042518-Schedule B - Pricing-(US-131).docx
DOCX document 39 KB Posted
- Attached to
- Concrete patch Supplies-Kalamazoo-US-131
- Solicitation number
- RFP 591 180000002361 1
- Issued by
- Kalamazoo County, Michigan
About this file
This is a pricing schedule (Schedule B) for a State of Michigan Request for Proposal (RFP) No. 071I for concrete patch supplies on northbound and southbound US-131, south of Schoolcraft city limits, between South Street and St Joseph County line. The proposal requires contractors to submit pricing for four distinct line items: 10 five-gallon pails of curing compound (white topping), 3,500 epoxy-coated smooth dowels measuring 1¼" x 18", 300 tubes of two-part epoxy with nozzles (53 ounces each), and 500 one-inch dowel caps (metal crimp type). All products must comply with MDOT 2012 Standard Specifications for Construction as referenced in the document. Contractors are required to submit pricing schedules in modifiable formats such as Microsoft Word or Excel, with the option to provide an additional non-modifiable format such as PDF.
Pricing proposals must include all costs associated with contract activities, including one-time or setup charges, fees, shipping and handling, per-piece pricing, and palletizing. The State encourages contractors to offer quick payment discount terms, which should be specified as a percentage discount off the invoice if paid within a stated number of days following receipt of the invoice, excluding processing time. Contractors must certify that all prices were determined independently without consultation, communication, or agreement with other contractors. The specific brand requirement applies only to the two-part epoxy (Adhesive Technologies Ultrabond Dowel Cap), while the remaining items specify no brand preference, allowing contractors flexibility in product selection provided specifications are met.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 042518-Proposal Instructions and Vendor Questions Worksheet (US-131).docx | DOCX document | |
| 030718-Schedule A - Statement of Work (US-131).docx | DOCX document | |
| 042518-Standard Contract Terms (US-131).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enter company name here.
STATE OF MICHIGAN
Request For Proposal No. 071I (proposal title/description)
SCHEDULE B
PRICING
Concrete Patch Supplies Northbound and Southbound US-131, south of Schoolcraft city limits, between South Street and St Joseph County line
1. The Contractor must provide a pricing schedule for the proposed Contract Activities using _Word/Excel____. The pricing schedule should be submitted in a modifiable format (e.g.. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
3. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.
Quick payment terms: ________ % discount off invoice if paid within ________ days after receipt of invoice.
4. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
| ITEM |
| QUANTITY |
| SIZE |
| BRAND SPECIFIC Yes/No |
| BRAND / PRODUCT |
PRICE
Curing Compound (commonly known as “White Topping) see MDOT 2012 Standard Specifications for Construction: Section 903.06 located at https://www.michigan.gov/mdot/0,4616,7-151-9622---,00.html
| 10 ea |
| 5 gallon pail |
| NO |
Epoxy coated smooth dowel see MDOT 2012 Standard Specifications for Construction: Section 914.07, part A located at https://www.michigan.gov/mdot/0,4616,7-151-9622---,00.html
| 3500 ea |
| 1/1/4” x 18” ea |
| NO |
Two Part Epoxy with nozzles
| 300 ea |
| 53 ozs tube |
| YES |
| Brand: Adhesive Technologies |
Product: Ultrabond
Dowel Cap, metal crimp type : see MDOT 2012 Standard Specifications for Construction: Section 914.07, part C. located at https://www.michigan.gov/mdot/0,4616,7-151-9622---,00.html
| 500 |
| 1 ¼” ea |
| NO |
Version 1 Revised Date: 7/28/2017
File details come from the government source that posted it. Updated .