02_Specifications_bldgs_65pct_draft.pdf

PDF 12 MB Posted

Attached to
JBLM MDTF Bldgs 3218, 19; & 3221-24 Construction Consolidation, Joint Base Lewis McChord, Washington
Solicitation number
W912DW25R0002
Issued by

About this file

The document appears to be a 65% draft specification for the construction of buildings 3218, 3219, and 3221-3224 at Joint Base Lewis-McChord in Washington. The construction is part of the JBLM MDTF Bldgs 3218, 19; & 3221-24 Construction Consolidation project, which is being solicited by the U.S. Army Corps of Engineers, Seattle District under Solicitation Number W912DW25R0002. The project is in the pre-solicitation phase, and requires contractors to review the attached draft specifications and provide feedback through a sources sought submission. The agency is seeking contractors with relevant experience to provide construction services for this project.

View the file

Other files

File Type Posted
W912DW25R0002-Sources Sought.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. ARMY CORPS OF ENGINEERS

SEATTLE DISTRICT

65% DESIGN SUBMITTAL

09 SEPTEMBER 2024

Prepared by

JOINT BASE LEWIS-MCCHORD, WASHINGTON

FY25 Multi-Domain Task Force (MDTF) PHASE 2

Repair Barracks 3218 to COF/HQ Repair Barracks 3219 to EAB HQ

Contract W912DW2101004 Task Order (FY25)W912DW23F2079

SPECIFICATIONS

RENOVATE BARRACKS 3218 & 3219

JBLM, WA

31800226.002

FY25 MDTF PH2

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION AND DECONSTRUCTION_JBLM

02 82 00 11/18 ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

02 84 16 04/06 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

01 11 00 02/24 SUMMARY OF WORK

01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS

01 31 20 05/22 PROJECT TECHNICAL DATA MANAGEMENT AND

VISUALIZATION

01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 01.00 10 08/23 PROJECT SCHEDULE

01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS

SCHEDULES

01 32 17.00 20 11/23 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

A – 4025-R ENG FROM

B – SUBMITTAL REGISTER

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

A – ARMY SUSTAINABILITY REPORT CARD

B – SUSTAINABILITY CHECKLIST

01 35 13.43 10 08/15 SPECIAL PROJECT PROCEDURES FOR

CONTAMINATED SITES

01 35 26 GOVERNMENT SAFETY REQUIREMENTS_JBLM

01 35 29.13 11/15, CHG 1: 08/22 HEALTH, SAFETY, AND EMERGENCY RESPONSE

PROCEDURES FOR CONTAMINATED SITES

01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS_JBLM

A – DD FORM 1354

01 78 23 OPERATION AND MAINTENANCE DATA_JBLM

01 78 24.00 10 05/23 FACILITY DATA REQUIREMENTS

01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)

01 91 00.15 05/23, CHG 2: 11/23 BUILDING COMMISSIONING

A - COMMISSIONING PLAN

B – OWNER’S PROJECT REQUIREMENTS (OPR)

31800226.002

PROJECT TABLE OF CONTENTS Page 2

DIVISION 03 - CONCRETE

03 01 00 REHABILITATION OF CONCRETE_JBLM

03 20 00.00 10 CONCRETE_REINFORCEMENT JBLM

03 30 00 02/19, CHG 7: 02/24 CAST-IN-PLACE CONCRETE

03 37 13 02/18 SHOTCRETE

DIVISION 05 - METALS

05 05 20

05 05 23.16

05/22

08/18

POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

STRUCTURAL WELDING_JBLM

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL_JBLM

05 30 00 STEEL DECKS_JBLM

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING_JBLM

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS_JBLM

05 51 33 METAL LADDERS_JBLM

05 52 00 08/23 METAL RAILINGS_JBLM

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 08/23 BITUMINOUS DAMPPROOFING

07 21 13 08/23 BOARD INSULATION

07 21 16 BOARD AND BLOCK INSULATION_JBLM

07 22 00 ROOF AND DECK INSULATIONS_JBLM

07 27 10 08/23 BUILDING AIR BARRIER SYSTEM

07 27 19.01 08/23 SELF-ADHERING AIR BARRIERS

07 42 13 PRE-FINISHED METAL WALL PANELS_JBLM

07 54 19 08/23 THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING

07 60 00 PRE-FINISHED METAL FLASHING AND SHEET

METAL_JBLM

07 81 00 SPRAY-APPLIED FIREPROOFING_JBLM

07 84 00 FIRESTOPPING_JBLM

07 92 00 JOINT SEALANTS_JBLM

DIVISION 08 - OPENINGS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 71 63.10 11/22 ELECTRICAL LOCKING CONTROL

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 06 00 08/22 SCHEDULES FOR FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

31800226.002

PROJECT TABLE OF CONTENTS Page 3

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR MONUMENT AND BUILDING SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE

10 22 39 08/20 FOLDING PANEL PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 24 13 08/20 ROLLER WINDOW SHADES

12 48 13 08/23 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION

12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 05/18 SEISMIC BRACING FOR MISCELLANEOUS

EQUIPMENT

13 49 20.00 10 10/07 RFI/EMI SHIELDING

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 – FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE

PROTECTION_JBLM

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 15 05/22, CHG 1: 02/24 COMMON PIPING FOR HVAC

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.01 02/19, CHG 1: 02/20 LONWORKS DIRECT DIGITAL CONTROL FOR

HVAC AND OTHER BUILDING CONTROL SYSTEMS

23 21 23 08/17 HYDRONIC PUMPS

31800226.002

PROJECT TABLE OF CONTENTS Page 4

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 7: 02/24 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

DIVISION 26 - ELECTRICAL

26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL

26 05 19.00 10 11/22 INSULATED WIRE AND CABLE

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM_JBLM

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG2:11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

