03-23-6625 CMM Arms and Probes Specification.docx

DOCX document 35 KB Posted

Attached to
CMM Arms and Probes per Specification Federal contract opportunity
Solicitation number
W911PT23Q0035
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This solicitation requests three CMM absolute arms, two additional CMM absolute arms, and six probe head upgrades per Equipment Engineering Specification #03-23-6625 dated 6 January 2023. Offerors must deliver all equipment within 120 days of contract award. The acquisition will be conducted as a sole source procurement with Hexagon Metrology, Inc. of North Kingstown, RI in accordance with FAR 6.302-1 and 10 USC 2304(c)(1). While only Hexagon Metrology will be considered for award, all responsible sources may submit a proposal which will be considered by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. Offerors must have an active SAM registration including all necessary representations and certifications to be eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to CMM Arms and Probes per Specification, newest first.
File Type Posted
W911PT23Q0035.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification for New CMM Arms and Probes

Spec. # 03-23-6625

Manufacturing Engineering Work Group Watervliet Arsenal Watervliet, New York 12189 01/06/2023

Department of the Army

TACOM

Section 1: CMM Arms Package (Total Qty. 5):

Description: Hexagon Absolute Arm V2P, 8725, 7-Axis (Qty 3.)

Part Number: H00030981 Details: 87 Series 7-Axis Arm Version 2 Protected with 2.5 m Measurement Volume, Includes:

A. Absolute Encoders and SMART Sensors B. Zero-G Counterbalance with SmartLock and HomeDock C. Wrist Display D. Haptic Feedback E. Spin Knob and Spin Grip F. Base Plate with Mounting Ring G. TESA TKJ Ball Probes: 3 mm Ruby / 6 mm Ruby / 15 mm Steel H. Certified Length Standard I. RDS Maintenance and Interface Software J. Travel Case and Accessory Case, IP K. Power Supply L. Hexagon Dust Cover M. ISO 10360-12 Certificate N. Hexagon SFx Asset Management PRO O. 24 Month Warranty

Description: Hexagon Absolute Arm V2P, 8735, 7-Axis (Qty. 2) Part Number: H00030983 Details: 87 Series 7-Axis Arm Version 2 Protected with 3.5 m Measurement Volume, Includes:

A. Absolute Encoders and SMART Sensors B. Zero-G Counterbalance with SmartLock and HomeDock C. Wrist Display D. Haptic Feedback E. Spin Knob and Spin Grip F. Base Plate with Mounting Ring G. TESA TKJ Ball Probes: 3 mm Ruby / 6 mm Ruby / 15 mm Steel H. Certified Length Standard I. RDS Maintenance and Interface Software J. Travel Case and Accessory Case, IP K. Power Supply L. Hexagon Dust Cover M. ISO 10360-12 Certificate N. Hexagon SFx Asset Management PRO O. 24 Month Warranty

Description: AS1 Kit V2P (Qty. 5) Part Number: H00030938 Details: AS1 IP Laser Scanner for Scanning in Standard Mode (with Pistol Grip) or in Compact Mode (without Pistol Grip). Scanner unit compatible with 7 axis Absolute Arm and Absolute Positioner AP21 (for use with laser trackers). Removable Pistol Grip for Probing in Standard Mode (with Pistol Grip) or in Compact Mode (without Pistol Grip). This includes:

A. AS1 Laser Scanner B. Nose Cone C. 3 sizes of Pistol Grip Handles: Small / Medium / Large D. The medium size grip is mounted on to Pistol Grip main body E. Certified Sphere for Probing and Scanning F. System Scanning Certification Report of the complete System Arm with Scanner G. 24 Month Warranty

Description: Magnetic Base with Mounting Rings (Qty. 5) Part Number: NCA7-5-19866

Description: Bluetooth Removed from RA8 (Qty. 5) Part Number: H00017695 Details: Bluetooth/Wi-Fi: Bluetooth component is permanently deactivated.

Description: Remove WiFi Communication (Qty. 5) Part Number: H00022554 Description: CP-W (Wireless Pack) will be removed from the 87 Series configuration and will be replaced with CP-C (Connector Pack).

Description: Label, UID, A2B (Qty. 5) Part Number: N/A

Description: PC-DMIS CAD++ Scanning / Mesh (Qty. 5) Part Number: ROY-SCANMESH Details: Includes All Portable interfaces (ROY-I-PORTABLE), Hexagon Scanning Probe Interface, Scanning Auto Features, Full COP support, XACT GD+T, IGES / DXF / DWG / STEP203 / STEP 214 / VDAFS / XYZIJK / DES and DMISI/O translators, STL Mesh Creation and Inspection, and updates for 1 year. PC-DMIS provided with LMS license.

Description: Classroom Training - Arm PC-DMIS Level 1 Probing and Scanning (Qty. 10) Part Number: CLASS-ARM-PCDMIS-L1-SCAN

Description: Premium Laptop - without Camera Bluetooth and Wi-Fi (Qty. 5) Part Number: 62144-15A Details: Dell Precision, Lenovo P Series, or equivalent with the following recommended specs A. PROCESSOR: 2.5 GHz 6 Core

B. RAM: 64 GB

C. DISK SPACE: 1 TB

D. ETHERNET: Gigabit E. WI-FI: No Wi-Fi, No Camera, No Bluetooth F. GRAPHICS: Nvidia Quadro P3200 G. SCREEN: HD 1080p (1920x1080) H. OS: Windows 10 Pro 64 bit I. WARRANTY: 3 years

Description: MyCare Premium 1st Year (Qty. 5) Part Number: H00009299 Details: Covers the 1st annual preventative maintenance and recertification. Includes a 3-Day MyCare Turnaround for both Annual Recertification and covered service guaranteed, or a loaner device will be provided free of charge. Includes technical support from remote to onsite services, ensuring the portable system is kept up and running at optimal conditions. Includes return shipping if the system needs to be sent in.

Description: Shipping Part Number: 704-FREIGHT Details: All shipping shall be included

Section 2: CMM Probe Upgrade (Total Qty. 6):

Description: HH-AS8-T2.5 Automatic Probe Head (Qty. 6) Part Number: 03939422 Details: Includes a fully embedded controller, capacitive crash protection, and a heavy-duty kinematic joint. Drive system includes a Hirth Gear for accurate positioning of the probe. Includes high degree of indexable positions (indexing in steps of 2.5° and 12,240 positions) and very high rotational torque (1.4 NM). Can be mounted on any CMM with an 80mm ram.

Description: HH-C-V2.1 Controller (Qty. 6) Part Number: 03939109

Description: HA-TM-31 Adapter (Qty. 6) Part Number: 03969365

Description: Associated Cabling (Qty. 6) Part Number: N/A

Description: HP-S-X1H Complete Probe Kit (Qty. 6) Part Number: N/A Details: Note - This probe kit consists of the next 17 listed items (from HP-S-X1H Scanning Probe to AC/DC Probe Interface)

Description: HP-S-X1H Scanning Probe (Qty. 6) Part Number: M00-114-042-000 Details: Can accommodate styli up to 225 mm in length and is designed to operate with Coordinate Measuring Machines equipped with the Hexagon series of Motorized Probe Heads. Can handle stylus lengths ranging from 20 to 225 mm. Supports all standard probing modes: single point, self-centering, and continuous high-speed scanning for fast and accurate measurement of form and profile. Provides simultaneous and unclamped probing in all axes, always orthogonal to the contact surface. Automatic stylus changes are accomplished using the HR-X Stylus Change Rack.

Description: (Qty. 1)HP-S-X1h Standard Stylus Kit (Qty. 6) Part Number: M00-694-014-000

Description: (Qty. 1) Stylus Holder, M3, Aluminum (Qty. 6) Part Number: M00-694-209-000

Description: (Qty. 1) Stylus Holder, rotatable, Aluminum/Steel (Qty. 6) Part Number: M00-694-244-000

Description: (Qty. 2) Stylus Ø 3.0 mm x L 20 mm, Steel (Qty. 12) Part Number: M00-694-211-000

Description: (Qty. 1) Stylus Ø 5.0 mm x L 20mm, Steel (Qty. 6) Part Number: M00-694-212-000

Description: (Qty. 1) Stylus Ø 5.0 mm x L 50 mm, Steel (Qty. 6) Part Number: M00-694-221-000

Description: (Qty. 1) Stylus Ø 8.0 mm x L 75 mm, Carbon Fiber (Qty. 6) Part Number: M00-694-241-000

Description: (Qty. 1) Extension, L 50 mm, Carbon Fiber (Qty. 6) Part Number: M00-694-245-000

Description: (Qty. 1) Extension, L 150 mm, Carbon Fiber (Qty. 6) Part Number: M00-694-248-000

Description: (Qty. 1) Cube, 13 mm, Aluminum (Qty. 6) Part Number: M00-694-243-000

Description: (Qty. 1) Mounting Key (Qty. 6) Part Number: M00-114-006-130

Description: (Qty. 2) Mounting Pins (Qty. 12) Part Number: M00-114-006-140

Description: HR-X-700 Stylus Change Rack (Qty. 6) Part Number: M00-1087-020-000 Details: Includes Mounting Legs & Changer Port Rail

Description: (Qty. 9) Stylus Holder (M3) (Qty. 54) Part Number: M00-694-209-000

Description: (Qty. 9) HR-X1-P-SF Covered Stylus Port (Qty. 54) Part Number: M00-114-167-000

Description: AC/DC Probe Interface (Qty. 6) Part Number: M00-190-419-000

Description: Installation & B89 Certification (ISO 10360-4 for X1H) (Qty. 6) Part Number: N/A Details: Shall include delivery, installation, and certification

Description: One Year Warranty (Qty. 6) Part Number: N/A

Enclosure A - Environmental Protections Requirements

1. Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).

2. Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.

3. Compliance with License and Certification Requirements: Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be provided.

4. Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.

5. Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.

6. Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.

7. Verification of National Environmental Policy Act Documents: Contractor shall obtain from the COR or DGR, a copy of AMC's National Environmental Policy Act Policy and 32 CFR 651 which addresses actions to be taken by contractor. These documents include but is not limited to the analysis-associated decision document of an Environmental Impact Statement and Record of Decision; Environmental Assessment and Finding of No Significant Impact or Notice to Proceed; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.

8. Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment.

9. Assignment of Environmental Compliance Designee (ECD): Contractor shall appoint an ECD for all contract work periods exceeding 180 consecutive days. Contractor shall appoint a primary and alternate ECD for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area. Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation or Major Subordinate Command (MSC) environmental compliance point of contact within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR and DGR, if using and/or storing very small quantities of hazardous materials.

10. Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activities and/or tasks on AMC installations without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.

11. Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility. Additional requirements include, but are not limited to, the following:

1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.

1. The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.

1. The Contractor shall make maximum effort to reduce and prevent waste.

12. Segregation of Hazardous Waste:

1. All hazardous waste generated on this contract must be segregated and kept physically separate from any other waste items and materials. All wastes must be properly containerized and labeled. Waste containers are to be supplied by the Contractor and must be designed for the waste type being disposed of according to all Federal, State and Local laws. In the event the waste classification is unknown prior to containerization, the container must be marked “under analysis, treat as hazardous waste”. All waste must be properly sampled and characterized at the Contractors expense, with copies of all analytical results submitted to the Environmental Department within 24 hours of receipt. Any waste characterized as Hazardous Waste must be properly labeled and will stored at the WVA RCRA Storage Area.

1. All waste items must be so marked, that they are readily identified to this contract throughout the process. In addition, the contractor must ensure that there is a clear audit trail for all items until final treatment/disposal is accomplished.

1. The Contractor is responsible for proper disposal of all excess samples, they shall be added to the corresponding waste container.

12.1. Treatment of Hazardous Waste on Government Facility:

1. Treatment of hazardous waste (including solidification) on Government facilities is not permitted. Treatment is defined as any process which meets the definition of treatment as set forth in applicable local, state, and Federal (including 40 CFR 260.10) laws and regulations.

1. The contractor shall not drain and/or flush PCB items at Government installations. Draining will be allowed only to prevent leaking and to meet DOT regulations.

1. Treatment, disposal, or release of gas (other than inert) to the atmosphere on Government premises is not permitted by this contract. The contractor may perform gas extraction for other than inert gas cylinders at the pickup location using self-contained apparatus. This apparatus shall emit no gas into the atmosphere and purge the entire cylinder contents into a closed receiver for transport to a recycling or disposal site.

12.2. Waste Disposal Requirements and Documentation:

1. The Contractor is responsible for the proper disposal of any Hazardous Waste generated during the project, in accordance with all applicable Federal, State, and Army regulations. Disposal shall only be through licensed/permitted Treatment Storage and Disposal Facilities (TSDF), utilizing properly permitted waste transporters. Waste profiles will be provided to the WVA Environmental Office for review prior to the removal of any waste. All Hazardous Waste Manifests MUST be signed only by a representative of the WVA Environmental Office. The Contractor may NOT sign hazardous waste manifests on behalf of the Generator. Non-RCRA regulated (Non-Hazardous) waste will be properly disposed of by the Contractor, at the Contractor’s expense. The contractor shall, without additional expense to the Government, be responsible for paying all fees, preparing or obtaining any necessary licenses, permits, notifications, waste profiles, or reports, which result from a contractor’s transportation, recycling, or disposal decision of such wastes.

1. The Contractor shall pay all fees, surcharges, fines, or civil penalties resulting from errant or illegal waste profiling, packaging, labeling, documentation, transport, or disposal of any waste from the project. The Contractor shall contact the Environmental Department immediately upon learning of any of the above.

1. All references to manifests in this provision relate to the “appropriate shipping paper” as required. The Contractor shall obtain and prepare all manifests, required for acceptance of waste into a Qualified Facility, and any other shipping documents. The contractor shall provide the COR with a copy of the completed form(s), for review by the appropriate Government official at least five (5) business days prior to removal. Prior to removal from the site, completed copies of all manifests shall be furnished to the Environmental Office. Disposal receipts, weight slips and/or recycling receipts shall be submitted to the Environmental Office within 24 hours of receipt by Contractor. Each manifest, as well as all other documentation required herein, shall be clearly and distinctly marked with the generator and the contract and task order number, as applicable. Emergency response information and twenty-four-hour emergency phone numbers shall be listed on the manifest as well. If blocks are not provided, this information shall be placed in the upper, right-hand corner of each document.

1. The contractor shall notify the Environmental Department at least five (5) business days BEFORE attempting analysis or pickups of any waste for disposal.

1. The Government reserves the right to take appropriate action, such as the pursuit of monetary consideration and/or annotation of negative past performance if the contractor fails to meet the above applicable notification of waste removal from the pick-up location.

1. Contractor may not ship waste outside of the United States to circumvent Environmental Protection Agency (EPA) land disposal restrictions.

13. Use of Hazardous Materials: Contractor shall assign all hazardous materials management responsibilities to the appointed ECD. Contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list without prior written approval from DGR and/or COR.

14. Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the Pollutant Discharge Elimination System general permit requirements. Applicable permits include, but are not limited to, “The Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities (MSGP)”. All Construction Activity Storm Water permits minimum control measures include, but not limited to:

0. Public Education and Outreach on Storm Water Impacts

0. Public Involvement and Participation

0. Illicit Discharge Detection and Elimination

0. Construction Site Storm Water Run-off Control

0. Post Construction Storm Water Management in New Development and Redevelopment

0. Pollution Prevention/Good Housekeeping for Municipal Operations Contractors will comply with the MSGP permit when the activity is identified as a permitted industrial activity. BMPs include, but are not limited to:

0. Practicing spill prevention and good housekeeping.

0. Installing and managing erosion and sediment control.

0. Contractors will obtain permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). BMPs include, but are not limited to:

0. Preparing and implementing a site-specific Storm Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.

0. Installing and managing erosion and sediment control.

0. Make available, upon request, permit associated documentation.

0. Practicing spill prevention and good housekeeping.

0. Schedule inspections and provide corrective actions for noted deficiencies.

15. Storm Water Management Low Impact Design/Development (LID): The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects regardless of size. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to:

0. Restoring predevelopment hydrology to the maximum extent technically feasible

0. Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water

0. Managing rainfall at the point where it falls

0. Meeting the requirements of the MS4 permit

0. Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division.

16. Use of Pesticides: N/A

17. Protection of Work Site Resources: Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Prior to site clearing and grubbing, the Contractor shall coordinate harvesting of saleable timber with the DGR and/or COR. Contractor shall notify the DGR and/or COR if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the DGR or COR.

18. Prevention of Spills: Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).

19. Protection of Sensitive Areas: Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:

19.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource located on public lands.

20. Corrective Action for Noncompliance: Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.

21. Noise: Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the DGR and COR.

22. Mercury: Mercury is prohibited, unless specified otherwise, except for mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition for disposal as directed. Immediately report to the DGR and COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.

23. Universal Waste / e-Waste Management: Universal waste and e-wastes including but not limited to some mercury containing building products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and installation instructions.

24. Pollution Prevention / Hazardous Waste Minimization: Minimize the use of hazardous materials and the generation of hazardous waste. Consult with the Environmental Office for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.

File details come from the government source that posted it. Updated .