03-25-26 Addendum #1.pdf

PDF 231 KB Posted

Attached to
Addendum #1 BDC03-25/26 Gamble Plantation - Patten House Roof Repair – Hurricane Milton
Solicitation number
ITB-13949
Issued by
Leon County, Florida

About this file

This document is an Addendum issued by the Florida Department of Environmental Protection (FDEP) for the Gamble Plantation - Patten House Roof Repair project in response to Hurricane Milton, with bid number BDC03-25/26. The addendum provides clarifications and answers to bidder questions regarding roof repair specifications, including product manufacturer flexibility, rafter replacement requirements, soffit and fascia board installations, and dimensional lumber interpretations. The bid submittal due date has been postponed to October 7, 2025, at 3:30 PM ET, with a bid posting date of October 21, 2025, at 3:30 PM ET, to be submitted to Brandon Williams, Contracts Specialist at the Bureau of Design and Construction in Tallahassee.

The addendum addresses multiple technical specifications for the historic house roof repair, such as allowing alternative product manufacturers, guidance on hurricane clip reuse, ridge installation requirements, and rafter replacement procedures. Contractors are required to sign and include this addendum with their bid submission, with failure to do so potentially resulting in bid rejection. The project appears focused on preserving the historic integrity of the Patten House while addressing roof damage, with specific instructions on maintaining original architectural profiles and replacing damaged structural elements as needed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BDC Bid No. BDC03-25/26, Addendum #1, Page 1 of 3

FLORIDA DEPARTMENT OF

Environmental Protection

Marjory Stoneman Douglas Building

3900 Commonwealth Boulevard Tallahassee, FL 32399

Ron DeSantis Governor

Jay Collins

Lt. Governor

Alexis A. Lambert Secretary

September 23, 2025

NOTICE TO APPLICANTS

ADDENDUM NO. ONE (1)

Gamble Plantation - Patten House Roof Repair – Hurricane Milton

DEP BID NO. BDC03-25/26

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED

PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH

YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Brandon Williams, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

1. Question: Must the product manufacturers specified in the bid be Gulf Coast or Drexel Metals, or is it acceptable to use another manufacturer that meets the requirements for this work?

Answer: (Acceptable to use others)

2. Question: Does the interior structure supporting the drywall need to be replaced?

Answer: (No drywall present, please clarify).

3. Question: Do hurricane clips need to be replaced?

Answer: (Existing clips may remain if they are not corroded, have proper installation and nailing and meet the uplift requirements of the new specified clips)

BDC Bid No. BDC03-25/26, Addendum #1, Page 2 of 3

4. Question: On the first floor, there is no existing ridge—should one be installed?

Answer: (Verify condition, if one does not exist install new 2x10).

5. Question: For external rotted rafters, is it necessary to cut them at the wall line and install new ones in their place?

Answer: Where external rafters are rotted they will require removal and replacement. Cut the existing rafters at the wall line and install a new member, provide lap with the existing rafter and nail.

6. Question: Should the soffit eaves around the entire perimeter be tongue-and-groove?

Answer: Yes, provide 1x4 t&g boards at soffits. Install new boards where soffits are missing, damaged or where they require replacement.

7. Question: Does the fascia board also need to be replaced?

Answer: Fascia board is to be installed where it presently does not exist and where it is damaged. Undamaged, straight and properly fastened fascia board may remain. Provide proper intersection between new/existing.

8. Question: There are some existing repairs on the house—should these be restored as part of this project?

Answer: Scope of this project is to address issues with the roof. We will need clarification and a description regarding what and where the repairs exist to provide a more concise answer.

9. Question: In some areas, there appear to be inconsistencies with maintaining the historic house profile (e.g., the plans show existing fascia as 1x6, while other areas show 2x4 PT). Should these be left as-is or removed?

Answer: Install 2x4 sub-fascia with 1x6 fascia board to match exist. conditions.

10. Question: On page 5 of the plans – Work Items, Work Framing Plans: rafters are noted to be 3x6 rough sawn. Should this be interpreted as actual 3x6 or 2x5 ½ lumber?

Answer: Rough sawn is considered to have actual dimensions of 2 1/2"x5 1/2".

11. Question: For “scab on each side,” what is the required length of scabbing the existing rafters?

Answer: Work note 5. indicates scab is to be 30" long. Please clarify "scabbing the existing rafters."

BDC Bid No. BDC03-25/26, Addendum #1, Page 3 of 3

The bid submittal due date and bid posting date for this project have been postponed:

BID SUBMITTAL DUE DATE: No later than 3:30 PM (ET), Tuesday, October 7, 2025, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000, Attention: Brandon Williams, Contracts Specialist, Bureau of Design and Construction, (850) 245-2535. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids.

BID POSTING DATE: No later than 3:30 PM (ET), Tuesday October 21, 2025, unless extended by the Department for good cause.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.