LF or more
ITEM BDrilled Soil NailLinear Feet$36.25$31.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,950.00District 7$7,950.00Flagger(s)$122.00
District 2$7,950.00District 8$7,950.00
District 3$7,950.00District 9$7,950.00
District 4$12,500.00District 10$7,950.00
District 5$7,950.00District 11$7,950.00
District 6$7,950.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$640.00HRExcludes hauling and wasting

Grading $640.00 HR Restore site to stable grade

Seeding $1.34 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$158.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$160.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$44.52TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.
ITEMPriceUnit of MeasureDescription
$18.55SFWire Mesh Surface Treatment, Tecco G65 3mm (or equivalent)Wire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface TreatmentWire Mesh Surface Treatment
$41.90SF8 in Shotcrete per ODOT Standard Specifications, Section 5208 in Shotcrete8 in Shotcrete8 in Shotcrete8 in Shotcrete8 in Shotcrete8 in Shotcrete
$55.12SF12 in Shotcrete per ODOT Standard Specifications, Section 52012 in Shotcrete12 in Shotcrete12 in Shotcrete12 in Shotcrete12 in Shotcrete12 in Shotcrete
$212.00LFCasing Installation, per API Standard Specifications (2019)Casing InstallationCasing InstallationCasing InstallationCasing InstallationCasing InstallationCasing Installation
$23.59CFCementitious Grout per ODOT Standard Specifications, Section 701Cementitious GroutCementitious GroutCementitious GroutCementitious GroutCementitious GroutCementitious Grout
$265.00CYFlowable Fill per ODOT Standard Specifications, Section 613

SELF - Drilling Soil Nail

059-26 Pricing Geohazard Maintenance 10/29/25ITEM C - Self Drilling Soil Nail
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties
NOTE
(1)The Drilled soil nail shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Self-Drilled Soil Nail or Approved Equivalent. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

750 LF or Less751 LF or more
ITEM CSelf Drilling Soil NailLinear Feet$39.75$37.25
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,950.00District 7$7,950.00Flagger(s)$122.00
District 2$7,950.00District 8$7,950.00
District 3$7,950.00District 9$7,950.00
District 4$12,500.00District 10$7,950.00
District 5$7,950.00District 11$7,950.00
District 6$7,950.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$640.00HRExcludes hauling and wasting

Grading $640.00 HR Restore site to stable grade

Seeding $1.34 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$158.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$160.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$44.52TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.
ITEMPriceUnit of MeasureDescription
$75.00SFSheet Piling: PZ 27 or Equiv. up to 30 ft long per ASTM A325Sheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft longSheet Piling: PZ 27 or Equiv. up to 30 ft long
$39.50LFHorizontal Drains, ASTM D2729Horizontal DrainsHorizontal DrainsHorizontal DrainsHorizontal DrainsHorizontal DrainsHorizontal Drains

$42.00 TON Free Draining Backfill Material per ODOT Standard Specifications, Section 520 Free Draining Backfill Material Free Draining Backfill Material Free Draining Backfill Material Free Draining Backfill Material Free Draining Backfill Material Free Draining Backfill Material

Plate Piles

059-26 Pricing Geohazard Maintenance 10/29/25ITEM D - Plate Piles
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties
NOTE
(1)The Plate Piles shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Plate Pile. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

250 SQYD or Less251 SQYD or Greater
ITEM DPlate PilesSQYD$380.00$355.00
FOR EQUIVALENT OPTIONS, COMPLETE THE INFORMATION BELOW
EQUIVALENT OPTIONUNIT OF MEASURERange ARange B
0Unit of Measure =For Instance: SQFT
Vendor shall list the equivalent option, identify the unit of measure, and a range for pricing.Range A =For Instance: 400 SQFT or less
Range B =For Instance: Greater than 400 SQFT
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,500.00Flagger(s)$122.00
District 2$7,500.00District 8$7,500.00
District 3$7,500.00District 9$7,500.00
District 4$12,500.00District 10$7,500.00
District 5$7,500.00District 11$7,500.00
District 6$7,500.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$640.00HRExcludes hauling and wasting

Grading $640.00 HR Restore site to stable grade

Seeding $1.34 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$158.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$160.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$44.52TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Plug Piles Drilled Shafts

059-26 Pricing Geohazard Maintenance 10/29/25ITEM E - Plug Piles/Drilled Shafts
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties
NOTE
(1)The Plug Piles/Drilled Shafts shall meet the requirement of Section 6
(2)Bid shall be the final in-place position of a Plug Piles/Drilled Shafts. Price shall include all labor, equipment and material.
(3)Mobilization is to any location within a District.
(4)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

WALL LENGTH
Less than 60 FT61 FT or Greater ** Upper Length of contract is approximately 100 FT
ITEM EPlug Piles/Drilled Shafts
Drilled Shafts, 24" Diameter, Above Bedroack, As per PlanLNFT$275.00$275.00
Drilled Shafts, 24" Diameter, Into Bedrock, As Per PlanLNFT$370.00$370.00
Drilled Shafts, Misc,: Plug Pile, 24” Diameter, UnreinforcedLNFT$255.00$255.00
Steel Piles, Misc.: W16x31 Steel BeamLNFT$64.00$64.00
Steel Piles, Misc.: W10x42 Steel BeamLNFT$76.00$76.00
Steel Piles, Misc.: W12x53 Steel BeamLNFT$85.00$85.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,950.00District 7$7,950.00Flagger(s)$122.00
District 2$7,950.00District 8$7,950.00
District 3$7,950.00District 9$7,950.00
District 4$12,500.00District 10$7,950.00
District 5$7,950.00District 11$7,950.00
District 6$7,950.00District 12$12,000.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$640.00HRExcludes hauling and wasting

Grading $640.00 HR Restore site to stable grade

Seeding $1.34 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$158.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$160.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$44.52TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Scaling

059-26 Pricing Geohazard Maintenance 10/29/25ITEM F - Scaling
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties
NOTE
(1)The Scaling shall meet the requirements of Section 6
(2)Bid shall be provided for the time lines provided.
(3)Hauling and removal of all materials.
(4)Mobilization is to any location within a District.
(5)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

Hourly
ITEM FScalingTime$795.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,500.00District 7$7,500.00Flagger(s)$122.00
District 2$7,500.00District 8$7,500.00
District 3$7,500.00District 9$7,500.00
District 4$12,500.00District 10$7,500.00
District 5$7,500.00District 11$7,500.00
District 6$7,500.00District 12$12,500.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation$640.00HRExcludes hauling and wasting

Grading $640.00 HR Restore site to stable grade

Seeding $1.34 SY Seeding of restored (stable grade) site.

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill$158.00HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting$175.00HRRemoval of excess from site and wasting it.
Hauling and Wasting$47.00TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

Trim Blasting

059-26 Pricing Geohazard Maintenance 10/29/25ITEM G - Trim Blasting
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties
NOTE
(1)The Scaling shall meet the requirements of Section 6
(2)Provide pricing for the time lines listed
(3)Hauling and removal of all materials.
(4)Mobilization is to any location within a District.
(5)One project may consist of up to three sites. ODOT will compensate the awarded vendor for travel between sites.

Awarded vendor will be compensated $150.00 for travel within County ($250 between Counties) for each additional site, plus $0.575 per mile per vehicle after the first 5 miles, for travel between sites.

250 SQFT or Less251 SQFT or Greater
ITEM GTrim BlastingSQFT$38.00$32.00
MobilizationTraffic Control (When Necessary)
Lump SumLump Sum$ / HR
District 1$7,950.00District 7$7,950.00Flagger(s)$122.00
District 2$7,950.00District 8$7,950.00
District 3$7,950.00District 9$7,950.00
District 4$12,500.00District 10$7,950.00
District 5$7,950.00District 11$7,950.00
District 6$7,950.00District 12$12,500.00

In the event the following work is required for a given site, providing a unit cost for the various services to be performed.

The cost of Materials can vary by location, availability, and time of year. For materials purchased locally at the time of the installation, ODOT will reimburse the vendor for the cost of the material at the unit price with proper invoices.

Unit PriceUnit of Measure
Excavation640HRExcludes hauling and wasting

Grading 640 HR Restore site to stable grade

601 Dumped Rock Fill Type A-D Supplied to Site Invoice CY Type to be determined at site meeting.

Placement of Dumped Rock Fill158HRTime spent placing Fill. Dumped Rock material paid on line above.
Option ( U/M ) determined during site visit
Hauling and Wasting165HRRemoval of excess from site and wasting it.
Hauling and Wasting44.52TNRemoval of excess from site and wasting it.
INCIDENTALS
ITEMS BELOW ARE TO PROVIDE A COST FOR INCIDENTALS, GIVING THE ODOT A DEFINED COST IN THE EVENT ADDITIONAL UNFORESEEN WORK IS NEEDED ABOVE AND BEYOND THE REQUIREMENTS AND PRICING ABOVE.

ITEM Price Unit of Measure Description

$352.00 LF Temporary Rockfall per ODOT Supplemental Spec 862 (2009) Temporary Rockfall Barrier Temporary Rockfall Barrier Temporary Rockfall Barrier Temporary Rockfall Barrier Temporary Rockfall Barrier Temporary Rockfall Barrier

MOT

059-26 Pricing Geohazard Maintenance 10/29/25MAINTENANCE OF TRAFFIC
Vendor NameGuardian Fence and Construction d/b/a GeoSpecialties

MAINTENANCE OF TRAFFIC

PriceUnit of Measure
M.O.T. / No Lane Closure$4,775.00Lump Sum(When requested)Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone.
M.O.T. w/Single Lane Closure$9,000.00Lump Sum(When requested)Maintenance of Traffic for the project, including all incidentals(excluding Flaggers, PCB & End Treatment) to properly setup and maintain the work zone.
PCB (M.O.T.)$58.35Linear Ft.(When requested)A separate charge for approved temporary portable concrete barrier has been provided.
End Treatment (M.O.T)$4,770.00Each(When requested)A separate charge for an approved temporary portable concrete barrier end treatment for work zones has been provided.
Flagger$122.00$ / hr / flagger(When necessary)The number of flaggers may vary from project to project. (This number should match the individual tabs if completed in both sections)

SS832

059-26 Pricing Geohazard Maintenance 10/29/25SS832 Pricing
Temporary Sediment and Erosion Control Best Management Practices (BMP)

Unit Price Schedule, July 2025

Project Identified EDA (acres)Fixed PriceComment
<55 to 1010 to 1515 to 20>20($)
ItemUnitDescriptionPrice ($)
832Sq. Yd.Construction Seeding and
Mulching$1.21$1.11$1.00$0.91$0.86Based on

NOI acres

832FeetSlope Drains$14.50
832Cu. Yd.Sediment Basins and Dams$16.50[3]
832Cu. Yd.Excavated Drop Inlet Protection$16.50
832FeetPerimeter Filter Fabric Fence$4.89$3.75$3.44$3.08$2.78Based on

NOI acres

832FeetFilter Fabric Ditch Check$13.50
832FeetInlet Protection$13.75
832Cu. Yd.Earthen Dike/Berm$3.75
832Sq. Yd.Temporary Stabilization Matting$3.25
832Cu. Yd.Rock Ditch Check, Type C or D
without Filter$87.00[1]
832Cu. Yd.Rock Channel Protection, Type C
or D with Filter$92.00[1]
832Cu. Yd.Rock Channel Protection, Type C
or D without Filter$87.00[1]
832Cu. Yd.Basin Sediment Removal$12.00
832Cu. Yd.Miscellaneous Sediment Removal$19.00
832FeetConstruction Fence$3.25
832Sq. Yd.Construction Mulching$0.96$0.86$0.70$0.68$0.66Based on

NOI acres 832 Sq. Yd. Winter Seeding and Mulching $1.30 $1.21 $1.11 $1.02 $0.98 Based on NOI acres

832Cu. Yd.Construction Entrance$104.00
[1]Add the following amount per cubic yard for the cost of Type C or D Rock materials.
[3]Add the amount for the appropriately sized surface dewatering device for sediment basin outlet.

EXPERIENCE

059-26 Pricing Geohazard Maintenance 10/29/25 VENDOR EXPERIENCE

PROVIDE EXPERIENCE AS DESCRIBED IN SPECIFICATIONS FOR EACH EQUIVALENT OPTION SUBMITTED

If you uare not providing an "equivalent option", you are not be required to complete this page.

EQUIVALENT OPTION to Item 6.1a

A minimum of three projects are requried, within the last three calendar years (2023-2025). Providing additional projects may be beneficial if any quesitons arise with the first three, but are not required

Project Begin Date
(MM / YY)Project Timeline
(Months and/or Weeks)Project lengthMOT / Traffic Control
Yes or NoPolitical SubdivisionProject Location/Description
1 (Required)
2 (Required)
3 (Required)
4 (Optional)
5 (Optional)
6 (Optional)

EQUIVALENT OPTION to Item 6.1d

A minimum of four projects are requried. Providing additional projects may be beneficial if any quesitons arise with the first four, but are not required

Project Begin Date
(MM / YY)Project Timeline
(Months and/or Weeks)Project lengthMOT / Traffic Control
Yes or NoPolitical SubdivisionProject Location/Description
1 (Required)
2 (Required)
3 (Required)
4 (Optional)
5 (Optional)
6 (Optional)

File details come from the government source that posted it. Updated .