040ADV-26-R-0019_FINAL.pdf

PDF 846 KB Posted

Attached to
Inspecting, Cleaning, and CIPP Rehabilitation of Under-Slab Sanitary Sewer Pipelines in the Building D Basement
Solicitation number
040ADV-26-R-0019
Issued by

About this file

Request for Proposal (RFP) Summary

This RFP is a firm fixed-price solicitation issued by the Government Publishing Office (GPO) for inspection, cleaning, and cured-in-place pipe (CIPP) rehabilitation services for under-slab sanitary sewer pipelines in Building D basement at GPO's main campus in Washington, DC. The contractor must remove blockages and rehabilitate approximately 510 linear feet of 3"–4" cast iron sanitary sewer pipes using CIPP lining technology or a more efficient alternative method. All work must be completed within eight (8) weeks or 56 days from Notice to Proceed. The solicitation number is 040ADV-26-R-0019, with a proposal due date of April 17, 2026 at 5:00 PM EST. A mandatory site visit is scheduled for March 11, 2026 at 10:00 AM EST at 732 North Capitol Street NW, Washington, DC. The deadline for submitting questions is March 18, 2026 at 5:00 PM EST.

The project scope includes pre- and post-CCTV inspection, hydro-jetting and descaling of all 510 linear feet of cast iron piping, excavation of at least two access pits (4 ft x 4 ft x 4 ft), Ground Penetrating Radar (GPR) scanning, CIPP liner installation with thermal or UV curing, post-CIPP inspection and flow testing, concrete restoration with #57 stone and high-early concrete, and project management with daily progress updates via Smartsheet. Key personnel required include a Project Manager (5 years experience), Lead Technician (5 years experience), Technician (3 years experience), Quality Control Lead (5 years experience), and Safety Lead (5 years experience). Proposals must demonstrate technical acceptability through a Lowest Price Technically Acceptable (LPTA) evaluation process, with award to the responsible offeror offering the lowest price among technically acceptable proposals. The contractor must provide a 12-month warranty on materials, labor, and workmanship, with all defective work to be repaired or replaced at no cost to the Government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31b. NAME OF CONTRACTING OFFICER (Type or print) 30c. DATE SIGNED

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

1. REQUISITION NUMBER

PR-26-GPO-2186

PAGE 1 OF 4 8

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

040ADV-26-R-0019

6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

WHITE, TROY D

b. TELEPHONE NUMBER (No collect calls)

8.

OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY CODE GPO 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 0 % FOR:

GPO

732 North Capitol St NW Washington, DC, 20401, US

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

8(A)

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

13b. RATING

14. METHOD OF SOLICITATION REQUEST

UNLESS BLOCK IS MARKED

SEE SCHEDULE

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

FOR

PROPOSAL

(RFP)

15. DELIVER TO

See Schedule

CODE 16. ADMINISTERED BY CODE

Same As Issuing Office

GPO

17a. CONTRACTOR/

OFFEROR

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

OFFER BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print)

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31c. DATE SIGNED

02/27/2026

04/17/2026 5:00 PM EST

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT

COMPLETE PARTIAL FINAL

37. CHECK NUMBER

PARTIAL FINAL

STOCK RECORD (S/R) 40. PAID BY

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

42a. RECEIVED BY (Print)

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 11/2021) BACK

040ADV-26-R-0019

TABLE OF CONTENTS:

Section B - Supplies or Services and Prices/Costs

Section C - Description/Specifications/Work Statement

Section D - Packaging and Marking: None

Section E - Inspection and Acceptance Terms

Section F - Delivery or Performance

Section G - Contract Administration Data

Section H - Special Contract Requirements

Section I - Contract Clauses

Section J - List of Documents, Exhibits, and other Attachments

Section K - Representations, Certifications, and Other Statements of Offerors

Section L - Instructions, Conditions and Notices to Offerors

Section M - Evaluation Factors for Award

Section B - Supplies or Services and Prices/Costs

B.1 CONTRACT TYPE

The Government Publishing Office intends to issue a firm fixed price contract for the inspection, cleaning, and cured-in-place pipe (CIPP) rehabilitation of under-slab sanitary sewer pipelines in the Building D basement at the agency’s main campus in Washington DC.

The successful offeror will remove blockages and rehabilitate approximately 510 linear feet of 3”–4” cast iron sanitary sewer pipes.

B.2 Period of Performance

All work shall be completed and delivered in approximately eight (8) weeks or 56 days from Notice to Proceed

(NTP). The exact period of performance will be determined after award.

