This is a Solicitation for a Blanket Purchase Agreement (BPA) for Contracts and Acquisition Training issued by the U.S. Government Publishing Office (GPO). The solicitation (040ADV-25-A-0003) seeks a training vendor to provide comprehensive acquisition and contracting training for GPO's workforce, with a base year from 1 August 2025 to 31 July 2026 and two optional additional years. The government intends to award either a single or multiple award BPA, with a preference for a single award if one vendor can provide all required courses.

The solicitation requires vendors to submit both technical and price proposals, with technical factors weighted more heavily than price. Technical submissions must include a Technical and Management Approach demonstrating understanding of the Statement of Work, a Quality Management Plan, instructor resumes, and a completed Training Price List. Past performance submissions are also required, with vendors asked to provide 3-5 relevant project summaries. Electronic submission of proposals is mandatory, due by 5:00 pm EST on 6 August 2025, with questions accepted until 5:00 pm EST on 17 July 2025. The solicitation is set aside for Women-Owned Small Business (WOSB) and includes provisions for tailoring courses to align with the Materials Management Acquisition Regulation (MMAR).

View the file

Other files

File Type Posted
Contracting and Acquisition Training BPA SOW.pdf PDF
Training Price List.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

040ADV-25-A-0003

TABLE OF CONTENTS:

Section II: Continuation of Section III: Contract Clauses Section IV: List of Documents, Exhibits, and other Attachments Section V: Solicitation Provisions

Section II: Continuation of

Item Number Base Item

Number Supplies/Services Quantity Unit

0001 Contracts and Acquisition Training Base Year

1 Lt

Contract Type: Firm Fixed Price Unit Price Extended Price

Description: 1 August 2025 – 31 July 2026

Purchase Requisitions PR-25-GPO-1245

Supplies/Services Quantity Unit

1001 Contracts and Acquisition Training Option Year 1

1 Lt

Contract Type: Firm Fixed Price

Description: 1 August 2026 – 31 July 2027

Purchase Requisitions

Supplies/Services Quantity Unit

2001 Contracts and Acquisition Training Option Year 2

1 Lt

Contract Type: Firm Fixed Price

Description: 1 August 2027 – 31 July 2028

Purchase Requisitions

Section III: Contract Clauses

52.212-4 52.212-4 Contract Terms and Conditions - Commercial Items (FEB 2002)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price. The Government must exercise its post-acceptance rights--

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Government-wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at MMAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at MMAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice. (1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices.

An invoice must include--

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv)Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN).The Contractor shall include its TIN on the invoice only if required else wherein this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer--Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer--Other Than Central Contractor Registration), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b.

destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 327, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58,Anti-Kickback Act of 1986;

41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(End of Clause)

52.212-5 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders

- Commercial Items (MAY 2002)

52.212-5Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial Items (MAY 2002)

a) The Contractor shall comply with the following MMAR clauses, which are incorporated in this contract by reference, to implement provisions of law or executive orders applicable to acquisitions of commercial items

(1) 52.222-3, Convict Labor (E.O. 11755).

(2) 52.233-3, Protest after Award (31 U.S.C. 3553).

(b) The Contractor shall comply with the MMAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components

X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government, with Alternate I (41 U.S.C. 253g and 10 U.S.C. 2402)(JUL 1995)

(2) 52.222-21, Prohibition of Segregated Facilities (Feb 1999)

(3) 52.222-26, Equal Opportunity (E.O. 11246)(APR 2002)

X (4) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (38 U.S.C.4212) (DEC 2001)

X (5) 52.222-36, Affirmative Action for Workers with Disabilities (29 U.S.C. 793)

(JUN 1998)

X (6) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (38 U.S.C.4212)(DEC 2001)

X (7) 52.222-19, Child Labor-Cooperation with Authorities and Remedies.(SEP 2002)

(8)(i)52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (42 U.S.C. 6962(c)(3)(A)(ii)). (AUG 2000)

(ii) Alternate I of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (AUG 2000)

(9) 52.225-1, Buy American Act-Supplies (41U.S.C. 10a - 10d). (MAY 2002)

(10)(i) 52.225-3, Buy American Act-North American Free Trade Agreement-Israeli Trade Act (41 U.S.C. 10a- 10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note).

