03. Build America, By America (BABA) Act.pdf

PDF 145 KB Posted

Attached to
Custom Electrofishing Boat and Trailer
Solicitation number
6100064242
Issued by
Cambria County, Pennsylvania

About this file

This document is a detailed policy document from the Department of the Interior (DOI) and Department of Environmental Protection regarding the Build America Buy America (BABA) Domestic Procurement Preference, implementing provisions of the Bipartisan Infrastructure Law (P.L. 117-58). The policy mandates that for any infrastructure project using federal financial assistance funds on or after May 14, 2022, all iron, steel, manufactured products, and construction materials must be produced in the United States, with specific requirements for domestic content and manufacturing processes.

The document outlines three primary waiver scenarios where non-domestic materials might be permitted: non-availability (materials not produced in sufficient US quantities), unreasonable cost (US materials increasing project costs by more than 25%), and public interest exceptions. Waiver requests must include detailed documentation and are subject to public comment and review by the Made in America Office. The policy defines infrastructure broadly, including roads, transportation systems, utilities, broadband infrastructure, energy facilities, and buildings. Construction materials are specifically defined to include non-ferrous metals, plastics, glass, lumber, and drywall, while excluding certain materials like cement, aggregates, and binding agents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-1-

BUILD AMERICA BUY AMERICA (“BABA”) DOMESTIC PROCUREMENT

PREFERENCE

Contractor must comply with the federal “Build American Buy American Act” P.L. 117-58 (also known as the Bipartisan Infrastructure Law or Infrastructure Investment and Jobs Act) regarding any work performed on or after May 14, 2022.

As required by Section 70914 of the Bipartisan Infrastructure Law (also known as the Infrastructure Investment and Jobs Act), P.L. 117-58, on or after May 14, 2022, none of the funds under a federal award that are part of Federal financial assistance program for infrastructure may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States, unless subject to an approved waiver. The requirements of this section must be included in all subawards, including all contracts and purchase orders for work or products under this program. In the event of any conflict between this section’s requirements and those described in DEP’s 2016 General Conditions for Construction, including but not limited to Subsections 4.10.K.16 and 5.14.B.3, this section’s requirements are controlling.

Recipients of an award of Federal financial assistance are hereby notified that none of the funds provided under this award may be used for a project for infrastructure unless:

1. all iron and steel used in the project are produced in the United States--this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;

2. all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and

3. all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.

The BABA preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a BABA preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

For further information on the BABA preference, please visit www.doi.gov/grants/BuyAmerica. Additional information can also be found at the White

-2-

House Made in America Office website: www.whitehouse.gov/omb/management/made-in-america/.

Waivers

When necessary, with the approval of the Department of Environmental Protection, recipients may apply for, and the Department of the Interior (DOI) may grant, a waiver from these requirements, subject to review by the Made in America Office. The DOI may waive the application of the domestic content procurement preference in any case in which it is determined that one of the below circumstances applies:

1. Non-availability Waiver: the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality;

2. Unreasonable Cost Waiver: the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent; or

3. Public Interest Waiver: applying the domestic content procurement preference would be inconsistent with the public interest.

There may be instances where an award qualifies, in whole or in part, for an existing DOI general applicability waiver as described at:

www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWaivers. If the specific financial assistance agreement, infrastructure project, or non-domestic materials meets the criteria of an existing general applicability waiver within the limitations defined within the waiver, the recipient is not required to request a separate waiver for non-domestic materials.

If a general applicability waiver does not already apply, and a recipient believes that one of the above circumstances applies to an award, a request to waive the application of the domestic content procurement preference may be submitted to the financial assistance awarding officer in writing. Waiver requests shall include the below information. The waiver shall not include any Privacy Act information, sensitive data, or proprietary information within their waiver request. Waiver requests will be posted to www.doi.gov/grants/buyamerica and are subject to public comment periods of no less than 15 days. Waiver requests will also be reviewed by the Made in America Office.

1. Type of waiver requested (non-availability, unreasonable cost, or public interest).

2. Requesting entity and Unique Entity Identifier (UEI) submitting the request.

3. Department of Interior Bureau or Office who issued the award.

4. Federal financial assistance listing name and number (reference block 2 on DOI

Notice of Award)

5. Financial assistance title of project (reference block 8 on DOI Notice of Award).

6. Federal Award Identification Number (FAIN).

http://www.whitehouse.gov/omb/management/made-in-america/ http://www.whitehouse.gov/omb/management/made-in-america/ http://www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWaivers http://www.doi.gov/grants/buyamerica

-3-

7. Federal funding amount (reference block 11.m. on DO Notice of Award).

8. Total cost of Infrastructure expenditures (includes federal and non-federal funds to the extent known).

9. Infrastructure project description(s) and location(s) (to the extent known).

10. List of iron or steel item(s), manufactured goods, and construction material(s) the recipient seeks to waive from Buy America requirements. Include the name, cost, countries of origin (if known), and relevant PSC or NAICS code for each.

11. A certification that the recipient made a good faith effort to solicit bids for domestic products supported by terms included in requests for proposals, contracts, and nonproprietary communications with the prime contractor.

12. A statement of waiver justification, including a description of efforts made (e.g., market research, industry outreach) by the recipient, in an attempt to avoid the need for a waiver. Such a justification may cite, if applicable, the absence of any Buy America-compliant bids received in response to a solicitation.

13. Anticipated impact if no waiver is issued.

Approved waivers will be posted at www.doi.gov/grants/BuyAmerica/ApprovedWaivers;

recipients requesting a waiver will be notified of their waiver request determination by an awarding officer.

Questions pertaining to waivers should be directed to the financial assistance awarding officer.

Definitions

“Construction materials” includes an article, material, or supply that is or consists primarily of:

• non-ferrous metals;

• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);

• glass (including optic glass);

• lumber; or

• drywall.

“Construction Materials” does not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.

“Domestic content procurement preference’’ means all iron and steel used in the project are produced in the United States; the manufactured products used in the project are produced in the United States; or the construction materials used in the project are produced in the United States.

“Infrastructure” includes, at a minimum, the structures, facilities, and equipment for, in the United States, roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical http://www.doi.gov/grants/BuyAmerica/ApprovedWaivers

-4-transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property. Infrastructure includes facilities that generate, transport, and distribute energy.

‘‘Project’’ means the construction, alteration, maintenance, or repair of infrastructure in the United States.

File details come from the government source that posted it. Updated .