04f Asbestos and Lead Based Paint Survey Report_R-000509-0045-4.pdf
PDF 1 KB Posted
- Solicitation number
- CB-2026-0061
- Issued by
- Texas
About this file
This is an Asbestos and Lead Based Paint Survey Report associated with the City of Houston's 69th Street Wastewater Treatment Plant Oxygen Plant Replacement project in Texas. The survey report appears to document the presence and assessment of asbestos and lead-based paint materials at the project site, which is a critical environmental compliance component for the demolition and construction activities planned for the facility replacement. The report provides baseline hazard identification necessary to inform safe demolition procedures and worker protection protocols during the removal of existing infrastructure at the 69th Street WWTP facility.
The survey findings are essential for contractors bidding on this project, as they establish the scope of hazardous material abatement and remediation required prior to and during construction. Contractors must account for the costs associated with proper handling, removal, and disposal of any identified asbestos and lead-based paint materials in their bid submissions. This environmental assessment ensures compliance with applicable federal, state, and local regulations governing hazardous materials in construction and protects project workers and the surrounding community during the oxygen plant replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
You need to enable JavaScript to access www.beaconbid.com
File details come from the government source that posted it. Updated .