(ii) Alternate I of 52.225-3.

(iii) Alternate II of 52.225-3.

(11) 52.225-5, Trade Agreements (19 U.S.C. 2501, et seq., 19 U.S.C.3301 note).

(12) 52.225-13, Restriction on Certain Foreign Purchases (E.O. 12722, 12724, 13059, 13067, 13121, and 13129). (JUL 2000)

(13) 52.225-15, Sanctioned European Union Country End Products (E.O. 12849). (FEB 2000)

(14) 52.225-16, Sanctioned European Union Country Services (E.O. 12849). (FEB 2000)

X (15) 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration (31 U.S.C. 3332). (MAY 1999)

(16) 52.232-34, Payment by Electronic Funds Transfer-Other than Central Contractor Registration (31 U.S.C. 3332). (MAY 1999)

(17) 52.232-36, Payment by Third Party (31 U.S.C. 3332). (MAY 1999)

(18) 52.239-1, Privacy or Security Safeguards (5 U.S.C. 552a). (AUG 1996)

(19) (i)52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (46

U.S.C.1241). (JUN 2000)

(ii) Alternate I of 52.247-64. (APR 1984)

(c) The Contractor shall comply with the MMAR clauses in this paragraph (c), applicable to commercial services, which the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items or components

(2) 52.222-41, Service Contract Act of 1965, As Amended (41 U.S.C. 351, et seq.). (MAY 1989)

(3) 52.222-42, Statement of Equivalent Rates for Federal Hires (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).(MAY 1989)

(4) 52.222-43, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).(MAY 1989)

(5) 52.222-44, Fair Labor Standards Act and Service Contract Act-Price Adjustment (29 U.S.C. 206 and 41 U.S.C. 351, et seq.). (FEB 2002)

(6) 52.222-47, SCA Minimum Wages and Fringe Benefits Applicable to Successor Contract Pursuant to Predecessor Contractor Collective Bargaining Agreement (CBA) (41 U.S.C. 351, et seq.). (MAY 1989)

(d) Comptroller General Examination of Record.The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in MMAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) or (d) of this clause, the Contractor is not required to include any MMAR clause, other than those listed below (and as may be required by an addenda to this paragraph to establish the reasonableness of prices under Part 15), in a subcontract for commercial items or commercial components

(1) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (38 U.S.C. 4212); (DEC 2001)

(2) 52.222-36, Affirmative Action for Workers with Disabilities (29 U.S.C. 793); (JUNE 1998)

(3) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (46 U.S.C. 1241) (flow down not required for subcontracts awarded beginning May 1, 1996); (JUNE 2000) and

(4) 52.222-41, Service Contract Act of 1965, As Amended (41 U.S.C 351, et seq.).

(End of clause)

DISPUTES DISPUTES (GPO Clause June 2008)

(a) This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613, and as modified by Section 1501 of Title I of Division H of the Consolidated Appropriations Act, 2008, Public Law No. 110-161).

(b) Except as provided in the Act, all disputes arising under or relating to this contract shall be resolved under this clause.

(c) "Claim," as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to this contract. However, a written demand or written assertion by the Contractor seeking the payment of money exceeding $50,000 is not a claim under the Act until certified. A voucher, invoice, or other routine request for payment that is not in dispute when submitted is not a claim under the Act. The submission may be converted to a claim under the Act, by complying with the submission and certification requirements of this clause, if it is disputed either as to liability or amount or is not acted upon in a reasonable time.

(d) (1) A claim by the Contractor shall be made in writing and, unless otherwise stated in this contract, submitted within 6 years after accrual of the claim to the Contracting Officer for a written decision. A claim by the Government against the Contractor shall be subject to a written decision by the Contracting Officer.

(2)(i) The Contractor shall provide the certification specified in paragraph (d)(2)(iii) of this clause when submitting any claim exceeding$50,000.

(ii) The certification requirement does not apply to issues in controversy that have not been submitted as all or part of a claim.

(iii) The certification shall state as follows: "I certify that the claim is made in good faith; that the supporting data are accurate and complete to the best of my knowledge and belief; that the amount requested accurately reflects the contract adjustment for which the Contractor believes the Government is liable; and that I am duly authorized to certify the claim on behalf of the Contractor."

(3) The certification may be executed by any person duly authorized to bind the Contractor with respect to the claim.

(e) For Contractor claims of $50,000 or less, the Contracting Officer must, if requested in writing by the Contractor, render a decision within 60 days of the request. For Contractor-certified claims over $50,000,the Contracting Officer must, within 60 days, decide the claim or notify the Contractor of the date by which the decision will be made.

(f) The Contracting Officer's decision shall be final unless the Contractor appeals, within ninety (90) days of receipt of a Contracting Officer’s decision, to the U.S. Government Accountability Office Contract Appeals Board (GAO CAB), 441 G Street, NW, Room 7182, Washington, DC, 20548;Facsimile:202-512-9749; E-Mail: CAB@gao.gov.

(g) If the claim by the Contractor is submitted to the Contracting Officer or a claim by the Government is presented to the Contractor, the parties, by mutual consent, may agree to use alternative dispute resolution(ADR). If the Contractor refuses an offer for ADR, the Contractor shall inform the Contracting Officer, in writing, of the Contractor's specific reasons for rejecting the offer.

(h) The Government shall pay interest on the amount found due and unpaid from (1) the date that the Contracting Officer receives the claim(certified, if required); or (2) the date that payment otherwise would be due, if that date is later, until the date of payment. With regard to claims having defective certifications, interest shall be paid from the date that the Contracting Officer initially receives the claim. [A defective certification means a certificate which alters or otherwise deviates from the language in(d)(2)(iii) above, or which is not executed by a person duly authorized to bind the contractor with respect to the claim. Failure to certify shall not be deemed to be a defective certification.] Simple interest on claims shall be paid at the rate, fixed by the Secretary of the Treasury as provided in the Act, which is applicable to the period during which the Contracting Officer receives the claim and then at the rate applicable for each 6- month period as fixed by the Treasury Secretary during the pendency of the claim.

(i) The Contractor shall proceed diligently with performance of this contract, pending final resolution of any request for relief, claim, appeal, or action arising under the contract, and comply with any decision of the Contracting Officer.

(j) This contract clause, Disputes (GPO Clause June 2008), cancels and supersedes the contract clause, MMAR Dispute 52.233-1 (July 2002), and all other references to the contract clause, Disputes. This contract clause also cancels and supersedes any other disputes language currently included in existing contractual actions.

mailto:CAB@gao.gov

52.233-2 52.233-2 Service of Protest (AUG 1996)

Agency protests filed with the Contracting Officer shall be sent to the following address:

Contracting Officer

U.S. Government Publishing Office

Acquisition Services: Room A530

732 North Capitol Street, NW Washington, DC 20401 Agency protests filed with the Director of Acquisition Services shall be sent to the following address:

Chief of Acquisition Services

U.S. Government Publishing Office

Acquisition Services: Room A530

732 North Capitol Street, NW Washington, DC 20401 If a protest is filed with either the Director of Acquisition Services or with the Government Accountability Office (GAO), a complete copy of the protest (including all attachments) shall be served upon the Contracting Officer and the GPO General Counsel within one day of filing with the Managing Director, Customer Services or with the GAO. Service upon the GPO Office of the General Counsel shall be made as follows:

General Counsel Office of the General Counsel. U.S. Government Publishing Office732 North Capitol Street, NW Room C- 814, Stop: GC Washington, DC 20401FAX (202) 512-0076

GPO INVOICE INSTRUCTIONS July 2024

Invoices shall be paid in accordance with the contract s terms and conditions, following receipt of a proper invoice under Part 3 of these instructions. Please note that the Prompt Pay Act (31 USC Chapter 39) does not apply to GPO.

Payments under this contract will be made by the GPO by electronic funds transfer (EFT). For additional information and questions please send an email to InvoiceGPO@gpo.gov.

The Contractor shall submit each invoice electronically via email to the following address invoicegpo@gpo.gov.

System for Award Management (SAM), formerly Central Contractor Registration (CCR) registration is required for all vendors doing business with the federal government with some exceptions. For mailing in invoices, use the following GPO s address

US Government Publishing Office (GPO) Office of Finance Mail Stop FMCE North Capitol & H Streets, NW Washington, DC 20401 Phone (202) 512 0874

Effective January 1, 1999, payments on all GPO purchase orders will only be made by electronic fund transfer (EFT) unless you are granted a waiver. A waiver can only be granted if you certify below in writing that you do not have an account with a financial institution or an authorized payment agent and return the certification to the Contracting Officer. If it is determined that the amount billed is incorrect, the invoice may be rejected by the Government, or the contractor may be required to submit a revised invoice.

NOTICE The following solicitation provisions and/or contract clauses pertinent to this section are hereby incorporated by reference mailto:InvoiceGPO@gpo.gov mailto:invoicegpo@gpo.gov

Materials Management Acquisition Regulation (MMAR) 52.232 33 Payment by Electronic Funds Transfer Central Contractor Registration (May 1999)

I. To constitute a proper invoice, each invoice must include the following information and/or attached documentation

(1) Name, address and telephone of the Contractor

(2) Date of invoice and invoice number

(3) Contract number (Delivery or Task Order, if applicable) complete numbers (including task order or call number and contract line item(s)) and also modification number, if applicable. All relevant information to the invoice that the contract contains must be reflected on the invoice.

(4) Description (quantity, unit of measure, unit price, and extended price) of the supplies or services rendered (including hours incurred and billing rate, as applicable to the contract). All relevant information that the contract contains must be reflected on the invoice.

(5) Name, title, phone number, email and mailing address of person to notify in the event of a defective invoice.

(6) A schedule depicting the following information a Amount Invoiced The Total Amount of Invoice and this Invoice Period separated by each CLIN Number (if applicable) b Total contract Price and price for each CLIN c Cumulative Amount Invoiced and Authorized Value of Contract Balance Remaining on Contract d If the contractor is billing for prices/costs incurred over more than a single month, the prices/costs for each month in which the costs were incurred and shall be segregated into the month they were actually incurred.

(7) Add all payment terms and related discount items on the invoice per the contract payment method and clauses.

(8) Name of Contracting Officer s Representative (COR) and

(9) Signature of authorized representative of the firm with the following invoice certification

The undersigned hereby certifies to the best of my knowledge and belief that the sum claimed under this contract is proper and due, and all the prices/costs of contract performance have been paid or to the extent allowed under the applicable payment clause will be paid by the Contractor when due in the ordinary course of business, the work reflected by these costs has been performed, and amounts involved are consistent with the requirements of this Contract.

BY NAME

TITLE

DATE

II. In the event the contractor owes money to GPO, the contractor shall clear the amount owed to GPO first before any new invoices will be processed and paid. The contractor shall send a refund check to GPO to the address above and provide GPO with the tracking information.

III. Inquiries regarding the status of invoices may be directed to invoicegpo@gpo.gov

52.217-8 MMAR 52.217-8 Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract.

These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days.

mailto:invoicegpo@gpo.gov

MMAR 52.217-8 EVALUATION OF OPTION TO EXTEND SERVICES:

For the purposes of the award of the Contract, the Government intends to evaluate the option to extend services, provided under MMAR 52.217-8, as follows:

1. The evaluation will consider the possibility that the option can be exercised at any time during any contract performance period and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract.

2. The evaluation will assume that the prices for any option exercised under MMAR 52.217-8 will be at the same rates as those in effect under the contract when the option is exercised.

3. The evaluation will therefore assume that the addition of the price or prices of any possible extension or extensions under MMAR 52.217-8 to the total price for the basic requirement and the total price for the priced options has the same effect on the total price of all proposals relative to each other, and will not affect the ranking of proposals based on price, unless, after reviewing the proposals, the Government determines that there is a basis for finding otherwise.

4. This evaluation will not obligate the Government to exercise any option under MMAR 52.217.

52.217-9 MMAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years and 6 months.

Section IV: List of Documents, Exhibits, and other Attachments

1. GPO Acquisition and Training Statement of Work

2. Training Price Sheet

Section V: Solicitation Provisions

INSTRUCTIONS TO OFFERORS

GENERAL

Contractors shall furnish the information required by this solicitation.

Contractors are expected to examine this entire solicitation document. Failure to do so will be at the contractor’s own risk.

Quotes shall set forth full, accurate, and complete information as required by this solicitation package (including attachments). The penalty for making false statements in quotes is prescribed in 18 USC 1001. Discussions may be utilized if it is in the best interest of the government as determined by the Contracting Officer.

The government intends to award either a single award Blanket Purchase Agreement (BPA) or multiple award BPA in response to this solicitation, with preference to a single award BPA if one vendor can provide all listed items.

The government is not responsible for costs incurred responding to this solicitation.

SUBMISSION OF QUOTES

i. The government will not accept paper submissions.

ii. The mandatory method for submission of quotations and revisions to the quotation is via electronic mail at the following addresses: Contract Specialist, Michael McKenzie at mrmckenzie@gpo.gov and Contracting Officer, Troy White at troywhite@gpo.gov. Microsoft Office Word (*.doc or *.docx), Microsoft Office Excel (*.xls or *.xlsx), or Adobe Acrobat (*.pdf) are only the acceptable file formats. No single e-mail shall exceed 40MB. All attachments must be unzipped.

iii. Electronic versions of quotations shall be submitted prior to 5:00 pm EST on 6 August 2025.

iv. Offerors shall include the solicitation number 040ADV-25-A-0003 in the subject email. The cut-off date and time for submitting questions is at 5:00 pm EST, 17 July 2025. Reponses to all questions received prior to the deadline will be posted on Sam.gov by amendment. Questions received after the deadline will not be answered.

v. Multiple emails may be sent to accommodate the proposal size and content, but each email must clearly identify the attachments and instructions for assembling the proposal.

vi. Offerors are responsible for submitting quotations, and any modifications, revisions, by the time specified in the solicitation.

Any proposal, modification, or revision received at the government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered for award.

vii. The Offeror must designate a point-of-contact (POC) for all communications associated with this solicitation.

Contact information for the POC must be provided.

viii. The point of contact responsible for supplying additional information and answering all inquiries is the Contracting Officer and Contract Specialist. All questions regarding this solicitation shall be submitted via email to the email addresses identified above.

Valid acceptance of offers. The offeror agrees to hold the prices in its offer firm for 180 days from the specified for receipt of offers, unless another time period is specified followed by an amendment to the solicitation.

Quote submission shall consist of two parts: Technical Submission and Price

The Government Publishing Office (GPO) will establish a BPA with the contractor that can provide the services that represent the best value.

Technical factors are more important than price. In addition to price, the following factors will be used to determine best value:

• Technical Approach

• Past Performance

SECTON I - TECHNICAL SUBMISSION

The technical submission shall include the following:

FACTOR 1 – Technical and Management Approach FACTOR 2 – Past Performance mailto:mrmckenzie@gpo.gov mailto:troywhite@gpo.gov

FACTOR 1 – Technical and Management Approach

Offerors shall provide an overview of the proposed solution to meet the objectives of the Statement of Work. The proposed solution, which will serve as a high-level basis for all calls placed under the BPA, shall include an explanation of how the contractor intends to manage and oversee the work required under this BPA. The technical and management approach shall demonstrate a clear and thorough understanding of the work required. The contractor shall include a Quality Management Plan (QMP) that will serve as an overview of how staff and performance will be managed, evaluated, and tracked for the duration of the BPA period of performance.

GPO uses the Materials Management Acquisition Regulation (MMAR) as its primary authority. Quotations must include a statement that contractors have reviewed and understand the differences between the Federal Acquisition Regulation (FAR) and MMAR and that they understand that all courses provided shall be tailored to align with the MMAR over the FAR to the maximum extent practicable.

The technical and management approach shall include resumes for any instructors (see Statement of Work for more details).

Contractors shall complete the attached Training Price List. If one or more courses cannot be provided, the contractor shall indicate which courses they are unable to offer. Contractors are encouraged to provide creative solutions in addressing the courses required. The contractor is also encouraged to add courses not listed on the attached price list that they think may be useful to the government, as well as how they propose to tackle the “custom” course listing. A request for a custom course may occur in some instances where GPO deems the additional course as a necessity for its employees on a situational basis.

TECHNICAL ASSUMPTIONS

Technical submissions shall include all (if any) assumptions, conditions, or exceptions with any of the terms and conditions of this solicitation or Statement of Work. If not noted in this section of the quote, it will be assumed that there are no assumptions for award, and that the contractor agrees to comply with all the terms and conditions as set forth herein.

FACTOR 2 – Past Performance

The contractor shall complete and submit relevant project summaries for at least three (3) but not more than five (5) relevant projects or contracts. Submissions shall identify contracts/agreements with the government and/or commercial customers that demonstrate recent and relevant past performance to the purpose, scope, and complexity of this requirement.

Past performance submissions shall include the following:

1. Name of government agency/commercial organization.

2. Points of contact.

3. Contract/agreement number (if applicable).

4. Status (e.g. completed, in progress, etc.).

5. Dollar value and type of contract/agreement.

6. A brief narrative of why the submission is relevant to this effort.

The contractor is responsible for ensuring the information provided is accurate and complete. Points of contract listed may be contracted for performance feedback.

The government may also consider information obtained from other sources, such as sam.gov, fapiis.gov, CPARS, etc.

SECTION II – Price

Offerors shall complete the attached price list. Additional pricing narratives or information may be submitted as necessary.

Contractors are again encouraged to be creative in the pricing, courses offered, and any other information to help the government reach a price fair and reasonable determination.

Any assumptions, conditions, or exceptions shall be submitted along with pricing information as the offeror deems necessary.

Discounts are encouraged, if applicable.

EVALUATION

BASIS FOR AWARD

The government intends to award either a Single Award BPA or Multiple Award BPA depending on responses received and how feasible it is for one or more contractors to offer all courses required by GPO. Award will be made to the offeror(s) that are determined to provide the best value to the government. In determining which quotation provides the best value to the Government, non-price (technical) evaluation factors, when combined, are more important than the evaluated price.

SECTION I – Technical Evaluation

FACTOR 1 – Technical and Management Approach

The government will evaluate Factor 1 on how well it demonstrates understanding of the Statement of Work and scope of effort.

Evaluators will consider the offeror’s understanding, competency, and approach for fulfilling this requirement for GPO.

The evaluation will include the completed price list, submitted resumes, the Quality Management Plan (QMP), and any other submitted Narratives or supporting information to arrive at an evaluation rating.

The following evaluation ratings will be used for Factor 1:

Ratings Factors 1 Evaluation Definitions Exceptional An exceptional offer contains exceptional strengths, exceptional features, highly preferred personnel qualifications or innovations that should substantially benefit the SOW and scope, and significantly exceeds the evaluation standards; the proposed solution indicates an exceptionally thorough and comprehensive understanding of the SOW, resources, schedules and other aspects essential to successful performance; has a high probability of satisfying the requirement; has no weaknesses or deficiencies. The risk of unsuccessful contract performance is extremely low.

Very Good A very good proposal contains one or more major and/or minor strengths which will benefit the program and exceeds the evaluation standards; the proposed solution indicates a strong grasp of the SOW objectives, resources, schedules and other requirements essential to successful performance and contains preferred personnel qualifications; has a good probability of satisfying the requirement; if there are some weaknesses, they are minor.

Strengths significantly outweigh any weaknesses that exist. There are no deficiencies.

The risk of unsuccessful contract performance is very low or no degree of risk of unsuccessful contract performance.

Good A good proposal contains some strengths and may have some weaknesses; the proposed solution indicates a good grasp of understanding of the SOW objectives, resources, schedules and other requirements essential to successful performance; has an ample probability of satisfying the requirement or meets the requirement; any weaknesses can be readily corrected. Any strengths outweigh any weaknesses that exist. There are no deficiencies.

The risk of unsuccessful contract performance is low.

Marginal A marginal proposal contains a number of weaknesses that are equal or outweigh any strengths. The proposed solution indicates a limited or vague understanding of the SOW objectives, resources, schedules and other requirements essential to successful performance;

has a moderate probability of satisfying the requirement or marginally meets the requirement;

has a number of deficiencies that may be corrected.

The risk of unsuccessful contract performance is moderate.

Unsatisfactory An unsatisfactory proposal contains numerous weaknesses and deficiencies that demonstrate a lack of understanding of the Government’s needs; the proposed solution indicates a lack of understanding of the SOW’s goals, resources, schedules and other requirements essential to successful; has a low probability of satisfying the requirement or fails to meet the evaluation standards; has deficiencies that cannot be corrected. Weaknesses and or deficiencies significantly outweigh any strengths that exist.

The risk of unsuccessful contract performance is high.

FACTOR 2 – Past Performance

Past performance summaries/narratives submitted will be evaluated using the evaluation ratings below.

The government reserves the right to obtain and utilize information from other sources not provided by the contractor.

IAW MMAR 15.305(a)(2)(iv), an offeror’s past performance will not be evaluated favorably or unfavorably when the offeror lacks relevant performance history or when information on performance is not available. When this occurs, offerors will be assigned a ‘Neutral’ rating.

The following evaluation ratings will be used for Factor 2:

Ratings Factor 2 Evaluation’s Definitions Satisfactory The offeror’s past performance of previously awarded recent and relevant projects met or exceeded most, if not all, project requirements. The company may have performed with some problems, for which corrective actions taken by the contractor were, or are expected to be, effective. Performance of completed projects was consistently of adequate or better quality. The offeror’s past performance record leads to an expectation of successful performance.

Unsatisfactory The offeror’s performance of previously awarded recent and relevant projects did not meet some or most project requirements and recovery, if any, did not occur within the stated period of performance. The offeror’s performance reflected some serious problems for which the offeror either failed to identify or implement corrective actions in a timely manner, or for which correctible actions were mostly ineffective. Performance of completed projects was consistently of mediocre or poor quality. The offeror’s past performance record leads to a reasonable expectation that successful performance would not be achieved or that it can occur only with increased levels of government management and oversight.

SECTION II – Price Evaluation

Prices will be evaluated by the Contracting Officer to determine price reasonableness. If prices cannot be determined to be fair and the offer will be removed from consideration.

(End of Provisions)

040ADV-25-A-0003_0_US
040ADV-25-A-0003 - Acquisition Training BPA Solicitation
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
STANDARD FORM 1449 (REV. 11/2021)
TABLE OF CONTENTS:
Section II: Continuation of
Section III: Contract Clauses
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number; (iv)Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN).The Contractor shall include its TIN on the invoice only if required else wherein this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contrac...
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
52.212-5Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial Items (MAY 2002)
a) The Contractor shall comply with the following MMAR clauses, which are incorporated in this contract by reference, to implement provisions of law or executive orders applicable to acquisitions of commercial items
(1) 52.222-3, Convict Labor (E.O. 11755).
(2) 52.233-3, Protest after Award (31 U.S.C. 3553).
(b) The Contractor shall comply with the MMAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of...

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .