036_45 Addendum 1 Response to Bidder Question.pdf

PDF 151 KB Posted

Attached to
ITB 036-45 FY25 Hall County CHIP Single-Family Home Repair Project
Solicitation number
PE-77129-NONST-2025-000000014
Issued by
Hall County, Georgia

About this file

This is an Addendum document from Hall County Government Financial Services Purchasing Division providing responses to bidder questions for ITB #036-45 FY25 Hall County CHIP Single-Family Home Repair Project. The document addresses five specific questions related to a home repair project in Gainesville, GA, focusing on construction details and logistics for work to be performed on a single-family residence.

The addendum clarifies that contractors must include pricing for rot repair below siding and at trim corners, replacement of non-compliant front porch decking, and specifies these items should be added as separate line items on the Cost Proposal Worksheet (Exhibit C). It confirms that a superintendent is not required to be on-site at all times during work. Regarding occupancy during construction, the document states that homeowners/residents will remain in the home during work, with the option to temporarily relocate during significant disruptions like ceiling work, though no funding is provided for relocation. A pre-construction meeting will be held to discuss schedules and work details with both contractor and residents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hall County Government

FINANCIAL SERVICES

PURCHASING DIVISION

POST OFFICE DRAWER 1435

GAINESVILLE, GA 30503

t: 770.535.8270 | f: 770.531.6711

FINANCIAL SERVICES DIRECTOR

Taylor Samples, CPA

ASSISTANT FINANCE DIRECTOR

Elizabeth White

PURCHASING MANAGER

Andy Penick

Addendum 1 for ITB #036-45

FY25 Hall County CHIP Single-Family Home Repair Project

Response to Bidder Questions

Q1. The rot on some portions of the siding appear to go below the siding. Do we include that in our pricing?

A1. Yes. Please include an additional line item at the bottom of the Cost

Proposal Worksheet included as Exhibit C of the invitation to bid packet.

Q2. Several spots like at the corners of the trim are rotted. Do we include replacement in our pricing?

A2. Yes. Please include an additional line item at the bottom of the Cost

Q3. Do we have to always have a superintendent on site during work by the prime contractor and/or subcontractors?

A3. No.

Q4. Will the people living here temporarily relocate during work, or will we have to work around them? What are the logistics – work around them or will they move out, and if so, when and for how long?

A4. The homeowners/residents will remain in the home during work.

When work involves more significant disruption or disturbance such as the ceiling work, then the homeowners/residents may choose to stay at another location. There is no funding for owner/resident relocation, and they are not required to relocate during the work. Both the contractor and the homeowners/residents will participate in the pre-construction meeting at which the schedule, nature of the work to be completed, etc.

will be discussed.

Q5. Front porch decking does not appear to be real deck boards. Do we need to include replacement to meet code in our price proposal?

A5. Yes. Please include an additional line item at the bottom of the Cost