040ADV-24-R-0005-C0003.pdf
PDF 2 MB Posted
- Attached to
- ROLL-UP DOORS REPLACEMENT
- Solicitation number
- 040ADV-24-R-0005
- Issued by
-
Government Publishing Office
About this file
This document is a contract modification for Solicitation 040ADV-24-R-0005 for the Roll-Up Doors Replacement project at the U.S. Government Publishing Office (GPO) facilities. The purpose of this modification is to attach the updated answered questions and answers (Q&A) sheets as Attachment 7.
The key details are:
- The solicitation is for the replacement of multiple existing roll-up doors of various sizes and types throughout the GPO facilities.
- Temporary barriers will be required at the door openings during the removal and reinstallation process, with specific requirements outlined.
- A fire protection engineer stamp is required for the overhead door shop drawings, but a fire protection engineer is not required for the overall project.
- The roll-up doors must be fire-rated as specified in UFGS 08_33_23 Overhead Door Specifications Guidance, with the necessary hardware and accessories to comply with NFPA 80 Standard for Fire Doors and Other Opening Protectives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 040ADV-24-R-0005-C0002.pdf | ||
| 040ADV-24-R-0005 Ver 6. Dated 03MAY2024.pdf | ||
| 040ADV-24-R-0005-C0001.pdf | ||
| 040ADV-24-R-0012 Ver 6. Dated 15MAR24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. AMENDMENT/MODIFICATION NO.
040ADV-24-R-0005-C0003
CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Same As Issuing Office
1 1
040ADV-24-R-0005
9B. DATED (SEE ITEM 11)
04/08/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
CODE
(X)
PAGE OF PAGES
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMENDMENT CONTROL NUMBER : 040ADV-24-R-0005
SUMMARY OF CHANGES : The purpose of this modification is to attach the attachment 7 - Updated Answered Q&A Sheets.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
(Signature of person authorized to sign)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
07 May 2024
GPO _ Rollup Doors Replacement _ RFI#2 Response
1) Please provide the drawings that were shown at the 4/11/24 walkthrough.
Please refer to the drawing attached at the bottom of this document.
2) Will temporary barriers be required at the door openings during the removal and reinstallation process? If so, please provide requirements for the temporary barriers. Most specifically for the doors on the building exterior.
Yes, temporary barriers will be necessary at the door openings. The purpose of these barriers is to ensure safety and to minimize any potential hazards during the replacement process. Here are the requirements for the temporary barriers:
• The barriers must be sturdy and securely anchored to prevent any accidental displacement
• They should extend to a sufficient height to block access to the work area and prevent unauthorized personnel from entering.
• Clear signage indicating the presence of construction work and potential hazards should be displayed on the barriers.
• The barriers should be easily removable to facilitate the movement of equipment and materials during the replacement process.
• Additionally, it's essential to ensure that the barriers comply with any relevant safety regulations and guidelines.
3) Per Evaluation Factor (2), please confirm a fire protection engineer is not required on this project. Please confirm the overhead door shop drawings are requiring a fire protection engineer stamp.
Based on Evaluation Factor (2), a fire protection engineer is not required for this project.
However, for the overhead door shop drawings, it's necessary to have a Licensed
Registered Engineer sign them.
4) Please confirm which doors, if any, are to be fire rated and the required rating.
Please confirm where in the statement of work indicates that all rollup doors on the list are to be fire rated. What is the fire rating?
Sorry for the oversight regarding the fire rating details for the new roll-up doors in the statement of work. In response to RFI#1, GPO has included UFGS 08_33_23 Overhead
Door Specifications Guidance. Please refer to section 2.2.6.1 for information on Fire
Ratings, which specifies the need to provide fire-rated door assemblies compliant with
NFPA 80 Standard for Fire Doors and Other Opening Protectives. The fire doors must be equipped with necessary hardware, accessories, and automatic closing devices as mandated by NFPA 80.
U.S. GOVERNMENT PUBLISHING OFFICE
PLANT OPERATIONS / FACILITIES ENGINEERING DIVISION
732 North Capitol Street NW, Washington, DC 20401
Attachment 7 - Updated Answered Q&A Sheets
SMOKING
SHED
LUMBER
SHED
DRUM STORAGE
I:-"--@
0 ---@ "' co Bl 31
B I 34 ________/;;\ l}=====,----0 Bl35
SALT BIN
ornocse I -;-@ B I 3&;------(z) llo===!
FUTURE
HAZARDOUS
WASTE
BUILDING
CAPITOL HILL
POLICE STORAGE
.... .....,.._.Bl4OB
Bl40A
Bl40
Bl44-
G5 G ST. !!a!!"' STORAGE BUILDINGS NOT Bi 18
~:~ SHOWN ON I ST FLOOR PLAN z 1
Bl37
BIS~--@
EL.27
j=----0
Uj Uj tn
....__1---12
Attachment 7 - Updated Answered Q&A Sheets dcheung Highlight dcheung Highlight dcheung Highlight dcheung Rectangle
Attachment 7 - Updated Answered Q&A Sheets hvo Rectangle hvo Rectangle hvo Rectangle hvo Rectangle hvo Rectangle hvo Rectangle hvo Rectangle hvo Rectangle
File details come from the government source that posted it. Updated .