04. Current and Future APF Room and PEC Needs.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
NIH CC Aseptic Processing Facility (APF) Certification and Testing Program Federal contract opportunity
Solicitation number
HHSN-21-Q-000048
Issued by
Department of Health and Human Services National Institutes of Health Clinical Center

About this file

This document contains details regarding a federal solicitation for certification and testing services for the Aseptic Processing Facility at the National Institutes of Health Clinical Center. The solicitation is seeking a firm-fixed price IDIQ contract to provide cleanroom certification, HEPA filter testing and maintenance, air visualization studies, equipment calibration, and controlled temperature unit qualification program services at NIH APF facilities in Bethesda, Maryland. The base period of performance is one year with four one-year option periods. Quotes are due by April 9, 2021 and award is intended by May 1, 2021. Evaluation will be based on technical qualifications, past performance, and price, with technical/past performance more important than price. The North American Industry Classification System code is 541380 and small businesses must meet a $16.5 million annual receipts standard.

View the file

Other files for this federal contract opportunity

Other files attached to NIH CC Aseptic Processing Facility (APF) Certification and Testing Program, newest first.
File Type Posted
05. Solicitation Amendment # 0002.pdf PDF
01. Price Schedule.xlsx XLSX spreadsheet
05. Solicitation Amendment # 0001.pdf PDF
04. Attachment C009 - PET GMP Lab B3 Layout HEPA Locations.pdf PDF
04. Attachment C006 - NCI TR-10B Reflected Ceiling Plan HEPA Locations.pdf PDF
04. Attachment C002 - CCE 2J Duct Layout West HEPA Locations.pdf PDF
04. Attachment C001 - CCE 2J Duct Layout East HEPA Locations.pdf PDF
04. Baseline Equipment and Calibration Needs.xlsx XLSX spreadsheet
01. RFQ - HHSN-21-Q-000048.pdf PDF
04. Attachment C012 - Pharmacy P-IVAU - Reflected Ceiling Plan HEPA 65. pdf.pdf PDF
04. Attachment C011 - Pharmacy IIVAU Reflected Ceiling Plan HEPA Locations.pdf PDF
04. Attachment C005 - NCI TIL Modular Ceiling Plan HEPA Locations.pdf PDF
04. Attachment C003 - CCE Terrace Modular Reflected Ceiling Plan HEPA Locations.pdf PDF
04. Attachment C007 - NCI 1B42 Reflected Ceiling Plan HEPA Locations.pdf PDF
04. Attachment C010 - Pharmacy E-IVAU Reflected Ceiling Plan HEPA Locations.pdf PDF
04. Attachment C008 - NCI 3W MECH Layout.pdf PDF
04. Attachment C004 - DLM Sterility Lab Reflected Ceiling Plan HEPA.pdf PDF
01. Price Schedule.xlsx XLSX spreadsheet
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APF - Current

APF Certification
Area# ISO Classified Rooms# of CNC RoomsTotal # of HEPA filters (ISO and CNC)Total Number of HEPA equipped PassthrusTotal # of Non-viable air samples - ISO# of PECs (LAFW/BSC/Isolator)# of Rooms for AVSFrequency of Room Certification (per year)Frequency of PEC certification (per year)
CQV End Date or most recent room certification/HEPA testingSatisfactory AVS performed (Yes/No)PEC CertificationDate of next required Room CertDate of next Required PEC certContact PersonNotes
I-IVAU101139090502212/11/19Yes12/11/196/30/206/30/20M. Ferron

C. Hamilton

2J1733911001002212/9/19Yes12/9/196/30/206/30/20R. Somerville
3T143150981500212/14/19N/A12/14/196/30/206/30/20R. Somerville
1B42 and Support Lab3050134 (2 in 1B42, 2 in Support Lab)02212/11/19Yes12/11/206/30/206/30/20Rachel Beyer

Hyunmi Halas cGMP Trailer 10B 2 1 8 1 13 1 0 2 2 2/27/20 Yes 2/26/20 8/31/20 8/31/20 Rachel Beyer Hyunmi Halas

PET GMP and Radiopharm31232 (1 of 2 pending install)9331 - CNC
2 - GMP23 GMP HEPA units : Sept 2019
20 CNC HEPA units : Mar 2019Yes9/2019 (2 units)
12/2019 (1)3/30/2020 (3 GMP units + 20 CNC units)
3/30/2020 (2 units)

6/30/2020 (1 unit) Taraneh Norouzi 5 total PECs, 2 currently not in use CNC HEPA annual, GMP HEPA semi-annual

Pharm
3-17410100010023/11/20N/A3/11/20TBD9/30/20M. Ferron
C. Hamiltonwill require dP and ACH calculations for room
CRC TIL (3W) and Support Lab206 + 1 FFU0295 - CPF
2-Support Lab211 - Support Lab
2 - CPF6/1/19No12/1/196/30/206/30/20Rachel Beyer
Hyunmi HalasSupport Lab Annual testing

CPF semi-annual DTM - Blood Bank (ad hoc only) 0 0 0 0 0 3 0 0 2 N/A N/A 9/1/19 N/A 4/1/20 William Ward

Totals 51 20 136 4 352 49 5

APF - Upcoming

APF Certification
Area# ISO Classified Rooms# of CNC RoomsTotal # of HEPA filters (ISO and CNC)Total Number of HEPA equipped PassthrusTotal # of Non-viable air samples - ISO# of PECs (LAFW/BSC/Isolator)# of Rooms for AVSFrequency of Room Certification (per year)Frequency of PEC certification (per year)
Current CQV End DateContact PersonNotes
cGMP Trailer 10B21811032222/27/20Rachel Beyer

Hyunmi Halas

Pharm
3-17410100010024/1/20M. Ferron

C. Hamilton

E-IVAU632142646225/9/20M. Ferron
C. HamiltonHaz. Storage will require annual dP and ACH calculations
TIL (modular)104560711010229/24/20Rachel Beyer

Hyunmi Halas

Sterility Lab5016423552212/1/20Anna Lau
Terrace Modules1535510644152212/2/20R. Somerville
P-IVAU295583116212292212/1/21M. Ferron

C. Hamilton

12E2410126816616242212/13/21R. Somerville
Radio pharmacy631533236222/1/22Ken Changestimated # of HEPA filter
29B Pilot Plant12/1/23Christpopher Hansonestimated # of HEPA flters

Totals 95 28 347 60 544 54 95

File details come from the government source that posted it. Updated .