Item Number Base Item

Number

Supplies/Services Quantity Unit

0001 Inspecting, Cleaning and CIPP

Rehabilitation of Under-Slab

Sanitary Sewer Pipelines in the

Building D Basement

1 EA

Contract Type: Firm Fixed Price

Unit Price

Extended Price

Description:

Purchase Requisitions PR-26-GPO-2186

[END OF SECTION B]

Section C - Description/Specifications/Work Statement

STATEMENT OF WORK

INSPECTING, CLEANING AND CIPP REHABILITATION OF UNDER-SLAB SANITARY SEWER

PIPELINES IN THE BUILDING D BASEMENT

1. BACKGROUND

The U.S. Government Publishing Office (GPO) provides publishing and dissemination services for official and authentic government publications to Congress, federal agencies, federal depository libraries, and the American public. GPO is experiencing recurring backup and drainage issues in the sanitary sewer pipeline beneath the basement of Building D, affecting both the east and west storm drain systems. To address this, GPO recently conducted a Drain and Sanitary Sewer Pipes Assessment in the Building D basement, performed by a qualified contractor. The drain system and sanitary sewer pipes on both the east and west sides of the basement were inspected using closed-circuit television (CCTV). The report revealed significant structural deterioration and operational blockages. The inspection identified critical issues, including multiple blockages, spalling, joint separation, corrosion, and debris buildup.

The purpose of this Statement of Work is to seek a contractor capable of removing the blockages and rehabilitating approximately 510 linear feet of 3”–4” cast iron sanitary sewer pipes using the Cured-In-Place Pipe

(CIPP) lining method or a more efficient and effective alternative.

2. OBJECTIVES

The objective of this contract is to restore the structural integrity and operational functionality of the under-slab sanitary sewer system, prevent collapse, restore flow, and extend the useful life of the existing piping system with minimal disruption to facility operations. The Contractor shall use advanced techniques and equipment to detect and locate any clogged, damaged or defective under-slab sanitary sewer pipelines that are causing the slow drainage and frequent blockages.

• Restore full operational capacity of the basement sanitary drainage system.

• Eliminate existing pipe blockages and prevent future backups.

• Repair damaged and compromised cast iron piping using CIPP lining to extend system lifespan and avoid full pipe replacement.

• Ensure all excavation activities are conducted safely and in accordance with utility detection and structural safety standards.

2.1 Compliance of Work

The Contractor shall comply with the most current editions of all applicable codes, directives, laws, procedures, practices, standards, regulations and handbooks including, but not limited to; American Society for Testing and

Materials (“ASTM”), National Sanitation 2

Foundation (“NSF”) American National Standards Institute (“ANSI”) Codes, American National Standards

Institute Inc. (“NEII”), International Building Code (“IBC”), International Existing Building Code (“IEBC”), and the Occupational Safety and Health Act (“OSHA”) Standards. The Contractor shall also comply with all Federal, State, City, Local and GPO policies, procedures and directives applicable to the work performed under the Terms and Conditions of the resultant Contract.

3. SCOPE

The Contractor shall furnish all labor, supervision, materials, equipment, and incidentals necessary to clean, inspect, and rehabilitate the nine identified sections of cast iron sanitary sewer piping using CIPP. The Contractor shall also perform limited excavation to access key connection points and restore excavated areas upon completion.

This scope covers the inspection, cleaning, and rehabilitation of approximately 510 linear feet of sanitary sewer lines located in the building’s basement. The contractor shall perform:

• Pre and post CCTV inspection.

• Cleaning all clogged sections.

• Rehabilitation of all sections (approx. 510 ft) of deteriorated pipe using CIPP or more efficient and better method.

• Ground Penetrating Radar (GPR) scanning of the basement floor prior to excavation.

• Excavation of at least two (2) pits (each approximately 4 ft x 4 ft x 4 ft) to provide access for inspection, cleaning, and CIPP lining operations.

Under the Terms and Conditions of the resultant Contract, the selected Contractor, shall be responsible for all the work there under including the provision of all personnel, labor, equipment, and tools and all other services required to perform all aspects of repairs including, but not limited to abuse, correction of deficiencies, routine and emergency callback services, data collecting and reporting to Operation Center of Facility Division within the terms of the Contract. The Contractor shall therefore submit a “Staffing Plan” with their Technical Proposal, addressing their plan for providing support. The Contractor shall attend conference calls/virtual meetings to discuss project details and results.

4. TASKS

Task 4.1 – Pre-CIPP Pipe Cleaning and Inspection

• Review as-built drawings and conduct a CCTV inspection of the entire 510 ft pipe length.

• Conduct a full CCTV camera inspection of the 510 ft line to identify clogged and deteriorated areas.

• Mark and document locations of all blockages and compromised pipe segments.

• Generate a detailed condition assessment report, including pipe defects, lengths, and locations.

• The Contractor shall hydro jet and descale all 510 LF of cast iron piping to restore normal flow. Pre-lining CCTV inspection shall be completed and video documented.

• Remove grease, roots, mineral scale, and obstructions using industry-accepted equipment.

• Collect and dispose of all debris in accordance with environmental regulations.

Task 4.2 – Excavation

• Excavate a minimum of two (2) access pits measuring approximately 4 ft x 4 ft x 4 ft in designated areas.

• Perform Ground Penetrating Radar (GPR) scanning of the basement floor to identify embedded utilities and structural elements prior to excavation.

• Use scanning results to identify safe areas for excavation and obtain approval before digging.

• Ensure shoring and trench safety measures comply with OSHA standards.

• Furnish and install temporary plywood cover over pit.

• Protect surrounding surfaces and restore any disturbed concrete, tile, or finishes upon project completion.

Task 4.3 – CIPP Lining Installation

• Rehabilitate entire segments of damaged cast iron piping using trenchless CIPP lining technology or a more efficient and effective method. The building D basement sanitary sewer pipelines are approximately

510 ft long.

• Ensure all liners are thermally or UV cured in place according to manufacturer specifications.

• Use materials compliant with ASTM F1216 and NSF/ANSI 14 for sanitary sewer use.

• Provide structural integrity, watertight sealing, and a minimum 10-year service life expectancy.

• Perform post-CIPP CCTV inspection and flow testing to verify structural rehabilitation.

• Document all rehabilitated sections with footage and pipe condition assessment.

Task 4.4 – Concrete Restoration

• Pits must be backfilled with #57 or better stone and restored with high-early concrete.

• Restore site to original or better condition.

Task 4.5 – Project Management and Reporting

An on-site project manager shall provide daily progress updates via Smartsheet. Final deliverables shall include all data analysis, pre- and post-CCTV recordings, concrete restoration documentation, and a completion report.

*All work shall be performed by qualified personnel with appropriate training and experience for Building D

Basement Sanitary Sewer Pipes rehabilitation.

5. PERIOD OF PERFORMANCE

All work shall be completed in coordination with the COR’s approval.

All rehabilitation, excavation, concrete restoration and cleaning work shall be completed within eight (8) weeks or

56 days from the Notice to Proceed (NTP). A projected completion schedule is provided below:

Task Number Work Milestones Projected Completion Date

4.1 Pre-CIPP Pipe Cleaning and Inspection Four (4) weeks after contract award

4.2 Excavation Five (5) days after completion of Task 4.1

4.3 CIPP Lining Installation Eight (8) days after completion of Task 4.2

4.4 Concrete Restoration Five (5) days after completion of Task 4.3

4.5 Project Management and Reporting Two (2) weeks after total project completion

6. PLACE OF PERFORMANCE

The services shall be performed at the GPO Building D - 735 N. Capital St. NE, Washington, DC 20002.

7. DELIVERY

• The Contractor shall submit a project plan of the work entailed prior to the start of work.

• The Contractor shall submit a Safety Plan to GPO’s Safety Office for them to review and approve prior to start of project.

• All work shall conform to the Statement of Work (SOW).

• All trash and debris resulting from this contract shall be removed by the Contractor.

8. GOVERNMENT-FURNISHED PROPERTY (GFP):

• GPO will remove all government furnished objects that are within the allowed working space.

• GPO will provide house services such as a minimum electrical requirement of 120V electrical, water, air, etc. if needed.

• GPO will provide sanitary sewer pipes plan view drawing of the Building D basement.

9. SECURITY CONSIDERATIONS:

• Contractor personnels’ vehicles, work bags, toolboxes, material, etc. will be inspected upon arrival and checked when leaving the premises of the building. Huseyin Men (COR) (202-655-8613) will be the point of contact (POC) and will escort the Contractors to the work location when they arrive.

• The Contractor shall safeguard all Government property in the work area. At the close of each work period, equipment shall be secured and/or taken away from the work site daily.

9.1 Safety Requirements

• Personnel assigned to this contract must always be under the direction and control of the Contractor.

Notwithstanding, any other provisions of this contract, the Contractor shall at all times be responsible for the supervision of its employees in while complete all SOW objectives. If the Contractor finds clarification necessary with respect to the scope of the services to be performed hereunder, he/she shall request, in writing, such clarification from the Contracting Officer. Contractor personnel shall not at any time, during the contract period, be employees of the U.S. Government.

• Contractor employees must adhere to OSHA, and GPO Safety Policies.

• Contractor employees shall follow the safety practices and procedures prescribed by the government.

• All accidents must be immediately reported to the COR. In the event of accidents of any kind, the

Contractor shall furnish GPO COR with copies of all accident reports at the same time they are forwarded to any other parties. without delay, for review.

10. TRAVEL

No routine travel is required outside place of performance.

11. PARKING

Contractor personnel may utilize the GPO Parking Program if parking spaces are available in Lot 50 at agency headquarters. If they decide to participate in the parking program, the Contractor shall adhere to the GPO policy and pay the non-refundable, daily fee of $9.00. Fees must be paid before the issuance of a permit.

12. SPECIAL MATERIAL REQUIREMENTS

The Contractor must provide all tools, equipment, and testing devices required for inspecting, cleaning and repairing under slab sanitary sewer pipelines.

12.1 Warranties

• The Contractor shall warranty material, labor and workmanship for a minimum of twelve (12) months from date of final acceptance.

• Any premature failure due to installation defects must be repaired or replaced at no cost to the

Government.

13. OTHER UNIQUE REQUIREMENTS AND CONSIDERATIONS

• The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the government’s property from injury or loss arising out of this contract. The Contractor shall also make good any such damages, injury, or loss, except such as may be directly caused by employees of the government. If the COR finds that the workplace is not safe, the COR will order that the Contractor stop the work until the correction is made. The government shall not extend the contract period for the time spent on fixing the problem. The Contractor shall not close or obstruct walkways, passageways, or stairways.

• The Contractor shall also not store or place materials in passageways, stairs or other means of egress and shall conduct operations with minimum traffic interference.

• The Contractor shall be responsible for any damage to the existing structure, including wall or contents by reason of the insufficiency of protection provided.

• The Contractor shall keep the work areas orderly and free from debris during the progress of the project.

• The Contractor shall remove all loose materials and filings resulting from the work.

• The Contractor shall remove any tools or equipment after work completed.

14. KEY PERSONNEL

The Government has designated the Project Manager, Lead Technician, Technician, Quality Control Lead, and

Safety Lead positions as key personnel. Each position shall be filled by one full-time equivalent (FTE) for the total duration of this project. The key personnel specified below are essential to the work being performed under this contract. All personnel shall possess the minimum education and experience identified in the tables below.

The Contractor shall follow the guidance outlined in Section H of this contract for the substitution of key personnel for the duration of this contract.

GPO reserves the right to interview all proposed key personnel. The Contracting Officer (CO) will notify offerors of the date and time scheduled for interviews.

• Project Manager

Responsibilities Provides overall management and leadership for the under-slab pipe inspection, cleaning, repair and CIPP rehabilitation project. Serves as the primary liaison with the Government.

Responsible for schedule, budget, subcontractor coordination, contract compliance, reporting, and overall project execution.

Minimum

Experience

Five (5) years managing underground utility inspection/repair, plumbing rehabilitation, or

CIPP-related projects.

Minimum

Education

Bachelor’s degree in Engineering, Construction Management, Environmental Engineering, or a related field. Waived for 10 years of experience in a similar role.

• Lead Technician

Responsibilities Leads field operations for CCTV inspection, pipe cleaning, liner installation, and curing activities. Supervises technicians, ensures compliance with manufacturer requirements and industry standards, and verifies quality of work prior to acceptance.

Minimum

Experience

Five (5) years performing under-slab pipe inspection, cleaning, repair or CIPP rehabilitation work.

Minimum

Education

Technical certification or associate degree in plumbing, construction technology, or a related field. Waived for 5 years of experience in a similar role.

• Technician

Responsibilities Performs CCTV inspections, pipe cleaning, liner installation support, reinstatement of laterals, testing, and site restoration under the direction of the Lead Technician.

Minimum

Experience

Three (3) years of experience in underground pipe inspection, cleaning, plumbing, or

CIPP rehabilitation.

Minimum

Education

High school diploma or equivalent; trade certification preferred.

• Quality Control Lead

Responsibilities Works with the COR and field staff to ensure all inspection, cleaning, and CIPP rehabilitation work conforms to contract requirements, manufacturer specifications, and industry standards. Coordinates inspections, reviews CCTV footage, and ensures documentation is complete and accurate.

Minimum

Experience

Five (5) years of experience in pipeline rehabilitation quality control or inspection.

Minimum

Education

Bachelor’s degree in Engineering, Construction, or related field. Waived for 10 years of experience in a similar role.

• Safety Lead

Responsibilities Performs safety inspections of under-slab pipe rehabilitation activities. Documents and reviews compliance with safety standards related to confined spaces, equipment operation, chemical handling, and facility protection. Ensures safe work practices are implemented and maintained.

Minimum

Experience

Five (5) years in construction or underground utility safety.

Minimum

Education

Bachelor’s degree in Occupational Safety, Industrial Hygiene, or a related field. Waived for 10 years of experience in a similar role.

[END OF SECTION C]

Section D - Packaging and Marking: None

[END OF SECTION D]

Section E - Inspection and Acceptance Terms

E.1 MATERIALS MANAGEMENT ACQUISITION REGULATION (MMAR) 46.503 PLACE OF

ACCEPTANCE (APR 2010)

The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract. The place of acceptance will be: United States Government Publishing Office 732 North

Capital Street NW Washington DC 20002.

E.2 RESPONSIBILITY FOR INSPECTION AND ACCEPTANCE

The Contracting Officer’s Representative (COR), as appointed/designated by letter per the information listed in

Section G of this document, is the Government's official responsible for inspection and acceptance of required services under the terms and conditions of this contract.

The Government may designate additional representative(s)to provide periodic inspections or observations during the performance of this contract. However, Government inspections are for the sole benefit of the Government and do not relieve the Contractor of its responsibilities to provide adequate quality control for the works described in Section J Attachments: Plans and Specifications. The Contractor is responsible for inspection of its own work to ensure that all work performed conforms to the terms and conditions of the contract.

E.3. NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following Contract clauses pertinent to this section are hereby incorporated by reference (by Citation, Number, Title, and Date) in accordance with the clause at MMAR 52.252-2 CLAUSES INCORPORATED BY

REFERENCE in Section I of this Contract. Full text of the clauses is available at:

https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/mmar.pdf.

