USCO Golden Thread JA FY24 signed_Redacted.pdf
PDF 411 KB Posted
- Solicitation number
- 030ADV24Q0194
- Issued by
-
Library of Congress
About this file
This document is a Justification and Approval for Other Than Full and Open Competition for a sole source contract award to Image Science Associates for the Library of Congress' digitization programs and the Federal Agencies Digitization Guidelines Initiative (FADGI).
The Library requires expert consultation and technical assistance from Image Science Associates on imaging science, digitization standards, and best practices for cultural heritage imaging. The consultant will serve as the technical advisor to the FADGI Still Digital Imaging Workgroup, provide training to digitization staff, and support the development of FADGI guidelines. The sole source award is justified because Image Science Associates is the creator and sole source for the Golden Thread quality digitization management system, which is essential to the Library's requirements, and there are no other competing products available. The period of performance is July 11, 2024 to July 10, 2029, with a base year and four option years. To increase competition, the Library is developing an open-source version of the Golden Thread software and testing targets in coordination with the vendor.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval For Other than Full and Open Competition
Requisition Number: CIO20200389
Form ## (2015 02) Form Updated 5/9/2018
Justification & Approval For Other than Full and Open Competition
As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the Competition in Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law.
This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 2110, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505. Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds.
This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.
Part 1 – Identification
1. Contracting Agency and Activity: Library of Congress, United States Copyright Office
Office of Copyright Records
2. Nature of Action Being Approved Contract (or modification) LoC or Leg Branch Order (or modification) GSA Schedule or GWAC: Identify Schedule/Contract Other: Identify
Requisition Number:
Contractor (or Brand Name): Image Science Associates Estimated Value (Base and all options):
Period of Performance: 07/11/2024 – 07/10/2029
3. Description of Supplies or Services Required to Meet Library Needs
Describe the supplies or services that are required to meet the Library’s minimum needs and the delivery schedule required to meet those needs. Do not focus on a description of the program.
The Library requires the following supplies or services:
Expert consultation on the current state of the art and future developments in imaging science, digitization standards and best practices related to cultural heritage imaging. The consultative advice must be aligned with ongoing standards developments in the national and international communities, including the International Standards Organization (ISO) and other standards bodies and international organizations, with special attention to the work underway within ISO IT10/TC42. Specifically, the consultant provides the following services:
• Serve as the Library’s technical consultant to the FADGI Still Digital Imaging Workgroup.
• Technical assistance and consultation in support of the Library’s digitization program.
• Training of digitization staff.
• Enhancement of the DICE image conformance process at LC.
• Development work for the FADGI 2023 Still Imaging Guidelines document, and additional documents published by the FADGI.
Requisition Number:
Form Updated 5/9/2018
Part 2 – Program Office Justification & Approval
4. Authority for Contracting Without Competition Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:
There is only one responsible source and no other supplies or services will satisfy Library requirements.
41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.
Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).
Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302- 1(b)(2).
Other exception identified in FAR 6.302-1: Identify the exception
There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.
41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.
Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5: Identify the authority Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302: Identify the exception
Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR 6.302-1(c).
The Product is listed on the Library’s Technical Reference Model (TRM) as part of the “As-is” Lifecycle, Page #: (Attach applicable page from TRM)
Up to $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:
Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.
Product or service is reasonably available from only one source.
Source controls copyrights, patents or other exclusive licensing arrangements.
Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.
Source is expressly authorized or required by statute: Identify the authority
Library’s needs can only be satisfied by a brand-name product The Product is listed on the Library’s Technical Reference Model as part of the “As-is” Lifecycle, Page #: (Attach applicable page from
TRM)
GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:
An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.
FAR 8.405-6(a)(1)(i)(A).
Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).
In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).
Library’s needs can only be satisfied by a brand-name product The Product is listed on the Library’s Technical Reference Model as part of the “As-is” Lifecycle, Page #: (Attach
Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:
The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).
The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and FAR
16.505(b)(2)(i)(B).
A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(C).
To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).
Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).
The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41 U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).
The Product is listed on the Library’s Technical Reference Model as part of the “As-is” Lifecycle, Page #: (Attach applicable page from the
TRM)
Requisition Number:
Form Updated 5/9/2018
5. Rationale for Contracting Without Competition
In supporting an action not providing for full and open competition, it is not sufficient to demonstrate that the contractor is exceptionally well qualified or even the best qualified, or that the required brand name product is well suited to the Library’s needs. The rationale must demonstrate that no one else, or no other competing product, can satisfactorily fulfill the Library’s requirement. Do not focus on the importance of the requirement; the issue is the rationale for not competing.
In supporting urgency, address the following What are the unexpected facts or the unpredictable events that led to this situation? When is the required delivery or performance start date? Why this date? What specific harm to the Government will occur if the delivery is not made or performance not begun as scheduled? (Note that expiration of funds is not sufficient harm to justify not competing.) Demonstrate that the contract is only for items and quantities urgently needed until a competitive procurement action can be developed, or that a separate competitive follow-on is not practical.
In supporting a brand name justification, the brand name or feature must be essential to the Library’s requirements, and market research indicates that other company’s similar products or products with similar features cannot meet or be modified to meet the Library’s needs.
We are authorized to limit competition on the basis of the citation in section 4 because: The vendor, Image Science Associates, is the creator and sole source for the Golden Thread quality digitization management system, which is the basis for the digitization quality management program here at the Library of Congress. There are no other sources and no competing products.
6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required
State what actions, if any, the program office can take to overcome barriers to competition before a contracting for this requirement again, such as:
using action to provide time to develop specifications for a competitive procurement by a certain date; licensing copyrights or patents so other contractors may use the works; or breaking the requirement into parts that may be purchased competitively. If this is a one-time requirement, explain that action to increase future competition is not needed. If the source is expressly required by statute, state “Source is statutory.”
To increase competition, we will: The Library, with the cooperation of Image Science Associates, is developing an open source version of the Golden Thread software and the required testing targets. Long term, this will eliminate the need for this to be a sole source contract. The process of completing this development will take several years, and involves testing and acceptance by the International Standards Organization, which the vendor (and the Library) are members of the appropriate committees. The vendor is critical to successfully accomplishing this task.
7. Program Office Certification
I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis for this justification are accurate and complete.
Name
Title
Signature
Date
Requisition Number:
Form Updated 5/9/2018
Requisition Number:
Form Updated 5/9/2018
Part 4 – Competition Advocate Approval (Required for actions valued at greater than $250,000)
Approved. Based on the information, determinations, and certifications provided by the program office and the contracting officer, and in accordance with the instructions below, I approve contracting without competition for this requirement.
Option periods: No Yes, Number through Date
Not Approved. As explained below, I do not approve contracting without competition for this requirement.
Comments or instructions:
________________________ Assist/Assoc General Counsel __________________________________ ________________ Name Title Signature Date
Part 5 – Senior Procurement Executive (Required for actions valued at greater than $12,500,000)
17. Head of the Procurement Activity Approval
Approved. Based on the information, determinations, and certifications provided by the program office and the contracting officer, and in accordance with the instructions below, I approve contracting without competition for this requirement.
Not Approved. As explained below, I do not approve contracting without competition for this requirement.
Comments or instructions:
Name
Director, Contracts and Grants _______________________________ Signature
Date
File details come from the government source that posted it. Updated .