PDF 7 MB Posted
- Attached to
- Upcut Safety Saw, OMGA T521ST 18"
- Solicitation number
- 040ADV-24-Q-0012
- Issued by
-
Government Publishing Office
About this file
This statement of work outlines the requirements for an upcut safety saw procurement for the Carpentry Branch of the Government Publishing Office. The contractor shall deliver and install an OMGA T521ST 18-inch upcut safety saw with 280V, 3-phase power supply, along with a 12-foot infeed and outfeed table with back fence, OMGA stop 6 left-hand support table, double bracket, and safety link kit. The contractor must also provide training to GPO employees on safety and operational features, and deliver an 18-inch x 1/8-inch ATB blade and an 18-inch x 1/8-inch TCG blade. Upon completion of delivery, installation, and training, the GPO will accept the equipment and make full payment to support fiscal year 2023 needs. The related federal contract opportunity is solicitation 040ADV-24-Q-0012 for an upcut safety saw from the OMGA T521ST 18-inch model through the Government Publishing Office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 040ADV-24-Q-0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
GPO Carpentry Branch Equipment Purchase
Upcut Safety Saw
1.0 BACKGROUND
The U.S. Government Publishing Office (GPO) Facility Division Carpentry Branch, would like to purchase an Upcut safety saw. This saw provides safety features to the operator, when cutting wood materials, in the fabrication process of all project construction duties assigned to the Carpentry Branch.
2.0 OBJECTIVE
The objective of this procurement is to obtain the proper equipment needed to support the many fabrication tasks the Carpentry Branch will need to support building maintenance and production requirements. This saw is needed to upgrade the Carpentry Branch workspace to adhere to the government safety guidelines for use of this type of machinery. This saw will also enhance the efficiency and quality during production of customer products.
3.0 SCOPE
The Contractor shall deliver and Install (1) new Upcut saw and the supporting equipment and supplies listed in the in the 5.0 "Deliverables" section below. This installation will occur in a specific location within the Carpentry Branch, located in GPO Main in Washington, D.C... All units provided under this procurement shall meet the technical requirements listed below. The contractor shall provide all labor, equipment, assembly, materials, management, supervision and other associated services (i.e. delivery, installation and demonstration) necessary to fulfill the Upcut saw maintenance needs and requirements and to supply and deliver the items listed above.
This equipment is in support of FY-23 and full payment will be made once all equipment is installed, operational, and all employee training is completed to GPO acceptance.
Attachment 1
040ADV-24-Q-0012
sgorgas Cross-Out
5.0 DELIVERABLES
The contractor shall deliver the following: (the deliverables come from the tasks that the contractor is performing.
5.1 Deliver and install (1) OMGA T521ST 18" Upcut Safety Saw, 280V, 3 Phase to GPO Main.
5.2 Deliver and install (1) 12' infeed and outfeed table with back fence.
5.3 Deliver and install (1) OMGA stop 6 left hand support table for OMGA stop.
5.4 Deliver and install (1) double bracket for OMGA stop.
5.5 Deliver and install (1) safety link kit for OMGA stop.
5.6 Deliver and install (1) 18" x 108th ATB blade.
5.7 Deliver and install (1) 18" x 108th TCG blade.
5.8 Train GPO employees /operators on Safety and operational features of the system.
4.0 TASKS
4.1 GPO will purchase (1) OMGA T521ST 18" Upcut Safety Saw, 280V, 3 Phase to GPO Main.
4.2 GPO will purchase (1) 12' in-feed and out-feed table with back fence.
4.3 GPO will purchase (1) OMGA stop 6 left hand support table for OMGA stop.
4.4 GPO will purchase (1) double bracket for OMGA stop.
4.5 GPO will purchase (1) safety link kit for OMGA stop.
4.6 GPO will purchase (1) 18" x 108th ATB blade.
4.7 GOPO will purchase (1) 18" x 108th TCG blade.
4.8 The vendor will train GPO employees /operators on Safety and operational features of the system.
Attachment 1
040ADV-24-Q-0012
6.0 OTHER
6.1 GPO will escort the vendor on day of delivery
6.2 GPO will provide access to the loading dock, Jackson Alley and the Operation floors.
6.3 GPO Electrical Branch shall provide the proper power requirements to support the installation of this equipment.
6.4 Industrial Truck Info Link Monitoring System to be maintained yearly or monthly via 9912 Facilities Maintenance Funds
Attachment 1
040ADV-24-Q-0012
File details come from the government source that posted it. Updated .