This Scope of Work document outlines landscaping maintenance services required by Dallas/Fort Worth (DFW) International Airport in Texas. The contractor shall provide all manpower, supervision, materials, supplies, and equipment to perform grounds maintenance services including mowing, flower bed maintenance, litter control, trash can servicing, and irrigation repairs. Services are measured by quantifiable metrics: acres of turf mowed across high-, medium-, and low-maintenance areas; number of flower beds maintained (3 high-maintenance beds, 12 medium-maintenance beds, and 25 low-maintenance beds); approximately 500 trash cans serviced seven days per week; and 402.91 acres of paved areas for litter control serviced 365 days annually. High-maintenance mowing requires 34 cycles per year, medium-maintenance requires 21 cycles per year, and low-maintenance tractor mowing requires 4-6 cycles per year. The contractor must conduct all-hands meetings once per pay period and implement a comprehensive quality control program within thirty days of contract award, including regular inspection schedules, documentation procedures, corrective action timelines, and performance standards. The contract requires the contractor to maintain a designated trailer at DFW Airport Yards (2698 E Airfield Drive, Irving, TX 75038) with utility hookups provided by the airport.

Work outside the established scope of work, including emergency storm cleanup, irrigation repairs, landscape restoration, seasonal color installation and changeouts, and specialized horticultural services, shall be billed as Charge Reimbursable services and require prior written authorization with itemized proposals detailing labor hours by classification, materials and quantities, equipment costs, and not-to-exceed amounts. The airport reserves the right to verify all work measurements using GIS mapping for acreage and onsite inventory for bed counts and trash can counts. The airport emphasizes cost containment and may negotiate lower costs or terminate portions of the contract if costs do not compare favorably with in-sourced or out-sourced alternatives. Corrective action timelines range from 24 hours for trash can service issues to five business days for low-maintenance mowing deficiencies, with payment withheld for incomplete work, unresolved deficiencies, or missing required documentation. The contractor assumes full responsibility and liability for damage caused by its employees, subcontractors, vehicles, tools, materials, or equipment and must immediately notify the airport of any property damage or safety incidents, with repairs completed at no additional cost to the airport unless authorized in writing.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Landscaping Services Scope of Work

1.0 General Description

1.1 The Contractor and its Subcontractor(s) shall provide all manpower, supervision, materials, supplies and equipment necessary to perform all Grounds Maintenance Service work, following the terms and conditions.

1.2 Additional ground maintenance service tasks for scheduled and non-scheduled grounds maintenance work beyond the Contract Scope of Work will be required during the term of the Contract. Work not specified in the scope of work will fall under charges reimbursable specified under section 11 of this contract.

1.3 Contractor shall implement and perform all services consistent with Standard Industry Level.

1.4 Contractor shall be responsible for estimating, planning, scheduling, controlling and accumulating all costs and work force efforts associated with the contract activities.

1.5 Contractor shall work with, coordinate and support other contractors providing services to the Airport.

1.6 Contractor shall abide by all specific policies and procedures as required in all Contract documents and related exhibits.

1.7 Contractor shall provide one-call servicing and ensure that the traveling public, facility tenants, visitors, and employees obtain high quality, timely and cost-effective grounds maintenance services with only one phone call to one phone number.

1.8 A significant area of focus in all work requested under this Contract is cost containment.

Costs for services will be monitored and evaluated on an ongoing basis. The Airport reserves the right to negotiate lower costs or terminate some or all of this contract’s scope if costs do not compare favorably with in-sourced and/or out-sourced provision of like services, or if lower cost alternatives are identified. The Contractor shall continuously review its Operational Approach and make improvements to efficiency. Where substantial improvements in fiscal performance are possible, benefit shall be shared between the Airport and contractor as reflected in price changes negotiated between the Contractor and the Airport and implemented through a Contract change order.

2.0 Overview

2.1 This Scope of Work defines all grounds maintenance activities using measurable units to ensure clarity. All services are billed using quantifiable metrics:

2.1.1 Acres of turf mowed (High-, Medium-, and Low-maintenance areas)

2.1.2 Approximate number of flower beds maintained (High, Medium, and Low maintenance levels)

2.1.3 Approximate number of trash cans serviced

2.1.4 Acreage of paved areas for litter control

3.0 Mowing Services (Measured by Acres)

3.1 High-Maintenance Mowing

3.1.1 Performed in high-visibility landscaped areas requiring:

3.1.1.1 Weekly mowing April – September

3.1.1.2 Twice monthly mowing in March and October

3.1.1.3 Monthly mowing November – February

3.1.1.4 34 total cycles per year

3.2 Medium-Maintenance Mowing

3.2.1 Performed in moderate-visibility roadway corridors and facility edges:

3.2.1.1 Biweekly mowing March – October

3.2.1.2 Monthly mowing November – February

3.2.1.3 21 total cycles per year

3.3 Low-Maintenance (Tractor) Mowing

3.3.1 Performed in large, open, low-visibility fields:

3.3.1.1 4–6 cycles per year

4.0 Flower Bed Maintenance (Measured by Number of Beds)

4.1 Each defined bed area is counted as a single bed unit and assigned a maintenance category.

4.1.1 High-Maintenance Beds (3 Total)

4.1.1.1 These beds require the most intensive horticultural care, including detailed pruning, edging, groundcover control, and seasonal color change-outs.

4.1.2 High-maintenance bed locations:

4.1.2.1 Terminal D Lower Arrival Level Beds

4.1.2.1.1 High-visibility passenger entry zone, containing structured shrubs, groundcover, and seasonal color beds.

4.1.2.2 Airport Headquarters Landscape Beds

4.1.2.2.1 Beds located around the HQ building entrance, walkways, front plaza, and central courtyard connecting the building to the parking garage.

4.1.2.3 Founders Plaza

4.1.2.3.1 Public observation area featuring ornamental grasses, shrubs, structured landscape beds, and seasonal color pockets.

4.1.2.4 Maintenance frequency: 21 cycles per year

(Color change-outs billed separately under charge-reimbursable materials + hourly labor.)

4.1.3 Medium-Maintenance Beds (12 Total)

4.1.3.1 Medium-maintenance beds are distributed across several roadway corridors and moderate-visibility operational areas. These beds include shrubs, small groundcover beds, and ornamental pockets requiring recurring but not intensive maintenance.

4.1.3.2 Medium-maintenance bed locations include:

4.1.3.2.1 Beds adjacent to the North Bound Service Road North, including shrub/groundcover pockets near DART transit areas.

4.1.3.2.2 Beds along South Bound Service Road North, adjacent to 1W Employee Parking and TexRail corridors.

4.1.3.2.3 Small beds located along South Airfield Drive East, near Remote South access points.

4.1.3.2.4 Landscape beds along Passport Avenue and Rental Car Drive, including RCC bus facility frontage.

4.1.3.2.5 Structured beds near the Fire Training Facility on West Airfield Dr. South.

4.1.3.2.6 Ornamental pockets in the DFW West Campus area near leased properties.

4.1.3.2.7 Additional medium-scale roadway corridor beds along NB/SB Service Roads and tenant frontage within ICP.

4.1.3.3 Maintenance frequency: 12 cycles per year

4.1.4 Low-Maintenance Beds (25 Total)

4.1.4.1 Low-maintenance beds are minimal planting areas such as shrub rings, small ornamental pockets, or isolated landscape points along major roadways and facility entrances.

4.1.4.2 Low-maintenance bed locations include:

4.1.4.2.1 Monument sign beds at South Control Plaza and North Control Plaza.

4.1.4.2.2 Small shrub rings along International Parkway shoulders.

4.1.4.2.3 Minimal pockets along Airfield Drive transitions.

4.1.4.2.4 Sparse gravel-bed transitions under bridges where decorative materials are limited.

4.1.4.2.5 Small ornamental pockets near Corporate Aviation, employee lots, and Express lots.

4.1.4.3 Maintenance frequency: 8 cycles per year

5.0 Litter Control Services

5.1 Trash Can Servicing

5.1.2 Trash cans shall be serviced 7 days per week.

5.1.2.1 Measurements:

5.1.2.2 Approximately 10–15 AOA roadway trash cans near access gates.

5.1.2.3 Additional cans located in terminals, express lots, employee lots, plazas, and parking structures.

5.1.2.4 Final quantity will be established during Contractor field verification.

Approximately 500.

5.1.3 Billing unit: Number of trash cans × 365 services/year

5.2 Parking Lot & Garage Litter Removal (Acreage-Based)

5.2.2 Parking and garage areas shall be serviced at 365 service days per year.

5.2.3 Total litter-control coverage:

5.2.3.1 402.91 acres of paved areas including garages, express lots, employee parking lots, cell phone lots, and control plazas.

5.2.3.2 Billing unit: Acres × annual frequency

6.0 STAFFING REQUIREMENTS

6.1 Minimum Staffing Levels

6.1.1 Contractor must maintain adequate staffing to meet service frequencies and performance standards. The Airport reserves the right to require minimum staffing levels whenever documented deficiencies demonstrate inadequate resourcing. This does not replace the Contractor’s responsibility for day-to-day staffing.

6.2 Contractor Personnel

6.2.1 Contractor must maintain trained, uniformed, professional staff capable of delivering consistent mowing, bed maintenance, litter control, and irrigation services.

7.0 COMMUNICATION & MEETINGS

7.1 All-Hands Meetings

7.1.1 Contractor shall conduct all-hands meetings once per pay period.

The Airport Representative shall be permitted to attend all meetings.

8.0 Irrigation, Emergency, and Specialty Services

8.1 Irrigation repairs, emergency cleanup, and specialized horticultural work will continue to be billed at hourly rates with appropriate material reimbursement where approved.

9.0 Measurement and Verification

9.1 The Airport retains the right to verify:

9.1.1 Acres of mowing

9.1.2 Number of beds

9.1.3 Trash can counts

9.1.4 Parking/garage acreages

9.2 Acreage values are based on GIS mapping, while bed counts and trash can counts are based on onsite inventory.

10.0 Quality Control Requirements

10.1 Contractor Quality Control Program

10.1.1 The Contractor shall develop, implement, and maintain a proactive Quality Control Program designed to ensure all mowing, bed maintenance, and litter services meet the performance standards of this Scope of Work. Within thirty (30) days of contract award, contractor shall submit a written quality control (QC) plan to DFW ETAM for review and approval. The program must demonstrate consistent service delivery across all measurable units (acres, number of beds, trash cans, and litter-control acreage).

10.1.2 The Quality Control Program shall include, at minimum:

10.1.2.1 Regular inspection schedules covering all mowing zones and bed units

10.1.2.2 Documentation procedures for deficiencies, corrective actions, and re-inspections

10.1.2.3 Staff training ensuring consistent horticultural, mowing, and litter-removal quality

10.1.2.4 A reporting structure that provides transparency and accountability

10.2 Inspection Requirements

10.2.2 The Contractor shall conduct internal inspections at the frequencies below:

10.2.2.1 High-maintenance mowing areas: inspected weekly

10.2.2.2 Medium-maintenance mowing areas: inspected bi-weekly

10.2.2.3 Low-maintenance (tractor) mowing areas: inspected after each cycle

10.2.2.4 High-maintenance beds: inspected each cycle

10.2.2.5 Medium-maintenance beds: inspected monthly

10.2.2.6 Low-maintenance beds: inspected quarterly

10.2.2.7 Trash cans: inspected weekly for liner condition and cleanliness

10.2.2.8 Parking/garage litter areas: inspected daily (Mon–Fri)

10.2.3 Inspection results shall be documented electronically and kept available for Airport review.

10.3 Corrective Action Requirements

10.3.1 Any substandard work identified by the Airport or Contractor shall be corrected within the timeframes below:

10.3.1.1 High-maintenance mowing areas: within 48 hours

10.3.1.2 Medium-maintenance mowing areas: within 3 business days

10.3.1.3 Low-maintenance mowing areas: within 5 business days

10.3.1.4 Bed maintenance deficiencies: within 72 hours

10.3.1.5 Trash can service issues: within 24 hours

10.3.1.6 Parking/garage litter deficiencies: by the next service day

10.3.2 Failure to meet corrective timelines will result in additional inspections, performance reviews, or contract remedies.

10.4 Documentation Requirements

10.4.1 The Contractor shall maintain:

10.4.1.1 Daily logs of mowing activities (acres serviced)

10.4.1.2 Completed QC inspection form. QC Inspection Form will be provided by

Contractor; and approved by DFW Airport ETAM Representative.

10.4.1.3 Before and after photographs for corrective, repair, replacement, emergency, and charge reimbursable work, when applicable.

10.4.1.4 Description and quantity of materials used, including mulch, soil, sod, plants, fertilizer, irrigation components, herbicides, pesticides, and other applicable materials.

10.4.1.5 Labor hours by classification, when required

10.4.1.6 Arrival, service start, and completion times, when applicable.

10.4.1.7 Documentation of corrective actions taken and date completed.

10.4.1.8 All required documentation shall be uploaded into the designated CMMS or other

DFW-approved system and associated with the applicable work order.

10.4.1.9 Contractor shall ensure work-order status fields are accurate and updated throughout the lifecycle of the work.

10.4.1.10 Bed maintenance logs indicating which bed units were serviced.

10.4.1.11 Trash can servicing records (counts and conditions)

10.4.1.12 Parking/garage litter logs (acreage serviced and issues found)

10.4.1.13 Corrective action records with follow-up inspections

10.4.1.14 Staffing schedules and resource allocation plans

10.4.2 These documents shall be made available to the Airport upon request.

10.5 Landscape Quality Standards

10.5.1 Contractor shall maintain landscaped areas in a healthy, safe, clean, and professional appearance consistent with Contract requirements.

10.5.2 Turf shall be uniformly maintained at the specified height and shall be free from excessive clippings, scalping, rutting, and visible mowing defects.

10.5.3 Edging shall be clean and defined along sidewalks, curbs, landscape beds, structures, and other designated areas.

10.5.4 Trees and shrubs shall be properly pruned and maintained free of dead, damaged, diseased, or hazardous growth.

10.5.5 Landscape beds shall be maintained free of excessive weeds, litter, debris, and unwanted vegetation.

10.5.6 Mulch shall be maintained at the specified depth and shall not be excessively accumulated against tree trunks, plant crowns, buildings, or structures.

10.5.7 Irrigation systems shall operate efficiently without excessive runoff, overspray, leaks, broken components, or unnecessary water loss.

10.5.8 Grass clippings, leaves, branches, and other debris generated by Contractor's operations shall be removed from sidewalks, roadways, parking areas, entrances, drainage areas, and other hardscape surfaces upon completion of service.

10.5.9 Contractor shall promptly identify and report dead, damaged, diseased, or declining plant material and recommend corrective action when required.

10.6 Communication and Performance Review

10.5.1 The Contractor shall designate a Quality Control Manager responsible for:

10.5.1.1 Serving as the primary point of contact for all quality-related matters

10.5.1.2 Communicating required corrective actions to field crews

10.5.1.3 Attending monthly performance review meetings with the Airport

10.5.1.4 Submitting monthly quality reports summarizing inspections, issues, and resolutions.

10.6 Airport Oversight

10.6.1 The Airport reserves the right to:

10.6.1.1 Conduct quality assurance inspections without prior notice

10.6.1.2 Compare Contractor documentation against Airport observations

10.6.1.3 Request immediate corrective action

10.6.1.4 Request adjustments to staffing or scheduling if patterns of deficiency occur

10.6.1.5 Audit quality control documents at any time

10.7 Performance Standards

10.7.1 All work must meet the following performance expectations:

10.7.2 Mowing

10.7.2.1 Turf height maintained within acceptable ranges for species

10.7.2.2 No scalping, missed sections, or uneven cuts

10.7.2.3 Clippings removed from paved surfaces

10.7.3 Beds

10.7.3.1 No weeds exceeding acceptable height

10.7.3.2 Shrubs pruned appropriately for species

10.7.3.3 Groundcover kept within defined borders

10.7.3.4 Beds free of litter, debris, and dead plant material

10.7.4 Litter

10.7.4.1 Trash cans free of overflow and offensive odors

10.7.4.2 Parking areas clear of loose litter and debris

10.7.4.3 Sidewalks and paved surfaces free of debris accumulation

10.8 Acceptance

10.8.1 Work shall not be considered complete until:

10.8.1.1 All required QC documentation has been submitted.

10.8.1.2 Required photographs and supporting documentation have been uploaded into the designated system.

10.8.1.3 Identified deficiencies have been corrected and documented.

10.8.1.4 DFW ETAM has performed Quality Assurance (QA) verification when required.

10.8.1.5 Written or electronic acceptance has been issued by DFW ETAM when required.

10.8.1.6 Acceptance by DFW ETAM shall be completed prior to invoice approval for work requiring formal acceptance.

10.8.1.7 Payment will be withheld for incomplete work, unresolved deficiencies, inaccurate work-order information, or missing required documentation.

10.9 Contractor Responsibility and Liability

10.9.1 Contractor shall assume responsibility for the safe operation and use of all tools, materials, vehicles, machinery, and equipment utilized in the performance of landscaping services.

10.9.2 Contractor shall be responsible for damage caused by its employees, subcontractors, vehicles, tools, materials, or equipment during the performance of the Work.

10.9.3 Contractor shall take appropriate precautions to protect DFW property, buildings, vehicles, roadways, sidewalks, irrigation systems, utilities, signage, lighting, drainage systems, and other assets from damage.

10.9.4 Contractor shall immediately notify DFW ETAM of any property damage, safety incident, irrigation line damage, utility damage, or other significant incident resulting from Contractor operations.

10.9.5 Contractor shall correct or repair damage attributable to Contractor operations in accordance with DFW ETAM requirements and at no additional cost to DFW unless otherwise authorized in writing.

11 CHARGE REIMBURSABLE SERVICES

11.1 General Requirements

11.1.1 Charge Reimbursable (CR) Services are services, materials, equipment, or other work specifically requested and authorized by the Airport that are outside the Contractor's established recurring Scope of Work and base contract pricing.

11.1.2 The Contractor shall not perform or invoice Charge Reimbursable work without prior written authorization from the Airport Representative or other authorized Airport personnel, except when specifically directed during an emergency condition.

11.1.3 Work required to correct deficiencies, incomplete work, damage caused by the Contractor, or failure to perform the requirements of the base Scope of Work shall not be considered Charge Reimbursable work and shall be corrected at no additional cost to the Airport.

11.2 Examples of Charge Reimbursable Services

11.2.1 Charge Reimbursable Services include, but are not limited to:

11.2.1.1 Emergency storm cleanup, debris removal, or restoration activities beyond routine litter-control requirements.

11.2.1.2 Irrigation system repairs, modifications, or replacement work not included in recurring maintenance.

11.2.1.3 Replacement of damaged or failed irrigation components.

11.2.1.4 Installation or replacement of trees, shrubs, sod, plants, mulch, soil, or other landscape materials when not included in the base scope.

11.2.1.5 Seasonal color installation and changeouts. Your existing SOW already identifies color changeouts as separately billable materials and hourly labor.

11.2.1.6 Landscape restoration resulting from construction, utility work, vehicle damage, weather events, or other extraordinary conditions.

11.2.1.7 Specialized horticultural services requested by the Airport.

11.2.1.8 Additional mowing, trimming, litter removal, or grounds maintenance requested outside the established locations, quantities, or frequencies identified in the Scope of Work.

11.2.1.9 Specialized equipment or services required for Airport-requested work that are not reasonably included in the Contractor's base services.

11.3 Authorization and Proposal Requirements

11.3.1 Prior to commencing CR work, the Contractor shall submit an itemized written proposal for Airport review and approval. At a minimum, the proposal shall identify:

11.3.1.1 Description and location of the requested work.

11.3.1.2 Reason the work is outside the base Scope of Work.

11.3.1.3 Estimated labor hours by applicable contract labor classification and hourly rate.

11.3.1.4 Materials, quantities, and unit costs.

11.3.1.5 Equipment required and applicable contract rates, when authorized.

11.3.1.6 Subcontractor costs, when applicable.

11.3.1.7 Estimated start and completion dates.

11.3.1.8 Total not-to-exceed amount for the requested work.

11.3.1.9 The Airport will request supporting documentation, photographs, supplier quotations, or other information necessary to validate the proposed cost.

12 Contractor Trailer, Location, and Utility Hookups

12.1 General Requirements

12.1.1 The Contractor shall provide its own office trailer(s) for use in supporting all grounds maintenance operations performed under this Contract. The trailer(s) shall be of sufficient size and configuration to house supervisory staff, store documents, conduct operational meetings, and support daily administrative functions.

12.2 Trailer Location

12.2.1 DFW Airport will provide the designated trailer location for Contractor use.

The assigned location is:

DFW Airport Yards (Across from the DFW Salvage Yard) 2698 E Airfield Drive Irving, TX 75038

12.2.2 Contractor is responsible for placement of the trailer in the area designated by DFW ETAM and shall not relocate or expand the footprint without written approval.

12.2.3 Utility Hookups

12.2.3.1 DFW Airport will provide access to the required utility hookups for the Contractor trailer(s), including electrical service and water connections where applicable.

The Contractor shall be responsible for all of the following:

12.2.3.1.1 Procuring and installing any trailer-to-utility interface equipment required to complete connections

12.2.3.1.2 Ensuring all installations meet DFW infrastructure standards and local code requirements

12.2.3.1.3 Maintaining the trailer’s internal systems, including HVAC, lighting, and all contractor-provided equipment

12.2.3.1.4 Coordinating access and scheduling of hookup activities with DFW ETAM

12.2.4 Compliance and Maintenance

12.2.4.1 The Contractor shall ensure the trailer remains in clean, safe, and in operable condition throughout the contract term. Any damage, unauthorized modifications, or safety concerns shall be corrected at the Contractor’s expense.

DFW reserves the right to inspect the trailer area at any time and require corrective actions where conditions present safety, operational, or compliance concerns.