This is a Supplement to Instructions to Bidders document for Zeeland Public Schools' BP-01 Creekside Middle School Additions & Renovations project, managed by Owen-Ames-Kimball Co. as Construction Manager. The project involves comprehensive additions and renovations to the middle school facility with work divided into 25 bid categories spanning earthwork, concrete, masonry, roofing, doors and hardware, mechanical/plumbing, electrical, and numerous specialty trades. A Pre-Bid Conference is scheduled for Monday, November 23 at 3:30 PM at Creekside MS, 179 West Roosevelt. Bids must be submitted in triplicate on the Bid Proposal Form and may be submitted for one bid category or a combination of multiple categories. Bid documents are available for examination at the Owen-Ames-Kimball Co. website and Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing, and Traverse City. Addenda will be issued no later than two days prior to the bid receipt date. After award, the Construction Manager will prepare and send a Notice of Pending Award to successful bidders, who must then furnish required submittals within ten (10) days, including insurance forms, cost breakdowns, subcontractor lists, manufacturer information, and schedule details.

Bid security is required in the form of a certified or cashier's check or bid bond payable to the Owner in an amount equal to five percent (5%) of the base bid. Each bid must be accompanied by a sworn and notarized Familial Disclosure Statement as required by Section 1267 of the Revised School Code. Bids may not be modified, withdrawn, or cancelled for sixty (60) days after the receipt deadline. For contracts exceeding $50,000, separate Performance and Payment Bonds are required. All contractors must comply with Owen-Ames-Kimball Co.'s Safety Policy and Requirements, obtain prevailing wage rate certification from the State of Michigan, and register with the Department of Labor and Economic Opportunity to submit certified payrolls. The required insurance shall name Owen-Ames-Kimball Co., the Owner, and the Architect as additional insureds on a primary and non-contributory basis using ISO form CG 20 37 07 04. Bidders are responsible for verifying that all prevailing wage information is current and complete at the time bids are received.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Zeeland Public Schools

BP-01: Creekside MS Additions & Renovations

SUPPLEMENT TO INSTRUCTIONS TO BIDDERS

STANDARD AIA FORMS

The Instructions to Bidders (AIA Document A701-2018 Edition), Articles 1 through 8, and as herein amended or added to, are a part of the Contract Documents, and shall apply to all Contractors, and/or Subcontractors.

ARTICLE 1 – DEFINITIONS Add Subparagraph 1.10 as follows:

1.10 All references made to Owner shall be implied to refer to the Construction Manager.

ARTICLE 3 – BIDDING DOCUMENTS

3.1 Distribution Add Subparagraph 3.1.6 as follows:

3.1.6 The Bidding Documents, including drawings, specifications, and necessary forms, can be examined at the following locations.

• Owen-Ames-Kimball Co. website: www.owen-ames-kimball.com/subcontractors/

• Builders Exchange plan rooms in Grand Rapids, Kalamazoo, Lansing, and Traverse City.

3.2 MODIFICATION OR INTERPRETATION OF BIDDING DOCUMENTS Revise Subparagraph 3.2.2. as follows: Line 2 shall read “…ten days…”

ARTICLE 4 – BIDDING PROCEDURES

4.1 PREPARATION OF BIDS Revise Subparagraph 4.1.1. and Add Subparagraph 4.1.6.1, 4.1.9 and 4.1.10 as follows:

Bids shall be submitted, in triplicate, on the Bid Proposal Form included within the bidding Documents.

4.1.6.1 Proposals will be accepted for one (1) Bid Category only, or a combination of two (2) or more Categories. If the Bidders wish to have their combined bid considered for separate categories, they must submit separate proposals for the individual category along with their combined bid proposal.

4.1.9 A Pre-Bid Conference will be held in accordance with the following schedule:

Date: Monday, 11/23

Place: Creekside MS, 179 West Roosevelt (Check in at main office)

Time: 3:30pm

4.1.10 In accordance with Section 1267 of the Revised School Code each bid must be accompanied by a sworn and notarized Familial Disclosure Statement completed by the bidder disclosing any familial relationship between the

Owner or any employee of the Bidder and any member of the District’s Board of Education or the Superintendent of the District.

4.2 BID SECURITY Add Subparagraphs 4.2.1.1, 4.2.1.2 and Revise Subparagraph 4.2.3 as follows:

4.2.1.1 Bid security shall be required for each bid tendered.

4.2.1.2 Bid security shall be in the form of either a CERTIFIED or CASHIER’S CHECK on an open and solvent bank or bid bond issued by surety company payable to the Owner in an amount equal to five percent (5%) of the base bid.

4.2.3 Revise Lines 1 and 2 to read “If a surety bond is provided the attorney-in-fact who …”.

4.3 ADDENDA Revise Subparagraph 4.3.3 as follows:

4.3.3 Addenda will be issued no later than two days prior to the date for receipt of Bids except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.

4.4 MODIFICATION OR WITHDRAWAL OF BIDS Revise Subparagraph 4.4.3 as follows:

4.4.3 After the time and date of receipt of Bids, a bid may not be modified, withdrawn or cancelled by the Bidder for sixty (60) days.

ARTICLE 5 – CONSIDERATION OF BIDS

5.3 ACCEPTANCE OF BID (AWARD) Revise Subparagraph 5.3.2 and add Subparagraph 5.3.4 as follows:

5.3.2 Revise Line 1 to read “…right to accept Mandatory and Voluntary Alternates in any order…”

5.3.3 Owner reserves the right to determine which bidders are considered the lowest qualified bidder and to award to said bidder.

5.3.4 After the Owner has awarded the Bid Categories the Construction Manager will prepare and send a Notice of

Pending Award to the successful Bidders.

ARTICLE 6 – POST-BID INFORMATION

6.1 CONTRACTOR’S QUALIFICATION STATEMENT Revise Subparagraph 6.1 as follows:

The Owner, Architect and Construction Manager may make such investigations as they deem necessary to determine the ability of the Bidder to perform the work. The Bidder shall furnish all such information and data for this purpose as the Construction Manager may request within twenty-four (24) hours, including, but not limited to, lists of projects completed, financial statements for the past two (2) years, a current list of work in progress. The Owner reserves the right, based on the advice of the Construction Manager and Architect, to reject any bid if the evidence submitted, or investigation of such Bidder, fails to prove that such Bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein.

6.3 SUBMITTALS Revise Subparagraph 6.3.1, replace Subparagraphs 6.3.1.1 thru 6.3.1.3 and add Subparagraphs

6.3.1.4 thru 6.3.1.6 as follows:

6.3.1 The Bidder shall within ten (10) days upon issuance of a Notice of Pending Award furnish to the Owner through the Construction Manager the following:

6.3.1.1 The necessary insurance forms as specified in the Bidding Documents.

6.3.1.2 A cost breakdown on the continuation sheets of the “Application and Certificate for Payment”, AIA Document

G703 showing all major work items, separated by both material and labor.

6.3.1.3 A list of the work which will be performed with the Bidder’s own forces, a list of their subcontractors and a list of work that will be performed by the subcontractor’s forces.

6.3.1.4 Names of the manufacturer’s, products and suppliers of principle items, materials or systems proposed for the work.

6.3.1.5 Schedule information.

6.3.1.6 The Bidder will be notified in writing if any of the above items are not acceptable.

ARTICLE 7 – PERFORMANCE BOND AND PAYMENT BOND

7.1 BOND REQUIREMENTS Revise Subparagraph 7.1.1 as follows and Delete Subparagraph 7.1.3

7.1.1 For Contracts exceeding $50,000 the Bidder shall furnish separate Performance and Payment Bonds covering the faithful performance of the Contract and the payment of all obligations arising thereunder.

ARTICLE 8 – FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR

8.1 Revise sentence to read: Copies of the proposed Contract Documents will be made available to the Awarded

Bidder as modified and would include but not limited to the following documents as issued by the Construction

Manager.

ARTICLE 9 – INSURANCE

9.1 INSURANCE REQUIREMENTS The required insurance will name Owen-Ames-Kimball Co., Owner and Architect, along with their respective officers, agents and employees are named as additional insureds for the auto liability and general liability on a primary and non-contributory basis for ongoing and completed operations. The ONLY acceptable endorsement for the additional insureds requirements is ISO form CG 20 37 07 04.

9.1.1 Commercial General Liability – ISO Occurrence form CG 20 10 07 04 and CG 20 37 07 04 are the required forms.

ARTICLE 10 – DESCRIPTION OF WORK Add paragraph 10.1 and 10.2

10.1 BID CATEGORIES Add Subparagraphs 10.1.1, 10.1.1.1, 10.1.1.2, 10.1.1.3 as follows:

10.1.1 Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in the Bid. If a conflict in the assignment of work exists between the Bidding Documents and the descriptions of these bid categories, the requirements of the bid category description(s) shall take precedence and the Construction Manager shall immediately be notified of the conflict. Bidders are to familiarize themselves with all Bid Categories.

10.1.1.1 Requirements for a specific Bid Category, trade or contract will generally be described in that portion of the

Specifications or Drawings related to that trade or contract. Such requirements may, however, be described in other sections of the contract documents. Contractors will be held responsible for having carefully examined all drawings and read all divisions of the specifications and all contract documents to avoid omissions or duplications and to ensure a complete job.

10.1.1.2 There is not necessarily a direct relationship between the Bid Category numbers or names and the

Specification Division or Section numbers.

10.1.1.3 Unless specifically noted as being furnished only, scopes include the complete installation including materials, labor, equipment, interface with the work of other trades, etc.

10.2 INDEX OF BID CATEGORIES Add paragraph 10.2

Bid Category No. 1 – Earthwork

Bid Category No. 2 – Concrete

Bid Category No. 3 – Masonry

Bid Category No. 4 – Joint Sealants

Bid Category No. 5 – Landscaping

Bid Category No. 6 – Metals

Bid Category No. 7 – Demolition

Bid Category No. 8 – General Trades

Bid Category No. 9 – Roofing

Bid Category No. 10 – Doors, Frames and Hardware

Bid Category No. 11 – Aluminum, Glass and Glazing

Bid Category No. 12 – Metal Wall Panels

Bid Category No. 13 – Lath, Plaster, Drywall and Acoustical (LPDA)

Bid Category No. 14 – Tiling

Bid Category No. 15 – Flooring

Bid Category No. 16 – Painting

Bid Category No. 17 – Casework and Countertops

Bid Category No. 18 – Window Treatments

Bid Category No. 19 – Toilet Partitions & Toilet Accessories

Bid Category No. 20 – Lockers

Bid Category No. 21 – Mechanical / Plumbing

Bid Category No. 22 – Testing and Balancing

Bid Category No. 23 – DDC Control System

Bid Category No. 24 – Commissioning

Bid Category No. 25 – Electrical / Communications & Security

10.3 BID CATEGORY DESCRIPTIONS Add paragraph 10.3

Bid Categories have been established to guide Bidders in determining scope of work where trade jurisdiction is not clearly defined. These descriptions are not meant to be all inclusive of work to be included in the Bid. Unless specifically noted as being furnished only or install only, scope includes complete installation including all labor, material, equipment, etc.

Bidders are required to familiarize themselves with all Bid Categories and Alternates.

BID CATEGORY NO. 1 – EARTHWORK

Include:

1. Complete site-related and site demolition work as shown on the drawings and as specified in the following sections:

31 1000 Site Clearing

31 2000 Earth Moving

31 3116 Termite Control

33 3115 Site Sanitary Sewerage Piping

33 4200 Stormwater Conveyance

2. All necessary surveying and staking for this contractor’s work. The Construction Manager will supply building control points and establish a benchmark.

3. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

4. Sleeves indicated on the drawings.

5. Slab and pavement subbase construction per details. Gravel subbase to be graded and compacted to +/- 0.05 foot. Final grading and proof rolling are the responsibility of the asphalt paving or concrete contractor. This contractor is responsible for compaction and/or correction of any areas that do not pass tests.

6. Responsible for keeping public roads clean of construction traffic dirt and debris.

7. Excavation, bedding materials, piping, structures, backfill, compaction, etc. as required for all underground utility construction, all to within 5 feet of the building unless noted otherwise.

8. Temporary tree and plant protection measures per Section 01 5639.

9. Strip, stockpile and respread topsoil to machine grade +/- 0.10 foot.

10. Site-related demolition, including but not limited to pavements, site walls, curbs, walks, utility structures, etc., per

Section 02 4116 Structure Demolition and the demolition drawings.

11. Soil erosion permit and erosion control; implement and maintain all BMP’s deemed necessary by the Certified

Storm Water Operator or the Agency having jurisdiction under Protection Act 451.

12. Maintain and control grades to facilitate the run-off of site surface water.

13. Supply and maintain barricading as required for the work of this contractor.

14. Excavation, over-excavation and controlled fill for building foundations installed by the concrete contractor, including proper disposal, at an off-site location, of unsuitable soils.

15. Responsible to follow the most stringent requirements between the architectural specifications and those listed in the recommendations of the geotechnical report.

16. See General Comment re: Demolition.

17. Demo of existing 4' black chain link fence at north end of project limits by new drive shown on Sheet C100. Only

50 LF has been removed by owner.

Exclude:

1. Testing will be provided for and paid for by the Owner.

2. Excavation and backfill for mechanical and electrical trades within 5 feet of the building.

3. Fine grading and proof rolling under pavements and slabs on grade (by paving/concrete contractor).

BID CATEGORY NO. 2 – CONCRETE

1. Complete concrete and related work as shown on the drawings and as specified in the following sections:

03 0130 Maintenance of Cast-in-Place Concrete

03 3000 Cast-in-Place Concrete

03 3543 Polished Concrete Finishing

03 6000 Post-Installed Anchors

07 2100 Thermal Insulation

32 1313 Concrete Paving

32 1373 Concrete Paving Joint Sealants

2. Fine grading and compacting for slabs on grade. The Earthwork contractor will establish subgrade +/- 0.05 foot.

Additional sand or removal of excess sand required to maintain final grade is this contractor’s responsibility.

3. Obtain the services of a registered surveyor to provide grade stakes prior to fine grading and prior to the placement of concrete. Any discrepancies of grades or structures must be reported to the Construction Manager prior to placing concrete.

4. Reinforcing steel, as shown.

5. Install embedded items supplied by others.

6. Necessary heat and weather protection for the completion of this contractor’s work.

7. Perimeter slab/foundation insulation.

8. Shoring and supports required for the completion of this contractor’s work.

9. Set and grout base/leveling plates and beam pockets, as indicated. Plates and anchor bolts for structural steel to be supplied by others.

10. Vapor barrier/retarder at all building slabs on grade per Section 07 2600.

11. Polished concrete finishing and concrete topping per Sections 03 3543 and 03 5300.

12. Concrete paving, curbs, sidewalks and concrete paving joint sealants per Sections 32 1313 and 32 1373.

13. Post-installed anchors per Section 03 6000.

14. Maintenance of / patching existing cast-in-place concrete per Section 03 0130.

15. Joint sealants at exposed concrete slabs.

16. See General Comment re: Anchor Bolt Locations.

Exclude:

1. Testing will be provided by the Owner.

2. Light pole bases (by Electrical) and flagpole/concrete flag bases (by General Trades).

3. Housekeeping and/or equipment pads (by the trade requiring same).

BID CATEGORY NO. 3 – MASONRY

1. Complete masonry and related work as shown on the drawings and as specified in the following sections:

04 0110 Masonry Cleaning

04 2000 Unit Masonry

07 2100 Thermal Insulation

07 2119 Foamed-in-Place Insulation

07 2500 Weather Barriers

07 9219 Acoustical Joint Sealants

07 8443 Joint Firestopping

2. Installation of anchor bolts and embedments furnished by others. Coordinate location of anchor bolts with trade(s) requiring same.

3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc. as shown and/or specified.

4. Grouting solid or hollow metal frames in masonry. Verify frames are plumb within an 1/8” at 10’.

5. Weld anchors where specified or required.

6. Necessary heat/weather protection for this contractor’s work.

7. Clean all new masonry per Section 04 0110.

8. Flashings and weepholes concealed in masonry work. Includes pre-finished flashings.

9. Cavity wall insulation, rigid insulation at brick veneer, and dampproofing.

10. Fire safeing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the wall system, where shown.

11. Patching, toothing, saw-cutting, tuckpointing, etc. where existing walls (interior and exterior) were removed.

Include any necessary patching of walls that were tied into walls removed. Coordinate existing masonry wall demo with demolition contractor for any new openings/portal walls/etc.

12. Cut, patch and install new beam pockets in existing walls for structural components.

13. Grouting of existing walls for new structural components where shown and/or required.

14. Mineral wool firestopping at tops of your walls per plans/specifications.

Exclude:

1. Setting of hollow metal frames will be by the General Trades contractor.

2. Fire-resistant joint sealers and firestopping at through-wall penetrations are by the contractors for Divisions 21, 22, 23, 26 and 28.

BID CATEGORY NO. 4 - JOINT SEALANTS

1. Complete moisture and firestopping protection work shown on the drawings and as specified in the following sections:

07 1900 Water Repellents

07 2726 Fluid-Applied Membrane Air Barriers

07 8413 Penetration Firestopping

07 9100 Preformed Joint Seals

07 9200 Joint Sealants

07 9513.16 Exterior Expansion Joint Cover Assemblies

2. Acoustical sealants at items built into wall construction (i.e. door frames). Acoustical sealant being an integral part of wall construction (i.e. top of wall) shall be by others.

3. Joints in concrete and masonry wall construction, as required.

4. Joint sealants at the perimeter of metal panel systems.

5. Provide/install expansion joint assemblies including but not limited to details on sheet A351 for example.

Exclude:

1. Fire resistant joint sealants.

2. Joint sealants at exposed concrete slabs.

3. Joint sealants at the perimeter of aluminum windows, curtainwalls and storefront systems.

4. Expansion joint assemblies in roofing shall be by roofing contractor.

BID CATEGORY NO. 5 – LANDSCAPING

Include:

1. Complete landscaping and related work as shown on the drawings and as specified in the following sections:

32 9113 Soil Preparation

32 9200 Turf and Grasses

32 9300 Plants

2. Soil preparation, topsoil placement and fine grading of planting and lawn areas from the machine grade left by the Earthwork contractor.

3. Provide topsoils and planting soils as required per landscape plans and CM Supplemental drawing showing areas of disturbance. Include fine grading and soil preparation per plans and specifications.

4. Furnish and install all plants, trees, shrubs, turf, seed and/or sod as shown and specified.

5. Site furnishings per Section 32 3300.

6. Maintenance and watering of plant material through the specified establishment/warranty period.

7. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

Exclude:

1. Irrigation system (not included in this project).

2. Rough grading to machine grade +/- 0.10 foot (by the Earthwork contractor).

BID CATEGORY NO. 6 – METALS

1. Complete metal fabrication work as shown on the drawings and as specified in the following sections:

05 1200 Structural Steel Framing

05 2100 Steel Joist Framing

05 3100 Steel Decking

05 5000 Metal Fabrications

2. Furnish and deliver all incidental steel and anchor bolts installed under other bid categories.

3. Take field measurements, onsite surveys and inspections required for the ordering and/or installation of items provided under their scope of work.

4. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

5. Furnish and erect all metal fabrications, including miscellaneous steel, lintels, angles, ladders, railings and similar items shown.

6. Necessary shoring and support for the completion of this contractor’s work.

7. Loose steel lintels furnished for installation by the Masonry contractor.

8. Markings on steel shall be placed on areas of the member which are concealed or shall be removed completely prior to finish painting.

9. Provide for holes in steel members that require subsequent installation of blocking and or utility openings/passage.

10. See General Comment re: Anchor Bolt Locations.

1. Testing will be provided by and paid for by the Owner.

2. Cold-formed metal framing (Section 05 4000) is included in the LPDA bid category.

3. Steel bollards will be set by others (concrete fill by Concrete).

BID CATEGORY NO. 7 – DEMOLITION

1. Complete building structure demolition and selective demolition as shown on the drawings and as specified in the following sections:

02 4116 Structure Demolition

02 4119 Selective Demolition

2. Architectural and structural demolition of the building(s) as shown on the demolition plans, including removal and legal off-site disposal of all resulting debris.

3. Coordinate all demo of existing masonry walls for new openings/portal frames/etc with masonry contractor prior to starting demolition of said walls.

4. All shoring is to be designed/stamped by certified engineer.

5. Survey existing conditions to determine the extent of demolition affecting this scope of work.

6. Provide dumpsters for architectural and structural demolition debris; such debris shall not be placed in

Construction Manager dumpsters. See General Comment re: Demolition.

7. All saw cutting of existing floors are to be radar scanned for any existing utilities/materials prior to cutting. See

General Comments notes, “Demolition”. Include removal of all existing floor slabs at new CMU non-load bearing walls per detail 4/S301.

8. Temporary protection, dust partitions, and shoring required to perform demolition safely in and adjacent to occupied areas.

9. Cutting, capping and safe-off coordination with the mechanical, plumbing, electrical and fire alarm trades prior to their respective demolition.

10. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

Exclude:

1. Site-related demolition (by the Earthwork contractor).

2. HVAC/plumbing, electrical and fire alarm demolition (by their respective contractors).

3. Patching of items resulting from demolition (by the contractor responsible for similar elements throughout the building).

4. Demolition of the WAP’s, AV projector screens, projectors and mounts by others.

5. Removal and reinstallation of bookshelves and circulation desk in Media Center A104 by General Trades.

BID CATEGORY NO. 8 – GENERAL TRADES

Include:

1. Complete general work as shown on the drawings and as specified in the following sections:

06 1000 Rough Carpentry

06 1600 Sheathing

06 4023 Interior Architectural Woodwork

06 6116 Solid Surfacing Fabrications

07 1700 Bentonite Waterproofing

08 1113 Hollow Metal Doors and Frames (Install Only)

08 1243 Fire-Resistance-Rated Frames (Install Only)

08 1416 Flush Wood Doors (Install Only)

08 7100 Door Hardware (Install Only)

10 1100 Visual Display Units

10 1423.18 ADA and Code Required Panel Signage

10 2600 Wall and Door Protection

10 4116 Emergency Key Cabinets

10 4413 Fire Protection Cabinets

10 4416 Fire Extinguishers

13 4823 Fabricated Sound and Vibration Control Assemblies

2. Schedule, take delivery, inventory, store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not so noted are to be furnished and installed.

3. Verify HM frames are plumb and square during masonry wall construction or within 24 hours of being constructed. Notify CM and masonry trade with any discrepancies.

4. Take field measurements, onsite surveys and inspections required for the ordering and/or installation of items provided under their scope of work.

5. Furnish and erect all blocking shown on the drawings or as specified in Rough Carpentry. Include all blocking not shown but incidental to your scope of work.

6. Roof sheathing/blocking as shown. Prior to installation schedule a meeting with the roofing contractor to coordinate requirements and notify the Construction Manager’s superintendent to attend. Refer to 6A &

7A/A322 as examples.

7. Rough carpentry, sheathing, interior architectural woodwork, flush wood paneling and solid surfacing fabrications per Division 06.

8. FRT wood locker bases as shown on plans per keyed note A07, coordinate final dimensions with Locker contractor prior to installation.

9. Install (only) hollow metal and fire-rated frames, flush wood doors and door hardware furnished by the Doors, Frames and Hardware contractor. Set all hollow metal frames, including those in masonry.

10. Provide/install 3'-0"x7'-0" 1 hour fire rated door and frame for use in temp fire wall. Door to have closer and lockable hardware. Install owner supplied door/frame/hdwr in second temp. wall assembly. See CM supplemental drawing for location and wall type.

11. Installation of electric strikes (power supplies installed by Electrical).

12. Visual display units, wall and door protection, fire protection cabinets, fire extinguishers, projection screens, and fabricated sound/vibration control assemblies.

13. Protect the tops of casework and countertops with cardboard until all work is completed in a given area.

14. Removal of all projection screens shown on demolition plans. Coordinate location for storage with CM for turnover to owner. Note that in Unit D, screens will remain for D122, D109 and D106. However, include reinstallation of screens in D141 and D118.

15. Provide temporary enclosures for all exterior openings at new additions. Enclosures to be constructed of wood

2x framing and reinforced plastic (min.). Also include construction access doors as follows:

a. Unit D Addition: latch-able and lockable double-door located at west end of corridor.

b. Unit D Addition: latch-able and lockable double-door located at north end at vestibule.

c. Include removal and disposal of all temporary items outlined above.

16. Include removal and reinstallation of bookshelves and circulation desk in Media Center A104 to allow for new flooring finish work.

17. Install rigid insulations shown at tops of parapets and screen walls furnished to you by Roofing trade. Pre-buck parapet blockings are preferred regardless of how detailed on drawings.

18. Include ADA Code required signage, including any mounting hardware and coordination of mounting heights per

ADA requirements.

19. Wall padding shown on Architectural drawings per note A06. Refer to Cool Down D154 and Sensory D155 rooms as an example.

20. See General Comment re: Access Doors.

21. See General Comment re: Demolition.

Exclude:

1. Installation of door hardware associated with aluminum entrances (by the Aluminum, Glass and Glazing contractor).

2. Automatic door operators (furnished and installed by the Doors, Frames and Hardware contractor).

BID CATEGORY NO. 9 – ROOFING

1. Complete roofing and related work as shown on the drawings and as specified in the following sections:

07 2100 Thermal Insulation

07 2500 Weather Barriers

07 5323 EPDM Roofing

07 6200 Sheet Metal Flashing and Trim

07 7100 Roof Specialties

07 7129 Manufactured Roof Expansion Joints

07 7200 Roof Accessories

2. Wood blocking needed solely for the installation of the roofing and/or metal panel system and not shown on the drawings.

3. Review mechanical plans for all locations of new RTU’s, EF’s, relief hoods, etc for patching around those items on existing roofs.

4. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

5. Flash and seal penetrations through roofing membranes, both existing and new. Existing warranties are to be protected and maintained.

6. Snow removal as required for the completion of this contractor’s work.

7. Flashing of prefabricated equipment curbs installed by Mechanical contractor.

8. Mineral wool insulations within your assemblies. See 7A/A322 for example.

9. Provide rigid insulations shown at tops of parapets and screen walls for installation by General Trades.

10. Include flexible flashings and terminations behind metal panels per plans/specifications placed prior to spray-foam insulations.

BID CATEGORY NO. 10 – DOORS, FRAMES AND HARDWARE

1. Furnish and deliver doors, frames and hardware as shown on the drawings and as specified in the following sections:

08 1113 Hollow Metal Doors and Frames

08 1243 Fire-Resistance-Rated Frames

08 1416 Flush Wood Doors

08 7100 Door Hardware

08 8813 Fire-Rated Glazing

2. Coordination with the supplier(s) of steel frames and finish hardware.

3. Take field measurements, onsite surveys and inspections required for the ordering of items provided under their scope of work.

4. Multiple deliveries may be required. Coordinate with the project schedule.

5. Provide temporary keying system during construction.

6. Automatic door operators (furnish and install).

7. Coordinate/verify door undercuts at all floor finishes.

8. Furnish electric strikes and power supplies for openings covered under this category. Electrical to install power supplies; General Trades to install electric strikes.

9. All fire rated glass scheduled per plans and specs in your doors.

Exclude:

1. Installation is by the General Trades contractor.

2. Furnishing of hardware for aluminum entrances, regardless of how specified in Section 08 4113 or in a section referenced in another bid category (by the Aluminum, Glass and Glazing contractor).

BID CATEGORY NO. 11 – ALUMINUM, GLASS AND GLAZING

Include:

1. Complete aluminum, glass and glazing work as shown on the drawings and as specified in the following sections:

07 2100 Thermal Insulation

08 1116 Aluminum Doors and Frames

08 1216 Aluminum Frames

08 8300 Mirrors

08 4113 Aluminum-Framed Entrances and Storefronts

08 7100 Door Hardware

08 8000 Glazing

08 8853 Security Glazing

10 8600 Security Mirrors and Domes

2. Furnish and install all door hardware associated with aluminum entrances, including closers, panic hardware, locks and thresholds, regardless of the section in which specified.

3. Take field measurements, onsite surveys and inspections required for the ordering and/or installation of items provided under their scope of work.

4. Perimeter sealants at aluminum windows, curtainwall and storefront systems.

5. All glazing, including interior borrowed lites and glazing at hollow metal and wood doors/frames as scheduled.

6. Batt/thermal insulation installed within curtainwall or storefront frames.

7. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

8. Frameless mirrors.

1. Fire rated glass in wood doors by others.

BID CATEGORY NO. 12 –METAL WALL PANELS

1. Complete metal wall panel and related work as shown on the drawings and as specified in the following sections:

07 2119 Foamed-in-Place Insulation

07 2500 Weather Barriers

07 2600 Vapor Retarders

07 4213.13 Formed Metal Wall Panels

07 4293 Soffit Panels

2. Formed metal wall panels and soffit panels, trims, etc., including panel-to-panel and perimeter joint sealants.

Coordinate sealant compatibility with the products installed. Include all misc. framing materials and furring (girts) require per plans/specifications.

BID CATEGORY NO. 13 – LATH, PLASTER, DRYWALL AND ACOUSTICAL (LPDA)

Include:

1. Complete finish and related work as shown on the drawings and as specified in the following sections:

05 4000 Cold-Formed Metal Framing

07 2100 Thermal Insulation

07 8100 Applied Fireproofing

07 8443 Joint Firestopping

07 9219 Acoustical Joint Sealants

09 2216 Non-Structural Metal Framing

09 2900 Gypsum Board

09 5113 Acoustical Panel Ceilings

09 8433 Sound-Absorbing Wall Units

09 8436 Sound-Absorbing Ceiling Units

2. Cold-formed metal framing per Section 05 4000, including exterior wall framing, and non-structural metal framing per Section 09 2216.

3. Fire safeing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the wall system, where shown.

4. All rigid insulation not in composite masonry walls, at foundation walls, or part of roofing systems.

5. All sound and batt insulation, except that installed in curtainwall or storefront frames.

6. Gypsum board assemblies, acoustical panel and tile ceilings and sound-absorbing wall/ceiling units.

7. Provide 1HR rated temp walls per CM Supplemental plan. Coordinate door openings with General Trades and

CM.

8. Mineral wool firestopping at tops of your walls per plans/specifications.

9. See General Comment re: Access Doors.

10. See General Comment re: Temporary Interim Classrooms -Unit B (Alternate No. 3).

1. Fire-resistant joint sealers and firestopping at through-wall penetrations are by others.

2. Acoustical sealants at built-in items (i.e. door frames) shall be by others.

3. Fire protection heads shall be cut in by the fire protection contractor.

BID CATEGORY NO. 14 – TILING

1. Complete tiling and related work as shown on the drawings and as specified in the following section:

09 3000 Tiling

2. Minor preparation of floor and wall surfaces such as grinding, patching, latexing, laitance, scum and paint removal, etc.

3. Setting materials, waterproofing/crack-isolation membranes, grout, movement joints and transition/edge trim as required.

4. Caulking of control joints in tile surfaces.

5. Final cleaning of tile surfaces.

6. Take special note of patching work required to be performed with owner-provided attic stock.

BID CATEGORY NO. 15 – FLOORING

1. Complete resilient and carpet flooring as shown on the drawings and as specified in the following sections:

09 6500 Resilient Flooring

09 6513 Resilient Base and Accessories

09 6566 Resilient Athletic Flooring

09 6813 Tile Carpeting

09 6816 Sheet Carpeting

2. Minor preparation of floor surfaces such as grinding, patching, latexing, laitance and scum removal, moisture testing and moisture mitigation as required.

3. Required reducer strips, transition strips and resilient base.

4. Include major floor preparation at all new door openings located at existing building to new addition transitions as well as Unit B area where toilet room removal is shown.

5. See General Comment re: Temporary Interim Classrooms -Unit B (Alternate No. 3).

BID CATEGORY NO. 16 – PAINTING

1. Complete painting and finishing work as shown on the drawings and as specified in the following sections:

09 9114 Exterior Painting

09 9123 Interior Painting

09 9628 Electrostatic Painting

2. Painting of exposed mechanical, fire protection, and electrical piping and equipment. Include painting of exposed exterior piping as well -refer to Plumbing Roofing Plans (P102 sheets), Units B, D, E & J.

3. Final touch-up.

4. Finishing of running wood trim and paneling veneers, including filling of nail holes; staining and transparent finishing per Section 09 9300.

5. Electrostatic painting of designated factory-finished items per Section 09 9628.

6. Stenciling above ceilings for all rated wall identifications at multiple locations as required and shown per detail.

7. Refer to BC 22 -Lockers, note #4: Locker Removal/Salvaging and Interim Relocation. Read this note to understand handling of painting of existing lockers.

8. See General Comment re: Temporary Interim Classrooms -Unit B (Alternate No. 3).

1. Wood doors are prefinished.

BID CATEGORY NO. 17 – CASEWORK AND COUNTERTOPS

Include:

1. Furnish and install casework and countertops as shown on the drawings and as specified in the following sections:

12 3216 Manufactured Plastic-Laminate-Clad Casework

12 3550.14 Instrument Storage Casework

12 3553.16 Plastic-Laminate-Clad Laboratory Casework

12 3623.13 Plastic-Laminate-Clad Countertops

12 3661 Simulated Stone Countertops

22 4000 Plumbing Fixtures (SK-1 & SK-2 sinks only)

2. Take field measurements, onsite surveys and inspections required for the ordering and/or installation of items provided under their scope of work to meet the project schedule.

3. All blocking, cleats and supports required for casework and countertop installation that are not shown but incidental to this scope.

4. Cut-outs in countertops for sinks and fittings; coordinate sink cut-ins with the Mechanical/Plumbing contractor.

5. Coordinate all wall rough-ins with the elements shown in elevations, i.e. cabinets, tackboards, etc.

6. Final cleaning of casework and countertops.

7. Provide/install SK-1 and SK-2. Connections by Mech/Plmg trade.

1. Plumbing fixtures, sinks and faucets not specifically noted to be included in your BC above (furnished and installed by the Mechanical/Plumbing contractor).

2. Final electrical connections at casework by Electrical.

3. SK-1 & SK-2 sinks connected by Mechanical/Plumbing.

BID CATEGORY NO. 18 – WINDOW TREATMENTS

1. Furnish and install window treatments as shown on the drawings and as specified in the following section:

12 2413 Roller Window Shades

11 6413 Stage Curtains

2. All blocking, pockets and supports required for the installation of the shades that are not shown but incidental to this scope. Coordinate blocking requirements with the General Trades contractor.

3. Take field measurements required for the ordering and installation of the shades.

4. Final cleaning and adjustment of installed shades.

BID CATEGORY NO. 19 – TOILET PARTITIONS & TOILET ACCESSORIES

Include:

1. Furnish and install toilet compartments and toilet & bath accessories as shown on the drawings and as specified in the following section:

10 2113.19 Plastic Toilet Compartments

10 2113.23 Fiberglass Reinforced Plastic Toilet Compartments

10 2800 Toilet, Bath, and Laundry Accessories

2. All mounting brackets, hardware, blocking and supports required for a complete installation.

3. Coordinate delivery, inventory and mounting locations with the General Trades contractor, who will install the accessories.

4. Provide required blocking layout information to the General Trades / LPDA contractors.

BID CATEGORY NO. 20 – LOCKERS

1. Complete metal lockers work as shown on the drawings and as specified in the following section:

02 4119 Selective Demolition

10 5113 Metal Lockers

2. All mounting hardware, trim, sloped tops, fillers, end panels and number plates required for a complete installation.

3. Removal of existing lockers not shown to be relocated. Turn-over excess stock of lockers to owner.

4. Locker Removal/Salvaging and Interim Relocation:

o Base Bid: Remove existing lockers from units E & D (Summer ’27), haul and store off-site, return to site for electrostatic painting process by painter (Summer ’28) and reinstall in permanent locations shown in Unit J after painting process completed. (See CM Supplemental drawing) o Alternate #4 (Interim Relocation): Remove existing lockers from units E & D and reinstall them temporarily in Unit B the Summer ’27 (See CM Supplemental drawing). In Summer ’28, select the quantity of existing lockers required to be salvaged/reinstalled in Unit J as necessary and relocate to a location on site

TBD for the electrostatic painting process by painter. Relocate and reinstall painted lockers in unit J after painting process is completed.

5. Final cleaning and adjustment.

1. FRT wood locker bases as shown on plans per keyed note A07 by General Trades.

BID CATEGORY NO. 21 – MECHANICAL / PLUMBING

Include:

1. Complete plumbing, HVAC and related work as shown on the drawings and as specified in Plumbing Division 22 and HVAC Division 23, except as noted below:

23 0593 Testing, Adjusting and Balancing

23 0900 Instrumentation and Control for HVAC

2. Take field measurements, onsite surveys and inspections required for the ordering and/or installation of items provided under their scope of work.

3. Wall louvers.

4. Fire resistant joint sealers as specified in Section 07 8413 for all mechanically- and plumbing-associated penetrations (firestopping of own penetrations).

5. Facility natural gas piping, hydronic piping and pumps, refrigerant piping, HVAC water treatment, metal ducts and accessories, air terminal units, diffusers/registers/grilles, and gravity ventilators per Division 23.

6. Condensing boilers, packaged compressor/condenser units, air-handling units, blower coil units and unit heaters per Division 23.

7. Domestic water piping and specialties, sanitary waste and vent piping, storm drainage piping, domestic water heaters and plumbing fixtures per Division 22.

8. Prefabricated equipment curbs. Coordinate timing with CM and Roofing trade.

9. Housekeeping and/or equipment pads required for the installation of this contractor’s equipment, whether or not indicated on the drawings.

10. HVAC and plumbing demolition required to facilitate new construction and/or remodeling. Survey existing conditions to determine the extent of this work. See General Comment re: Demolition.

11. Cut-in templates of sinks furnished under this bid category, coordinate with the Casework and Countertops contractor.

12. Access doors required for access to mechanical/plumbing systems, furnished to the Masonry/LPDA contractors for installation. See General Comment re: Access Doors.

13. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

14. Include connection of SK-1 & SK-2 sinks.

15. See General Comment re: Temporary Interim Classrooms -Unit B (Alternate No. 3).

16. Provide the residential grade kitchen light/exhaust hoods in Life Skills spaces. Other appliances by ZPS where shown.

Exclude:

1. Testing, adjusting and balancing (by the Testing and Balancing contractor).

2. SK-1 and SK-2 sinks provided/installed by casework contractor, connections by this contractor.

3. DDC control system (by the DDC Control System contractor).

4. Commissioning (by the Commissioning contractor).

5. Final electrical power connections to mechanical equipment by Electrical.

BID CATEGORY NO. 22 - TESTING and BALANCING (ControlNET)

1. Complete testing and balancing of systems and related work as shown on the drawings and as specified in the following sections:

23 0593 Testing, Adjusting and Balancing

2. A minimum of two site visits to complete a pre-functional checklist of all equipment as shown on Mechanical and

Electrical drawings. Requirements include submission of written checklist to the Construction Manager.

3. Sample Documentation with the bid.

4. See General Comments re: Commissioning.

BID CATEGORY NO. 23 - DDC CONTROL SYSTEM & ACCESS CONTROL (ControlNet)

1. Complete Direct Digital Control systems and related work as shown on the drawings and as specified in specification: 23 0900 -Instrumentation and Control for HVAC

2. Furnish all motorized dampers, including exhaust fan dampers for installation by Mechanical trade.

3. All actuators.

4. Coordinate with electrical rough-ins.

5. Coordinate with related mechanical system installations.

6. Fire resistant joint sealers as specified in Section 07 8413 for all penetrations associated with this bid category.

7. Furnish, mount, start, and commission VFD’s. Electrician provides power.

8. Applicable fees, permits, inspections, etc…as required for the completion of the work in this bid category.

9. All required low voltage wiring for motorized dampers.

10. Sequence of Operations and Control Points. See M601 for example.

11. Access control wiring and hardware for door controls.

12. See General Comment re: Access Doors

13. See General Comments re: Fireproofing.

14. See General Comments re: Commissioning

BID CATEGORY NO. 24 - COMMISSIONING (By Functional Consulting Services)

Include:

1. Complete commissioning of systems and related work as shown on the drawings and as specified in the following sections:

01 9113 General Commissioning Requirements

22 0800 Commissioning of Plumbing

23 0800 Commissioning of HVAC Systems

2. A minimum of two site visits to complete a pre-functional checklist of all equipment as shown on Mechanical and

Electrical drawings. Requirements include submission of written checklist to the Construction Manager.

3. Sample Documentation with the bid.

4. Work required from General Commissioning Requirements. Note item C in 01 9113. Expectation is that active engagement and observations are occurring from this contractor during the construction of this project.

5. DDC Control Systems shall assist in providing remote BAS access and providing trend logs of documented set points, derived values and charted values.

6. See General Comments re: Commissioning.

BID CATEGORY NO. 25 – ELECTRICAL / COMMUNICATIONS & SECURITY

1. Complete electrical and related work as shown on the drawings and as specified as follows:

01 9113 General Commissioning Requirements.

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety and Security

2. Temporary electrical system(s) if necessary. This trade to determine the need to provide based on existing conditions. If provided, remove upon the direction of the Construction Manager.

3. Technology and communications related (voice, data, video, etc.) boxes, raceways and pull wires as required by the documents. Coordinate with appropriate contractor(s). Refer to technology provision matrix provided on

Sheet TG001.

4. Fire resistant joint sealers as specified in Sections 07 8413 for all electrical associated penetrations.

5. Take field measurements, onsite surveys and inspections required for the ordering and/or installations of items provided under their scope of work.

6. Applicable fees, permits, inspections, etc. as required for the completion of the work in this bid category.

7. Third party Lighting Control Commissioning as required for permitting.

8. Furnish and install electrical sleeves.

9. Final hook-up of mechanical equipment and installation of power supplies for electric strikes. Power for DDC control panels, figure 3 locations if none provided on electrical drawings.

10. Install power supplies for electric strikes. See Door Hardware schedule for locations.

11. Housekeeping and/or equipment pads not shown but required for the installation of this contractor’s equipment.

12. Demolition of and removal of electrical, fire alarm, security/access systems required to facilitate new construction and/or remodeling. It is this contractor’s responsibility to survey existing conditions to determine the extent that this affects this scope of work.

13. Cutting/removal of floor slab shown on architectural drawings will be by demolition contractor. Any additional floor cutting/removal required by this trade that is not shown on the drawings will be the responsibility of this contractor. Note that floor scanning is required prior to any floor cutting.

14. Demo of existing CMU for installation of new electrical, minimal removal for installation of flexible conduit only.

Owner to carry an allowance for patching with masonry contractor. Detail 1/E 410 for example.

15. This contractor is responsible for soil removal/replacement/compaction as a result of trenching of any of your conduits. (Interior and exterior locations)

16. Any fire alarm wiring and devices as required.

17. Metal support framing specifically required for support of electrical systems.

18. All conduit and cabling for A/V (Speakers, WAP’s, Teaching Stations, etc.) , Public Address System, Clocks and

Security Cameras. Owner to provide hardware/devices to this contractor for installation.

19. Removal of all WAP’s, AV projectors and mounts shown on demolition plans. Coordinate location for storage with CM for turnover to owner. Note that in Unit D, all previously mentioned items will remain for D122, D109 and D106. However, include reinstallation of previously mentioned items in D141 and D118.

20. Include rough-in for all stats/sensors.

21. Include final connections for owner provided appliances.

22. Include connection and disconnection of power to CM job trailer.

23. See General Comments re: fireproofing.

24. See General Comment re: Access Doors.

25. See General Comment re: Demolition.

26. See General Comments re: Commissioning.

27. See General Comment re: Temporary Interim Classrooms -Unit B (Alternate No. 3).

GENERAL COMMENTS

Support for Building Systems/Components:

Any component of the building construction that requires support and/or blocking that is not shown in the

Documents shall be provided by the contractor that is responsible for the installation of the component.

Anchor Bolt Locations:

1. After anchor bolts have been placed and concrete foundation work completed in one or more areas of the building, as agreed upon by the Construction Manager, the concrete contractor shall survey/verify the location and elevation of all anchor bolts. Any variation in location and elevation of the anchor bolts shall be noted on the approved anchor bolt layout drawing and given to the Construction Manager, who shall forward it to the structural steel contractor. If any anchor bolt is not located properly, and the structural steel contractor agrees that the anchor bolt can remain as located, then, with the approval of the structural engineer, the anchor bolt will not be removed, but the concrete contractor shall bear all costs related to any adjustment necessary in the column base plate. If the anchor bolt is required to be relocated, the concrete contractor shall immediately do so as not to delay the installation of the structural steel.

Access Doors:

1. The responsibility for access doors shall be as follows: the General Trades contractor shall furnish all access doors that are shown on the Documents to be installed by the masonry contractor in masonry partitions and by the

LPDA contractor in drywall partitions, drywall ceilings or acoustical ceilings. Any access door that is not shown in the Documents, but that is required by the plumbing, HVAC or electrical contractor, shall be provided by the contractor that requires the access door. The door shall be furnished to the masonry contractor for installation into masonry partitions and to the LPDA contractor for installation into drywall partitions, drywall ceilings or acoustical ceilings.

Fireproofing:

1. The LPDA contractor shall include in the base bid return trips to touch up all spray fireproofing that may be disturbed by other trades during the installation of their work. However, any unreasonable destruction of the fireproofing by the trade contractors will not be considered touch-up, and the cost of repairing these areas shall be the responsibility of the contractor causing damage (backcharge).

Demolition:

1. Dumpsters provided by the Construction Manager for use during construction shall not be available for the disposal of the following items: debris resulting from architectural, structural, mechanical, or electrical demolition operations; site-related materials; paint products; hazardous materials. Contractors generating such materials shall provide dumpsters for them and legally dispose of them off site.

2. Unless specifically noted otherwise the division of demolition work shall be as follows: Earthwork contractor – site demolition; Demolition / General Trades contractor – architectural and structural demolition;

Mechanical/Plumbing contractor – HVAC and plumbing demolition; Electrical contractor – electrical demolition;

Fire Alarm contractor – fire alarm demolition.

3. Demolition shown on the demolition plans is the responsibility of the Demolition / General Trades contractor.

Patching of items as a result of demolition shown on the demolition plans is…