RENOVATE BARRACKS 3218 & 3219 31800226.002

JBLM, WA FY25 MDTF PH2

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

BUILDING 3218

SHEET NUMBER SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX

G-003 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

GI001 LIFE SAFETY GENERAL NOTES & LEGEND

GI002 LIFE SAFETY SITE PLAN

GI100 OCCUPANT LOAD BASEMENT FLOOR PLAN

GI101A OCCUPANT LOAD FIRST FLOOR - AREA A

GI101B OCCUPANT LOAD FIRST FLOOR - AREA B

GI102 OCCUPANT LOAD SECOND FLOOR PLAN

GI103 OCCUPANT LOAD THIRD FLOOR PLAN

GI110 LIFE SAFETY BASEMENT FLOOR PLAN

GI111A LIFE SAFETY FIRST FLOOR PLAN - AREA A

GI111B LIFE SAFETY FIRST FLOOR PLAN - AREA B

GI112 LIFE SAFETY SECOND FOOR PLAN

GI113 LIFE SAFETY THIRD FLOOR PLAN

CIVIL

C-001 CIVIL GENERAL NOTES

C-002 CIVIL LEGEND AND ABBREVIATIONS

C-003 HAUL ROUTE

CS101 SITE PLAN

V-101 EXISTING CONDITIONS PLAN

CD101 OVERALL EXISTING CONDITIONS AND DEMOLIOTION PLAN

CD102 EXISTING CONDITIONS AND DEMOLIOTION PLAN

CD103 EXISTING CONDITIONS AND DEMOLIOTION PLAN

CD104 EXISTING CONDITIONS AND DEMOLIOTION PLAN

CU101 OVERALL WATER AND SEWER PLAN

CU102 WATER AND SEWER PLAN

CU103 WATER AND SEWER PLAN

CU104 WATER AND SEWER PLAN

CU501 WATER AND SEWER DETAILS

CU502 WATER AND SEWER DETAILS

CU503 WATER AND SEWER DETAILS

CU504 WATER AND SEWER DETAILS

CG101 OVERALL GRADING AND DRAINAGE PLAN

CG102 GRADING AND DRAINAGE PLAN

CG103 GRADING AND DRAINAGE PLAN

CG104 GRADING AND DRAINAGE PLAN

CG501 PAVING DETAILS

DOCUMENT 00 01 15 Page 1

C-401 OVERALL HORIZONTAL CONTROL PLAN

C-402 HORIZONTAL CONTROL PLAN

C-403 HORIZONTAL CONTROL PLAN

C-404 HORIZONTAL CONTROL PLAN

C-405 HORIZONTAL CONTROL COORDINATE LIST

C-601 EROSION CONTROL PLAN

C-651 EROSION CONTROL DETAILS

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-002 STRUCTURAL GENERAL NOTES

S-003 ABBREVIATIONS AND LEGEND

S-004 WIND LOAD DIAGRAMS

SD110A DEMO PLAN - BASEMENT AREA A

SD110B DEMO PLAN - BASEMENT AREA B

SD111A DEMO PLAN - FIRST FLOOR AREA A

SD111B DEMO PLAN - FIRST FLOOR AREA B

SD112B DEMO PLAN - SECOND FLOOR AREA B

SD113B DEMO PLAN - THIRD FLOOR - AREA B

S-110A FOUNDATION PLAN - BASEMENT AREA A

S-110B FOUNDATION PLAN - BASEMENT AREA B

S-111A FRAMING PLAN - FIRST FLOOR AREA A

S-111B FRAMING PLAN - FIRST FLOOR AREA B

S-112B FRAMING PLAN - SECOND FLOOR AREA B

S-113B FRAMING PLAN - THIRD FLOOR AREA B

S-201 EXTERIOR ELEVATION

S-202 EXTERIOR ELEVATION

S-203 EXTERIOR ELEVATION

S-204 EXTERIOR ELEVATION

S-301 INTERIOR SECTION

S-311 WALL SECTIONS - AREA A

S-312 WALL SECTIONS - AREA B

S-321 SECTIONS - VAULT ROOM

S-322 SECTIONS - VAULT ROOM

S-323 SECTIONS - WALL OPENINGS

S-410A ENLARGED PLAN - BASEMENT AREA A

S-411A ENLARGED PLAN - FIRST FLOOR AREA A

S-411B ENLARGED PLAN - FIRST FLOOR AREA B

S-501 TYPICAL DETAILS - CONCRETE

S-502 TYPICAL DETAILS - COLD FORMED

S-503 TYPICAL DETAILS - STEEL

S-504 TYPICAL DETAILS - INFILL

S-510 DETAILS - FOUNDATION

S-520 DETAILS - SHOTCRETE SHEAR WALLS

S-521 DETAILS - SHOTCRETE SHEAR WALLS

S-530 DETAILS - BEAM REINFORCING

S-531 DETAILS - CORRIDOR CHANNELS

S-532 DETAILS - CORRIDOR STEEL STRAPS

S-533 DETAILS - PINCH CHANNEL

S-540 DETAILS - VAULT

S-541 DETAILS - VAULT

S-550 DETAILS - WINDOW REINFORCING

S-551 DETAILS - WINDOW REINFORCING

S-560 DETAILS - NON-STRUCTURAL SUPPORT

S-570 DETAILS - PARTITION

S-580 DETAILS - VESTIBULE

S-581 DETAILS - VESTIBULE ARCHITECTURAL

ARCHITECTURAL

DOCUMENT 00 01 15 Page 2

AS101 ARCHITECTURAL SITE PLAN

AD110 DEMOLITION PLAN - BASEMENT

AD111A DEMOLITION PLAN - FIRST FLOOR AREA A

AD111B DEMOLITION PLAN - FIRST FLOOR AREA B

AD112 DEMOLITION PLAN - SECOND FLOOR

AD113 DEMOLITION PLAN - THIRD FLOOR

AD114 DEMOLITION PLAN - ROOF

A-001 ACCESSIBLE MOUNTING HEIGHTS

A-002 ACCESSIBLE MOUNTING CLEARANCES

A-003 PROGRAM AREAS SCHEDULE

A-004 AREA CALCULATIONS

A-005 AREA CALCULATIONS

A-011 AIR BARRIER DIAGRAMS

A-012 AIR BARRIER DIAGRAMS

A-111 FLOOR PLAN - FIRST FLOOR OVERALL

A-110 FLOOR PLAN - BASEMENT

A-111A FLOOR PLAN - FIRST FLOOR AREA A

A-111B FLOOR PLAN - FIRST FLOOR AREA B

A-112 FLOOR PLAN - SECOND FLOOR

A-113 FLOOR PLAN - THIRD FLOOR

A-114 ROOF PLAN OVERALL

A-114A ROOF PLAN AREA A

A-114B ROOF PLAN AREA B

A-120 REFLECTED CEILING PLAN - BASEMENT

A-121A REFLECTED CEILING PLAN - FIRST FLOOR AREA A

A-121B REFLECTED CEILING PLAN - FIRST FLOOR AREA B

A-122 REFLECTED CEILING PLAN - SECOND FLOOR

A-123 REFLECTED CEILING PLAN - THIRD FLOOR

A-201 EXTERIOR ELEVATIONS

A-202 EXTERIOR ELEVATIONS

A-203 EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS

A-302 BUILDING SECTIONS

A-303 BUILDING SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-401 ENLARGED VIEWS - ROOM 107 & 108

A-402 ENLARGED VIEWS - ROOM 140

A-403 ENLARGED VIEWS - ROOMS 144 & 145

A-404 ENLARGED VIEWS - ROOM 151

A-405 ENLARGED VIEWS - ROOMS 214 & 215

A-406 ENLARGED VIEWS - ROOM 222

A-407 ENLARGED VIEWS - ROOM 316

A-408 ENLARGED VIEWS - ROOMS 320 & 322

A-409 ENLARGED VIEWS - ENTRY FOYER

A-410 ENLARGED VIEWS - ACCESSIBLE RAMP

A-501 EXTERIOR MASONRY DETAILS

A-502 EXTERIOR METAL PANEL DETAILS

A-503 EXTERIOR WINDOW DETAILS

A-504 EXTERIOR DOOR DETAILS

A-505 INTERIOR DOOR DETAILS

A-506 WALL DETAILS

A-507 FLOOR DETAILS

A-508 ROOF DETAILS

A-511 STAIR AND RAILING DETAILS

A-541 CASEWORK DETAILS

A-551 OPERABLE PARTITION DETAILS

A-603 DOOR SCHEDULE AND TYPES

A-604 WINDOW TYPES

DOCUMENT 00 01 15 Page 3

A-601 INTERIOR WALL TYPES

A-602 EXTERIOR WALL TYPES

A-605 SCHEDULES

INTERIORS

I-001 INTERIORS GENERAL SHEET NOTES, LEGENDS, AND DETAILS

IF101 BASEMENT FLOOR FF&E PLAN

IF102 FIRST FLOOR PLAN FF&E AREA A

IF103 FIRST FLOOR PLAN FF&E AREA B

IF104 SECOND FLOOR PLAN FF&E

IF105 THIRD FLOOR PLAN FF&E

IF601 FURNITURE AND EQUIPMENT SCHEDULE

IN601 FINISH MATERIAL LEGEND

IN602 ROOM FINISH SCHEDULE

IG501 SIGNAGE DETAILS

IG502 SIGNAGE DETAILS

IG503 SIGNAGE DETAILS

IG504 SIGNAGE DETAILS FIRE PROTECTION

FIRE PROTECTION

FX001 FIRE SUPPRESSION GENERAL NOTES & LEGEND

FX100 FIRE SUPPRESSION BASEMENT PLAN

FX101A FIRE SUPPRESSION FIRST FLOOR PLAN - AREA A

FX101B FIRE SUPPRESSION FIRST FLOOR PLAN - AREA B

FX102 FIRE SUPPRESSION SECOND FLOOR PLAN

FX103 FIRE SUPPRESSION THIRD FLOOR PLAN

FX401 FIRE SUPPRESSION HYDRAULIC CALCULATIONS

FX501 FIRE SUPPRESSION DETAILS

FX601 FIRE SUPPRESSION RISER PLAN

FA001 FIRE ALARM GENERAL NOTES & LEGEND

FA100 FIRE ALARM BASEMENT PLAN

FA101A FIRE ALARM FIRST FLOOR PLAN - AREA A

FA101B FIRE ALARM FIRST FLOOR PLAN - AREA B

FA102 FIRE ALARM SECOND FLOOR PLAN

FA103 FIRE ALARM THIRD FLOOR PLAN

FA501 FIRE ALARM DETAILS

FA601 FIRE ALARM RISER PLAN

MECHANICAL

M-001 MECHANICAL LEGENDS

M-002 MECHANICAL LEGENDS

MD110A DEMO PLAN - BASEMENT AREA A

MD110B DEMO PLAN - BASEMENT AREA B

MD111A DEMO PLAN - FIRST FLOOR AREA A

MD111B DEMO PLAN - FIRST FLOOR AREA B

MD112 DEMO PLAN - SECOND FLOOR

MD113 DEMO PLAN - THIRD FLOOR

M-110A HVAC PLAN - BASEMENT AREA A

M-110B HVAC PLAN - BASEMENT AREA B

M-111A HVAC PLAN - FIRST FLOOR AREA A

M-111B HVAC PLAN - FIRST FLOOR AREA B & AREA C

M-112 HVAC PLAN - SECOND FLOOR

M-113 HVAC PLAN - THIRD FLOOR

M-130A PIPING PLAN - BASEMENT AREA A

M-130B PIPING PLAN - BASEMENT AREA B

M-131A PIPING PLAN - FIRST FLOOR AREA A

M-131B PIPING PLAN - FIRST FLOOR AREA B & AREA C

M-132 PIPING PLAN - SECOND FLOOR

M-133 PIPING PLAN - THIRD FLOOR

DOCUMENT 00 01 15 Page 4

M-401 MECHANICAL ENLARGED PLANS

M-402 MECHANICAL ZONE PLANS

M-403 MECHANICAL ZONE PLANS

M-404 MECHANICAL ZONE PLANS

M-405 MECHANICAL ZONE PLANS

M-406 MECHANICAL ZONE PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

M-702 MECHANICAL CONTROLS

M-703 MECHANICAL CONTROLS

M-704 MECHANICAL CONTROLS

M-801 CHILLED WATER SCHEMATIC

M-802 HEATING HOT WATER SCHEMATIC ELECTRICAL

PLUMBING

P-001 PLUMBING LEGEND, NOTES, AND ABBREVIATIONS

PD110A BASEMENT AND CRAWLSPACE PLUMBING DEMO PLAN AREA A

PD110B BASEMENT AND CRAWLSPACE PLUMBING DEMO PLAN AREA B

PD111A FIRST FLOOR PLUMBING DEMO PLAN AREA A

PD111B FIRST FLOOR PLUMBING DEMO PLAN AREA B

PD112 SECOND FLOOR PLUMBING DEMO PLAN

PD113 THIRD FLOOR PLUMBING DEMO PLAN

PD114 ROOF DEMO PLAN

P-110A BASEMENT AND CRAWLSPACE DRAIN WASTE VENT PLAN AREA A

P-110B BASEMENT AND CRAWLSPACE DRAIN WASTE VENT PLAN AREA B

P-111A FIRST FLOOR DRAIN WASTE VENT PLAN AREA A

P-111B FIRST FLOOR DRAIN WASTE VENT PLAN AREA B

P-112 SECOND FLOOR DRAIN WASTE VENT PLAN

P-113 THIRD FLOOR DRAIN WASTE VENT PLAN

P-114A ROOF VENT PLAN AREA A

P-114B ROOF VENT PLAN AREA B

P-130A BASEMENT AND CRAWLSPACE DOMESTIC PLUMBING PLAN AREA A

P-130B BASEMENT AND CRAWLSPACE DOMESTIC PLUMBING PLAN AREA B

P-131A FIRST FLOOR DOMESTIC PLUMBING PLAN AREA A

P-131B FIRST FLOOR DOMESTIC PLUMBING PLAN AREA B

P-132 SECOND FLOOR DOMESTIC PLUMBING PLAN

P-133 THIRD FLOOR DOMESTIC PLUMBING PLAN

P-401 PLUMBING ENLARGED PLANS - FIRST FLOOR RESTROOMS

P-402 PLUMBING ENLARGED PLANS - SECOND FLOOR RESTROOMS

P-403 PLUMBING ENLARGED PLANS - THIRD FLOOR RESTROOMS

P-501 DOMESTIC PLUMBING ISOMETRICS

P-502 DRAIN WASTE VENT PLUMBING ISOMETRICS

P-503 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

ELECTRICAL

E-001 ELECTRICAL SYMBOLS, LEGENDS, AND GENERAL NOTES

ES101 ELECTRICAL SITE PLAN - DEMOLITION

ES102 ELECTRICAL SITE PLAN

ED110A DEMOLITION PLAN - BASEMENT AREA A

ED110B DEMOLITION PLAN - BASEMENT AREA B

ED111A DEMOLITION PLAN - FIRST FLOOR AREA A

ED111B DEMOLITION PLAN - FIRST FLOOR AREA B

ED112 DEMOLITION PLAN - SECOND FLOOR

ED113 DEMOLITION PLAN - THIRD FLOOR

DOCUMENT 00 01 15 Page 5

EG110 GROUNDING PLAN - OVERALL

E-110A LIGHTING PLAN - BASEMENT AREA A

E-110B LIGHTING PLAN - BASEMENT AREA B

E-111A LIGHTING PLAN - FIRST FLOOR AREA A

E-111B LIGHTING PLAN - FIRST FLOOR AREA B

E-112 LIGHTING PLAN - SECOND FLOOR

E-113 LIGHTING PLAN - THIRD FLOOR

E-120A POWER PLAN - BASEMENT AREA A

E-120B POWER PLAN - BASEMENT AREA B

E-121A POWER PLAN - FIRST FLOOR AREA A

E-121B POWER PLAN - FIRST FLOOR AREA B

E-122 POWER PLAN - SECOND FLOOR

E-123 POWER PLAN - THIRD FLOOR

E-301 SECTIONS

E-401 ENLARGED PLANS

E-402 ENLARGED PLANS

E-501 LIGHTING CONTROLS DETAILS

E-502 LIGHTING DETAILS

E-503 LIGHTING DETAILS

E-601 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

E-602 ELECTRICAL ONE-LINE DIAGRAM

E-603 LUMINAIRE SCHEDULE

E-604 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 PANEL SCHEDULES

E-608 PANEL SCHEDULES

E-609 PANEL SCHEDULES

E-610 PANEL SCHEDULES

E-611 PANEL SCHEDULES

TELECOMMUNICATIONS

T1-001 TELECOM LEGENDS, ABBREVIATIONS, NOTES

T1-102 TELECOMMUNICATION SITE PLAN - NEW WORK

T1-101 TELECOMMUNICATION SITE PLAN - DEMOLITION

TD113 DEMOLITION PLAN - THIRD FLOOR

TD112 DEMOLITION PLAN - SECOND FLOOR

TD111B DEMOLITION PLAN - FIRST FLOOR - AREA B

TD111A DEMOLITION PLAN - FIRST FLOOR - AREA A

TD110 DEMOLITION PLAN - BASEMENT

T1-113 OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - THIRD FLR

T1-112 OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - SECOND FLR

T1-110 OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - BASEMENT

T1-111 OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - FIRST FLR

T2-111B TELECOM NIPR - FIRST FLOOR PLAN AREA B

T2-111A TELECOM NIPR - FIRST FLOOR PLAN AREA A

T2-112B TELECOM NIPR - SECOND FLOOR PLAN AREA B

T2-113B TELECOM NIPR - THIRD FLOOR PLAN AREA B

T2-110A TELECOM NIPR - BASEMENT PLAN AREA A

T2-110B TELECOM NIPR - BASEMENT PLAN AREA B

T1-120A TELECOM SIPR - BASEMENT PLAN AREA A

T1-120B TELECOM SIPR - BASEMENT PLAN AREA B

T1-121A TELECOM SIPR - FIRST FLOOR PLAN AREA A

T1-121B TELECOM SIPR - FIRST FLOOR PLAN AREA B

T1-122B TELECOM SIPR - SECOND FLOOR PLAN AREA B

T1-123B TELECOM SIPR - THIRD FLOOR PLAN AREA B

T3-411 ENLARGED PLAN - TELECOMMUNICATIONS ROOM 118

T3-412 ENLARGED PLAN - TELECOMMUNICATIONS ROOM 204

T3-413 ENLARGED PLAN - TELECOMMUNICATIONS ROOM 303

DOCUMENT 00 01 15 Page 6

T3-410 ENLARGED PLAN - TELECOMMUNICATIONS ROOM 105

T4-501 BUILDING ACCESS CONTROL DETAILS

T4-602 TELECOMMUNICATIONS RISER DIAGRAMS

T4-601 TELECOMMUNICATIONS GROUNDING DETAILS

T4-502 TELECOMMUNICATIONS OUTLET DETAILS

BUILDING 3219

SHEET NUMBER SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX

G-003 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

GI001 LIFE SAFETY GENERAL NOTES AND SYMBOLS

GI002 LIFE SAFETY SITE PLAN

GI100 OCCUPANT LOAD BASEMENT FLOOR

GI101A OCCUPANT LOAD FIRST FLOOR - AREA A

GI101B OCCUPANT LOAD FIRST FLOOR - AREA B

GI102A OCCUPANT LOAD SECOND FLOOR - AREA A

GI102B OCCUPANT LOAD SECOND FLOOR - AREA B

GI103A OCCUPANT LOAD THIRD FLOOR - AREA A

GI103B OCCUPANT LOAD THIRD FLOOR - AREA B

GI110 LIFE SAFETY BASEMENT FLOOR PLAN

GI111A LIFE SAFETY FIRST FLOOR PLAN - AREA A

GI111B LIFE SAFETY FIRST FLOOR PLAN - AREA B

GI112A LIFE SAFETY SECOND FLOOR PLAN - AREA A

GI112B LIFE SAFETY SECOND FLOOR PLAN - AREA B

GI113A LIFE SAFETY THIRD FLOOR PLAN - AREA A

GI113B LIFE SAFETY THIRD FLOOR PLAN - AREA B

CIVIL

C-001 CIVIL GENERAL NOTES

C-002 CIVIL LEGEND AND ABBREVIATIONS

C-003 HAUL ROUTE

CS101 SITE PLAN

V-101 EXISTING CONDITIONS PLAN

CD101 OVERALL EXISTING CONDITIONS AND DEMOLIOTION PLAN

CD102 EXISTING CONDITIONS AND DEMOLIOTION PLAN

CD103 EXISTING CONDITIONS AND DEMOLIOTION PLAN

CD104 EXISTING CONDITIONS AND DEMOLIOTION PLAN

CU101 OVERALL WATER AND SEWER PLAN

CU102 WATER AND SEWER PLAN

CU103 WATER AND SEWER PLAN

CU104 WATER AND SEWER PLAN

CU501 WATER AND SEWER DETAILS

CU502 WATER AND SEWER DETAILS

CU503 WATER AND SEWER DETAILS

CU504 WATER AND SEWER DETAILS

CG101 OVERALL GRADING AND DRAINAGE PLAN

CG102 GRADING AND DRAINAGE PLAN

CG103 GRADING AND DRAINAGE PLAN

CG104 GRADING AND DRAINAGE PLAN

CG501 PAVING DETAILS

C-401 OVERALL HORIZONTAL CONTROL PLAN

C-402 HORIZONTAL CONTROL PLAN

C-403 HORIZONTAL CONTROL PLAN

C-404 HORIZONTAL CONTROL PLAN

C-405 HORIZONTAL CONTROL COORDINATE LIST

C-601 EROSION CONTROL PLAN

DOCUMENT 00 01 15 Page 7

C-651 EROSION CONTROL DETAILS

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-002 STRUCTURAL GENERAL NOTES

S-003 ABBREVIATIONS AND LEGEND

S-004 WIND LOAD DIAGRAMS

SD110A DEMO PLAN - BASEMENT AREA A

SD110B DEMO PLAN - BASEMENT AREA B

SD111A DEMO PLAN - FIRST FLOOR AREA A

SD112A DEMO PLAN - SECOND FLOOR AREA A

SD113A DEMO PLAN - THIRD FLOOR AREA A

SD111B DEMO PLAN - FIRST FLOOR AREA B

SD112B DEMO PLAN - SECOND FLOOR AREA B

SD113B DEMO PLAN - THIRD FLOOR - AREA B

S-110A FOUNDATION PLAN - BASEMENT AREA A

S-110B FOUNDATION PLAN - BASEMENT AREA B

S-111A FRAMING PLAN - FIRST FLOOR AREA A

S-111B FRAMING PLAN - FIRST FLOOR AREA B

S-112B FRAMING PLAN - SECOND FLOOR AREA B

S-112A FRAMING PLAN - SECOND FLOOR AREA A

S-113B FRAMING PLAN - THIRD FLOOR AREA B

S-113A FRAMING PLAN - THIRD FLOOR AREA A

S-201 EXTERIOR ELEVATIONS

S-202 EXTERIOR ELEVATIONS

S-203 EXTERIOR ELEVATIONS

S-204 EXTERIOR ELEVATIONS

S-205 EXTERIOR ELEVATIONS

S-206 EXTERIOR ELEVATIONS

S-210 ELEVATOR ELEVATIONS

S-211 ELEVATOR ELEVATIONS

S-301 INTERIOR SECTION

S-302 INTERIOR SECTION

S-311 WALL SECTIONS - AREA A

S-312 WALL SECTIONS - AREA B

S-321 SECTIONS - VAULT ROOM

S-322 SECTIONS - VAULT ROOM

S-323 SECTIONS - WALL OPENINGS

S-410A ENLARGED PLAN - FIRST FLOOR AREA A

S-411A ENLARGED PLAN - VESTIBULE AREA A

S-412B ENLARGED PLAN - ELEVATOR AREA B

S-501 TYPICAL DETAILS - CONCRETE

S-502 TYPICAL DETAILS - CMU

S-503 TYPICAL DETAILS - STEEL

S-504 TYPICAL DETAILS - INFILL

S-510 DETAILS - FOUNDATION

S-520 DETAILS - SHOTCRETE SHEAR WALLS

S-521 DETAILS - CONCRETE SHEAR WALLS

S-530 DETAILS - BEAM REINFORCING

S-531 DETAILS - CORRIDOR CHANNELS

S-532 DETAILS - CORRIDOR STEEL STRAPS

S-533 DETAILS - PINCH CHANNEL

S-540 DETAILS - VAULT

S-541 DETAILS - VAULT

S-550 DETAILS - WINDOW REINFORCING

S-560 DETAILS - NON-STRUCTURAL SUPPORT

S-580 DETAILS - VESTIBULE

S-581 DETAILS - VESTIBULE

DOCUMENT 00 01 15 Page 8

ARCHITECTURAL

AS101 ARCHITECTURAL SITE PLAN

AD110 DEMOLITION PLAN - BASEMENT

AD111A DEMOLITION PLAN - FIRST FLOOR AREA A

AD111B DEMOLITION PLAN - FIRST FLOOR AREA B

AD112 DEMOLITION PLAN - SECOND FLOOR

AD113 DEMOLITION PLAN - THIRD FLOOR

AD114 DEMOLITION PLAN - ROOF

A-001 ACCESSIBLE MOUNTING HEIGHTS

A-002 ACCESSIBLE MOUNTING CLEARANCES

A-003 PROGRAM AREAS SCHEDULE

A-004 AREA CALCULATIONS

A-005 AREA CALCULATIONS

A-011 AIR BARRIER DIAGRAMS

A-012 AIR BARRIER DIAGRAMS

A-013 AIR BARRIER DIAGRAMS

A-110 FLOOR PLAN - BASEMENT OVERALL

A-110A FLOOR PLAN - BASEMENT AREA A

A-110B FLOOR PLAN - BASEMENT AREA B

A-111 FLOOR PLAN - FIRST FLOOR OVERALL

A-111A FLOOR PLAN - FIRST FLOOR AREA A

A-111B FLOOR PLAN - FIRST FLOOR AREA B

A-112 FLOOR PLAN - SECOND FLOOR OVERALL

A-112A FLOOR PLAN - SECOND FLOOR AREA A

A-112B FLOOR PLAN - SECOND FLOOR AREA B

A-113 FLOOR PLAN - THIRD FLOOR OVERALL

A-113A FLOOR PLAN - THIRD FLOOR AREA A

A-113B FLOOR PLAN - THIRD FLOOR AREA B

A-114 ROOF PLAN - OVERALL

A-114A ROOF PLAN - AREA A

A-114B ROOF PLAN - AREA B

A-120 REFLECTED CEILING PLAN - BASEMENT

A-121A REFLECTED CEILING PLAN - FIRST FLOOR AREA A

A-121B REFLECTED CEILING PLAN - FIRST FLOOR AREA B

A-122A REFLECTED CEILING PLAN - SECOND FLOOR AREA A

A-122B REFLECTED CEILING PLAN - SECOND FLOOR AREA B

A-123A REFLECTED CEILING PLAN - THIRD FLOOR AREA A

A-123B REFLECTED CEILING PLAN - THIRD FLOOR AREA B

A-201 EXTERIOR ELEVATIONS

A-202 EXTERIOR ELEVATIONS

A-203 EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS

A-302 BUILDING SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-401 ENLARGED VIEWS - ROOMS 140, 145 & 151

A-402 ENLARGED VIEWS - ROOMS 144 & 109

A-403 ENLARGED VIEWS - ROOMS 207 & 209

A-404 ENLARGED VIEWS - ROOM 214

A-405 ENLARGED VIEWS - ROOM 101

A-406 ENLARGED VIEWS - ROOMS 309 & 310

A-407 ENLARGED VIEWS - ROOM 316

A-408 ENLARGED VIEWS - ENTRY

A-409 ENLARGED VIEWS - RAMP AND ENTRY

A-410 ENLARGED VIEWS - ENHANCED ENTRY

A-411 ENLARGED VIEWS - ELEVATOR

A-501 EXTERIOR MASONRY DETAILS

A-502 EXTERIOR METAL PANEL DETAILS

A-503 EXTERIOR WINDOW DETAILS

DOCUMENT 00 01 15 Page 9

A-504 EXTERIOR DOOR DETAILS

A-505 INTERIOR DOOR DETAILS

A-506 WALL DETAILS

A-507 FLOOR DETAILS

A-508 ROOF DETAILS

A-511 STAIR AND RAILING DETAILS

A-552 CANOPY DETAILS

A-541 CASEWORK DETAILS

A-551 ELEVATOR DETAILS

A-601 INTERIOR WALL TYPES

A-602 EXTERIOR WALL TYPES

A-603 DOOR SCHEDULE AND DETAILS

A-604 WINDOW TYPES

A-605 SCHEDULES

INTERIORS

I-001 INTERIORS GENERAL SHEET NOTES, LEGENDS AND, GENERAL NOTES

IF101 BASEMENT FLOOR FF&E PLAN

IF102 FIRST FLOOR PLAN FF&E AREA A

IF103 FIRST FLOOR PLAN FF&E AREA B

IF104 SECOND FLOOR PLAN FF&E AREA A

IF105 SECOND FLOOR PLAN FF&E AREA B

IF106 THIRD FLOOR PLAN FF&E AREA A

IF107 THIRD FLOOR PLAN FF&E AREA B

IF601 FURNITURE & EQUIPMENT SCHEDULE

IN101 BASEMENT FLOOR FINISH PLAN

IN102 FIRST FLOOR FINISH PLAN AREA A

IN103 FIRST FLOOR FINISH PLAN AREA B

IN104 SECOND FLOOR FINISH PLAN AREA A

IN105 SECOND FLOOR FINISH PLAN AREA B

IN106 THIRD FLOOR FINISH PLAN AREA A

IN107 THIRD FLOOR FINISH PLAN AREA B

IN601 FINISH MATERIAL LEGEND

IN602 ROOM FINISH SCHEDULE

IG101 SIGNAGE PLAN - BASEMENT

IG102 SIGNAGE PLAN - FIRST FLOOR AREA A

IG103 SIGNAGE PLAN - FIRST FLOOR AREA B

IG104 SIGNAGE PLAN - SECOND FLOOR AREA A

IG105 SIGNAGE PLAN - SECOND FLOOR AREA B

IG106 SIGNAGE PLAN - THIRD FLOOR AREA A

IG107 SIGNAGE PLAN - THIRD FLOOR AREA B

IG501 SIGNAGE DETAILS

IG502 SIGNAGE DETAILS

IG503 SIGNAGE DETAILS

IG504 SIGNAGE DETAILS

FIRE PROTECTION

FX001 FIRE SUPPRESSION GENERAL NOTES AND SYMBOLS

FX100 FIRE SUPPRESSION BASEMENT PLAN

FX101A FIRE SUPPRESSION FIRST FLOOR PLAN - AREA A

FX101B FIRE SUPPRESSION FIRST FLOOR PLAN - AREA B

FX102A FIRE SUPPRESSION SECOND FLOOR PLAN - AREA A

FX102B FIRE SUPPRESSION SECOND FLOOR PLAN - AREA B

FX103A FIRE SUPPRESSION THIRD FLOOR PLAN - AREA A

FX103B FIRE SUPPRESSION THIRD FLOOR PLAN - AREA B

FX401 FIRE SUPPRESSION HYDRAULIC CALCULATIONS

FX501 FIRE SUPPRESSION DETAILS

FX601 FIRE SUPPRESSION RISER DIAGRAM

FA001 FIRE ALARM GENERAL NOTES AND SYMBOLS

DOCUMENT 00 01 15 Page 10

FA100 FIRE ALARM BASEMENT PLAN

FA101A FIRE ALARM FIRST FLOOR PLAN - AREA A

FA101B FIRE ALARM FIRST FLOOR PLAN - AREA B

FA102A FIRE ALARM SECOND FLOOR PLAN - AREA A

FA102B FIRE ALARM SECOND FLOOR PLAN - AREA B

FA103A FIRE ALARM THIRD FLOOR PLAN - AREA A

FA103B FIRE ALARM THIRD FLOOR PLAN - AREA B

FA501 FIRE ALARM DETAILS

FA601 FIRE ALARM RISER

MECHANICAL

M-001 MECHANICAL LEGENDS

M-002 MECHANICAL LEGENDS

MD110A DEMO PLAN - BASEMENT AREA A

MD110B DEMO PLAN - BASEMENT AREA B

MD111A DEMO PLAN - FIRST FLOOR AREA A

MD111B DEMO PLAN - FIRST FLOOR AREA B

MD112A DEMO PLAN - SECOND FLOOR AREA A

MD112B DEMO PLAN - SECOND FLOOR AREA B

MD113A DEMO PLAN - THIRD FLOOR AREA A

MD113B DEMO PLAN - THIRD FLOOR AREA B

M-110A HVAC PLAN - BASEMENT AREA A

M-110B HVAC PLAN - BASEMENT AREA B

M-111A HVAC PLAN - FIRST FLOOR AREA A

M-111B HVAC PLAN - FIRST FLOOR AREA B & AREA C

M-112A HVAC PLAN - SECOND FLOOR AREA A

M-112B HVAC PLAN - SECOND FLOOR AREA B

M-113A HVAC PLAN - THIRD FLOOR AREA A

M-113B HVAC PLAN - THIRD FLOOR AREA B

M-130A PIPING PLAN - BASEMENT AREA A

M-130B PIPING PLAN - BASEMENT AREA B

M-131A PIPING PLAN - FIRST FLOOR AREA A

M-131B PIPING PLAN - FIRST FLOOR AREA B & AREA C

M-132A PIPING PLAN - SECOND FLOOR AREA A

M-132B PIPING PLAN - SECOND FLOOR AREA B

M-133A PIPING PLAN - THIRD FLOOR AREA A

M-133B PIPING PLAN - THIRD FLOOR AREA B

M-401 MECHANICAL ENLARGED PLANS

M-402 MECHANICAL ZONE MAP

M-403 MECHANICAL ZONE MAP

M-404 MECHANICAL ZONE MAP

M-405 MECHANICAL ZONE MAP

M-406 MECHANICAL ZONE MAP

M-407 MECHANICAL ZONE MAP

M-408 MECHANICAL ZONE MAP

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

M-702 MECHANICAL CONTROLS

M-703 MECHANICAL CONTROLS

M-704 MECHANICAL CONTROLS

M-801 CHILLED WATER SCHEMATIC

M-802 HEATING HOT WATER SCHEMATIC

PLUMBING

DOCUMENT 00 01 15 Page 11

P-001 PLUMBING LEGEND, NOTES, AND ABBREVIATIONS

PD110A BASEMENT AND CRAWLSPACE DEMO PLUMBING PLAN AREA A

PD110B BASEMENT AND CRAWLSPACE DEMO PLUMBING PLAN AREA B

PD111A FIRST FLOOR DEMO PLUMBING PLAN AREA A

PD111B FIRST FLOOR DEMO PLUMBING PLAN AREA B

PD112A SECOND FLOOR DEMO PLUMBING PLAN AREA A

PD112B SECOND FLOOR DEMO PLUMBING PLAN AREA B

PD113A THIRD FLOOR DEMO PLUMBING PLAN AREA A

PD113B THIRD FLOOR DEMO PLUMBING PLAN AREA B

PD114 ROOF DEMOLITION PLAN

P-110A BASEMENT AND CRAWLSPACE DRAIN WASTE VENT PLAN AREA A

P-110B BASEMENT AND CRAWLSPACE DRAIN WASTE VENT PLAN AREA B

P-111A FIRST FLOOR DRAIN WASTE VENT PLAN AREA A

P-111B FIRST FLOOR DRAIN WASTE VENT PLAN AREA B

P-112A SECOND FLOOR DRAIN WASTE VENT PLAN AREA A

P-112B SECOND FLOOR DRAIN WASTE VENT PLAN AREA B

P-113A THIRD FLOOR DRAIN WASTE VENT PLAN AREA A

P-113B THIRD FLOOR DRAIN WASTE VENT PLAN AREA B

P-114A ROOF DWV PLAN AREA A

P-114B ROOF DWV PLAN AREA B

P-130A BASEMENT AND CRAWLSPACE DOMESTIC PIPING PLAN AREA A

P-130B BASEMENT AND CRAWLSPACE DOMESTIC PIPING PLAN AREA B

P-131A FIRST FLOOR DOMESTIC PIPING PLAN AREA A

P-131B FIRST FLOOR DOMESTIC PIPING PLAN AREA B

P-132A SECOND FLOOR DOMESTIC PIPING PLAN AREA A

P-132B SECOND FLOOR DOMESTIC PIPING PLAN AREA B

P-133A THIRD FLOOR DOMESTIC PIPING PLAN AREA A

P-133B THIRD FLOOR DOMESTIC PIPING PLAN AREA B

P-401 PLUMBING ENLARGED PLANS - FIRST FLOOR RESTROOMS

P-402 PLUMBING ENLARGED PLANS - SECOND FLOOR RESTROOMS

P-403 PLUMBING ENLARGED PLANS - THIRD FLOOR RESTROOMS

P-501 PLUMBING ISOMETRICS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

ELECTRICAL

E-001 ELECTRICAL SYMBOLS, LEGENDS, AND GENERAL NOTES

ES102 ELECTRICAL SITE PLAN

ES101 ELECTRICAL SITE PLAN - DEMOLITION

ED110A DEMOLITION PLAN - BASEMENT AREA A

ED110B DEMOLITION PLAN - BASEMENT AREA A Copy 1

ED111A DEMOLITION PLAN - FIRST FLOOR AREA A

ED111B DEMOLITION PLAN - FIRST FLOOR AREA B

ED112A DEMOLITION PLAN - SECOND FLOOR AREA A

ED112B DEMOLITION PLAN - SECOND FLOOR AREA B

ED113A DEMOLITION PLAN - THIRD FLOOR AREA A

ED113B DEMOLITION PLAN - THIRD FLOOR AREA B

EG110 GROUNDING PLAN - OVERALL

E-110A LIGHTING PLAN - BASEMENT AREA A

E-110B LIGHTING PLAN - BASEMENT AREA B

E-111A LIGHTING PLAN - FIRST FLOOR AREA A

E-111B LIGHTING PLAN - FIRST FLOOR AREA B

E-112A LIGHTING PLAN - SECOND FLOOR AREA A

E-112B LIGHTING PLAN - SECOND FLOOR AREA B

E-113A LIGHTING PLAN - THIRD FLOOR AREA A

E-113B LIGHTING PLAN - THIRD FLOOR AREA B

E-120A POWER PLAN - BASEMENT AREA A

E-120B POWER PLAN - BASEMENT AREA B

E-121A POWER PLAN - FIRST FLOOR AREA A

DOCUMENT 00 01 15 Page 12

E-121B POWER PLAN - FIRST FLOOR AREA B

E-122A POWER PLAN - SECOND FLOOR AREA A

E-122B POWER PLAN - SECOND FLOOR AREA B

E-123A POWER PLAN - THIRD FLOOR AREA A

E-123B POWER PLAN - THIRD FLOOR AREA B

E-401 ENLARGED PLANS

E-402 ENLARGED PLANS

E-403 ELEVATIONS

E-501 LIGHTING CONTROLS DETAILS

E-502 LIGHTING DETAILS

E-503 LIGHTING DETAILS

E-601 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

E-602 ELECTRICAL ONE-LINE DIAGRAM

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 PANEL SCHEDULES

E-608 PANEL SCHEDULES

E-609 PANEL SCHEDULES

E-610 PANEL SCHEDULES

E-611 PANEL SCHEDULES

E-604 MECHANICAL SCHEDULE

E-603 LIGHTING FIXTURE SCHEDULE

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS LEGEND

T-102 TELECOMMUNICATIONS SITE PLAN - NEW WORK

T-101 TELECOMMUNICATIONS SITE PLAN - DEMOLITION

TD101 TELECOMMUNICATIONS DEMO PLAN - BASEMENT

TD102 TELECOMMUNICATIONS DEMO PLAN - FIRST FLOOR - AREA A

TD103 TELECOMMUNICATIONS DEMO PLAN - FIRST FLOOR - AREA B

TD104 TELECOMMUNICATIONS DEMO PLAN - SECOND FLOOR

TD105 TELECOMMUNICATIONS DEMO PLAN - THIRD FLOOR

T-120 TELECOM SIPR - BASEMENT PLAN

T-110 OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - BASEMENT

T-124 TELECOM NIPR - BASEMENT PLAN

T-121A TELECOM SIPR - FIRST FLOOR PLAN AREA A

T-111A OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - FIRST FLR AREA A

T-125A TELECOM NIPR - FIRST FLOOR PLAN AREA A

T-121B TELECOM SIPR - FIRST FLOOR PLAN AREA B

T-111B OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - FIRST FLR AREA B

T-125B TELECOM NIPR - FIRST FLOOR PLAN AREA B

T-122A TELECOM SIPR - SECOND FLOOR PLAN AREA A

T-112 OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - SECOND FLR

T-126 TELECOM NIPR - SECOND FLOOR PLAN

T-122B TELECOM SIPR - SECOND FLOOR PLAN AREA B

T-123A TELECOM SIPR - THIRD FLOOR PLAN AREA A

T-113 OVERALL TELECOMMUNICATIONS PLAN PATHWAY NIPR - THIRD FLR

T-127 TELECOM NIPR - THIRD FLOOR PLAN

T-123B TELECOM SIPR - THIRD FLOOR PLAN AREA B

T-400 ENLARGED PLANS - TELECOMMUNICATIONS ROOM 301

T-401 ENLARGED PLANS - TELECOMMUNICATIONS ROOM 118

T-402 ENLARGED PLANS - TELECOMMUNICATIONS ROOM 201

T-403 ENLARGED PLANS - TELECOMMUNICATIONS ROOM 302

T-501 BUILDING ACCESS CONTROL DETAILS

T-502 TELECOMMUNICATIONS OUTLET DETAILS

T-601 TELECOMMUNICATIONS GROUNDING DETAILS

T-602 TELECOMMUNICATIONS RISER DIAGRAMS

DOCUMENT 00 01 15 Page 13

DRAWING NO. [REVISION NO.] NAVFAC DWG NO. TITLE

[ 1.3 SUBSURFACE DATA

Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders [ in the office of the Contracting Officer][ at the station] . [ The soils report is included as part of the solicitation. ]

1.4 SUPPLEMENTARY DRAWINGS

These supplementary drawings may not be a part of the contract but are included with the drawings for information.

[ 1.4.1 Reference Drawing[s]

The following reference drawing[s] [is][are] intended only to show the original construction. Drawing[s] [is][are] the property of the Government and shall not be used for any purpose other than that intended by the contract.[ The drawing[s] [is][are] [half-][full-]size. Full-size drawings are available at the bidder's or Contractor's expense.[ Information on procuring these full-size drawings may be obtained from the Contracting Officer.][ Full size drawings may be inspected during regular working hours at[ the office of the Contracting Officer.][ the station.]]

NAVFAC DWG NO. TITLE

] ][ 1.4.2 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.[ Subsurface data, not specified or indicated, have been obtained by the Government at this station. The data are available for examination by prospective bidders[ in the office of the Contracting Officer][ at the station].]

][ 1.4.3 Subsurface Data

Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders[ in the office of the Contracting Officer][ at the station].[ The soils report is included as part of the solicitation.]

] ] -- End of Document --

DOCUMENT 00 01 15 Page 14

SECTION 01 11 00

SUMMARY OF WORK

02/24

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are [ for Contractor Quality Control approval. ][for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan ; G[, [_____]]

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes [_____] and incidental related work. Construction Services, supporting the renovation and conversion of two separate and existing 1950’s era Barracks Facilities comprising approximately 76,781 SF of combined renovation work. The larger of the two facilities is a former 225-personnel ‘hammerhead’ barracks facility (Building #3219), which is to be converted to Echelon Above Brigade (EAB) Headquarters (HQ) facility and facility components. The smaller facility is a former 165-personnel ‘hammerhead’ barracks facility (Building #3218), which is to be converted into a combined HQ COF and BDE HQ facility and facility components. The project is located at Joint Base Lewis-McChord (JBLM), Washington, supporting the First Multi-Domain Task Force (1st MDTF) Battalion.

The two buildings are two different sizes, however will have similar exterior construction, interior construction, and interior HQ functions.

Facility repair, renovation and construction ends at the 5 feet line from the building exterior, with the exception of selected site features and various site utility work serving the building. Construction work includes site investigation and mobilization, hazardous materials abatement, selective demolition and deconstruction down to the buildings’ existing concrete structural frame, reconstruction of the exterior envelope, including roof assembly, exterior brick and metal infill wall assemblies, new storefront windows, doors, interior partitions, ceilings, finishes and spaces, creating a complete and usable facility. Construction also includes the demolition and replacement of all HVAC, Power, Lighting, Fire-Protection, Telecommunications, SIPR/NIPR, Fire Alarm/Mass-Notification systems, constructed to current UFC requirements.

Seismic repairs, including new concrete shear-walls and foundations and steel opening supports are also to be provided. An elevator and elevator tower structure, accessibility CIP concrete entry ramps and new painted steel guardrail /handrail assemblies are also included within the scope of work. This construction contract will be managed by the US Army Corps of Engineers, Seattle District, and/or their designated AE Service Provider.

SECTION 01 11 00 Page 1

1.2.2 Location

The work is located at the [_____] JBLM, WA, approximately as indicated.

The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.[ Occupancy notifications will be posted in a prominent location in the work area.]

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

[ 1.3 EXISTING WORK

Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

] 1.4 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities. [ Contact local utility locating service a minimum of [ 48 hours ][_____] prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. ] Verify existing utility locations indicated on contract drawings, within area of work.

[ Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground [, pier deck] or paved surface where existing underground utilities [or utilities encased in pier structures ]are discovered.

Verify the elevations of existing piping, utilities,and any type of underground [or encased ]obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

] 1.4.1 Notification Prior to Excavation

Notify the Contracting Officer at least [48 hours] [ 15 days ][_____] prior to starting excavation work.

[ 1.5 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

The Government will furnish the following materials and equipment for installation by the Contractor:

SECTION 01 11 00 Page 2

DESIGNATION NO. DESCRIPTION QUANTITY

Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.

Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.

1.5.1 Delivery Schedule

[ Notify the Contracting Officer in writing at least 60[_____] calendar days in advance of the date on which the materials and equipment are required.

Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the rate of [_____] per 100 [pounds][cubic feet] per month or fraction thereof.

][ Materials and equipment will be available on or after [_____] calendar days after the award of contract.

] 1.5.2 Delivery Location

The materials and equipment[ are located at [_____]] [are located within [_____] miles of the jobsite] [will be delivered to [_____]][ the salvage receiving point [_____]].

][ 1.6 GOVERNMENT-INSTALLED WORK

] 1.7 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS

1.7.1 NMCI Contractor Access

Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.

Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

1.6 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the [Government designated] storage area located within 30[_____] miles of the construction site.

Provide a salvage plan , listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or

SECTION 01 11 00 Page 3 equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 4

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

11/20, CHG 3: 02/23

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A615/A615M (2022) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are [for Contractor Quality Control approval.] [ for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. ] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

[Schedule of Prices][Earned Value Report] ; G

SD-03 Product Data

Weight Certificates

1.3 [SCHEDULE OF PRICES][EARNED VALUE REPORT]

1.3.1 Data Required

[This Contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS.][ Within [15][_____] calendar days of [notice of award][Contract Award], prepare and deliver to the Contracting Officer a [Schedule of Prices][Earned Value Report] (construction Contract) as directed by the Contracting Officer.][ Schedule of Prices must have cost summarized and totals provided for each construction category.] Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.

1.3.2 Payment Schedule Instructions

Payments will not be made until the [Schedule of Prices][Earned Value Report from the cost-loaded NAS] has been submitted to and accepted by the

SECTION 01 20 00 Page 1

Contracting Officer. For design phase progress payment(s), the Schedule of Prices or Earned Value Report from the Cost Loaded CPM must include detailed design activities and general (summarized) approach for the construction phase(s) of the project. The Schedule of Prices or Earned Value Report must be fully developed with detailed construction line items as design progresses. The complete design and construction Schedule of Prices or Earned Value Report must be submitted and accepted prior to starting construction work.

For Fast-Tracked or Critical Path Submittals of construction projects, the [Schedule of Prices][Earned Value Report] must include detailed design and construction line items for each fast-tracked/ critical path phase(s), submitted to and accepted by the Contracting Officer during the Post Award Kickoff Meetings and confirmed prior to starting construction work in that phase. Additionally, the [Schedule of Prices][Earned Value Report] must be separated as follows:

a. Primary Facilities Cost Breakdown:

Defined as work on the primary facilities out to the 5 foot line.

Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

[ 1.3.3 Schedule Requirements for HVAC TAB

The field work requirements in Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC must be broken down in the [Schedule of Prices and in the Construction Progress Documentation][Earned Value Report from the cost-loaded NAS] by separate line items which reflect measurable deliverables. The value for each pay item listed below will be established on a case by case basis for each Contract. The line items are as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. Submit the resulting findings to the Government to allow correction of the design. The progress payment will not be issued until the report is reviewed and approved.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report must contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational

SECTION 01 20 00 Page 2 data must be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. Compile this data into a report and submit to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.

] 1.3 CONTRACT COST BREAKDOWN

The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts.