02 Drawings.pdf

PDF 392 KB Posted

Attached to
Warehouse Renovation and Reorganization
Solicitation number
1305M2-21-Q-01086
Issued by

View the file

Other files

File Type Posted
01 Warehouse Reorganization 2021 SOW.pdf PDF
00 RFP.pdf PDF
CLAUSES.pdf PDF
03 DBA Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0002

Figure 1.

Figure 1. Relative location of the warehouse/garage building to the ancillary building.

Figure 2.

Figure 2 – All items, except those located in the shaded areas (Security Cage and Bay 5) will be removed from the building.

Warehouse

Garage (5 Bays)

Bay 1 Bay 2 Bay 3 Bay 4 Bay 5

Security Cage

Figure 3.

Figure 3 - depicts the approximate location of new shelving. Shelves are the following sizes:

A –48-inches wide by 36-inches deep by 72-inches tall B - 60-inches wide by 36-inches deep by 72-inches tall C - 72-inches wide by 36-inches deep by 72-inches tall

Bay 1 Bay 2 Bay 3 Bay 4 Bay 5

Security Cage

A A

B

B

B

B

B

B

B

B

B

B

B

B

B

B

C

C

C

C

C

C C

C

C

C

C

C

C C C C C

Figure 4.

Figure 4 – New wall construction. Location of wall, electrical outlets, garage door opener and remote garage door opener keypad.

Warehouse

Electrical Panel

Bay 1 Bay 2 Bay 3 Bay 4 Bay 5

AC Outlet AC Outlet

Door

Garage Door Opener Keypad Garage Door Opener

New Wall

Figure 5.

Figure 5. Location of (18) shelves to be installed in Ancillary Building.

All shelving (A) are to be 48-in wide by 36-in deep by 72-in tall.

File details come from the government source that posted it. Updated .