Statement of Work Summary

This Statement of Work describes the installation of nineteen (19) electrical outlets at the Ira C. Eaker Center for Leadership (Building 832) at Maxwell Air Force Base–Gunter Annex, Alabama. The project involves installing new 120V duplex electrical outlets across eight locations: Rooms 125, 128, and 140 (one outlet each on walls for televisions); Seminar Rooms 1-4 (one floor-mounted outlet each); and Lecture Hall Room 165 (ten floor-mounted outlets). The contractor must conduct site assessments to verify electrical capacity, install outlets with necessary conduit, wiring, junction boxes, and mounting hardware, tie new outlets into existing circuits or install new circuits as required, label circuits and update panel schedules, perform compliance testing to meet National Electrical Code and local building codes, and restore work areas including patching and painting wall penetrations and reinstalling carpet squares in seminar rooms and the lecture hall. Work must be completed within thirty days of vendor selection and performed between 0630–1730 Monday through Friday to minimize disruption to academic activities.

The contractor is responsible for providing all labor, materials, tools, and equipment while maintaining a safe work environment and communicating progress regularly. Deliverables include fully installed and operational electrical outlets, updated electrical documentation with panel schedules and circuit maps, and post-installation test results with inspection sign-offs. The performance location is Building 832, Maxwell AFB–Gunter Annex, 50 South Turner Boulevard, Maxwell AFB–Gunter Annex, Alabama 36114. Security requirements include contractor notification to the contracting officer within 30 days before on-base performance, compliance with Force Protection Condition Bravo measures, completion of Antiterrorism Level 1 training, acquisition of base identification and vehicle passes with REAL ID-compliant credentials, commercial vehicle inspections at designated gates, compliance with installation traffic and weapons policies, and adherence to reporting requirements for security threats. The point of contact is Ms. Dava Hornbeak, Eaker AV MSD, at dava.hornbeak.1@us.af.mil or (334) 953-6427.

View the file

Other files

File Type Posted
Sources Sought SAM.gov Eaker Electrical Outlets.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Ira C. Eaker Center for Leadership BLDG 832

Install Nineteen (19) Electrical Outlets at Bldg. G832 Prepared By: Eaker Center Facility Managers

1. Project Overview

This project involves the installation of new electrical outlets in eight (8) locations. Rooms 125, 128, 140, Seminar rooms 1-4 and the Lecture Hall RM 165 in building G832. The purpose of these outlets is to support instructional activities by providing reliable power sources for classroom electronics, including laptops, projectors, document cameras, and other teaching equipment.

2. Objectives

• Provide sufficient electrical access to support modern classroom technology.

• Ensure outlets are installed in locations that maximize usability for instructors and students.

• Meet all electrical code requirements and institutional safety standards.

• Minimize disruption to ongoing academic activities.

3. Scope of Work

3.1 Site Assessment

Conduct a walkthrough of the eight (8) locations the outlets are required.

RM 128 - install one (1) electrical outlet on the wall for the tv.

RM 125 - install one (1) electrical outlet on the wall for the tv.

RM 140 - install three (3) electrical outlets on the wall for tv’s.

Seminar room #1 - install one (1) floor mounted electrical outlet.

Seminar room #2 - install one (1) floor mounted electrical outlet.

Seminar room #3 - install one (1) floor mounted electrical outlet.

Seminar room #4 - install one (1) floor mounted electrical outlet.

Lecture Hall - install ten (10) floor mounted electrical outlets.

• Verify available electrical capacity and panel load.

3.2 Electrical Installation

• Install new 120V duplex electrical outlets at designated locations in each room.

• Provide necessary conduit, wiring, junction boxes, and mounting hardware.

• Tie new outlets into existing electrical circuits or install new circuits if required.

• Label circuits and update panel schedules as needed.

3.3 Compliance & Safety

• All work will comply with NEC (National Electrical Code), local building codes, and institutional safety policies.

• Ensure proper grounding, load balancing, and circuit protection.

• Perform testing of all outlets to confirm functionality and safety.

3.4 Cleanup & Restoration

• Patch and paint any wall penetrations created during installation.

• Patch the concrete floors in the lecture Hall after installation of the electrical outlets and reinstall the carpet squares.

• Reinstall carpet squares after installing the electrical outlets in Seminar rooms 1-4

• Remove debris and restore rooms to pre-work condition.

4. Deliverables

• Fully installed and operational electrical outlets in Rooms 125, 128, 140, Seminar rooms 1-4 and the Lecture Hall RM 165.

• Updated electrical documentation (panel schedules, circuit maps).

• Post-installation test results and inspection sign-offs.

5. Schedule

• Start Date: As soon as 42 CONS approves the package.

• Completion Date: Reasonable (30) thirty days after package / vendor is selected.

• Work will be coordinated to avoid disruption to scheduled classes.

• All work must be completed during the hours of 0630 – 1730 Monday thru Friday.

6. Responsibilities

Contractor Responsibilities

• Provide all labor, materials, tools, and equipment.

• Maintain a safe work environment.

• Communicate progress and any issues promptly.

Client Responsibilities

• Provide access to rooms and electrical panels.

• Confirm outlet placement prior to installation.

• Notify instructors or staff of scheduled work.

7. Assumptions

• Existing electrical infrastructure can support additional outlets; if not, change orders may be required.

• Rooms will be unoccupied during installation windows.

• No hazardous materials will be encountered during wall penetrations

8. Place of Performance & Delivery

Building 832 (G832), Maxwell AFB – Gunter Annex, AL.

Delivery/Receiving Address:

Ira C. Eaker Center for Leadership Development, Bldg. 832 50 South Turner Blvd., Maxwell AFB – Gunter Annex, AL 36114, United States

Loading dock in the rear of the bldg.

9. Point of Contact Ms. Dava Hornbeak, Eaker AV MSD Email: dava.hornbeak.1@us.af.mil Phone: (334) 953-6427

10. SECURITY REQUIREMENTS FOR UNCLASSIFIED SERVICES ONLY

No CAC REQUIRED

10.1 Contractor Notification Responsibilities: The contractor shall notify the contracting officer within 30 days before on-base performance of the service. The notification shall include:

a. Name, address, and telephone number of contractor employees working on the contract.

b. The contract number and contracting agency.

c. The location(s) of service performance and future performance, if known.

d. The date service performance begins.

e. Any change to information previously provided under this paragraph.

10.2 Antiterrorism: The contractor, all employees and any subcontractors are required to obey all orders from Security Forces personnel and are subject to spot checks/inspections while on the installation. The contractor, all employees and any subcontractors must adhere to all security measures implemented by the installation as a result of directed Force Protection Condition (FPCON) measures, currently Maxwell AFB and Gunter Annex are in FPCON Bravo.

The contractor, all employees and any subcontractors are expected to report any suspicious activities to the Security Forces Squadron (334-953-7222). Suspicious activities can be defined as suspicious packages or items observed, personnel conducting surveillance of the installation, unauthorized personnel requesting access to the installation, or personnel asking a lot of questions about the installation.

mailto:dava.hornbeak.1@us.af.mil

The contractor, all employees and any subcontractors should be aware of the Emergency Mass Warning (EMW) notification system. In the event of an incident on the installation the EMW system may be activated, and all personnel must follow all directions given via this system. To familiarize personnel about antiterrorism, the contractor, all employees and any subcontractors are highly encouraged to complete Antiterrorism Level 1 training. Antiterrorism Level 1 training can be completed at the following link: https://jkodirect.jten.mil/pdf/atl1/launch.html If there are any questions or concerns regarding antiterrorism matters regarding Maxwell AFB or Gunter Annex contact the Installation Antiterrorism Program Manager at 334-953-9057.

10.3 Installation Access Requirements: The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.

The contractor shall submit a written request on company letterhead to the Contracting Officer (CO) listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

During performance of the service, the contractor shall be responsible for obtaining the required identification for newly assigned personnel and for prompt return of credentials for any employee who no longer requires access to the work site.

Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

Failure to comply with these requirements may result in the withholding of final payment.

10.4 Vehicle Inspections: All commercial vehicles will be directed to Gate 3 (Kelly St) or Gate 4 (Congressman Dickenson for Gunter) for processing through the Commercial Vehicle Inspection (CVI) Area, when operational. During non-duty hours and holidays, commercial vehicle inspections will be conducted at Gate 1 (Maxwell Blvd) or Gate 4 (Congressman Dickinson Drive) only. Inspection members will conduct thorough inspections of the interior and exterior of the vehicle for items prohibited from the installation such as explosive devices, weapons and ammunition, drugs, and open or closed alcohol containers.

10.5 REAL ID Act: All Maxwell Air Force Base and Gunter Annex visitors must present a REAL ID-compliant credential to be issued a pass.

https://jkodirect.jten.mil/pdf/atl1/launch.html

REAL ID-compliant cards have a star marking ⭐on the upper portion of the card. If the card does not have a star marking, it is not REAL ID-compliant and won’t be accepted as proof of identity to board commercial aircraft or access military installations like Maxwell or Gunter.

Those without a REAL ID-compliant driver’s license may also use a U.S. passport or passport card, a Transportation Worker Identification Card (TWIC), a Veteran Health Identification Card (VHIC), or a combination of the following documents to be issued a pass:

• An original or certified true copy of a birth certificate with a raised seal

• A social security card

• A driver’s license issued by a state, territory, or the District of Columbia that is not REAL

ID-compliant.

All three documents must reflect the same name (or a documented former name through legal name change documents such as a court order, marriage certificate, or divorce decree).

More information about accessing Maxwell can be found here: https://www.maxwell.af.mil/About-Us/Fact-Sheets/Display/Article/4024201/base-access-information/

10.6 Controlled/Restricted Areas: If work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DAFI 31-101, Integrated Defense, and DoDM5200.02_DAFMAN 16-1405, Air Force Personnel Security Program.

If unescorted access is not authorized and the contractor requires access to controlled/restricted areas, they must be escorted by appropriately cleared government personnel at all times.

If work is required in a classified environment, the area must be sanitized, and the contractor will be escorted at all times by appropriately cleared government personnel.

10.7 Reporting Requirements: The contractor shall comply with DAFI 71-101, Volume-1, Criminal Investigations, and AFI 71-101, Volume-2, Protective Service Matters, requirements.

Contractor personnel shall report to 42d Air Base Wing Information Protection Office, any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.

Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment and as required thereafter.

10.8 Traffic Laws: The contractor and their employees shall comply with base traffic regulations set forth in AFI 31-218, Motor Vehicle Traffic Supervision and DoDM5200.08v3_AFMAN31- 101v3, Installation Perimeter Access Control. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.

10.9 Random Installation Entry/Exit Checks: Entry/exit vehicle checks are conducted by order of the 42 ABW Commander. These checks are conducted for the purpose of safeguarding the base and protecting government property by discovering and seizing stolen property, classified https://www.maxwell.af.mil/About-Us/Fact-Sheets/Display/Article/4024201/base-access-information/ https://www.maxwell.af.mil/About-Us/Fact-Sheets/Display/Article/4024201/base-access-information/ information, and contraband. Refusal to submit to an installation (entry/exit) vehicle check may result in the loss of base driving privileges, revocation of base registration, or debarment action.

10.10 Cellular Phone Operation Policy: The use of cellular phones while operating a motorized vehicle is prohibited on Maxwell-Gunter. Although discouraged, drivers are authorized to use devices, i.e. ear bud or ear boom, which allows their cellular phone to be operated hands-free.

The device must not cover both ears. This policy applies to everyone driving on Maxwell AFB and Gunter Annex. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.

10.11 Wireless Electronic Devices: The contractor will not establish their own Information Technology (IT) systems or networks (Local Area Networks [LAN], Wide Area Network [WAN], Cellular phone/USB Modem as WAN, Wi-Fi as WAN, etc.), or camera system without the direct permission of the Program Manager and governing communications and responsible information systems office (42 CS).

10.12 Firearms and Ammunition: Transporting weapons or ammunition, concealed or otherwise, IS NOT permitted by any non-law enforcement personnel on Maxwell AFB/Gunter Annex at any time regardless of state issued concealed weapons/LEOSA permits. Violations may result in criminal prosecution under applicable federal laws.

10.13 Illegal Weapons: The weapons below are considered illegal, unless specifically authorized by competent authority and are prohibited on Maxwell AFB/Gunter Annex. Violations may result in criminal prosecution under applicable federal laws.

a. Switchblade knives or knives with any type of automatic blade release.

b. An incendiary/explosive weapon (e.g., grenades, flash bangs).

c. Fireworks

d. Homemade mortars, aka "tennis ball launchers" or similar devices.

File details come from the government source that posted it. Updated .