040ADV-26-R-0022-C0002 (Approval).pdf
PDF 556 KB Posted
- Solicitation number
- 040ADV-26-R-0022-C0002
- Issued by
-
Government Publishing Office
About this file
This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the General Services Administration (GSA) General Services Officer on April 30, 2026. The amendment (040ADV-26-R-0022-C0002) modifies the solicitation 040ADV-26-R-0022, dated October 10, 2026, and is associated with requisition number PR-26-GPO-2550. The amendment is not extending the receipt deadline for offers.
The substantive change in this amendment is limited in scope: all prospective contractors are being provided a copy of the site visit sign-in sheet as Attachment 2. The contracting officer, Troy D. White, Supervisory Contracting Officer, notes that contractors are not required to sign and return the amendment document. All other terms and conditions of the original solicitation remain unchanged and in full force and effect. Offerors must acknowledge receipt of this amendment prior to the offer deadline through one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each copy of their submitted offer, or sending separate written or electronic communication referencing the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2- Site Visit Sign In Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 040ADV-26-R-0022-C0002 |
| Code[0]: GPO |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Troy D. White, Supervisory Contracting Officer |
| Description[0]: Amendment Control Number: 040ADV-26-R-0022 |
Summary of Changes: All Prospective contractors, the purpose of this amendment is to provide a copy of the site visit sign-in sheet as Attachment 2.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: GPO |
732 North Capitol St NW Washington, DC, 20401, US
| NameandAddress[0]: | |
| AdministeredBy[0]: | |
| ContractIDCode[0]: | |
| ReqNumber[0]: PR-26-GPO-2550 | |
| AmendmentNo[1]: 040ADV-26-R-0022 | |
| ModificationNo[0]: | |
| ProjectNo[0]: | |
| Page[0]: 1 | |
| Pages[0]: 1 | |
| EffectiveDate[0]: 04/30/2026 | |
| Dated9B[0]: 04/10/2026 | |
| Dated10B[0]: | |
| CheckBox9[0]: 1 | |
| CheckBox10[0]: Off | |
| CheckBox11[0]: 1 | |
| CheckBox13A[0]: Off | |
| CheckBox13B[0]: Off | |
| CheckBox13C[0]: Off | |
| CheckBox13D[0]: Off | |
| IsNot[0]: 1 | |
| Is[0]: Off | |
| Extended[0]: Off | |
| NotExtended[0]: 1 | |
| 2026-04-30T15:00:47-0400 | |
| Troy D. White |
| DateSigned[0]: |
| DateSigned[1]: 04/30/2026 |
| Copies[0]: |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .