This is a Scope of Work document for the Texas Department of Transportation (TxDOT) related to a State Let Construction Contract for roadway rehabilitation on US 67 in Ellis County, Texas. The project involves rehabilitating existing roadway, flexible pavement repair, milling, overlay work, and slope repair on US 67 extending from the Dallas County Line to BUS 287Q, covering a total length of 5.443 miles. This is a Federal Aid Project requiring a notarized Buy America Certification Form for all items classified as construction materials. The scope of work document provides detailed specifications and requirements for contractors bidding on this rehabilitation project, establishing the technical standards and performance expectations for the work to be completed.
The project is federally funded through the Federal Aid program, necessitating compliance with Buy America requirements for construction materials. Contractors submitting bids must provide proper certification documentation demonstrating compliance with these federal regulations. The scope of work outlines the specific construction standards, material specifications, and workmanship requirements that successful contractors must meet throughout the duration of the project. As a State Let Construction Contract, this project follows Texas's procurement and contracting procedures for public works projects.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control 0261-01-053 Project F 2026(653) Highway US 67 County ELLIS
ADDENDUM ACKNOWLEDGMENT
Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This page is provided for the purpose of acknowledging an addendum.
FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT
BEING READ.
In order to properly acknowledge an addendum, place a mark in the box next to the respective addendum.
ADDENDUM NO. 1
ADDENDUM NO. 2
ADDENDUM NO. 3
ADDENDUM NO. 4
ADDENDUM NO. 5
In addition, the bidder by affixing their signature to the signature page of the proposal is acknowledging that they have taken the addendum(s) into consideration when preparing their bid and that the information contained in the addendum will be included in the contract, if awarded by the Commission or other designees.
1-1
This page intentionally left blank.
Highway US 67 County ELLIS
PROPOSAL TO THE TEXAS
TRANSPORTATION COMMISSION
2024 SPECIFICATIONS
Work Consisting of Rehabilitate Existing Roadway
ELLIS COUNTY, TEXAS
The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated.
This project is to be completed in 133 working days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.
Provide a proposal guaranty in the form of a Cashier’s Check, Teller’s Check (including an Official Check) or Bank Money Order on a State or National Bank or Savings and Loan Association, or State or Federally chartered Credit Union made payable to the Texas Transportation Commission in the following amount:
ONE HUNDRED THOUSAND AND 00/100 (Dollars) ( $100,000.00)
A bid bond may be used as the required proposal guaranty. The bond form may be detached from the proposal for completion. The proposal may not be disassembled to remove the bond form. The bond must be in accordance with Item 2 of the specifications.
Any addenda issued amending this proposal and/or the plans that have been acknowledged by the bidder, become part of this proposal.
By signing the proposal the bidder certifies:
1. the only persons or parties interested in this proposal are those named and the bidder has not directly or indirectly participated in collusion, entered into an agreement or otherwise taken any action in restraint of free competitive bidding in connection with the above captioned project.
2. in the event of the award of a contract, the organization represented will secure bonds for the full amount of the contract.
3. the signatory represents and warrants that they are an authorized signatory for the organization for which the bid is submitted and they have full and complete authority to submit this bid on behalf of their firm.
4. that the certifications and representations contained in the proposal are true and accurate and the bidder intends the proposal to be taken as a genuine government record.
• Signed: **
(1) (2) (3) Print Name:
(1) (2) (3) Title:
(1) (2) (3) Company:
(1) (2) (3)
• Signatures to comply with Item 2 of the specifications.
**Note: Complete (1) for single venture, through (2) for joint venture and through (3) for triple venture.
* When the working days field contains an asterisk (*) refer to the Special Provisions and General Notes.
NOTICE TO CONTRACTORS
ANY CONTRACTORS INTENDING TO BID ON ANY WORK TO BE AWARDED
BY THIS DEPARTMENT MUST SUBMIT A SATISFACTORY “AUDITED FINANCIAL
STATEMENT” AND “EXPERIENCE QUESTIONNAIRE” AT LEAST TEN DAYS
PRIOR TO THE LETTING DATE.
UNIT PRICES MUST BE SUBMITTED IN ACCORDANCE WITH ITEM 2 OF
THE STANDARD SPECIFICATIONS OR SPECIAL PROVISION TO ITEM 2 FOR
EACH ITEM LISTED IN THIS PROPOSAL.
TEXAS DEPARTMENT OF TRANSPORTATION
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS,
That we, (Contractor Name)
Hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Texas Department of Transportation, hereinafter called the Obligee, in the sum of not less than two percent (2%) of the department’s engineer’s estimate, rounded to the nearest one thousand dollars, not to exceed one hundred thousand dollars ($100,000) as a proposal guaranty (amount displayed on the cover of the proposal), the payment of which sum will and truly be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the principal has submitted a bid for the following project identified as:
Control 0261-01-053
Project F 2026(653)
Highway US 67
County ELLIS
NOW, THEREFORE, if the Obligee shall award the Contract to the Principal and the Principal shall enter into the Contract in writing with the Obligee in accordance with the terms of such bid, then this bond shall be null and void. If in the event of failure of the Principal to execute such Contract in accordance with the terms of such bid, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not as a penalty but as liquidated damages.
Signed this Day of 20
By:
(Contractor/Principal Name)
(Signature and Title of Authorized Signatory for Contractor/Principal)
*By:
(Surety Name)
(Signature of Attorney-in-Fact) Impressed
*Attach Power of attorney (Surety) for Attorney-in-Fact Surety Seal Only
This form may be removed from the proposal
BIDDER’S CHECK RETURN
IMPORTANT
The space provided for the return address must be completed to facilitate the return of your bidder’s check. Care must be taken to provide a legible, accurate, and complete return address, including zip code. A copy of this sheet should be used for each different return address.
NOTE
Successful bidders will receive their guaranty checks with the executed contract.
RETURN BIDDERS CHECK TO (PLEASE PRINT):
Control 0261-01-053 Project F 2026(653) Highway US 67 County ELLIS
IMPORTANT
PLEASE RETURN THIS SHEET IN ITS ENTIRETY
Please acknowledge receipt of this check(s) at your earliest convenience by signing below in longhand, in ink, and returning this acknowledgement in the enclosed self-addressed envelope.
Check Received By: Date:
Title:
For (Contractor's Name):
Project: County:
NOTICE TO THE BIDDER
In the space provided below, please enter your total bid amount for this project. Only this figure will be read publicly by the Department at the public bid opening.
It is understood and agreed by the bidder in signing this proposal that the total bid amount entered below is not binding on either the bidder or the Department. It is further agreed that the official total bid amount for this proposal will be determined by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.
Total Bid Amount
Control Project Highway County
ALT ITEM DESC SP Bid Item Description Unit Quantity Bid Price Amount Seq
Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________
Additional Signature for Joint Venture:
Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________
Total Bid Amount _______$2,664.00________
EXAMPLE OF BID PRICES SUBMITTED BY COMPUTER PRINTOUT
0001-03-030
STP 2000(938)HES
SH 20
EL PASO
104 509 REMOV CONC (SDWLK) SY 266.400 $10.000 $2,664.00 1
EXAMPLE EXAMPLE EXAMPLE EXAMPLE
EXAMPLES
BID PRICES SUBMITTED BY HAND WRITTEN FORMAT
Unit price for each plant in place
249 014 FLEX BASE(DEL)(DENSCOT)(TY A GR4 CL2) TON 56,787.00 14
ALT
ITEM-CODE
ITEM
NO
DESC
NO
S.P.
NO.
UNIT BID PRICE ONLY
WRITTEN IN WORDS UNIT
APPROX
QUANTITIES
DEPT
USE
ONLY
190 026 RED OAK 1 1/2” - 1 3/4” GAL BB EA 9.000 1
DLRS
CENTS
DLRS
CENTS
Unit price for each ton of Flexible Base
430 001 001 CL A CONC FOR EXT STR (CULV) CY 45.000 27
Unit price for each cubic yard of Concrete
DLRS
CENTS
610 007 001 RDWY ILL ASSEM(TY ST 50T-8-8)(.4 KW)S EA 13.000 7
Unit price of each Roadway Illumination Assembly
DLRS
CENTS
EXAMPLE EXAMPLE EXAMPLE EXAMPLE
F 2026(653) Proposal Sheet
ELLIS FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
110 7001
EXCAV (ROADWAY)
CY 11,133.000 1 DOLLARS
and CENTS
132 7010
EMBANK (FNL)(DC)(TY C2)
CY 14,388.000 2 DOLLARS
and CENTS
134 7001
BACKFILL (TY A)
STA 375.280 3 DOLLARS
and CENTS
162 7002
BLOCK SODDING
SY 4,160.000 4 DOLLARS
and CENTS
164 7023
HYDRO MULCH SEED (TEMP_WARM_COOL)
SY 4,160.000 5 DOLLARS
and CENTS
168 7001
VEGETATIVE WATERING
TGL 1,237.680 6 DOLLARS
and CENTS
344 7021
SP MIXES SP-C SAC-B PG70-22
TON 15,278.000 7 DOLLARS
and CENTS
344 7077
TACK COAT
GAL 15,278.000 8 DOLLARS
and CENTS
351 7011
FLEXIBLE PAVEMENT STRUCTURE REPAIR
(12")
SY 2,246.000 9 DOLLARS
and CENTS
354 7002
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 138,883.000 10 DOLLARS
and CENTS
401 7001
FLOWABLE BACKFILL
CY 26.000 11 DOLLARS
and CENTS
403 7001
TEMPORARY SPL SHORING
SF 10,534.000 12 DOLLARS
and CENTS
420 7006
CL A CONC (FLUME)
CY 31.600 13 DOLLARS
and CENTS
1-6
ELLIS FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
420 7010
CL B CONC (FLUME)
CY 3.380 14 DOLLARS
and CENTS
420 7052
CL C CONC (RAIL FOUNDATION)
CY 114.000 15 DOLLARS
and CENTS
423 7001
RETAINING WALL (MSE)
SF 3,532.000 16 DOLLARS
and CENTS
432 7013
RIPRAP (MOW STRIP)(4 IN)
CY 142.750 17 DOLLARS
and CENTS
432 7041
RIPRAP (STONE PROTECTION)(12 IN)
CY 15.000 18 DOLLARS
and CENTS
432 7043
RIPRAP (STONE PROTECTION)(18 IN)
CY 14.000 19 DOLLARS
and CENTS
450 7016
RAIL (TY T551)
LF 640.000 20 DOLLARS
and CENTS
467 7308
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 13.000 21 DOLLARS
and CENTS
496 7037
REMOV STR (PIPE)
EA 2.000 22 DOLLARS
and CENTS
500 7001
MOBILIZATION
LS 1.000 23 DOLLARS
and CENTS
502 7001
BARRICADES, SIGNS AND TRAFFIC
HANDLING
MO 9.000 24 DOLLARS
and CENTS
503 7002
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 25 DOLLARS
and CENTS
505 7001
TMA (STATIONARY)
DAY 92.000 26 DOLLARS
2-6
ELLIS FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
505 7002
TMA (MOBILE OPERATION)
HR 352.000 27 DOLLARS
and CENTS
506 7003
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 115.000 28 DOLLARS
and CENTS
506 7011
ROCK FILTER DAMS (REMOVE)
LF 115.000 29 DOLLARS
and CENTS
506 7020
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 30 DOLLARS
and CENTS
506 7024
CONSTRUCTION EXITS (REMOVE)
SY 112.000 31 DOLLARS
and CENTS
506 7039
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,460.000 32 DOLLARS
and CENTS
506 7041
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,460.000 33 DOLLARS
and CENTS
506 7044
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 420.000 34 DOLLARS
and CENTS
506 7046
BIODEG EROSN CONT LOGS (REMOVE)
LF 420.000 35 DOLLARS
and CENTS
512 7041
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 530.000 36 DOLLARS
and CENTS
533 7001
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 483.000 37 DOLLARS
and CENTS
540 7001
MTL W-BEAM GD FEN (TIM POST)
LF 1,925.000 38 DOLLARS
and CENTS
540 7005
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 39 DOLLARS
3-6
ELLIS FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
540 7015
DOWNSTREAM ANCHOR TERMINAL
SECTION
EA 7.000 40 DOLLARS
and CENTS
540 7039
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 41 DOLLARS
and CENTS
542 7001
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 42 DOLLARS
and CENTS
542 7002
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 43 DOLLARS
and CENTS
544 7001
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 44 DOLLARS
and CENTS
544 7003
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 45 DOLLARS
and CENTS
545 7003
CRASH CUSH ATTEN (STKPL)
EA 1.000 46 DOLLARS
and CENTS
556 7008
PIPE UNDERDRAINS (TY 8) (6")
LF 640.000 47 DOLLARS
and CENTS
658 7001
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 16.000 48 DOLLARS
and CENTS
658 7021
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2
EA 8.000 49 DOLLARS
and CENTS
662 7005
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 7,610.000 50 DOLLARS
and CENTS
662 7012
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 5,614.000 51 DOLLARS
and CENTS
662 7017
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 236.000 52 DOLLARS
4-6
ELLIS FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
662 7112
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,850.000 53 DOLLARS
and CENTS
662 7114
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 86.000 54 DOLLARS
and CENTS
666 7024
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,614.000 55 DOLLARS
and CENTS
666 7030
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,269.000 56 DOLLARS
and CENTS
666 7036
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 236.000 57 DOLLARS
and CENTS
666 7042
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 58 DOLLARS
and CENTS
666 7045
REFL PAV MRK TY I(W)(DBL ARROW)
(100MIL)
EA 2.000 59 DOLLARS
and CENTS
666 7066
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 60 DOLLARS
and CENTS
666 7117
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 340.000 61 DOLLARS
and CENTS
666 7347
PAVEMENT SLER 6"
LF 1,110.000 62 DOLLARS
and CENTS
666 7408
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 7,610.000 63 DOLLARS
and CENTS
666 7411
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 36,501.000 64 DOLLARS
and CENTS
666 7423
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 38,994.000 65 DOLLARS
5-6
ELLIS FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
672 7006
REFL PAV MRKR TY II-C-R
EA 737.000 66 DOLLARS
and CENTS
677 7001
ELIM EXT PM & MRKS (4")
LF 1,110.000 67 DOLLARS
and CENTS
678 7002
PAV SURF PREP FOR MRK (6")
LF 1,110.000 68 DOLLARS
6-6
CERTIFICATION OF INTEREST IN OTHER BID
PROPOSALS FOR THIS WORK
By signing this proposal, the bidding firm and the signer certify that the following information, as indicated by checking “Yes” or “No” below, is true, accurate, and complete.
A. Quotation(s) have been issued in this firm's name to other firm(s) interested in this work for consideration for performing a portion of this work.
________ YES
________ NO
B. If this proposal is the low bid, the bidder agrees to provide the following information prior to award of the contract.
1. Identify firms which bid as a prime contractor and from which the bidder received quotations for work on this project.
2. Identify all the firms which bid as a prime contractor to which the bidder gave quotations for work on this project.
DISCLOSURE OF LOBBYING ACTIVITIES
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for public burden disclosure.)
1. Type of Federal Action:
a. contract
b. grant
c. cooperative agreement
d. loan
e. loan guarantee
f. loan insurance
2. Status of Federal Action:
a. bid/offer/application
b. initial award
c. post-award
3. Report Type:
a. initial filing
b. grant
For material change only:
year _______ quarter _____ date of last report ___________
4. Name and Address of Reporting Entity:
Prime Subawardee Tier __________, if known:
Congressional District, if known:
5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
Congressional District, if known:
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable: _____________________________
8. Federal Action Number, if known: 9. Award Amount, if known:
10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):
b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
11. Amount of Payment (check all that apply):
$ ___________________________ actual planned
13. Type of Payment (check all that apply):
a. retainer
b. one-time fee
c. commission
d. contingent fee
e. deferred
f. other; specify: _______________________________
12. Form of Payment (check all that apply)
a. cash
b. in-kind; specify: nature ____________________ value ____________________
14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
15. Continuation Sheet(s) SF-LLL-A attached: Yes No
16. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required dis-closure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature: __________________________________________
Print Name: _________________________________________
Title: ______________________________________________
Telephone No: _____________________ Date: ___________
FEDERAL USE ONLY Authorized for Local Reproduction Standard Form - LLL
INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Use the SF-LLL-A Continuation Sheet for additional information if the space on the form is inadequate. Com-plete all items that apply for both the initial filing and material change report. Refer to the implementing guidance pub-lished by the Office of Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity or this covered Federal action.
4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in item 4 checks "Subawardee", then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number, the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.
(b) Enter the full names of the individual(s) performing services, and include full address if different from 10(a).
Enter Last Name, First Name, and Middle Initial (MI).
11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned).
Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.
12. Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.
13. Check the appropriate box(es). Check all boxes that apply. If other, specify nature.
14. Provide a specific and detailed description of the services that the lobbyist has performed, or will be expected to perform, and the date(s) of any services rendered. Include all preparatory and related activity, not just time spent in actual contact with Federal officials. Identify the Federal official(s) or employee(s) contacted or the officer(s), employee(s), or Member(s) of Congress that were contacted.
15. Check whether or not a SF-LLL-A Continuation Sheet(s) is attached.
16. The certifying official shall sign and date the form, print his/her name, title, and telephone number.
Public reporting burdon for this collection of infromation is estimated to average 30 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments reguarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burdon, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.
DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB 0348-0046
CONTINUATION SHEET
Authorized for Local Reproduction
Standard Form - LLL-A
Reporting Entity: ____________________________________ Page ______ of ______
CONTRACTOR’S ASSURANCE
(Subcontracts-Federal Aid Projects)
By signing this proposal, the contractor is giving assurances that each subcontract and further all lower tier subcontracts will incorporate the Standard Specification to Article 9.9, Payment
Provisions for Subcontractors and will also physically attach the following:
Form FHWA 1273
Wage Rates
Special Provision 000-001
Special Provision 000-002
Special Provision 000-007
Required Contract Provisions Federal-Aid Construction
Contracts
All Construction Projects
Nondiscrimination, Sections 3.1-3.6 (include materials and leases of equipment)
Certificate of Nondiscrimination in Employment
Cargo Preference Act Requirements in Federal-Aid
11-25
ENGINEER SEAL
Project F 2026(653)
Highway US 67 County ELLIS
The enclosed Texas Department of Transportation Specifications, Special Specifications, Special Provisions, General Notes and Specification Data in this document have been selected by me, or under my responsible supervision as being applicable to this project.
Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act.
The seal appearing on this document was authorized by:
Vanrajsinh K Mahida P.E.
April 28, 2026
Seal Applies to CSJ(s):
All CSJs within the Contract
137833
Vanrajsinh K Mahida
CSJ:0261-01-053 Sheet 10
County: ELLIS
Highway: US 67
General Notes Sheet A
SPECIFICATION DATA
Table 1: Soil Constants Requirements
Item Description Plasticity Index
Note Max Min
132 EMBANK(FNL)( DC)(TY C2) 25 8 2
Note 1: Material excavated from the project must meet the PI requirements when used in the top 10 feet of embankment that supports the pavement structure or other locations shown in the plans. Do not use shale and obtain approval to incorporate shaley clay produced by the construction project.
Note 2: Use as a non-select embankment backfill as defined under Item 423.2.4.1. Use as an embankment to backfill behind abutments to the extent of the approach slab or to backfill areas enclosed by an abutment and / or retaining walls or other locations as shown in the plans.
Table 2: Basis of Estimate for Permanent Construction
Item Description Thickness Rate Quantity
162 Block Sod N/A See
Specifications
4160 SY
166 * Fertilizer (12-6-6) N/A 500 Lbs./Ac 0.21 Ton 168 Vegetative Watering (Warm)** N/A 12 TGL/Ac/Day 618.84 TGL
344 SP MIXES SP-C SAC-B SP-C
SAC-B PG70-22 See Plans 110 Lbs./SY/In 15278 Ton
344, Tack Coat (Undiluted Application/Spray Rate)
Milled HMA
0.11
Gal/SY 15278 Gal
*For contractor’s information only **Use Summer rate for calculation, adjust for actual field conditions/temperatures as necessary.
See Vegetation Establishment Plan Sheet for estimated daily rates.
Note:
(1) Asphalt weight based on 110 Lbs./SY/In
General Notes Sheet B
Table 3: Basis of Estimate for Temporary Erosion Control Items
Item Description Rate Quantity
164 Hydro Mulch Seed (Temp_Warm_Cool) See Specifications 4160 SY
166* Fertilizer (12-6-6) 500 Lb/Ac 0.21 Ton 168 Vegetative Watering (Warm)** 12 TGL/Ac/Day 618.84 TGL
*For Contractor’s Information Only.
**Use Summer rate for calculation, adjust for Actual Field Conditions/Temperatures as Necessary. See Vegetation Establishment Sheet for estimated daily rates.
GENERAL
The construction, operation and maintenance of the proposed project will be consistent with the state implementation plan as prepared by the Texas Commission on Environmental Quality.
The disturbed area for this project, as shown on the plans is 1.23 acres. However, the Total Disturbed Area (TDA) will establish the required authorization for storm water discharges. The TDA of this project will be determined by the sum of the disturbed area in all project locations in the contract, and all disturbed area on all Project-Specific Locations (PSL) located in the project limits and/or within 1 mile of the project limits. The department will obtain an authorization to discharge storm water from the Texas Commission on Environmental Quality (TCEQ) for the construction site as shown on the plans, according to the TDA of the project. The contractor will obtain any required authorization from the TCEQ for the discharge of storm water from any PSL for construction support activities on or off of the project row according to the TDA of the project.
When the TDA for the project exceeds 1 acre, provide a copy of the appropriate application of permit (NOI, or Construction Site Notice) to the engineer, for any PSL located in the project limits or within 1 mile of the project limits. Follow the directives and adhere to all requirements set forth in the TCEQ, Texas Pollution Discharge Elimination System, Construction General Permit (TPDES, CGP).
This project required permits with environmental resources agencies. There is a high probability that an environmentally sensitive area could be encountered on the contractor designated Project-Specific Locations (PSL) for this project (haul roads, equipment staging areas, borrow pits, disposal sites, field offices, storage areas, parking areas, etc.). Item 7.6 “Project-Specific Locations”, provides a listing of regulatory agencies that may need to be contacted regarding this project.
Leave all right of way areas undisturbed until actual construction is to be performed in said areas.
Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address:
https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors
General Notes Sheet C or Contractor questions on this project are to be addressed to the following individual(s):
Juan A. Paredes, P.E. Juan.Paredes@txdot.gov Nolan Del Hierro, P.E. Nolan.DelHierro@txdot.gov
Contractor questions will be accepted through email, phone, and in person by the above individuals.
All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page.
The Letting Pre-Bid Q&A web page for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.
Item 5:
Underground utilities owned by the Texas Department of Transportation may be present within the Right-Of-Way on this project. For signal, illumination, surveillance, and communications & control maintained by TxDOT, call the TxDOT Traffic Signal Office (214-320-6682) for locates a minimum of 48 hours in advance of excavation. For irrigation systems, call TxDOT Landscape Office (214-320-6205) for locates a minimum of 48 hours in advance of excavation. If city or town owned irrigation facilities are present, call the appropriate department of the local city or town a minimum of 48 hours in advance of excavation. The Contractor is liable for all damages when utilities are damaged due to Contractor’s negligence including, but not limited to, repair or replacement at the Contractor’s expense.
For the project to be deemed complete, permanently stabilize all unpaved disturbed areas of the project with a vegetative cover at a minimum of 70% density for the control of erosion.
Place construction stakes/station markings at intervals of no more than 100 feet or as directed by the Engineer. Place stakes and markings so as not to interfere with normal construction operations.
Submit all shop drawings, working drawings, or other documents which require review sufficiently in advance of scheduled construction to allow no less than thirty (30) calendar days for review and response.
Item 7:
Repair or replace any structures and utilities that might have been damaged by negligence or a failure to have utility locates performed.
Holiday restrictions – The Engineer may decide that no lane closures or construction operations shall be allowed during the restricted periods listed in the following holiday schedule. TxDOT has the right to lengthen, shorten, or otherwise modify these restricted periods as actual, or expected, traffic conditions may warrant. Working days will not be charged for these restricted
General Notes Sheet D periods. No additional compensation will be allowed for these closures (i.e., overhead, delays, stand-by, barricades or any other associated cost impacts).
• New Year’s Eve and Day (5 am on December 31 thru 10:00 pm January 1)
• Easter Holiday weekend (5 am on Friday thru 10:00 pm Sunday)
• Memorial Day weekend (5 am on Friday thru 10:00pm Monday)
• Independence Day (5 am on July 3 thru 10:00 pm on July 5)
• Labor Day weekend (5 am on Friday thru 10:00 pm Monday)
• Thanksgiving Holiday (5 am on Wednesday thru 10:00 pm Sunday)
• Christmas Holiday (5 am on December 23 thru 10:00 pm December 26)
No significant traffic generator events identified.
Item 8:
This Project will be a Standard Workweek in accordance with Article 8.3.1.4
Nighttime work is allowed in accordance with Article 8.3.3.
Critical Path Method (CPM) schedule in P6 format will be required for this project. Submit baseline schedule and obtain approval prior to beginning construction. The Estimate will be held if monthly schedule update is not submitted.
This project contains a 60 day convenience delay per the Item 8 special provisions for Contractor Mobilization
Items 110 and 132:
Excavated shale is not an acceptable material for embankment.
Scarify and loosen the excavated areas, unpaved surface areas, except rock, to a depth of at least 8 inches and compact in accordance with the specifications.
Excavation and embankment for driveways, sleeper slabs, alleys and intersections will not be paid for directly, but will be considered subsidiary to these items.
Removal of existing geotextile fiber shall not be paid for directly but will be considered subsidiary to these items.
Item 132:
Excavated material from the project site has not been determined to be suitable for embankment. The bidder assumes all risk for the use of excavated materials for embankment and is expected to meet all material requirements for embankment regardless of the source.
Perform Tex-106-E (Plasticity Index) by an approved laboratory on excavated soils from sources outside right of way when used in roadway embankment. Provide the test results at no expense to the department. The engineer will sample and test soils produced by the construction project for specification requirements or material sources specified in the plans.
General Notes Sheet E
Earth embankment Type C2 is mainly composed of material other than shale. Furnish material that is free from vegetation or other objectionable material and that conforms to the requirements of Table 1 (Sheet A). If necessary, treat material with lime slurry in accordance with Item 260, “Lime Treatment (Road-Mixed)” in order to meet these requirements. Use Tex- 121-E, figure 1, page 4 to calculate the amount of lime required. When lime treated subgrade is specified, 3000 PPM is the maximum allowed sulfate content in the top 3 feet when material comes from borrow source. Follow recommendations of 260.4.4 for mixing and mellowing. The engineer will test material placed or excavated to a depth of one foot below and laterally to one foot outside the proposed treatment limit. Lime treatment of this material will not be paid for directly, but will be considered subsidiary to this item.
Do not use shaley clays in embankment unless approved in writing. RAP is not allowed in embankment unless otherwise approved.
Use embankment material Type C2 described in Table 1 “Soil Constants Requirements” for embankments behind bridge abutments to the extent of the bridge approach slabs, and other embankments enclosed by an abutment and / or retaining walls.
Item 134 & 160:
Start backfilling pavement edges as soon as possible after the surface course is started.
Backfill and compact the pavement edges to produce a smooth surface adjacent to the pavement with no vertical edges.
Use Type “A” material to backfill pavement edges as shown in plans. Type “A” material shall consist of suitable material that when compacted will support the pavement edge. Rap is considered suitable Type “A” material.
Blade the existing vegetation into a neat wind-row prior to overlay. After placing Ty A backfill and placing seeding, the material from the wind-row shall be replaced on the completed slopes.
Emulsion shall be placed at a 50/50 solution of water to emulsion over disturbed area.
Emulsion rate=0.15 Gal/SY residual. This work, materials and equipment shall be subsidiary to Item 134.
Sequence construction operations to salvage topsoil from one location and spread on areas ready to receive topsoil. Keep stockpiling of topsoil to a minimum.
Use fertile clay or loam from the project site not more than six inches below natural grade as topsoil.
Item 301:
Provide liquid antistripping agents unless otherwise directed. Add the minimum dosage determined by the manufacturer or higher dosage determined by design requirement and try subsequent trials at 0.25% increments.
General Notes Sheet F
Item 320:
Use a self-propelled wheel mounted MTV capable of receiving mix from the haul trucks, separate from the paver. It shall have a minimum storage capacity of approximately 25 tons. It shall be equipped with a pivoting discharge conveyor and shall completely and thoroughly remix the material prior to placement. The effectiveness of the MTV’s remixing ability is subject to the approval of the Engineer. In addition, the paver shall have a surge storage insert with a minimum capacity of 20 tons.
The use of windrow pick-up equipment is allowed except on the first aggregate course of roadway material placed over the subgrade.
Item 344:
Use aggregate that meets the Surface Aggregate Classification (SAC) requirement of Class B
Item 354:
Saw existing asphalt along neat lines where portions are to be left in place temporarily or permanently. Sawing is not paid for directly, but is subsidiary to this item.
Take possession of recycled asphalt pavement from the project.
Properly dispose of unsalvageable material at your own expense.
Slope longitudinal faces greater than 1 ¼" to a minimum of 1:1 slope at the end of the work period if traffic is able to traverse the joint. Slope transverse tapers to a minimum of 36:1 at the end of the workday. Remove the taper prior to continuing the milling.
For open shoulder sections, plane the asphalt so the flow of water is not impeded at the shoulder edge or across the surface. Added planing up to three feet in width outside the lines and grades of the plans, necessary to provide proper drainage, will be subsidiary to the bid item.
Remove the loose material from the roadway before opening to traffic.
Patch pavement cut to excessive depth by equipment failure with an approved epoxy material.
Re-plane patched area to an acceptable approved ride quality. Payment for these corrections is subsidiary to this item.
Prior to overlay operations, sludge, sediment/fines from the milling operations must be removed and there shall be no standing water.
The maximum ridge to valley (RTV) allowed will be 5MM.
Item 400:
Structural Excavation is not paid for directly but is considered subsidiary to pertinent Items unless otherwise shown on the plans.
General Notes Sheet G
Item 403:
If benching or sloping is proposed by the contractor where Temporary Special Shoring is called out in the plans, receive concurrence from the Engineer prior to performing the work. If temporary special shoring is needed that is not called out in the plans, request approval from the Engineer prior to proceeding with design and construction. Temporary special shoring not quantified in the plans and installed for the convenience of the contractor will not be paid.
Item 420:
For Bridge Class Culverts, place National Bridge Inventory numbers at the middle of the downstream headwall using 3" block letters.
For Bent Numbering and NBI Numbering, furnish materials that conform to the pertinent requirements of the following items:
Stencil ink, black 11 oz., spray can (lead, CFC, and CFHC free). Black spray will be waterproof, weather resistance and dry instantly on all surfaces, without smearing, smudging or rippling and
Die cut stencils or Brass stencil, 3 in., numbers and letters, adjustable interlocking stencil, set content 92 piece numbers and letters, legend height 3 in., symbol height 3 in. Stencils must be industrial grade and interlocking.
All materials, labor and incidentals associated with placing NBI numbers are subsidiary to the various bid items.
Item 421:
Furnish mix designs to the Engineer in a format compatible to the latest version of the Department’s Construction Management System (Site Manager). Mix Design templates will be provided by the Engineer.
Strength evaluation using maturity testing, Tex-426-A, may be used for all concrete elements except drilled shafts and mass concrete pours.
Provide a digital hydraulic compression testing Machine and accessories. The machine shall have a minimum testing range of 2500 pounds force to 250,000 pounds force with a hydraulic switching valve to allow for rapid advancing, hold, controlled advancing and rapid retracting. The machine shall have a load cell to measure compressive forces within the testing range and shall be calibrated and verified in accordance with ASTM latest version. The Machine can meet or exceed the following when approved by the Engineer:
Supply the Engineer with a list of certified personnel and copies of their current ACI certificates before beginning production and when personnel changes are made. Supply hard copies of calibration reports for testing equipment when required by the Engineer.
Deliver Department test specimens to curing facilities within 24 to 48 hours after molding unless otherwise directed. The Department will remove molds and place in curing tanks.
General Notes Sheet H
Item 423:
For Mechanically Stabilized Earth (MSE) walls, provide a system from one of the following approved suppliers:
Table:3 List Of Approved Manufactures Name Maufacture Phone
Reinforced Earth Walls
Geoquest USA, Inc
817-283-5503
9001 Airport Frwy., Ste. 800 North Richland Hills, TX 76180
(prior to March 2025) The Reinforced Earth Company 1331 Airport Freeway, Suite 302 Euless, TX 76040-4150
Vist-A-Wall Precast MSE Walls Contech Engineered Solutions LLC 800-338-1122 (Grid-Strip, Wide Mesh) 650 Justice Lane
Mansfield, TX 76063
Strengthened Soil Walls ROSCH Earth Technologies
636-519-7770 18390 Wings Corporate Drive Chesterfield, MO 63005
Structural Embankment MSE Walls
Structural Embankment, LLC 817-599-5700 P.O. Box 2200
Weatherford, TX 76086
Tricon Retained Soil Walls Tricon Precast, Ltd.
281-931-9832 15055 Henry Road Houston, TX 77060
VP Wall System
Valley Prestress Products, Inc.
979-234-7899 1520 Calhoun Road P.O. Box 309 Eagle Lake, TX 77434
Jobe Wall System Jobe Materials, L.P.
915-298-9900 12123 Dyer Street El Paso, TX 79934
All retaining walls will have a uniform texture and appearance.
Unless otherwise noted in the plans, the top of the leveling pad is located 2 feet below the proposed ground.
General Notes Sheet I
Square foot surface area of retaining wall is measured from the top of retaining wall to the top of the leveling pad. Footing adjustments made to accommodate the available optional retaining walls are not measured.
Unless otherwise shown on the plans, provide Type AS backfill as defined under this item for permanent MSE or concrete block (CB) walls not subject to inundation. Unless otherwise shown on the plans, provide type DS backfill as defined under this item for permanent MSE or CB walls subject to inundation.
Cement-Stabilized Backfill (CSB) is not permitted.
Unless otherwise noted on the plans, provide flowable backfill meeting the requirements of Item 401 between the back of panels and inlets or drainage pipes where the required compaction can not be achieved. Flowable backfill used for this purpose is subsidiary to this item.
Provide earth reinforcements with a minimum length of 8’ or longer as required by RW(MSE)- DD. Earth reinforcement length is measured perpendicular to the wall. Adjust skewed earth reinforcements as necessary of obtain required length.
Submit design calculations supporting the details necessary to incorporate coping, railing, inlets, drainage, electrical conduits and any additional necessary features.
The contractor has the option of constructing any of the types of retaining walls for which details and specifications are included in the plans. Footing adjustments made to accommodate the available optional retaining walls are not measured. Regardless of option or options chosen, use the same fascia pattern throughout the entire project, including cast in place full height retaining walls or retaining wall type abutments.
Submit detailed drawings depicting the patterns and matching of precast with cast-in-place for approval.
Unless otherwise shown on the plans, form the map of Texas emblem into a wall panel next to each bridge abutment. Engineer approval of the exact location of each emblem is required.
The cost of forming emblems is considered subsidiary to this item. Inset the map of Texas a minimum of ¾ inch into the face of the panel, and provide a smooth finish with an engineer approved contrasting color.
At contractor's expense, repair all damage to the precast units (such as chips) as required to match the fascia pattern.
Use Embankment Type C2 as non-select embankment backfill as defined under Item 423.2.4.1.
For non-select embankment fill behind retaining walls provide and install fill in accordance with Item 132, Type C2.
For cut walls, the backfill between the select fill zone and the existing ground shall be either select material as required for the select fill zone or backfill meeting or exceeding the requirements of Item 132, type C2. Place material in accordance with Item 132, Type C2
General Notes Sheet J requirements. If existing ground is laid back (i.e. not vertical), the lay back shall be done as a series of equal height benches so as to prevent the formation of a smooth surface at the material interface.
Avoid distinct vertical joints between select backfill and embankment (Non-Select) backfill as required by Section 423.3.4. This may be conveniently done by providing a zone of material behind the strap zone (1’ min width) in which alternating lifts of select and non-select materials are interlaced.
Items 423 and 427:
Unless otherwise noted on the plans, provide a striated finish on all retaining walls and retaining wall type bridge abutments. Supply form liners providing a finish similar to that derived from ¾” Fractured Fin"-From Symons by Dayton, Ribbed Pattern No. 312 from Sika-by Greenstreak, 16950 Adam’s Rib by Fitzgerald Formliners, Maximum depth of the striations is ¾ inch.
Retaining wall colors are shown elsewhere in the plans.
Item 427:
Finish concrete structures surface area I with an opaque sealer of the color(s) shown elsewhere in the plans in accordance Item 427.
Apply a 4-SF sample of each color on the project surfaces for approval. Adjust color as required by Engineer to compensate for surroundings and natural lighting conditions on the project site.
Ensure that surfaces are free of weak surface material, curing compounds and other surface contaminants prior to coating.
FORM LINER FINISHES: Place architectural concrete treatments as shown. Placement is subsidiary to this item.
Where used, provide fractured fin/ribs/striations that are continuous with no apparent curves or discontinuities. Variations of the fractured ribs from true vertical exceeding ¼" for each 4'-0" of panel height are not acceptable.
Provide form liners that release without leaving pieces of liner material on the concrete and without pulling or breaking concrete from the textured surface. Provide form release agents as recommended by the manufacturer. Replace form liners as directed that have become damaged or worn. Replacement of form liners is considered incidental to the work and no additional compensation is provided.
No horizontal splices in the form liner are permitted. Vertical splices may occur only in valleys between fractured ribs.
Provide sample panels a minimum of ten days in advance of starting construction of the textured concrete surfaces. Construct sample panel(s) in accordance with Item 427.4.3.5 “Form Liner Finish” using each type of approved form liner. Sample panels must meet the
General Notes Sheet K requirements of the plans and specifications and be approved before any construction form liners may be ordered, obtained or used. Provide panels having a textured portion at least 5'-0" by 5'-0" with a representative un-textured surrounding surface. If directed, construct and finish additional test panels until a satisfactory concrete surface texture is obtained.
The approved sample panel is the standard of comparison for the production concrete surface texture. If directed, build a new test panel to demonstrate acceptability of any proposed change in construction method.
Tool or replace areas requiring surface treatment that do not match their associated sample panels. Upon completion, tooled or replaced panels must match the associated sample panel.
Tooling or replacement is at the contractor's expense.
For proper placement of the expansion joint behind the rail, omit surface finish from the top of RW (BTR)DAL or RW(BTR) rail to bottom of panel as directed.
Joint reveal details and location may vary slightly from what is shown to match the adjacent MSE walls as directed. No additional compensation will be allowed.
Item 502:
The Contractor Force Account “Safety Contingency” that has been established for this project is intended to be utilized for work zone enhancements, to improve the effectiveness of the Traffic Control Plan, that could not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor’s Responsible Person based on weekly or more frequent traffic management reviews on the project. The Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.
Access will be provided to all business and residences at all times. Coordinate with stakeholders where their access will be impacted by construction. Where turning radii are limited during phased construction at intersections, provide all weather surfaces such as RAP or base in turning movements to accommodate and to protect the traffic from edge drop-offs.
Materials, labor, maintenance and removal for these temporary accesses and radii will not be paid for directly but will be considered subsidiary to the various bid items.
The Contractor’s Responsible Person or designee must be able to respond on the project 24 hours/day, 7 days/week within 60 minutes from initial notification of a work zone issue for the duration of the project. The person must be knowledgeable of TxDOT Guidelines for traffic control devices and signs.
Provide written proposed lane closure information by 11:00 am on the business day prior to the proposed closures. Do not close lanes when this requirement is not met.
When excavation is required next to a pavement lane carrying traffic and the widening is not completed by the end of the workday, backfill against the edge of the pavement with at least a 3:1 slope using an acceptable material to support vehicular traffic. Carefully remove and
General Notes Sheet L dispose of this material when work resumes.