This solicitation document from the Millennium Challenge Corporation seeks proposals for a Nutrition Toolkit Development Consultancy. Key details include the following:
The solicitation requests proposals from consultants to support the development of a Nutrition Toolkit for use in MCC partner countries. The consultancy period is expected to last approximately six months. The consultant will work with MCC staff to conduct formative research, develop toolkit content and materials, pre-test drafts, and finalize the toolkit. Deliverables include an inception report, draft toolkit components, a pre-testing report, and a finalized toolkit. The solicitation closes on [date] and the period of performance is anticipated to begin in [month/year].
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 06 Amendment 0001 Questions.xlsx | XLSX spreadsheet | |
| 01 SOW.docx | DOCX document | |
| 05 95332422Q0090.pdf | ||
| 01 SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE 17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print)
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
8 (A)
NAICS:
SIZE STANDARD:
STANDARD FORM 1449 (REV. 3/2005) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
95332422Q0029
TABLE OF CONTENTS:
Listing of Incorporated Purchase Requisitions Section B - Supplies or Services and Prices/Costs Section C - Description/Specifications/Work Statement Section D - Packaging and Marking Section E - Inspection and Acceptance Terms Section F - Delivery or Performance Section G - Contract Administration Data Section H - Special Contract Requirements Section I - Contract Clauses Section J - List of Documents, Exhibits, and other Attachments Section K - Representations, Certifications, and Other Statements of Offerors Section L - Instructions, Conditions and Notices to Offerors Section M - Evaluation Factors for Award
Listing of Incorporated Purchase Requisitions
Incorporated Purchase Requisition Numbers:
Section B - Supplies or Services and Prices/Costs
Item Number Base Item Number
Supplies/Services Quantity Unit
0001 ESP Consultant 1 LT Contract Type:Time and Materials
Unit Price Other Direct Costs
Extended Price
Description:
ENVIRONMENTAL AND SOCIAL PERFORMANCE CONSULTANT
Purchase Requisitions
IDC Type: Not Applicable FSC Codes: R499 SUPPORT- PROFESSIONAL: OTHER NAICS Code: 541990 All Other Professional, Scientific, and Technical S...
Supplies/Services Quantity Unit
1001 Option Period 1: ESP Consultant 1 LT Contract Type:Time and Materials
Unit Price Other Direct Costs
Extended Price
Description:
ENVIRONMENTAL AND SOCIAL PERFORMANCE CONSULTANT
Purchase Requisitions
Option:
Option Time Date: 5/9/23 Option Time Duration: 365 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
2001 Option Period 2: ESP Consultant 1 LT Contract Type:Time and Materials
Unit Price Other Direct Costs
Extended Price
Description:
ENVIRONMENTAL AND SOCIAL PERFORMANCE CONSULTANT
Purchase Requisitions
Option:
Option Time Date: 5/9/24 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
3001 Option Period 3: ESP Consultant 1 LT Contract Type:Time and Materials
Unit Price Other Direct Costs
Extended Price
Description:
ENVIRONMENTAL AND SOCIAL PERFORMANCE CONSULTANT
Purchase Requisitions
Option:
Option Time Date: 5/9/25 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
4001 Option Period 4: ESP Consultant 1 LT Contract Type:Time and Materials
Unit Price Other Direct Costs
Extended Price
Description:
ENVIRONMENTAL AND SOCIAL PERFORMANCE CONSULTANT
Purchase Requisitions
Option: 1 Option Time Date: 5/9/26 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Clauses incorporated by reference
None
Clauses incorporated by full text
Section B - Supplies or Services and Prices/Costs Item Number Base Item Number
B.1 SERVICES TO BE PROVDED
MCC requires consultant services to support MCC's ESP team to assess environmental and social impacts, risks, and opportunities associated with the development, implementation, and closure of MCC-supported projects.
B.2 CONTRACT TYPE
MCC is awarding a Time and Materials type Contract. Multiple awards may be considered.
B.3 LABOR RATES
This RFQ is issued in accordance with FAR Part 12 Acquisition of Commercial Items and FAR Part 13 Simplified Acquisition
Procedures.
Labor Category Billing Hourly Rate
(Base)
Billing Hourly Rate (Option
1)
Billing Hourly Rate (Option
2)
Billing Hourly Rate (Option
3)
Billing Hourly Rate (Option
4)
ESP
Consultant(s)
B.4 Other Direct Costs (Estimated)
The Government estimates the following ODCs for each contract period. As ODCs cannot be defined at this time, these estimates will be used to evaluate the offeror's price
Period Total Other Direct Costs
Base Period $145,109
Option Period One $126,913
Option Period Two $133,121
Option Period Three $125,786
Option Period Four $106,362
Other Direct Costs Grand Total $637,290
Section C - Description/Specifications/Work Statement
Description/Specifications/Work Statement
STATEMENT OF WORK
ENVIRONMENTAL AND SOCIAL PERFORMANCE CONSULTANT(S)
A. Introduction The Millennium Challenge Corporation (MCC) is a U.S. Government corporation whose mission is to provide assistance that will support economic growth and poverty reduction in carefully selected developing countries that demonstrate a commitment to just and democratic governance, economic freedom, and investments in their citizenry. For more information on the MCC, please visit www.mcc.gov. On January 23, 2003, the United States established the Millennium Challenge Corporation (MCC), an innovative foreign assistance program designed to reduce poverty by promoting sustainable economic growth. MCC, a U.S. government corporation, is based on the principle that aid is most effective in countries that promote good governance, economic freedom, and investments in people. Key MCC operating principles relating to the award of grants include emphasis on economic impact, reward for performance, partnership with recipient countries, and focus on results. Eligible countries are invited to develop and submit grant proposals to MCC for consideration. MCC will seek to enter into a Compact for assistance with those countries that submit quality proposals for poverty reduction through economic growth. All proposed projects and activities are subjected to MCC's comprehensive project appraisal process prior to approval of a Compact, including the requirement for an environmental and social review. Once a Compact is signed and has entered into force, MCC continues to conduct reviews, analyses and assessments in consultation with the host country accountable entity and it's implementing partners on an as-needed basis to carry out post-Compact oversight responsibilities.
MCC recognizes that the pursuit of sustainable economic growth and a healthy environment are related. Economic growth that doesn't adequately address the associated risks of environmental degradation can leave the poor particularly vulnerable.
MCC's Environmental and Social Performance (ESP) team works with partner countries to integrate internationally-accepted principles of environmental and social sustainability into the design and implementation of compacts. In collaboration with MCC, partner countries are striving to achieve sustainable economic development through their compact-funded activities while at the same time minimizing environmental and social risks and enhancing environmental and social benefits.
MCC requires consultant services to support MCC's ESP team to assess environmental and social impacts, risks, and opportunities associated with the development, implementation, and closure of MCC-supported projects. MCC expects to award multiple contracts through this solicitation. Each contract may include a period of performance of up to five (5) years.
B. Scope The Consultant shall support MCC's ESP team members in their efforts to assess environmental and social impacts, risks, and opportunities associated with compact development, implementation, and closure. MCC expects to award multiple contracts through this solicitation. Each contract may include a period of performance of up to five (5) years.
C. Country Assignment
MCC shall require consultant services in MCC eligible countries – both threshold and compact.
D. Tasks
The Consultant may be asked to do any or all of the following tasks:
Due Diligence: The Consultant shall identify major environmental and social risks and opportunities associated with the investments being considered by MCC. The Consultant shall propose mitigation measures for any environmental and social risks/impacts identified, along with recommendations for enhancing project design and/or benefit streams from an environmental and social perspective. The Consultant will be requested to conduct site visits to proposed project areas and carry out a review of existing documentation to identify the range of relevant environmental and social issues potentially associated with the project. The Consultant will be expected to advise MCC on any additional environmental and social studies that maybe required as a part of MCC's due diligence and/or cost implications for assuming any of the Consultant's proposed mitigation or enhancement measures.
Compact Oversight: The Consultant shall assist MCC in conducting oversight of project implementation and performance from an environmental and social perspective. The Consultant shall advise MCC by conducting periodic (typically quarterly) visits to project sites and carry out desk reviews to provide assurance that funding should be continued and that projects are on track to meet agreed-upon specifications, schedules, milestones, and budgets related. Additionally, the Consultant shall assist in identifying potential unforeseen impacts of implementation and provide recommendations for resolution.
General Technical Advisory Support: In addition to above, the Consultant may be asked to provide general technical advisory support, including:
• Assist MCC in determining requirements and scope for Environmental and Social Management Systems (ESMS);
Environmental and Social Impact Assessments (ESIAs); other environmental analyses; and/or Environmental and Social Management Plans (ESMPs) under MCC Environmental Guidelines, MCC Gender Policy and international best practices;
• Review technical documents (e.g., preliminary design documents, feasibility and design studies, ESIAs, ESMPs, Health and Safety Plans, etc.) for compliance with the International Finance Corporation (IFC) Performance Standards and provide recommendations as necessary;
http://www.mcc.gov
• Assess the coverage or consistency of local environmental laws and regulations as compared to MCC Environmental Guidelines and international best practices;
• Provide guidance and oversight to MCA counterparts in environmental and social Program Management, QA/QC, construction works, FIDIC contracting and other similar topics;
• Provide appropriate guidance, tools, and assistance and, where necessary, help to strengthen institutional capacity and policies to integrate internationally accepted principles of environmental and social sustainability and social equity into the design and implementation of MCC-funded projects;
• Draft terms of reference (TOR) for ESIAs/ESMPs and other related studies, where such studies are required by
MCC;
• Provide technical input and support (1) in the development of a stakeholder engagement process that ensures that project design and mitigation programs incorporate stakeholder priorities and concerns, and (2) that facilitates the development of a stakeholder engagement plan;
• Review implementation plans and work plans developed by Country Teams and related implementing entities as they pertain to environmental, social and resettlement activities, providing advice to MCC in terms of the appropriateness of same, from a technical perspective. This advice will provide MCC with the information needed to make a decision on whether or not to approve the implementation plans for their subsequent execution;
• Review draft tender documents and contracts for consistency with MCC Environmental Guidelines and international best practices;
• Review proposal evaluation reports from technical panel and procurement agent;
• Review proposed implementing entity arrangements and cooperation agreements between the Core Team and other entities as they pertain to the projects;
• Review safety design features, recommendations and applicable programs;
• Review qualifications of key Core Team technical staff prior to their engagement;
• Provide general technical advice and assistance to MCC related to the proposed Compact;
• Perform evaluations on capacity of the Core Team, its implementing entities, and other stakeholders involved in Compact implementation and provide recommendations for capacity building and improvements where applicable;
• Provide general technical advice and assistance on the development and implementation of training programs on environmental and social management and IFC Performance Standards for Core Team, implementing entities, and others as necessary; and
• Other requirements specific to environment and social activities of the Compact as necessary.
E. Deliverables
The Consultant shall assist MCC in conducting project due diligence, appraisal and implementation oversight activities in MCC eligible countries as needed, and Washington, DC. The consultant shall provide services to MCC on a regular but intermittent basis, as required.
Acceptance Criteria
Deliverables will be evaluated according to the following criteria:
• Thoroughness and timeliness in complying with all of the elements in the tasks specified.
• Quality and clarity of analyses and work produced.
• Timeliness and efficacy of communications with relevant counterparts at MCC, MCA, and other relevant organizations.
• All reports are to be submitted in English in hard and electronic copy (in MS Word), with tables, data and calculations in MS Excel.
F. Period and Place of Performance All work shall be completed between the dates of the award through a one-year base period of performance, with four additional one-year options. The estimated level of effort is up to 3,480 hours for the first year with an estimated 15 trips and 2,300 hours per year for each option year with an estimated 15 trips per year. MCC anticipates this level of effort but does not guarantee this level of effort as it may increase or decrease.
The Consultant shall perform the tasks under this contract at his/her own facilities with occasional travel to MCC offices in Washington DC and eligible countries as requested.
G. Subcontracting The Consultant is authorized to subcontract data collection, data preparation, technical analyses (such as structural or maintenance), and related services as needed. The overall costs for subcontracting shall not exceed 25% of the Consultant's total negotiated unloaded direct labor cost.
H. Conflict of Interest The expert will be precluded from bidding on work and services (design, assessment, construction, and supervision) to be procured by the local accountable entity or using funds advanced under MCC work in the relevant country.
I. Timing and Reporting All formal communication with MCC, including reports, will be submitted to the COR/PM. The COR/PM for this requirement will be identified via separate correspondence.
The COR/PM will have technical responsibility for monitoring the contractor's performance. The COR/PM will review and evaluate the contractor's performance, and also will coordinate any communications with relevant counterparts and other donor agencies and organizations.
Any changes in the terms of the Call Order will be made in writing and approved by the Contracting Officer. No representation of the COR/PM shall serve as a basis for an alteration in the general scope of this Call Order or of the terms and conditions of the Call Order unless confirmed in writing by the Contracting Officer. The contractor must communicate with the Contracting Officer on all matters that pertain to the Contract terms. Proceeding with the work without proper contractual coverage could result in nonpayment for that work.
The designated Expert would be expected to coordinate with local authorities responsible for MCC Compact implementation as well as other donors, where relevant. However, designated Expert would report directly to the designated COR/PM.
J. Evaluation Factors
The Consultant(s) shall have a background appropriate to the tasks and output set out above should at least have:
Mandatory:
• Minimum fifteen (15) years of experience managing environmental and social risks and impacts in large infrastructure projects, specifically in the Energy, Transport and Water sectors.
• Detailed knowledge of the International Finance Corporation's Performance Standards on Environmental and Social sustainability in MCC partner countries. relevant experience applying.
• Proven experience carrying out site visits to project areas to verify projects are in compliance with the International Finance Corporation's Performance Standards on Environmental and Social sustainability and on track to meet agreed-upon specifications, schedules, milestones, and budgets related.
• Proven experience identifying major environmental and social impacts, risks, and opportunities associated with large infrastructure projects during project development/design and proposing mitigation measures as necessary.
• Proven experience providing recommendations for enhancing project design and/or benefit streams from an environmental and social perspective.
• Proven experience developing approaches/options to enhance sustainability and resiliency of project designs within an integrated project management framework, and translating those into scopes of work
• Experience providing training and developing guidance on environmental and social management systems, labor and working conditions, health and safety strongly preferred.
• Strong diplomatic and interpersonal skills required.
• Minimum qualifications: Bachelor's Degree in an environmental and/or social field.
• Excellent oral and written communication skills.
Preferred:
• Previous experience in with MCC project development and implementation
• Previous experience working in MCC eligible countries, especially countries targeted for this Scope of Work:
Lesotho, Tunisia, Ghana, Sierra Leone, Mozambique
• Advanced postgraduate degree (Masters or Ph. D) a plus.
11. Other requirements:
International travel is required. The Consultant may be requested to mobilize on a short notice and will be expected to deliver high quality finished products in a timely manner.
Section D - Packaging and Marking
Section E - Inspection and Acceptance Terms
Section F - Delivery or Performance
Line Item: 0001 Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address
5/9/22 5/8/23 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700
WASHINGTON
US 20005
Line Item: 1001 Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address
5/9/23 5/8/24 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700
Line Item: 2001
5/9/24 5/8/25 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700
Line Item: 3001
5/9/25 5/8/26 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700
Line Item: 4001
5/9/26 5/8/27 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700
Delivery or Performance
F.1 PLACE OF PERFORMANCE
The Consultant(s) shall perform the tasks under this contract at his/her own facilities with occasional travel to MCC offices in Washington DC and eligible countries as requested.
F.2 TASK AND DELIVERABLES
The Consultant(s) may be asked to do any or all of the following tasks:
Due Diligence: The Consultant shall identify major environmental and social risks and opportunities associated with the investments being considered by MCC. The Consultant shall propose mitigation measures for any environmental and social risks/impacts identified, along with recommendations for enhancing project design and/or benefit streams from an environmental and social perspective. The Consultant will be requested to conduct site visits to proposed project areas and carry out a review of existing documentation to identify the range of relevant environmental and social issues potentially associated with the project. The Consultant will be expected to advise MCC on any additional environmental and social studies that maybe required as a part of MCC's due diligence and/or cost implications for assuming any of the Consultant's proposed mitigation or enhancement measures.
Compact Oversight: The Consultant shall assist MCC in conducting oversight of project implementation and performance from an environmental and social perspective. The Consultant shall advise MCC by conducting periodic (typically quarterly) visits to project sites and carry out desk reviews to provide assurance that funding should be continued and that projects are on track to meet agreed-upon specifications, schedules, milestones, and budgets related. Additionally, the Consultant shall assist in identifying potential unforeseen impacts of implementation and provide recommendations for resolution.
General Technical Advisory Support: In addition to above, the Consultant may be asked to provide general technical advisory support, including:
• Assist MCC in determining requirements and scope for Environmental and Social Management Systems (ESMS);
Environmental and Social Impact Assessments (ESIAs); other environmental analyses; and/or Environmental and Social Management Plans (ESMPs) under MCC Environmental Guidelines, MCC Gender Policy and international best practices;
• Review technical documents (e.g., preliminary design documents, feasibility and design studies, ESIAs, ESMPs, Health and Safety Plans, etc.) for compliance with the International Finance Corporation (IFC) Performance Standards and provide recommendations as necessary;
• Assess the coverage or consistency of local environmental laws and regulations as compared to MCC Environmental Guidelines and international best practices;
• Provide guidance and oversight to MCA counterparts in environmental and social Program Management, QA/QC, construction works, FIDIC contracting and other similar topics;
• Provide appropriate guidance, tools, and assistance and, where necessary, help to strengthen institutional capacity and policies to integrate internationally accepted principles of environmental and social sustainability and social equity into the design and implementation of MCC-funded projects;
• Draft terms of reference (TOR) for ESIAs/ESMPs and other related studies, where such studies are required by
MCC;
• Provide technical input and support (1) in the development of a stakeholder engagement process that ensures that project design and mitigation programs incorporate stakeholder priorities and concerns, and (2) that facilitates the development of a stakeholder engagement plan;
• Review implementation plans and work plans developed by Country Teams and related implementing entities as they pertain to environmental, social and resettlement activities, providing advice to MCC in terms of the appropriateness of same, from a technical perspective. This advice will provide MCC with the information needed to make a decision on whether or not to approve the implementation plans for their subsequent execution;
• Review draft tender documents and contracts for consistency with MCC Environmental Guidelines and international best practices;
• Review proposal evaluation reports from technical panel and procurement agent;
• Review proposed implementing entity arrangements and cooperation agreements between the Core Team and other entities as they pertain to the projects;
• Review safety design features, recommendations and applicable programs;
• Review qualifications of key Core Team technical staff prior to their engagement;
• Provide general technical advice and assistance to MCC related to the proposed Compact;
• Perform evaluations on capacity of the Core Team, its implementing entities, and other stakeholders involved in Compact implementation and provide recommendations for capacity building and improvements where applicable;
• Provide general technical advice and assistance on the development and implementation of training programs on environmental and social management and IFC Performance Standards for Core Team, implementing entities, and others as necessary; and
• Other requirements specific to environment and social activities of the Compact as necessary.
The Consultant shall assist MCC in conducting project due diligence, appraisal and implementation oversight activities in MCC eligible countries as needed, and Washington, DC. The consultant shall provide services to MCC on a regular but intermittent basis, as required.
Acceptance Criteria
Deliverables will be evaluated according to the following criteria:
• Thoroughness and timeliness in complying with all of the elements in the tasks specified.
• Quality and clarity of analyses and work produced.
• Timeliness and efficacy of communications with relevant counterparts at MCC, MCA, and other relevant organizations.
• All reports are to be submitted in English in hard and electronic copy (in MS Word), with tables, data and calculations in MS Excel.
F.3 DOCUMENT OWNERSHIP AND INFORMATION MANAGEMENT SYSTEM REQUIREMENTS
All documents produced and/or collected by the contractor, electronic and hard copies, shall be the sole property of MCC. The Contractor shall establish and maintain a comprehensive electronic data base and reference index of all relevant documents reviewed, produced, and/or edited by the Contractor. Any and all such documents will be electronically compiled in usable form and delivered to MCC, in an organized electronic format acceptable to MCC, at the end of the contract, and if requested by MCC also in hard copies. The Contractor shall provide a document management system acceptable to MCC. MCC, at its sole discretion, may provide such system as SharePoint or similar in addition or in lieu of the Contractor's system. The Contractor shall abide by MCC required communication protocol including sharing information and reports with the MCC team, and/or other MCC consultants for efficient and timely reviews and communications as specifically requested.
F.4 ACCEPTANCE CRITERIA
The deliverables shall be evaluated according to the following criteria:
• Thoroughness and timeliness in complying with all of the elements in the tasks specified.
• High quality finished products in a timely manner, and clarity of analyses and work produced.
• Timeliness and efficacy of communications with relevant counterparts at MCC, MCA, and other relevant organizations.
• All reports are to be submitted in English in hard and electronic copy (in MS Word), with tables, data and calculations in MS Excel.
F.5 ESTIMATED LEVEL OF EFFORT AND TRAVEL
Base Period and Option Periods
Below is the estimated level of effort by labor category.
Estimated Level of Effort
Labor Category Hours (Base) Hours (Option 1)
Hours (Option 2)
Hours (Option 3)
Hours (Option 4)
ESP Consultant(s) 3,480 2,300 2,300 2,300 2,300
Estimated hours shall not exceed the total listed above.
Other Direct Costs
In the performance of this contract the contractor may incur expenses (ODCs) mainly associated with travel this may include domestic air fare, ground transportation, per diem etc. Information on ODCs and travel reimbursement is found in section B.
F.6 TECHNICAL DIRECTION
Performance of the work under this Purchase Order shall be subject to the technical direction of the COR/PM.
The term "technical direction" is defined to include, without limitation, the following:
a) Directions to the Contractor, which redirect the Purchase Order effort, shift work emphasis between work areas, require the pursuit of certain lines of inquiry, fill in details or otherwise serve to accomplish contractual requirements;
b) Provision of information to the Contractor, which assists in the interpretation of renderings, specifications or technical portions of the work description; and
c) Review and, where required by the Purchase Order, approval of reports, creative renderings, specifications, materials or technical information to be delivered by the Contractor to MCC under this Purchase Order.
Technical direction must be within the general scope of work stated in the contract. The COR/PM does not have the authority to, and may not, issue any technical direction which:
1) Constitutes the assignment of any additional work outside the general scope of the Task Order;
2) Constitutes a change as defined in the contract clause entitled, "Changes";
3) In any manner causes an increase or decrease in the total estimated Purchase Order costs, fixed fee, or time required for the Purchase Order performance; or
4) Changes any of the express terms, conditions or specifications of the contract.
All technical direction shall be issued in writing by the COR/PM; verbal direction, if necessary, shall be confirmed by the COR/PM in writing within five (5) working days after their issuance, with a copy to the Contracting Officer (CO). The Contractor shall acknowledge acceptance of the technical direction by submitting a letter of acceptance, via email or Fax, to the COR/PM and Contracting Officer. The technical direction will provide clear and concise instructions on tasks and deliverables requested of the Contractor's team, and designate the MCC technical contact with whom the Contractor should coordinate. The Contractor shall proceed promptly with the performance of technical directions duly issued by the COR/PM in the manner prescribed by this article and within his/her authority under the provisions of this article. If, in the opinion of the Contractor, any instruction or direction issued by the COR/PM is not within one of the tasks defined above, the Contractor shall not proceed, but shall notify the CO, in writing, within five (5) working days after receipt of any such instruction or direction and shall request the CO to modify the contract accordingly. Upon receiving such notification from the Contractor, the CO shall issue an appropriate Purchase Order modification or advise the Contractor, in writing, that in his/her opinion, the technical direction is within the scope of this article and does not constitute a change under the "Changes" clause of the Purchase Order. The Contractor shall thereupon proceed immediately with the direction given.
Section G - Contract Administration Data
Requesting Office Address
MCC-HQ
Millennium Challenge Corporation Contracts and Grants Management Division 1099 Fourteenth St NW, Suite 700 Washington DC 20005-3550 Phone: Fax:
Contact Details:
Property Administration Office Address
Millennium Challenge Corporation Contracts and Grants Management Division 1099 Fourteenth St NW, Suite 700 Washington DC 20005-3550
COTR Office Address
Millennium Challenge Corporation Contracts and Grants Management Division 1099 Fourteenth St NW, Suite 700 Washington DC 20005-3550
Issuing Office Address
Millennium Challenge Corporation Contracts and Grants Management Division 1099 Fourteenth St NW, Suite 700 Washington DC 20005-3550
MCC 52.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND/OR PROJECT MONITOR
(PM) (JULY 2012)
(a) The Contracting Officer may designate a Government representative to act as the Contracting Officer's Representative (COR) or Project Monitor (PM) to perform functions under the contract such as review and/or inspection and acceptance of supplies, services, including construction, and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the COR and/or PM and the Contractor. The designation letters will set forth the authorities and limitations of the COR and/or PM under the contract.
(b) Modifications to this contract are effective only if reduced to writing and executed by the Contracting Officer. The Contractor is specifically prohibited from performing any work that is outside the scope of this contract without the approval of the Contracting Officer. The Contracting Officer cannot authorize the COR or any other representative to sign documents (i.e., contracts, contract modifications, etc.) that require the signature of the Contracting Officer.
(End of clause)
MCC 52.245-70 CONTRACTOR ACQUIRED MCC GOVERNMENT PROPERTY OVERSEAS (JULY 2012)
Property and equipment (hereafter stated "property") that MCC Contractors (other than Personnel Service Contractors) acquire and for which they receive MCC reimbursement through the invoice process is Government (MCC) owned property.
Government property is to be used, monitored, and inventoried in accordance with FAR Part 45, Subpart 45.5 Management of Government Property in the Possession of Contractors, as well as MCC Policy 350, "Policies and procedures on Property, Plant, and Equipment." The contractor should start a running property inventory as soon as it begins to procure property and equipment the cost of which is charged back to the Government. The Contractor shall furnish a copy of such inventory to the COR semi-annually or at least as the contract is in its final stages of completion if its duration does not exceed six months.
Mandatory fields on the inventory include: The Contractor's Name; the Contractor Number; the Country Location and address location; a description of the item with model number serial number, and manufacturer; the acquisition date and cost; the Quantity; the expected life; and its condition at the time of the report. The contractor is responsible for removing US Government identification from property that is to be abandoned.
(End of Clause)
MCC 52.203-70 CONTRACTOR NON-DISCLOSURE AGREEMENT (MAY 2017)
All contractor employees or independent contractors engaged in this contract shall provide a non-disclosure agreement as follows signed by the individual contractor/consultant and, if a contractor employee, by the contractor's contract administrator:
NON-DISCLOSURE AGREEMENT
I, _________ do solemnly swear (or affirm) that I will not divulge any information, whether obtained orally or in writing from, or data maintained by the Millennium Challenge Corporation (MCC) to any unauthorized person for any purpose. I will not directly or indirectly use, or allow the use of Confidential Information for any other purpose other than that directly associated with my officially assigned duties for MCC.
Further, I will not directly or indirectly reveal or cause to be revealed the nature or content of any _________, except to authorized personnel.
I am aware that the unauthorized use of information may be a violation of law and this Agreement.
Company or Subcontractor
Understand that authorized persons refer only to persons assigned to a project requiring access to Confidential Information or directly in the line of management over the project requiring access to the data.
[signatory]
Contract Administrator Date
MCC 52.204-72 COVER LETTER REQUIREMENTS AND IDENTIFICATION OF POINTS OF CONTACT
(NOV 2019)
Offerors/quoters must provide a Cover Letter signed by an individual authorized to commit the company to the quote/proposal. The cover letter must include the Offeror/Quoter's Business Entity Name, Address, Point of Contact, Phone Number, Email and DUNS number and identify all enclosures included in the quote/proposal. In addition, the Offeror/quoter must identify the company's anticipated Contractor Performance and Assessment Reporting System (CPARS) Contractor Representative, to include the individual's full name, telephone number and email address. The letter shall reference the solicitation number and acknowledge that it transmits an offer in response to the solicitation and amendment(s).
It shall state: Quote validity for 90 days after submission.
(End of Clause)
MCC 52.243-70 INCREASE IN SERVICES (OCT 2006)
The services described in Sections B and C (statement of work) represent the Government's best estimate for known requirements at this time. However, due to the uncertainty of the work, the Government reserves the right to add or delete services if the need arises.
52.204-71 MCC 52.204-71 NOTICE OF MCC ELECTRONIC MAIL FILTERS (JUNE 2019)
Offerors and other interested parties are hereby notified that the Millennium Challenge Corporation utilizes electronic mail filters for security purposes that may block certain messages from unknown or suspicious senders and certain potentially malicious file types. As such, the following information and guidance is provided:
a) General Inquiries, Questions, and/or Submission of Quotes/Proposals. As unrecognized or unknown senders may be blocked by MCC's email security measures, Offerors and interested parties are advised of the following:
1. Offerors and interested parties must conform to any submission instructions included in this solicitation or notice, including referencing any solicitation or notice number(s) identified in the subject line of any communications regarding it to minimize the chance that the message will be identified as spam or as a suspicious message.
2. MCC considers Offerors and interested parties responsible for confirming with MCC personnel that messages containing such communications, including general inquiries about MCC solicitations, questions regarding MCC solicitations, and electronic submissions of quotes or proposals have been received.
3. As a general practice, MCC acknowledges receipt of inquiries about a solicitation, questions about a solicitation, or submission of quotes/proposals in writing, so if such an acknowledgement has not been received, then the offeror or interested party should contact MCC directly for confirmation of receipt.
4. This verification should be completed by contacting MCC personnel identified directly in this solicitation or notice regarding the inquiry, question, or quote/proposal via telephone number if a confirmation of receipt or acknowledgement is not returned by MCC personnel. As such, Offerors and interested parties, if submitting questions or quotes/proposals that are time-sensitive, must provide sufficient time to contact MCC and verify receipt prior to any quotation/proposal/question due date.
b) Blocked and Unacceptable File Types. Offerors and interested parties are advised that due to current cybersecurity threats, MCC currently blocks attachments containing extensions that run programs. These include any files that contain or are executables, macros, and other extensions that present a threat. As such the Offeror must not use any of these file extensions and remove all macros from Microsoft Office documents (Word, Excel) or their inquiry, question, or quote/proposal will be blocked, preventing receipt of the message by MCC and potentially preventing the Offeror from being considered for award. The following are examples of file types that are blocked, however this list is not exhaustive or fully-inclusive as additional, similar file types may be blocked in the future:
.vbs (Microsoft visual basic scripting)
.vbe (VBScript Encoded Script File)
.scr (script)
.reg (registration file)
.jar (java file extension)
.exe (executable)
.docm (word with macros)
.xlsm (excel with macros)
.pptm (powerpoint with macros)
.app (executable)
.ani (animation files)
.ace (data compression archive file format used by WinAce)
.ico (image file format)
.js (java script)
.zip (compression file)
52.242-70 MCC 52.242-70 CONTRACTOR PERFORMANCE ASSESSMENT RATING SYSTEM
(CPARS) REGISTRATION (NOV 2019)
The Millennium Challenge Corporation (MCC) utilizes the Contractor Performance Assessment Rating System (CPARS) to evaluate contractor performance (see FAR, Subparts 42.1502 and 42.1503). Contractors doing business with MCC are required to register in CPARS accessible via the Internet at: http://www.cpars.gov. An evaluation of contractor performance using the CPARS is mandatory for all contract actions exceeding the simplified threshold, but may be conducted for contract actions lower than that amount should significant events occur such as a contract termination or extraordinary contract performance by the contractor. Inquiries regarding the registration process should be addressed to the CPARS help desk.
The email address is WEBPTSMH@NAVY.MIL and the telephone number is (207) 438-1690. As part of this process, the contractor must determine who will serve as their CPARS "Contractor Representative" in the CPARS system. If, at any time, the contractor makes a determination that their CPARS Contractor Representative needs to change to a different individual, the contractor must contact MCC via email at the address CPARS@mcc.gov to notify MCC of the change so that appropriate action can be taken by MCC's CPARS Focal Points to ensure that the contractor receives timely notification of their evaluation. Failure to do so may result in the contractor not receiving their evaluation in a timely manner and may result in the contractor not receiving the opportunity to provide comments in response to MCC's evaluation. The email notification to CPARS@mcc.gov must contain the following information:
1. Name and email address of previous CPARS Contractor Representative
2. Name and email address of new CPARS Contractor Representative
3. Contract and order number (if applicable) of each affected contract that the contractor has with MCC.
MCC 52.232-74 ODC REIMBURSEMENT (JAN 2007)
Other Direct Charges (ODCs) will be reimbursed for direct costs as provided in the contract and/or task order. To be reimbursed, invoices including ODCs, must provide a detailed breakdown of the actual expenditures invoiced. The contractor shall maintain the original or legible copy of receipts for all ODCs invoiced. MCC reserves the right to request evidence of any ODC reimbursed. To assure timely reimbursement of ODC's, the contractor is strongly encouraged to submit charges within 45 days of the expense.
MCC 52.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST: PRECLUSION FROM IMPLEMENTATION
CONTRACT (JULY 2012)
Work under this contract may call for the Contractor to furnish important services in support of the design or feasibility of specific activities that may become part of a Millennium Challenge Corporation (MCC) Compact. In accordance with the principles of FAR Subpart 9.5, THE CONTRACTOR MAY BE INELIGIBLE TO FURNISH, AS A PRIME OR SUBCONTRACTOR OR OTHERWISE; THE IMPLEMENTATION SERVICES FOR ANY ACTIVITIES FOR WHICH IT PROVIDES SUBSTANTIAL DESIGN SERVICES EXCEPT FOR SUCH SERVICES THAT MAY BE FURNISHED UNDER THIS CONTRACT. If a determination is made that the contractor is ineligible for implementation services, the MCC Managing Director of Contracts and Grants Management may authorize a waiver (in accordance with FAR 9.503) if the Director determines that preclusion of the Contractor from the implementation contract would not be in the Government's best interest.
MCC 52.204-70 SECURITY REQUIREMENTS FOR CONTRACTOR PERSONNEL - FEBRUARY 2019
A. Compliance with MCC Safety and Security Regulations at MCC Headquarters
1. Personal services contractors (PSCs) and contract employees including those working for subcontractors shall be subject to and abide by all MCC safety and security policy and procedures while on MCC premises, and satisfy applicable requirements for fitness to perform work for or on behalf of MCC, personnel security, and obtaining an MCC Photo Identification (ID) Badge.
2. MCC may impose applicable criminal, civil and/or administrative sanctions, including removal, suspension, termination or suspension of access to information, information systems, or MCC facilities, against any PSC or contractor employee who fails to adequately protect classified national security information or sensitive information, including such information designated as Controlled Unclassified Information, from unauthorized disclosure. The sanctions imposed are under the authority of the applicable laws, regulations, Government-wide and MCC policies.
B. PSC and Contract Employee Fitness and MCC Photo ID Badge Requirements
1. The following are requirements for a PSC or contractor employee who works under this contract and requires access to any of the following: MCC Headquarters, MCCNet, Sensitive But Unclassified (SBU), Foreign Government Information (FGI) or any other designated sensitive information (such as classified national security information and Controlled Unclassified Information under 32 CFR Part 2002).
a. Such an individual must be:
i. A U.S. citizen or have Permanent Resident Status in the U.S;
ii. Screened for fitness to work for or on behalf of MCC;
iii. Determined by MCC to be fit to work for or on behalf of MCC; and
iv. Determined eligible to be issued an MCC Photo Identification Badge.
b. In addition, if the individual is not a U.S. citizen for or in a position designated as moderate or high risk (i.e., a public trust position), the individual must have been residing, working and/or attending an educational institution in the U.S. for at least three, years.
c. MCC may allow such an individual to perform services under this contract based on: (1) a favorable suitability/fitness screening as an interim fitness determination, and (2) a favorable interim credentialing determination for issuance of an MCC Photo ID Badge, as applicable. An interim fitness determination does not satisfy requirement a. iii.) of this paragraph, and an interim credentialing determination does not satisfy requirement a. iv.) of this paragraph.
d. An investigation for an individual's fitness will be required to satisfy requirement a. iii.) except whenever the individual already has an investigation on file that meets the requirements for an investigation based on all applicable position designation(s) for the individual that satisfies/satisfy guidelines issued by the Suitability and Credentialing Executive Agent (SuitCredEA), the Security Executive Agent (SecEA) and the individual has been working for or on behalf of a Federal agency continuously for at least one year in one or more Federal positions or as a contractor employee that was/were subject to suitability or fitness investigation satisfying guidelines issued by the Suitability and Credential Executive Agent. However, no exception to the investigation requirement will be granted whenever MCC obtains new information in connection with the individuals that calls into question the individual's fitness under the criteria for suitability in 5 CFR 731.202. The investigation required will be based on position designation performed by MCC in accordance with 5 CFR 731 and 5 CFR 1400.
2. PSCs and contractor employees for or in public trust positions are subject to reinvestigation for fitness within the timeframe specified by the SuitCredEA.
3. A PSC or contractor employee whose position risk designation increases due to reassignment or change in job duties or responsibilities, is subject to the fitness investigation requirements for the higher risk position at the time the position designation is changed. If the position with the higher risk designation is the same one occupied by the individual, the individual may remain in the position while the investigation is being conducted; otherwise, the individual may not perform services under this contract in the new capacity until the requirements of B.1. of this clause are satisfied. Any upgrade in the investigation required for the new risk level will be initiated by MCC within 14 calendar days of the reassignment or change in job duties or responsibilities.
4. Fitness determinations will be made by MCC using the criteria and guidelines for making suitability determinations in 5 CFR 731.202 and related guidelines of the SuitCredEA. When no new investigation is required, MCC may determine an individual unfit when the investigative record on file for the individual shows conduct that is incompatible with the core duties of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .