STATEMENT OF WORK
Naval Base Point Loma SUBASE 140 Sylvester Rd Bldg 500, San Diego, CA 92106 San Diego, CA 92147
Project Title: Mixed Media Art Installation
1.0 Objective
The purpose of this Statement of Work is to define the requirements for the fabrication, delivery, and installation of custom mixed media art displays and murals at the Naval Base Point Loma SUBASE (NBPL) located in Point Loma.
2.0 Scope of Work
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to fulfill the requirements of the art installations as specified in this document. The work includes the creation of mixed media art with integrated photography, artist relief elements, and proper mounting/application to designated glass and drywall surfaces.
3.0 Deliverables and Specifications
All deliverables are to be Mixed Media Art Installations with Hand Done Art Relief on Dry Wall, cut to size, using CMYK 3M materials.
| Item No. |
| Location / Description |
| Dimensions |
| Qty |
| 0001 |
| Drink Line First Wall |
| 39' W x 7' H |
| 1 |
| 0002 |
| Drink Line Wall 2 |
| 12' W x 7' H |
| 1 |
| 0003 |
| Drink Machine Wall |
| 16' W x 3' H |
| 1 |
| 0004 |
| Mess Line to Mess Deck Wall (Site A) |
| 3' W x 5 1/2' H |
| 1 |
| 0005 |
| Mess Line to Mess Deck Wall (Site B) |
| 3' W x 5 1/2' H |
| 1 |
| 0006 |
| Mess Deck Wall 1 |
| 11 1/2' W x 5 1/2' H |
| 1 |
| 0007 |
| Mess Deck Wall 2 |
| 29 1/2' W x 5 1/2' H |
| 1 |
| 0008 |
| Salad Bar STBD Side |
| 20' W x 3' H |
| 1 |
| 0009 |
| Salad Bar Port Side 1 |
| 24' W x 3' H |
| 1 |
| 0010 |
| Salad Bar Port Side 2 |
| 8' W x 5 1/2' H |
| 1 |
| 0011 |
| Khaki Side Hat Area |
| 19' W x 5 1/2' H |
| 1 |
| 0012 |
| Khaki Side Wall 1 |
| 5' W x 5 1/2' H |
| 1 |
| 0013 |
| Khaki Side Wall 2 |
| 15 1/2' W x 5 1/2' H |
| 1 |
| 0014 |
| Khaki Side Wall 3 |
| 9' W x 5 1/2' H |
| 1 |
| 0015 |
| Point Loma Wall |
| 27' W x 12' H |
| 1 |
| 0016 |
| Grill Serving Line 1 |
| 10' W x 2 1/2' H |
| 1 |
| 0017 |
| Serving Line 2 |
| 9 1/2' W x 2 1/2' H |
| 1 |
| 0018 |
| Serving Line 3 |
| 8 3/4' W x 2 1/2' H |
| 1 |
| 0019 |
| Inside Galley Wall 1 |
| 9 1/2' W x 8 1/2' H |
| 1 |
| 0020 |
| Inside Galley Wall 2 |
| 21' W x 8 1/2' H |
| 1 |
4.0 Additional Requirements
a. The contractor shall provide consultation services to gain an understanding of specific visual references to incorporate into the mural work that are expressive of the location, culture, interest, or desired aesthetic of the client.
b. The contractor shall use a professional visual artist, design a mixed-media mural wall(s) that incorporates custom, commercial-grade wallpaper or high tach commercial grade vinyl, hand painted accents, high definition photography integration, LED lighting, wood, floating walls to create a 3 dimensional effect, and any other materials needed to enhance the overall look and feel of the space. (Consideration to the use of props, such as hanging décor, should be included and provided to further established the desired look and feel of the space.) The design should be artistic in nature and employ the use of stylization, fonts, negative and positive space, color, and texture to create a final look.
c. The contractor shall provide a visual artist’s draft using photo specific references of the space to show the full layout of elements, colors, textures, lighting, etc.
d. The contractor shall asses and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc.
e. The contractor shall fabricate floating walls that create a three dimensional effect and layered aesthetic while simultaneously integrating walls into an overall cohesive design.
f. The contractor shall install LED lighting (backlighting) integrated into floating walls that create visual interest and align with the overall look and feel of the space. The contractor shall ensure the proper wiring and wire management of all electronic elements.
g. The contractor shall fabricate and install all visual aspects of mixed-media walls, including but not limited to, custom wallpaper or vinyl, hand-done painting, wood accents, veneers, stains or other specialty finishes. The contractor shall ensure the full design extends throughout floating walls while maintaining one cohesive look.
5.0 Contractor Responsibilities
a. Contractor is responsible for verifying all dimensions prior to bidding and installation.
b. The contractor will provide personnel who are certified to perform required tasks.
c. Contractor will be permitted to work inside of the Dining Facility during the following hours: Monday through Friday - 0730-1700 except during meal hours and holidays.
Meal Hours (No work permitted): Coordinate with the Installation FSO Breakfast 0600 - 0730 Lunch 1100 - 1230 Dinner 1600 - 1730 Night or weekend shift may be coordinated with Food Service Officer with no additional cost in pricing. Night shift is preferred if project involves loud noise and heavy dust to not interfere with patrons during meal hours and must be coordinated with the FSO. Exact days of work will be coordinated before commencement to ensure space availability. Coordinate with LCPO /FSO before commencing work to ensure serving line or each section is secured for work while utilizing different serving lines to serve the patrons. Immediate work area will be properly secured by the contractor and will not conflict with meals being served or dining area being utilized.
d. Contractor will provide plastic barriers to contain dust or paint.
e. Contractor is responsible for daily clean up and disposal of all generated debris/materials to proper disposal or recycle containers at the back dock.
f. Contractor is responsible to obtain necessary security pass for base access. The government will not provide escorts to and from the gate.
6.0 Period and Place of Performance & Contacts
| Period of Performance |
| 01 September 2026 to 31 August 2027 |
| Place of Performance |
| Naval Base Point Loma SUBASE, 140 Sylvester Rd Bldg 500, San Diego, CA 92106. |
WAWF Information and routing Data Table
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDACC |
| N50082 |
| Acceptor E-mail address |
| TBD |