Article Number Reference Text

52.236-1 Performance of Work by the Contractor (APR 1984)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

52.236-26 Preconstruction Conference (FEB 1995)

52.246-12 Inspection of Construction (AUG 1996)

52.246-21 Warranty of Construction (MAR 1994)

In accordance with MMAR 36.204(h) the disclosure of magnitude is between $1,000,000 and $5,000,000.

[END OF SECTION E]

Section F - Delivery or Performance

F.1. NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following Contract clauses pertinent to this section are hereby incorporated by reference (by Citation, Number, Title, and Date) in accordance with the clause at MMAR 52.252-2 CLAUSES INCORPORATED BY

REFERENCE in Section I of this Contract. Full text of the clauses is available at:

https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/mmar.pdf.

Article Number Reference Text

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

F.2 All work shall be completed within eight (8) weeks or 56 days of the Notice to Proceed (NTP).

F.3 The Contracting Officer (CO) and Contracting Officer Representative (COR) will conduct periodic reviews with the Contractor to review progress. The Contractor must perform the work required within the limits of the schedule

F.4 NOTIFICATION OF DELIVERIES

The contractor shall notify the COR via email at least 14 business days before each carrier delivery. The email list https://www.gpo.gov/docs/default-source/forms-and-standards-files-for-vendors/mmar.pdf will be provided to the Contractor after award. In addition, the driver of the truck shall call the respective loading dock the day of delivery to notify the Government of the estimated time of delivery.

The email notification of delivery shall include:

1. Delivery date and estimated arrival time.

2. Delivery list.

• Deliveries shall be made between the hours of 8:00 am to 15:30 pm (EST) Monday through Friday, excluding

Federal holidays. Due to the traffic constraints, the deliveries may need to be scheduled during off-hours or on the weekends.

• Loading dock phone number is: primary 202-297-2956; secondary 202-512-1392.

• Drivers must be U.S. citizens.

F.5 NOTICE TO THE GOVERNMENT OF DELAYS

In the event the Contractor encounters difficulty in meeting performance requirements, or when the Contractor anticipates difficulty in complying with the delivery schedule or completion date, or whenever the Contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this requirement, the Contractor must immediately notify the Contracting Officer and the COR, in writing, giving pertinent details provided, however, that this data shall be informational only in character and that this provision shall not be construed as a waiver by the Government of any delivery schedule or date, or any rights or remedies provided by law or under this contract.

F.6 PRECONSTRUCTION CONFERENCE.

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

F.7 OBSERVANCE OF LEGAL HOLIDAYS/FEDERAL NON-WORKDAYS

Work will be performed during normal business hours, 7:00 AM until 3:00 PM. Coordinate working schedule with the COR prior to beginning construction. Any work to be performed outside normal business hours and on weekends or holidays will need to be coordinated with the COR three (3) days prior.

For work to be performed at the Government site(s), the Contractor must establish a standard holiday schedule that exactly coincides with the Government's schedule for employees working on a government site(s). Holidays observed are listed below. For Government site work, holidays and other non-workdays are not billable unless work is specifically requested by the Government and productive hours are performed on those days. For work to be performed at Contractor site(s), the Holiday schedule may differ if it is customary practice (For example, when the day after Thanksgiving is given in lieu of Columbus or Veterans’ Day).

The following is a list of the official Federal Government holidays:

Date Holiday

Monday, January 01 New Year’s Day

Monday, January 15 Birthday of Martin Luther King, Jr.

Monday, February 19 * Washington’s Birthday

Monday, May 27 Memorial Day

Wednesday, June 19 Juneteenth National Independence Day

Thursday, July 04 Independence Day

Monday, September 02 Labor Day

Monday, October 14 Columbus Day

Monday, November 11 Veterans Day

Thursday, November 28 Thanksgiving Day

Wednesday, December 25 Christmas Day

*This holiday is designated as "Washington’s Birthday" in section 6103(a) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law. Detailed information regarding federal holidays can be found on the U.S. Office of

Personnel Management’s website.

Retrieved from https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2024.

In addition to the days designated as holidays, the Government observes the following days:

• Any other day designated by Federal Statute

• Any other day designated by Executive Order

• Any other day designated by the President’s Proclamation

F.8 SECURITY

ID Badges, Sign-In/Out, Parking and Smoking: All contractor personnel are required to sign-in at 732 North

Capitol St. NW Washington, DC 22041. Contractor personnel shall wear identification badges during the entire time they are on GPO grounds. All contractor personnel are required to sign-out at the same location above. It is the responsibility of contractor personnel to purchase parking pass for the designated parking areas. Parking information is available from GPO Police service. The GPO will not validate nor make reimbursement for parking violations of the contractor’s personnel under any circumstances.

Smoking, tobacco use, or e-cigarettes is not permitted in designated smoking section. No individual is permitted to bring illegal drugs, alcohol or firearms of any type onto a government installation. The contractor shall exchange his/her valid federal or state identification for a GPO Visitor’s Badge for entry to GPO. Expired

Identification shall not be an acceptable form of ID. The Visitor’s Badge shall be visible at all times as safety allows. Contractors shall be escorted at all times and/or in line of sight of the escort.

F.9 ON-SITE VENDOR RESPONSIBILITY

The Contractor must be responsible for all facilities in which the work will take place and to also be familiar with the conditions under which the work will be accomplished. The Contractor must inspect existing conditions prior to commencing work, including elements subject to damage or movement during the project. The Contractor shall provide adequate personnel to reset alarm panels. Should the work create dust, water or mud, the Contractor shall https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2024 be responsible for cleaning the floors and walls. The Contractor shall also be responsible for adhering to the

COVID-19 and other relevant policies as advised by the COR.

[END OF SECTION F]

Section G - Contract Administration Data

CONTRACT MANAGEMENT

Notwithstanding the Contractor s responsibility for total management responsibility during the performance of the contract, the administration of the contract will require maximum coordination with the GPO points of contact during performance of the contract.

CONTRACTING OFFICER (CO), CONTRACTING SPECIALIST AND CONTRACTING OFFICERS

REPRESENTATIVE (COR)

Troy D. White, Supervisory Contracting Officer

U.S. Government Publishing Office Acquisition Services

Room: A530

Address: 732 North Capitol St NW Washington DC 20401 E mail: twhite@gpo.gov

Sara Chan, Contract Specialist

U.S. Government Publishing Office Acquisition Services

Address: 732 North Capitol St NW Washington DC 20401 E mail: schan@gpo.gov

Contracting Officer s Representative (COR): Huseyin Men, hmen@gpo.gov

GPO will designate one or more persons as the Contracting Officer's Technical Representative (COR). The COR may be changed at any time by GPO without prior notice to the Contractor, through unilateral modification to the contract.

An administrative letter issued by the Contracting Officer which designates the COR will be provided separately to the Contractor.

CONTRACTING OFFICER S AUTHORITY

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer s. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made at the contractor s risk. No adjustment will be made to the contract terms and conditions of this contract, including price.

CONTRACTING OFFICER S REPRESENTATIVE (COR)

The COR is responsible for the technical aspects of the project and serves as technical liaison with the Contractor.

The COR is also responsible for the final inspection and acceptance of all products, services, reports, and such other responsibilities as may be specified in this contract. The COR is not authorized to make any commitments or otherwise obligate the GPO or authorize any changes, which affect the Contract price, terms or conditions. Any

Contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the expressed prior authorization of the Contracting Officer.

If the Contractor performs a service that alters the current cost, quantity, or scope without prior written approval mailto:twhite@gpo.gov mailto:schan@gpo.gov mailto:hmen@gpo.gov from the CO, the Contractor does so at his/her own risk. The COR may designate assistant COR(s) to act for the

COR by naming such assistant(s) in writing and transmitting a copy of such designation through the Contracting

Officer to the Contractor.

The COR is not authorized to make any commitments or otherwise obligate the GPO or authorize any changes, which affect the quantity, quality, scope or Contract price. All request for changes shall be referred to the

Contracting Officer directly or through the COR. No such changes shall be made without the expressed prior authorization of the Contracting Officer. If the Contractor performs a service that alters the current cost, quantity, or scope without prior written approval from the CO, the Contractor does so at his/her own risk. The COR may designate an alternate COR(s) to act for the COR by naming such alternate(s) in writing and transmitting a copy of such designation through the Contracting Officer to the Contractor.

GPO INVOICE INSTRUCTIONS July 2024

I. Invoices shall be paid in accordance with the contract’s terms and conditions, following receipt of a proper invoice under Part 3 of these instructions. Please note that the Prompt Pay Act (31 USC Chapter 39) does not apply to GPO.

Payments under this contract will be made by the GPO by electronic funds transfer (EFT). For additional information and questions please send an email to InvoiceGPO@gpo.gov.

The Contractor shall submit each invoice electronically via email to the following address invoicegpo@gpo.gov.

System for Award Management (SAM), formerly Central Contractor Registration (CCR) registration is required for all vendors doing business with the federal government with some exceptions. For mailing in invoices, use the following GPO s address:

US Government Publishing Office (GPO) Office of Finance Mail Stop FMCE North Capitol & H Streets, NW

Washington, DC 20401

Phone (202) 512 0874

II. Effective January 1, 1999, payments on all GPO purchase orders will only be made by electronic fund transfer

(EFT) unless you are granted a waiver. A waiver can only be granted if you certify below in writing that you do not have an account with a financial institution or an authorized payment agent and return the certification to the Contracting Officer. If it is determined that the amount billed is incorrect, the invoice may be rejected by the Government, or the contractor may be required to submit a revised invoice.

NOTICE The following solicitation provisions and/or contract clauses pertinent to this section are hereby incorporated by reference Materials Management Acquisition Regulation (MMAR) 52.232-34 Payment by

Electronic Funds Transfer Central Contractor Registration (May 1999)

III. To constitute a proper invoice, each invoice must include the following information and/or attached documentation.

(1) Name, address and telephone of the Contractor, and

(2) Date of invoice and invoice number

(3) Contract number (Delivery or Task Order, if applicable) complete numbers (including task order or call number and contract line item(s)) and also modification number, if applicable. All relevant information to the invoice that the contract contains must be reflected on the invoice.

(4) Description (quantity, unit of measure, unit price, and extended price) of the supplies or services rendered

(including hours incurred and billing rate, as applicable to the contract). All relevant information that the contract mailto:InvoiceGPO@gpo.gov mailto:invoicegpo@gpo.gov contains must be reflected on the invoice.

(5) Name, title, phone number, email and mailing address of person to notify in the event of a defective invoice.

(6) A schedule depicting the following information.

a. Amount Invoiced the Total Amount of Invoice and this Invoice Period separated by each CLIN Number

(if applicable).

b. Total contract Price and price for each CLIN.

c. Cumulative Amount Invoiced and Authorized Value of Contract Balance Remaining on Contract.

d. If the contractor is billing for prices/costs incurred over more than a single month, the prices/costs for each month in which the costs were incurred and shall be segregated into the month they were actually incurred.

(7) Add all payment terms and related discount items on the invoice per the contract payment method and clauses.

(8) Name of Contracting Officer s Representative (COR) and

(9) Signature of authorized representative of the firm with the following invoice certification

The undersigned hereby certifies to the best of my knowledge and belief that the sum claimed under this contract is proper and due, and all the prices/costs of contract performance have been paid or to the extent allowed under the applicable payment clause will be paid by the Contractor when due in the ordinary course of business, the work reflected by these costs has been performed, and amounts involved are consistent with the requirements of this Contract.

BY NAME _________________

TITLE _____________________

DATE _____________________

In the event the contractor owes money to GPO, the contractor shall clear the amount owed to GPO first before any new invoices will be processed and paid. The contractor shall send a refund check to GPO to the address above and provide GPO with the tracking information.

Inquiries regarding the status of invoices may be directed to invoicegpo@gpo.gov.

MERGERS, ACQUISITIONS, NOVATIONS, AND CHANGE-OF-NAME AGREEMENTS

In accordance with MMAR 42.12, if a contractor merges, is acquired, or recognizes a successor in interest to

Government contracts when contractor assets are transferred; or, recognizes a change in a contractor’s name; or, executes novation agreements and change-of-name agreements, the contractor shall notify the CO and provide a copy of the novation or other any other agreement that changes the status of the contractor.

Title 41 U.S.C. 6305 prohibits the transfer of Government contracts from an awardee to a third party. However, the Government may, when in its interest, novate an awardee’s contract to a third party when there is a transfer of all of the awardee’s assets or the entire portion of the assets involved in the performance of the contract.

For a novation to be approved by the CO, the following elements shall occur:

a. The company shall submit a novation agreement with all the required legal elements in accordance with

MMAR 42.12.

b. The novation agreement shall include the transfer of personnel performing work under the contract and mailto:invoicegpo@gpo.gov any awarded delivery orders, as applicable.

c. The novation agreement shall be determined by the CO to be in the best interest of the Government.

[END OF SECTION G]

Section H - Special Contract Requirements

H.1 KEY PERSONNEL

Certain experienced professionals and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract. Such personnel are defined as "Key Personnel" and are those persons whose resumes were submitted for evaluation of the proposal. The contractor agrees that such personnel shall not be removed from the contract or replaced without compliance with the following:

a) The personnel specified under this contract are essential to the work the contractor agrees to perform hereunder be essential to the work. The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section.

b) If one or more of the key personnel, for whatever reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall immediately notify the Contracting Officer and shall, subject to the concurrence of the contracting officer, promptly replace the personnel with personnel of at least substantially equal ability and qualifications. Personnel must be replaced within 30 days of the contractor leaving the Agency. This substitution must be pre-vetted and able to pass through our background check by our Security Services unit.

c) Each request for approval of substitutions must be in writing and contain a detailed explanation of the circumstances necessitating the proposed substitutions. The request must also contain a complete resume for the proposed substitute and other information requested or needed by the contracting officer to evaluate the proposed substitution. The Contracting Officer and the Contracting Officer’s Representative shall evaluate the contractor's request, and the contracting officer shall promptly notify the contractor of his or her decision in writing.

d) If the Contracting Officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated, or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair the successful completion of the contract or the service order, the contract may be terminated by the contracting officer for default or for the convenience of the Government, as appropriate. If the

Contracting Officer finds the contractor at fault for the condition, the contract price or profit/fixed fee may be equitably adjusted downward to compensate the Government for any resultant delay, loss, or damage.

The Key Personnel Positions under this contract are:

Key Personnel Positions Quantity Names

Project Manager 1 TBD

Lead Technician 1 TBD

Technician 1 TBD

Quality Control Lead 1 TBD

Safety Lead 1 TBD

H.2 CONTRACTOR’S EMPLOYEES IDENTIFICATION AND GOVERNMENT CONTRACTOR

RELATIONS

a. All contractor personnel when attending meetings, sending emails, or participating on telephone calls shall identify themselves as contractor personnel. Identification in meetings and on Microsoft Teams shall be at the beginning of the call or meeting to allow government personnel to excuse contractors if appropriate.

b. Contractor personnel shall identify themselves with their company name in the signature block of emails.

c. Pursuant to MMAR 7.5, the contractor shall not perform any inherently governmental actions under this contract. No contractor employee shall hold him or herself out to be a government employee, agent, or representative.

No contractor employee shall state orally or in writing at any time that he or she is acting on behalf of the

Government. No Employer-employee relationship exists of will exist under this Contract. Contractor’s employees shall not:

i. Be placed in a position where they are under the supervision, direction, or evaluation of a government employee.

ii. Be placed in a position of command, supervision, administration or control over Government personnel, or over personnel of other contractors under other GPO’s contracts or become a part of the

Government organization.

iii. Be used in administration or supervision of Government procurement activities.

d. The services to be performed under this contract do not require the contractor of his employees to exercise personal judgment and discretion on behalf of the Government. Rather, contractor personnel will act and exercise personal judgment and discretion on behalf of the contractor.

H.3 INSURANCE

Neither GPO nor the US Government shall in any event be liable or responsible for any damage or injury to any person or property occasioned by the actions of the Contractor or Contractor’s employees in performing under this contract. The Contractor must maintain adequate insurance with the proper coverage limits, including general liability and professional liability insurances, and others if needed, during the term of this contract, insuring the contractor against any claims for injury or damage.

H.4 DISSEMINATION OF INFORMATION

There shall be no dissemination or publication, except within and between the Contractor and any Subcontractors, of information developed under this contract or contained in the reports to be furnished pursuant to this contract without prior written approval of the Contracting Officer and Contracting Officer’s Representative(s). Language similar to this provision shall be included in all subcontracts to this contract. This provision includes news releases: blogs, posts, and published papers.

H.5 NOTIFICATION OF DEBARMENT/SUSPENSION STATUS

The Contractor shall provide written notice to the Contracting Officer within ten (10) calendar days of being suspended, debarred, or declared ineligible by any Department or other Federal Agency, or upon receipt of a notice of proposed debarment during the performance of this contract.

H.6 CONSENT TO SUBCONTRACTS (if applicable)

In accordance with Contract MMAR clause 52.244 2, Subcontracts, the Contracting Officer consents to award of subcontracts as proposed in the Contractor’s proposal, which resulted in the award of this Contract to the following firms for the products or services specified here:

Contractor Name Services to be Performed: TBD

The Contractor must request Contracting Officer consent and submit the information required by the aforementioned clause for any subcontracts requiring consent not listed here. If the Contractor has an approved contracting system, they must follow MMAR 52.244 2 requirements for a Contractor with an approved contracting system subsequent to providing evidence of their approved contracting system to the Contracting

Officer.

Subcontract means any contract, as defined in FAR Subpart 2.1, entered into by a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract. It includes but is not limited to:

awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts;

orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications.

H.6 CONTRACTOR S PERSONNEL BUSINESS ETHICS AND CONDUCT

In accordance with MMAR 52.203-13, the Contractor shall exercise due diligence on personnel to be engaged under this contract.

H.7 CONFLICTS OF INTEREST

a. It is understood and agreed that some of the work required hereunder may place the Contractor, or its personnel or its subcontractors or their personnel (hereinafter referred to collectively as Contractor), in the position of having a potential personal or organizational conflict of interest (OCI), i.e., because of other activities or relationships with other persons,

(1) the Contractor is unable or potentially unable to render impartial assistance or advice; or

(2) the Contractor objectivity in performing the Contract is or might be impaired; or

(3) the Contractor may receive an unfair competitive advantage; or

(4) the Contractor may have a financial or other personal interest which would or potentially would impair his/her objectivity and/or from which he/she would improperly benefit.

Further discussion of OCIs may be found in MMAR 9.5.

The performance/actions of personnel under this Contract will be imputed to the Contractor (or subcontractor) by whom they are employed or retained, and the performance/actions of any subcontractor will be imputed to the

Contractor, unless the Contractor, on a case-by-case basis, can demonstrate otherwise and satisfy the Contracting

Officer that such imputation is unreasonable.

b. If it is discovered that the Contractor engaged in any activities which constitute a potential or actual conflict without having first obtained the Contracting Officer s approval to undertake such activities; or if it is subsequently discovered that, notwithstanding the Contracting Officer s authorization to undertake the activity based on his/her initial determination that no significant potential conflict existed or appeared to exist, a conflict did, in fact exist or arise, restrictions, as permitted by MMAR 9.5, on the Contractor future activities may be placed unilaterally by the Contracting Officer for this contract or the Contracting Officer for such other contract as may be involved in the conflict, and other remedies (including termination of this contract for default, debarment or suspension, and those permitted by the clauses of this contract entitled Cancellation, Rescission and

Recovery of Funds for Illegal or Improper Activity (MMAR 52.203 8) and Price or Fee…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .