05. JT Project Specifications.pdf

PDF 551 KB Posted

Attached to
Construct Jamestown Substation, Stage 15 in North Dakota
Solicitation number
89503420BWA000018
Issued by

About this file

This solicitation requests bids to construct Jamestown Substation Stage 15 in North Dakota. Key requirements include demolishing existing structures and foundations; installing new steel structures, concrete foundations, electrical equipment including transformers, circuit breakers, switches, buses, cables and grounding systems; and removing and disposing of outdated equipment. Bids are due within 10 calendar days of notice to proceed and work must be completed by specified intermediate and final completion dates. The Western Area Power Administration will furnish most electrical equipment for installation by the contractor by estimated delivery dates. The solicitation provides detailed product and construction specifications to complete the work in accordance with federal regulations and industry standards.

View the file

Other files

File Type Posted
12. Wage Determination.docx DOCX document
05. JT Project Drawings.pdf PDF
21. Sol_89503420BWA000018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

DESCRIPTION/SPECIFICATIONS

Solicitation No. 89503420BWA000018 Spec. No. 20WC136023-974

NORTH DAKOTA

Jamestown Substation Stage 15

SECTION C

DESCRIPTION/SPECIFICATIONS

JAMESTOWN SUBSTATION STAGE 15

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

B. DESCRIPTION OF WORK:

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. SUBMITTAL APPROVAL TIME:

2. COMMENCEMENT OF CONTROL WORK:

3. INTERMEDIATE COMPLETION DATE:

4. OUTAGE RESTRICTIONS:

5. PROTECTIVE GROUND LEADS:

6. MAXIMUM AVAILABLE FAULT CURRENT:

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME:

2. FORMAT AND DETAIL:

3. CONSTRUCTION SCHEDULE RESTRICTIONS:

F. MATERIAL:

1. POINTS-OF-DELIVERY:

G. RIGHTS-OF-WAY:

H. GEOLOGIC INVESTIGATIONS:

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

J. WATER FOR CONSTRUCTION PURPOSES:

K. CONTRACTOR’S SAFETY AND HEALTH PROGRAM:

L. EXPLOSIVES AND BLASTING:

M. BURIED UTILITIES:

N. EMPLOYEE REQUIREMENTS:

O. ELECTRICAL MINIMUM APPROACH DISTANCES:

P. SUBMITTALS AND CORRESPONDENCE:

1. GENERAL:

2. TRANSMITTAL:

3. PHYSICAL SAMPLE SUBMITTALS:

4. SUBMITTAL RESPONSE:

5. APPROVAL TIME:

6. PROJECT PROTOCOL:

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Demolition”

2. Bidding Schedule does not contain separate items for the following

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE:

3. REBAR DEVELOPMENT (LD) AND LAP LENGTH:

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Concrete foundations”

DIVISION 4 – SUBSTATION METALWORK

A. GENERAL:

1. MEASUREMENT:

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Steel structures, welded (galvanized)”

2. Bidding Schedule item “Modifying steel structures”

DIVISION 9 – SUBSTATION - ELECTRICAL

A. GENERAL:

1. Bidding Schedule for Government-furnished items

2. Bidding Schedule for items (not furnished by the Government)

3. Unless otherwise specified, associated support structures

4. Installation and painting of electrical equipment and material

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “LTC Power transformer, 115-kV, 56-MVA, 3-phase (Government-furnished)”:

2. Bidding Schedule item “Power circuit breaker, 72-kV, 2,000-amps (Government-furnished)”: ... 14

3. Bidding Schedule items “Circuit switcher/Interrupter, 123-kV, 1,200-amps (Government-furnished)” and ”Circuit switcher/Interrupter, 72-kV, 1,200-amps (Government-furnished)”:

4. Bidding Schedule items “Disconnecting switch, 123-kV, 1,600-amps”, “Disconnecting switch, 48.3-kV, 1,200-amps”, and “Disconnecting switch side break, 48.3-kV, 1,200-amps”:

5. Bidding Schedule item “Single-pole fuse disconnecting switch, 48.3-kV”

6. Bidding Schedule item “Voltage transformer, 46-kV, single-phase”

7. Bidding Schedule item “Transformer surge arrester, 46-kV, single-phase” and “Surge arrester, 46-kV, single-phase”

8. Bidding Schedule item “Associated electrical equipment and material”

9. Bidding Schedule item “Existing outdoor electrical equipment and material”

10. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c No. 10

AWG control cable”

11. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c No. 10

AWG control cable”

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete Jamestown Substation, Stage 15, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; WAPA’s Construction Standards, including Standard 1 – General Requirements (September 2016), Standard 2 – Sitework (September 2016), Standard 3 – Concrete (September 2016), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2016), Standard 5 – Transmission Line Steel Pole Structures (September 2016), Standard 6 – Light Duty Steel Pole Structures (September 2016), Standard 7 – Wood Poles (September 2016), Standard 8 – Glued Laminated Structures (September 2016), Standard 9 – Substation – Electrical (September 2016), Standard 10 – Transmission Line – Electrical (September 2016), Standard 11 – Service Building (September 2016), Standard 12 – Painting (September 2016), Standard 13 – Environmental Quality Protection (September 2016), Standard 14

– Communication Facilities (September 2016), Standard 15 – Drawings (September 2016); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

WAPA’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

WAPA Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

The principal components of work include removal and replacement of two (2) power transformers, two (2) 115-kV interrupters, switches and associated conductor and insulators bus feeding the transformers. Remove existing 41.4-kV interrupter with switch blades, 3-phase current transformers, power circuit oil breaker, four (4) 3-phase disconnecting switches, one (1) voltage transformer and associated electrical conductor and insulators. Install two (2) 46-kV interrupters, six (6) 3-phase switches, two (2) voltage transformers and associated conductor, insulators and electrical material.

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 3, 4, 5, 6, 7, 8 and 9 describe the work to be performed.

The work is located near Jamestown, North Dakota, shown on Drawing JT 0016.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Sections H and M of the contract clauses.

b. Preparing and submitting a Construction Schedule and furnishing a Safety and Health

Program.

c. Complying with applicable Environmental Standards.

d. Complying with DOE O 442.2, Differing Professional Opinions for Technical Issues Involving Environment Safety and Health.

https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in

Section F of the solicitation/contract.

1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 20-calendar days for review of drawings or data submitted for approval.

2. COMMENCEMENT OF CONTROL WORK: Do not perform any outdoor equipment wiring until receipt of Government-furnished wiring diagrams. WAPA will furnish outdoor wiring and schematic diagrams no later than 20-days after delivery of GFE material. Include these restrictions in the Construction Program.

3. INTERMEDIATE COMPLETION DATE:

a. Completion of the two foundations (15T1) shall be completed NLT 10/19/2020 for sufficient cure time prior to the delivery of the transformers.

4. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:

a. The electrical operation of the transmission lines are under the jurisdiction of WAPA’s

Watertown Operations Office. All outage requests by the Contractor shall be subject to the approval of the Contracting Officer’s Representative (COR). Approval or denial of an individual outage request will be based on transmission system electrical loads, system operating configurations and weather conditions at the time the outage is scheduled to begin. At any time because of transmission system electrical loads, transmission system operation or reliability, WAPA may deny an outage request or direct the Contractor to return facilities to operating conditions and release the applicable Special Work Permit.

b. Make all outage requests in writing to the COR a minimum of 3-weeks in advance.

c. Meeting the minimum advance notice requirement of 3-weeks does not guarantee an outage will be approved. To improve the chances of an outage being approved, all outages should be submitted with as much advance notice as possible. Weather conditions and other system conditions such as other scheduled and nonscheduled (forced) outages must be evaluated against an outage request before approval can be granted

d. Outage requests on the 41.8-kV bus will not be granted until WAPA has installed a mobile transformer as shown on drawing JT T100.

5. PROTECTIVE GROUND LEADS: See WAPA Construction Standards, Standard 1 “General Requirements”, Section 1.4.14.3(1).

6. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current in the 115-kV and 41-kV areas are 11,500 and 5,100-amps and the X/R ratio of 8.5 and 15.2 prior to completing construction. The maximum available fault current in the 115-kV and 43-kV areas will be 11,000 and 9,400-amps and X/R ratio of 8.3 and 16 after completing construction.

b. A minimum of one (1) 1/0, 2/0, or 4/0 grounds shall be used in the 115-kV and 43-kV areas.

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the Contracting Officer (CO) within 10-calendar days after date of Notice to Proceed.

2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided.

Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.

3. CONSTRUCTION SCHEDULE RESTRICTIONS:

a. The Contractor shall not install foundation designated 15T2, as shown on drawing JT 2044, until after the delivery of the new transformers. The Contractor shall remove existing transformer KY1A and coordinate location of temporary storage with WAPA.

b. The Contractor shall not work more than 12 hours per day and not more than 60-hours in one continuous period without approval from the COR.

F. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below:

ITEM

ESTIMATED

WEIGHT

(LBS)

ESTIMATED

DELIVERY

DATE

ESTIMATED

COST

Two (2) LTC power transformer 115-kV, 56-MVA, 3-phase

193,500 ea NST 11-08-2020

NLT 11-21-2020

$1,120,000 ea

One (1) Power circuit breaker, 72-kV, 2,000-amp, 3-phase

4,660 On site $55,500

Circuit switcher/interrupter:

Two (2) 123-kV, 1,200-amps, 3-phase with stands

4,000 ea NST 09-01-2020

NLT 10-30-2020

$60,000 ea

Two (2) 72-kV, 1,200-amps, 3-phase with stands

4,200 ea NST 09-01-2020

NLT 10-30-2020

$40,000 ea

Disconnecting Switches:

Two (2) 123-kV, 1,600-amp, 3-phase 2,700 ea NST 09-08-2020

NLT 09-15-2020

$11,000 ea

Four (4) 48.3-kV, 1,200-amps, 3-phase

1,800 ea NST 09-08-2020

NLT 09-15-2020

$6,980 ea

Two (2) 48.3-kV, 1,200-amps, side break, 3-phase

1,800 ea NST 09-08-2020

NLT 09-15-2020

$6,980 ea

NST – No sooner than.

NLT – No later than.

1. POINTS-OF-DELIVERY: Material furnished by WAPA are stored or will be delivered to site. The

Contractor is responsible for unloading of WAPA-furnished switches and circuit switchers/interrupters. The LTC power transformers and power circuit breaker will stored at the site on temporary cribbing. The Contractor shall load, transport, and unload material to their final locations as shown on the Drawings. The Contractor shall inspect the equipment and report any damages to the COR.

G. RIGHTS-OF-WAY:

Orient construction methods and equipment to utilize Government-furnished rights-of-way or obtain additional temporary access without additional cost to WAPA. Any additional temporary access acquired by the Contractor shall have prior COR approval, since several areas of the transmission line have travel restricted areas. During the contract period, WAPA reserves the right to use Contractor-obtained access.

H. GEOLOGIC INVESTIGATIONS:

The JT 8000 geologic log of subsurface explorations included in the “Drawings” Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on the Drawings.

The latest geotechnical report prepared by Northern Technologies, Inc., NTI Project No 02-2859.08, December 2, 2002, is available upon request.

Samples and cores of recovered material were not retained. Bidders shall obtain their own samples and perform tests on the material to evaluate properties, which they believe to be significant. WAPA does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.

The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the worksite.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Electric power up to a maximum of approximately 5-kVA for construction purposed will be available without cost. Source of supply is located throughout the substation. Power made available by WAPA will be delivered as single-phase, 60-Hz, AC at approximately 120 VAC and 240 VAC.

The Contractor may furnish power for his operations by other means at no additional cost to WAPA.

Make arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment for distributing the power to the places of use. At contract completion, remove temporary electrical equipment and distribution lines.

J. WATER FOR CONSTRUCTION PURPOSES:

Provide potable water for construction purposes, equipment and personnel throughout the duration of the contract.

K. CONTRACTOR’S SAFETY AND HEALTH PROGRAM:

Shall include designation of the Safety Professional with resume of qualifications, experience and training as related to this subject.

L. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

M. BURIED UTILITIES:

Prior to excavation, examine the area and determine the location of buried utilities. Utilities shall be identified with a marker denoting the type of service.

N. EMPLOYEE REQUIREMENTS:

In addition to the requirements listed in WAPA Construction Standard 1.4.3 all employees are restricted from wearing a headset, headphone, or other listening device, other than a hearing aid or instrument for the improvement of defective human hearing, hearing protection worn as the hazard exists, or for communication purposes while on a WAPA jobsite.

O. ELECTRICAL MINIMUM APPROACH DISTANCES:

In addition to the requirements listed in WAPA Construction Standard 1.4.9 equipment other than cranes and derricks, conductive objects, or personnel, shall not be brought closer to energized facilities than the electrical minimum approach distances established by OSHA 1926.958(b), “Materials, Handling, and Storage”. The less stringent equipment clearance distances established by OSHA 1926.960, “Working On or Near Exposed Energized Parts”, Table V-5 and Table V-6, may only be used after the Contractor has completed and submitted WAPA’s Electrical Clearance Variance form and has received the signed form in return from the COR.

P. SUBMITTALS AND CORRESPONDENCE:

1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction

Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements:

a. Submittals shall be in standard PDF, Microsoft Word (.doc/.docx), Microsoft Excel

(.xls/.xlsx), or Electronic CAD (.dwg) (AutoCAD 2010 or 2014) formats. All submittals in .dwg format shall also be submitted in .pdf format.

b. All submittals shall include the WAPA Contract number, Specification number, WAPA project title, Bidding Schedule Contract Line Item Number (CLIN) and applicable division number.

c. Multiple CLIN’s on a single submittal are not permitted.

d. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email submittal.

2. TRANSMITTAL: The Contractor shall transmit all submittals to the Construction Office.

Email: UGP-CS-B5600@WAPA.GOV

3. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e. brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a digital cover letter outlining the physical sample submittal prior to sending the sample (including tracking data when applicable) and shall deliver physical specimens to:

Western Area Power Administration Civil/Structural Design ATTN: 7920, Civil Engineering Manager mailto:UGP-CS-B5600@WAPA.GOV

12155 W. Alameda Parkway Lakewood, CO 80228-2802

A courtesy copy of the submittal letter shall be emailed to the Construction office at the above address.

4. SUBMITTAL RESPONSE: WAPA will respond to submittals electronically with an “Accepted” or

“Not Accepted” status with comments as appropriate in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph to the email address where the submittals originated.

5. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecutions, and Completion of Work” paragraph.

6. PROJECT PROTOCOL:

a. Submittals – Electronic Correspondence:

SUBJECT LINE IN EMAIL -- SUBMITTAL FORMAT

CLIN + Submittal Name – Applicable Division Number or Drawing Number – Project Title – Specification Number – Contract Number Example: 0011 Concrete Mix Design – 3.A.1 – Jamestown Substation, Stage 15, ND –

20WC136023-974 – 89503420CWA0000XX

b. Payment Requests:

SUBJECT LINE IN EMAIL -- PAYMENT REQUEST FORMAT

Invoice Number – Project Title – Specification Number – Contract Number Example: Invoice 01 – – Jamestown Substation, Stage 15, ND – 20WC136023-974 –

89503420CWA0000XX

c. Certified Payrolls – Prime and Sub-Contractors:

SUBJECT LINE IN EMAIL -- CERTIFIED PAYROLL FORMAT

Certified Payroll (CP) – Contractor Name – Week Ending (WE) – Project Title – Specification Number – Contract Number Example: CP – Bob’s Asphalt Repair – WE 08/13/16 & 08/20/16 – – Jamestown Substation, Stage 15, ND – 20WC136023-974 – 89503420CWA0000XX

d. Request for Information:

SUBJECT LINE IN EMAIL -- REQUEST FOR INFORMATION (RFI) FORMAT

RFI Number – Subject – Project Title – Specification Number – Contract Number Example: RFI 003 – Labeling Info – – Jamestown Substation, Stage 15, ND – 20WC136023-974

– 89503420CWA0000XX

DIVISION 2 – SITEWORK

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Demolition” includes the following:

a. Completely removing concrete foundations designated on Drawings JT 2001, JT 2004, JT 2089 and JT 2093.

b. Removing the following structures:

(1) Two (2) – Equipment Support – Type II (JT 2083).

(2) Two (2) – Equipment Support – Type III (JT 2083).

(3) Two (2) – 41.8-kV Interrupter Switch Support – Type I (JT 2087).

(4) Two (2) – 115-kV Interrupter Switch Support (No Reference, Similar to 115-kV Switch

Support on Drawing JT 2603).

Drawings are included showing typical structure details.

c. The Contractor shall include any credit to the Government for salvage of the equipment and/or materials in this bid item

2. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Excavations for foundations, structures, and trenches.

b. Placing and compacting earth material and backfill.

c. Providing gravelfills for the Service Building and under concrete foundations as shown on the Drawings.

d. Disposing of excavated material. The Contractor shall make arrangements required for disposal of waste material in an approved landfill.

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

a. Cement: Type V cement. Types are according to ASTM C 150.

b. Compressive Strength: 4500-psi minimum at 28-days.

c. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed 0.45 by weight.

d. Type A and D water-reducing and retarding admixtures may be used if approved by the COR.

e. Class F fly ash is required to neutralize severe alkali in accordance with ASTM C 311 (regarding test data), ASTM C 618 (regarding material) and Standard 3 – Concrete (regarding WAPA-specific requirements). Proposed concrete mix designs shall incorporate fly ash up to a maximum of 20-percent; minimum 28-day compressive strength shall be maintained in mix design.

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used. Perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, a suitable source will be obtained by the Contractor.

3. REBAR DEVELOPMENT (LD) AND LAP LENGTH:

a. Class B lap splices apply unless noted otherwise; refer to Table 3 on Standard Drawing 01

2004-1 General Outline and Reinforcement Notes.

b. Typical closed circular tie lap splice lengths for drilled piers and columns, 4,000 - 4,500-psi normal weight concrete, unless noted otherwise, are 18-inches for No. 3 ties, 24-inches for No. 4 ties and 30-inches for No. 5 ties.

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item “Concrete foundations” includes the following:

a. Earthwork, formwork, reinforcement, material used in concrete, void forming material, drilling and grouting anchor bars, anchor bolts, curing, finishing, joints, and other related work and material needed to complete the concrete construction.

b. Concrete foundations for steel structures.

c. Concrete foundations for electrical equipment.

d. Unwatering foundation excavations, if required.

e. Casing auger excavations, if required.

f. Trial augering, if required.

Measurement for quantities for concrete foundations will be made on the basis of concrete quantities shown on Drawing JT 2070-2. If separate quantities of formed and auger concrete for each type of foundation are shown on the drawing, the concrete quantity shall be the total of the formed and auger concrete quantities. Regardless of the concrete quantities actually placed, payment will be based on the quantities of concrete shown on the Drawing.

DIVISION 4 – SUBSTATION METALWORK

A. GENERAL:

1. MEASUREMENT: Measurement for quantities for Bidding Schedule items “Steel structures, welded (galvanized)” and “Modifying steel structures” will be made on the basis of weights calculated in accordance with LRFD, “ AISC Code of Standard Practice for Steel Buildings and Bridges”, except that weights for nonrectangular shapes and plates are to be based on actual detailed dimensions.

a. Steel structure weights, calculated as noted above, are shown on the Government-furnished shop drawings and shall be shown on the Contractor-furnished final shop drawings, and payment will be based thereon. Steel estimated weights are shown on the specifications drawings for the structures requiring approval drawings as noted in the Bidding Schedule items “Steel structures, welded (galvanized)” and “Modifying steel structures”.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “Steel structures, welded (galvanized)” includes providing the following:

a. Two (2) 43-kV switch supports - Type I (JT 2630).

b. Two (2) 115-kV switch supports - Type II (JT 2630). *

c. Ten (10) single-switch operating platforms, including grating and concrete foundations

(JT 2929).

d. Equipment cabinet platforms as follows, including gratings and concrete foundations.

(1) Two (2) - Type VI for the 115/43-kV Transformer (JT 2928).

(2) One (1) - Type IV for the 43-kV Circuit Breaker (JT 2928).

(3) Four (4) – type IV for circuit switchers (JT 2928)

*Denotes structures requiring approval drawings.

The above material including connection bolts, nuts, washers, and lock nuts shall be galvanized.

2. Bidding Schedule item “Modifying steel structures” includes performing the following:

a. Modifying Steel Structures:

(1) Provide and install additional steel beam within 41.8-kV Bus Structure as shown on Drawing JT 2008-5 and JT 2009-3.

The above material including connection bolts, anchor bolts, nuts, washers, lock nuts shall be galvanized.

DIVISION 9 – SUBSTATION - ELECTRICAL

A. GENERAL: Electrical equipment and material shall be as specified in WAPA’s “WAPA ES” Standard

Equipment Specifications, as shown on project drawings and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL and Federal specifications and standards as applicable. Applicable requirements shall be met under the following service conditions:

Ambient Temperatures:

Maximum ........................................................................................... +40°C Maximum 24-Hour Average .............................................................. +30°C Minimum ............................................................................................. -50°C

Elevation:

Above Mean Sea Level .............................................................. 1,475-Feet

*ASCE-7 Wind Load:

Minimum Basic Wind Speed………………………………………….90 MPH Importance Factor………………………………………………………….1.15

*IEEE 693 Seismic Qualification ............................................................................ Low

*May include support structure in accordance with STANDARD 9.1.1.2. Wind and seismic loads are nonsimultaneous.

1. Bidding Schedule for Government-furnished items (including associated supporting structures when furnished) require the Contractor to provide:

a. Unless otherwise indicated, unloading and inspecting Government-furnished items.

b. Installing Government-furnished items as shown on drawings.

c. Furnishing equipment and material not furnished by WAPA.

2. Bidding Schedule for items (not furnished by the Government) shall be furnished by the

Contractor and shall include the following:

a. Providing (furnishing and installing) bidding schedule items.

b. Furnishing equipment and material not furnished by WAPA.

c. Installing bidding schedule items as shown on drawings.

3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel.

Instrument transformers that are seismically qualified shall be 96-inches in height. If tubular steel supports are furnished, they shall be galvanized internally and externally.

4. Installation and painting of electrical equipment and material shall be provided in accordance with

Standards 9 and 12 respectively.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule item “LTC Power transformer, 115-kV, 56-MVA, 3-phase (Government-furnished)”:

DESIGNATION KY1A, KY2A

Manufacturer Waukesha

Voltage Rating (kV) 115-43.8

Rating (MVA) 33.6/44.7/56.1

Oil (gallons) 7,653

Total Weight (including oil) (LBS) 166,000

a. The equipment supplier will unload the power transformers from the truck and Contractor personnel shall inspect the power transformers for possible damage during shipment or transportation and report any damage to WAPA’s COR.

b. The Contractor shall move and install the transformer in accordance with the equipment manufacturer's instruction books, the oil purification instruction book and manufacturer's erection engineer. The Contractor is responsible for contacting the transformer manufacturer and complying with all their requirements for completing the vacuum filling process.

c. Special tools and spare parts will be furnished with each transformer (a complete list will be included with the instruction books). The Contractor shall inspect tools and spare parts for possible damage during shipment and report any damage to WAPA’s COR and deliver the tools and spare parts to WAPA’s onsite representative.

2. Bidding Schedule item “Power circuit breaker, 72-kV, 2,000-amps (Government-

DESIGNATION JX4A

Manufacturer Mitsubishi

Model Number 70-SFMT-32HF-B

Type SF6 gas

Nominal Voltage Rating (kV) 69

Maximum Voltage Rating (kV) 72.5

Continuous Current (Amps) 2,000

Short Circuit Fault Rating (KA) 31.5

Rated Interrupting Time (cycles) 3

Number CT’s per Bushing 3

DESIGNATION JX4A

Estimated Weight of 3-pole Breaker with Gas (LBS) 4,660

Approximate SF6 Gas Weight (LBS) 28

a. The Material is located at the site.

b. Special tools and spare parts will be furnished with the power circuit breakers (a complete list will be included with the breaker instruction books). The Contractor shall inspect report any damages to WAPA’s COR and deliver the spare parts furnished with the breakers to WAPA’s onsite representative.

3. Bidding Schedule items “Circuit switcher/Interrupter, 123-kV, 1,200-amps (Government-furnished)” and ”Circuit switcher/Interrupter, 72-kV, 1,200-amps (Government-

DESIGNATION JY1A, JY2A JX1A, JY2A

System Nominal Voltage (Rating) (kV) 115 43

Rated Maximum Voltage (kV) 123 72

Basic Impulse Insulation Level (kV) 550 350

Continuous Current Rating (Amps) 1,200 1,200

Short Circuit Fault Rating (KA 40 40

Transformer Primary Interrupting Rating (kA) 40 40

Interrupting Time (cycles (maximum)) 6 6

Phase Spacing (feet-inches) 7’-0” 4’-0”

Space heater voltage (Volts) 120 ac 120 ac

Approximate Weight (LBS)(EA) 4,200 4,000

* Primary side fault interrupting symmetrical is 20-kA and temperatures between negative thirty degrees Celsius and negative forty degrees Fahrenheit.

The circuit switchers, or candle-stick interrupters, have no integrated disconnect blades.

4. Bidding Schedule items “Disconnecting switch, 123-kV, 1,600-amps”, “Disconnecting switch, 48.3-kV, 1,200-amps”, and “Disconnecting switch side break, 48.3-kV, 1,200-amps” includes providing the following disconnecting switches as shown on the Drawings and in accordance with WAPA ES 8.1 equipment standard and providing associated support structures:

DESIGNATION WY1A,

WY2A

WX1A,

WX2A WX4A, YX4A XX5A, WX3A

Type

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

3-pole, single throw, outdoor, group operated, side break, rotating insulator, Pascor SBP or equal.

3-pole, single throw, outdoor, group operated, vertical break, rotating insulator

System Nominal Voltage Rating (kV) 115 43 43 43

Rated Maximum Voltage (kV) 123 48.3 48.3 48.3

Basic Impulse Insulation Level (kV) 550 250 250 250

Continuous Current Rating (Amps) 1,600 1,200 1,200 1,200

Short-Time (3-seconds) Symmetrical Current Rating (kA)

44 38 38 38

Peak Withstand Current (kA @ 60Hz) 114 99 99 99

Grounding Blades None None None None

Standard Arcing Horns Yes Yes Yes Yes

Switch Operator Type Manual

Worm-Gear Operator

Manual Swing

Operator

Manual Swing Operator

Manual Swing

Operator

Phase Spacing (feet-inches) 7-0 5-0 6-0 6-0

Height of Support Structure (feet-inches) 8-6 8-6 16-3* 27-6*

Mounting Position Horizontal Horizontal Vertical/ Cantilever Horizontal

DESIGNATION WY1A,

WY2A

WX1A,

WX2A WX4A, YX4A XX5A, WX3A

Insulator Technical Reference No. 550 250 250 250

Auxiliary Switch Not Required Not Required Not Required Not Required

Key Interlock None None None None

* Approximate mounting height.

a. Disconnecting switches shall be qualified to operate under service conditions specified in paragraph A. General and as follows:

*IEEE 693 Seismic Qualification ......................................................................... Low *in accordance with STANDARD 9.1.1.2. Wind load per paragraph A. General and seismic loads are nonsimultaneous.

5. Bidding Schedule item “Single-pole fuse disconnecting switch, 48.3-kV” includes providing single-pole fuse disconnecting switch in accordance with WAPA ES 8.3 equipment specifications:

DESIGNATION (SINGLE-PHASE) FX3A1, FX3A2, FX3A3

Nominal Voltage Rating (kV) 43 Maximum Rated Voltage (kV) 48.3 Basic Impulse Level (kV) 250 Mounting Position Vertical Approximate Mounting Height (feet) 15-0 Phase Spacing (feet) 5-0 Fuse Symmetrical Interrupting Rating (RMS amps) 13,100

Fuse Asymmetrical Interrupting Rating (amps) 21,000

*Approximate Fuse E Rating 175E

*Exact E rating will be furnished after the Contractor has submitted the time current curves of proposed fuse units.

a. Equipment Type: Outdoor, single-pole, hook-operated, low noise fuses S&C Electric

Company SMD drop out indicating type or equivalent.

b. Fuse Units: Each fuse disconnecting switch shall be furnished complete with one (1) fuse unit and one (1) spare fuse unit. Each fuse unit shall be of a type that can be re-fused readily in the field.

c. Fuse disconnecting switches shall be qualified to operate under service conditions specified in paragraph A. General and as follows:

*IEEE 693 Seismic Qualification ......................................................................... Low *In accordance with STANDARD 9.1.1.2. Wind load per paragraph A. General and seismic

6. Bidding Schedule item “Voltage transformer, 46-kV, single-phase” includes providing voltage transformers in accordance with WAPA ES 6.1 equipment standard:

DESIGNATION

(SINGLE-PHASE) VX4A1, VX5A1

Type

Single-phase, two-bushing, 60- Hz, wound type, outdoor, dual tapped secondary, in accordance with ANSI C57.13

Manufacturer GE JVT-250 Superbute or equal

Nominal Rated Primary Voltage (kV) 43

Maximum System Voltage (kV) 46

Basic Impulse Level (kV) 250

Ratio Primary to Secondary* {2}

240/400:1 240/400:1

ANSI Accuracy Class 0.3W, X, Y, Z

Type Dry Type

Minimum Thermal Burden Rating at 30°C Ambient (VA) 4500

Terminal Pad NEMA 2-hole

Mounting Horizontal mounting plate

*The non-polarity terminal of the secondary winding shall be the common terminal connection required for the 69 and 115 secondary voltages.

a. Voltage transformers shall have dual tapped secondaries, or secondary and tertiary, windings. A single tapped secondary is not acceptable.

b. Voltage transformers shall be qualified to operate under service conditions specified in paragraph A. General and as follows:

*IEEE 693 Seismic Qualification ......................................................................... Low *in accordance with STANDARD 9.1.1.2. Wind load per paragraph A. General and seismic

7. Bidding Schedule item “Transformer surge arrester, 46-kV, single-phase” and “Surge arrester, 46-kV, single-phase” includes providing surge arresters in accordance with ANSI C62.1 and WAPA ES 9.1 equipment standard:

(SINGLE-PHASE)

(THREE (3) XFMR

KX3A REPLACEMENT)

AX4A1, AX4A2,

AX4A3, AX5A1,

AX5A2, AX5A3

Class Station Station

System (kV) (L-L) 43 43

MCOV*(kV, RMS) (Not less than) 29 42

(SINGLE-PHASE)

(THREE (3) XFMR

KX3A REPLACEMENT)

AX4A1, AX4A2,

AX4A3, AX5A1,

AX5A2, AX5A3

Duty Cycle Voltage (kV) 36 54

* MCOV = Maximum Continuous Operating Voltage

a. The Contractor shall replace existing transformer, KX3A, high voltage winding’s surge arrester with surge arresters from the table above with a 3-phase designation of eight (8).

b. Surge arresters shall be qualified to operate under the service conditions specified in paragraph A. General.

c. Surge arresters shall have the following features:

(1) Be suitable for base mounting.

(2) Be metal oxide station-type.

(3) Be equipped with pressure relief diaphragm.

(4) Have gray colored porcelain.

(5) Have NEMA CCI terminal pads.

(6) Have ground connector for No. 2 AWG to 400-kcmil copper cable.

(7) Be equipped with grading rings if required for application.

8. Bidding Schedule item “Associated electrical equipment and material” includes providing equipment, material, and services required to complete the following substation installations as shown on the Drawings:

a. Electrical Testing: Includes providing electrical testing in accordance with Standard 9, paragraph 9.1.2 Acceptance Tests - Method A.

b. Substation Grounding System: Includes providing material and services required to complete and test the substation grounding system. All ground cable risers shall be 4/0 copper bare conductor. Unless otherwise specified on drawings, splices, crosses, tees and other fittings may be compression type (DMC Power’s Swage, AFL Swage system, or equal. It is recommended to obtain the necessary tooling from the respective manufacturer.). Note: On Standard Drawing 31 1085, the Contractor shall size and provide the ground connector, item 4, to fit the provided grounding conductor in lieu of Burndy ground connector type K2C20B1.

c. Electrical Conduit System: Including embedded and exposed conduit. Conduit entering the cable trench with a 90-degree bend is allowed to be Schedule 40 PVC as shown on Drawing 31 1006. A red or yellow polyethylene warning tape shall be installed directly above each conduit run and located 12-inches below finished grade. All conduits shall have sealing compound installed at both ends. Informational drawings and data are not required for this item.

d. Outdoor Bus System: Includes providing material and services required to complete the outdoor strain and jumper buses, rigid buses, and overhead ground wire installations.

Unless otherwise specified on the Drawings, splices, elbows, pad type terminal connectors and other fittings used on rigid or cable buses shall be compression type (DMC Power’s Bus & Cable Connectors and Swage System, AFL Swage system, or equal. If required, tools shall be obtained from respective manufacturers.). Post insulators for new structures shall use industry standard 3, 5, or 7-inch base cap bolt circles in lieu of WAPA Standard

9.3.1.1.3.2 and Drawing 31 1081. Replacement insulators shall match existing bolt circles.

Insulators shall be ANSI 70 gray. Informational drawings and data are required for the rigid bus, conductors, overhead ground wire, and insulators only.

e. Insulated conductors: Insulated conductors and cables except 5/c and12/c No. 10 AWG control cable. Informational drawings and data are not required for this item.

f. Terminal boxes: Terminal boxes’ internal components arrangements shown on Drawings 31 1085 and 31 1086 are typical and the Contractor shall provide internal components for Option 1 Type A terminal box configuration. Actual internal arrangements will be determined by the COR. Note: on Drawing 31 1085, note 7 should be: “Ground all boxes to the main ground grid with 3 conductor No. 7 bare copper-clad cable. 7 conductor No. 4 bare copper-clad cable may be substituted.” Regardless, the Contractor shall size and provide the ground connector, item 4, to fit the provided grounding conductor in lieu of Burndy ground connector type K2C20B1.

g. Gas Cart and Safety Switches: The safety switches shall be outdoor type, single throw, fusible, 3-phase plus neutral, 4-wire, 240-V, 60-amps with phase markings to identify phases from the neutral. Safety switch enclosures shall be NEMA Type 4X. Safety switch shall include interlocked Arktite receptacle, Eaton Crouse-Hinds WSRD6352CH-S901 series, or equal. Safety switch shall be installed in locations shown on the Drawings or as directed by the COR.

h. Molded case circuit breakers: The contractor shall field determine and provide panelboard

DHE matching molded case circuit breakers for the station service as shown on Drawing JT 1619.

i. Service panel circuit nameplates: The Contractor shall furnish new individual station service engraved nameplates in accordance with ES 2.3.3.5 for circuits modified on Drawings JT

j. Phase Identification Signs (31 1000):

(1) One (1) on each phase at both ends of main and bypass buses, at each high voltage circuit terminating structure, and on each phase of an instrument transformer or single-phase transformer:

(a) Phase A – 12 required

(b) Phase B – 10 required

(c) Phase C – 10 required

k. Equipment Identification Signs (31 1000): Lettering on the signs shall be as shown on

Drawing JT 1101.

9. Bidding Schedule item “Existing outdoor electrical equipment and material” includes constructing a temporary storage facility to hold existing equipment containing PCB oil with 2-ppm or greater. The temporary storage facility shall be in accordance with the standards. Bidding Schedule item “Existing outdoor electrical equipment and material” also includes removal, disposal, modifying, and reinstalling existing electrical equipment and material.

a. Material to be removed and delivered to WAPA is as follows:

(1) Existing molded case circuit breakers removed/replaced as shown on Drawings JT

(2) One (1) ABB transformer, designated KY1A, approximate total weight of 104,550-lbs., containing approximately 3700-gallons of oil shall be moved to the new foundation designated 15T2 as shown on drawing JT 2044.

b. Material that will be removed by others is as follows:

(1) One (1) Moloney transformer, designated KY2A, approximate weight of 112,150-lbs., containing approximately 5523-gallons of oil.

(2) One (1) GE oil filled 46-kV power circuit breaker, designated JX1C, approximate total weight of 10,100-lbs., 125-gallons of oil.

(3) (2) 3-phase hook operated disconnecting switches, designated WX1C and YX1C.

c. Material to be Removed and Disposed of is as follows:

(1) Three (3) single-phase, GE or Moloney grounding transformers, designated KX1A1, KX1A2, KX1A3, each weighing approximate 5,300-lbs. for GE and 7950-lbs. or Moloney, with approximately 260-gallons for GE and 410-gallons for Moloney of oil in each. KX1A2 has an attached instrument transformer that shall also be disposed of.

(2) Two (2) Siemens 115-kV, 1,200-amp, SF6 gas interrupter (circuit switcher) with disconnecting blades, designated WY1D and WY2C, and associated steel structure.

(3) Three (3) single-phase Associated Engineering Company’s (Kuhlman) 115-kV current transformers, designated QY2C1 QY2C2, and QY2C3, and associated steel support structure.

(4) Two (2) S&C 46-kV SF6 gas interrupter (circuit switcher) with disconnecting blades, designated WX1A and WX3B.

(5) Two (2) 46-kV three-phase, group operated, disconnecting switches, designated XX2C and WX3A.

(6) Three (3) single-phase Associated Engineering Company’s (Kuhlman) 46-kV current transformers, designated QX3B1, QX3B2, and QX3B3, and associated support structure.

(7) Existing 115-kV conductor, suspension insulators, and post insulators as shown on

Drawings JT 1001, JT 1010, JT 1011, and JT 1012.

(8) Existing 41.8-kV conductor, rigid bus, suspension insulators, and station post insulators as shown on Drawing JT 1013.

(9) One (1) GE JVT 250 voltage transformer, designated VX1B2.

(10) Six (6) surge arresters, designated as 11 in the switching diagram, JT 0001.

(11) Three (3) surge arresters, designated as 8 on the switching diagram, JT 0001, mounted to the existing transformer KX3A.

(12) Terminal box for VX1B2.

(13) Two (2) Terminal boxes EY2C and EX3B.

(14) One (1) 46-kV voltage indicator, horizontally mounted to the outer steel column of exiting bay X1, near the take-off point, to phase-A, and has no existing designation.

It is approximately 46-kV insulator size.

(15) Three (3) single pole fuse disconnecting switches designed FX3A.

(16) Replaced equipment signs.

(17) Substation control, power cables and conduit as designated on the Drawings.

Portions of cables in conduit, trench, and/or trays shall be removed and disposed of.

d. The Contractor shall include any credit to the Government for salvage of the equipment and/or materials in this bid item.

10. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c No. 10 AWG control cable” include furnishing the required linear feet for 5/c No. 10 and 12/c No. 10 AWG control cable, respectively.

11. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c

No. 10 AWG control cable” include installing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively, according to the details shown on Drawing JT T601. All control cables shall be labeled according to Drawing JT T601 and Standard 9 – Substation Electrical. The Construction Contractor shall terminate control cable at the outdoor equipment. The Contractor shall provide sufficient cable in the service building to reach the farthest corner of the building.

Message from the Administrator

At Western Area Power Administration (WAPA), we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to WAPA. In performing work for WAPA, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure WAPA is a safe place to work.

Mark A. Gabriel Administrator and CEO

DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: See FAR 52.211-10 in Section F of the solicitation/contract.
1. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, WAPA will require 20-calendar days for review of drawings or data submitted for approval.
2. COMMENCEMENT OF CONTROL WORK: Do not perform any outdoor equipment wiring until receipt of Government-furnished wiring diagrams. WAPA will furnish outdoor wiring and schematic diagrams no later than 20-days after delivery of GFE material. Includ...
3. INTERMEDIATE COMPLETION DATE:
4. OUTAGE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:
5. PROTECTIVE GROUND LEADS: See WAPA Construction Standards, Standard 1 “General Requirements”, Section 1.4.14.3(1).
6. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f...
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the Contracting Officer (CO) within 10-calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
3. CONSTRUCTION SCHEDULE RESTRICTIONS:
F. MATERIAL: Furnish all material for completing the work, except material furnished by WAPA as listed below:
1. POINTS-OF-DELIVERY: Material furnished by WAPA are stored or will be delivered to site. The Contractor is responsible for unloading of WAPA-furnished switches and circuit switchers/interrupters. The LTC power transformers and power circuit break...
G. RIGHTS-OF-WAY:
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. CONTRACTOR’S SAFETY AND HEALTH PROGRAM:
L. EXPLOSIVES AND BLASTING:
M. BURIED UTILITIES:
N. EMPLOYEE REQUIREMENTS:
O. ELECTRICAL MINIMUM APPROACH DISTANCES:
P. SUBMITTALS AND CORRESPONDENCE:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specification to the email address listed under the Transmittal section below and with the following requirements:
2. TRANSMITTAL: The Contractor shall transmit all submittals to the Construction Office.
3. PHYSICAL SAMPLE SUBMITTALS: When physical specimens or digital media are required to be submitted for approval, (i.e. brick samples, roofing material samples, carpeting, CDs, DVDs, etc.) the Contractor shall provide a digital cover letter outlinin...
A courtesy copy of the submittal letter shall be emailed to the Construction office at the above address.
4. SUBMITTAL RESPONSE: WAPA will respond to submittals electronically with an “Accepted” or “Not Accepted” status with comments as appropriate in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph to the email address w...
5. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecutions, and Completion of Work” paragraph.
6. PROJECT PROTOCOL:
DIVISION 2 – SITEWORK
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Demolition” includes the following:
2. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used. Perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be u...
3. REBAR DEVELOPMENT (LD) AND LAP LENGTH:
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Concrete foundations” includes the following:
DIVISION 4 – SUBSTATION METALWORK
A. GENERAL:
1. MEASUREMENT: Measurement for quantities for Bidding Schedule items “Steel structures, welded (galvanized)” and “Modifying steel structures” will be made on the basis of weights calculated in accordance with LRFD, “ AISC Code of Standard Practice f...
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS: