04-26.pdf

PDF 525 KB Posted

Attached to
Lake Saint Louis Boulevard Widening and Resurfacing Phase 1
Solicitation number
STP-5418 (625) Bid No. 04-26
Issued by
St. Charles County, Missouri

About this file

This is a Project Description document for the Lake Saint Louis Boulevard Widening and Resurfacing Phase 1 project in Missouri. The project involves widening and resurfacing Lake Saint Louis Boulevard from just north of Freymuth Road to just south of Hawk Ridge Circle South, spanning approximately 2,065 feet. The scope encompasses milling and resurfacing of existing pavement, pavement widening to accommodate increased capacity, storm sewer and inlet installation or replacement, median construction, removal and replacement of concrete sidewalk and shared use path, installation of new curb ramps and truncated domes for ADA compliance, and pavement striping. The project represents a comprehensive roadway improvement initiative designed to enhance safety, accessibility, and traffic flow along this corridor.

The document establishes the technical and functional requirements for the project but does not specify pricing terms, contract award dates, bid submission deadlines, or specific funding amounts and sources within the provided excerpt. No information regarding set-asides, incumbent contractors, site visit schedules, or pre-bid meetings is detailed in this summary section of the project documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .