This Scope of Work document outlines the painting services requirements for the Dallas/Fort Worth International Airport Board's Airports Energy, Transportation, and Asset Management (ETAM) Department. The project encompasses both exterior and interior painting services throughout DFW International Airport, with work to be performed as requested and authorized by the ETAM Department. The scope defines specific painting tasks, surface preparations, material specifications, quality standards, and safety requirements that contractors must comply with when executing painting work across various airport facilities and locations. The document establishes performance standards, inspection procedures, and documentation requirements to ensure all painting work meets airport operational and aesthetic specifications.

The Scope of Work establishes the technical requirements and standards that qualified contractors must follow to successfully bid on and execute painting services at DFW Airport. The document specifies contractor responsibilities for surface preparation, paint application techniques, equipment protection, waste management, and compliance with airport security protocols during project execution. Performance metrics and quality assurance procedures are detailed to ensure contractor accountability and consistent delivery of professional painting services throughout the airport's facilities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS/SCOPE OF WORK

1 GENERAL REQUIREMENTS

1.1 The Contractor shall provide exterior and interior painting services throughout the Dallas Fort Worth

International Airport (herein called the Airport) as requested and authorized by the Airport’s Energy, Transportation, and Asset Management (ETAM) Department.

1.2 ETAM Representative is defined as an employee of the Energy, Transportation, and Asset

Management (ETAM) Department or someone designated in writing by the Vice President of the

ETAM Department

1.3 All structures, surfaces, and equipment, of any type, material, and size, wherever located within the Airport’s property; and where tasks listed in the Pricing Schedule can be performed following the scope of work and specifications detailed under this Article, shall be covered under this

Contract, such as, but not limited to:

Concrete floors, wood floors, interior walls and ceilings, exterior walls, concrete block walls, masonry walls, metal beams, metal I beams, acoustical ceiling tile, ceiling rails, metal pipe, fiberglass pipe, metal railing, window trim, mullions and grills, metal panel, metal building trim and down spouts, jersey barriers, wood and metal doors, wood and metal door trims, canopies including all supportive structures, electrical equipment, plumbing equipment, jet bridges and related equipment, handrails, tanks, conduits, motors and signs.

1.4 The Contractor shall provide all labor, materials, equipment, supplies, tools, transportation services, layout, barricades, signs, related permits, fees, certification, on-site supervision, and all necessary incidentals required to perform all tasks required following the scope of work and specifications of this Contract in a safe, orderly, timely, efficient, satisfactory and workmanlike manner.

1.4.1 The Contractor shall provide all motor vehicles, trucks, and motor driven equipment necessary to perform the Work in this Contract and assume all liability for their operation and use.

1.4.1.1 Contractor vehicles for use on DFW Airport property shall be kept in good repair and shall be of a type appropriate to pertinent operations and services.

1.4.1.2 Under no circumstances shall the Contractor’s employees’ or Subcontractors’ employees’ use privately owned vehicles in performance of this Contract.

1.4.1.3 The operation of the Contractor and subcontractor’s vehicles by its employees on or about the Airport property shall conform to regulations and safe driving practices.

1.4.2 The Contractor shall provide all barricades, wet-paint signs, warning signs, and/or other safety and protective equipment required to isolate or restrict public access to the work site and/or to protect Airport employees and the general public from personal injury due to materials, equipment or operations at the job site; and/or to provide sufficient notice of potential safety hazards prior to, during, and after the performance of the services.

1.5 The Contractor shall be responsible for all measurements, coordination, and verification of the project’s existing conditions prior to beginning work.

1.6 The Contractor shall perform each painting work according to a detailed written job schedule and plan prepared by the Contractor and approved by the ETAM Representative at least seven (7) days prior to the scheduled day to begin the work. The plan shall include the Contract number, the

Airport’s department, including the location (facility number, name, address, room names and numbers) where work is to be performed, a detailed summary, including the square footages and/or linear footages, of the work to be performed, the name(s) and phone number(s) of the supervisor/lead that will be overseeing the work, the dates work will be performed from commencing to completion, scheduled working hours per day, and each task to be performed including task item number as listed on the Price Schedule.

1.7 Contractor shall be required to collect and dispose of wastewater created by high pressure blasting, waste materials generated as a result of its work in accordance with the Airport guidelines for collection and disposal of all debris and environmental regulatory provisions detailed in

Specification/Scope of Work, Section 5, Subsection 5.7 herein. Contractor shall coordinate disposal activities with DFW Airport Board Environment Affairs Department.

1.8 Parking is allowed only in designated areas and shall be coordinated with the Airport ETAM

Representative.

Contractor shall be exempt from parking fees at any and all DFW Airport Terminal Parking

Locations (excluding valet parking). This exemption only applies to parking privileges in accordance with Contract Scope of Work and is not applicable to personal or non-scope activities. The four (4) Contractor’s Vehicles that have been granted permission to park and/or enter the Central Terminal Area (CTA) for a predetermined period (24 hours) will be charged the appropriate rate thereafter. All parking privileges associated with Vehicular Access require the individuals to obtain and use an NTTA Toll-Tag (backed by a credit card) for each vehicle. Any cost incurred to maintain a NTTA Toll Tag are the responsibility of the Contractor.

1.9 The Contractor shall submit manufacturer’s Safety Data Sheets (SDS), and a list of all types of paint colors and products to be incorporated into the work, including samples and literature, to the

Airport ETAM Representative for approval prior to commencing work.

1.10 All painting operations at each site of work, including all necessary mobilization and demobilization, shall be considered as one “Move In”. The Contractor shall be guaranteed a minimum of $1,000.00 worth of painting work for each “Move In”. A “Move In” may include work at several locations to meet the $1,000.00 worth of painting work requirement.

1.11 The Contractor shall commence painting operations at the site of work and continue such operation until the work is completed, including all necessary mobilizations and demobilizations.

1.12 Except otherwise noted in the specifications, normal business hours for painting services will be

8:30 a.m. to 5:00 p.m. central time, Monday through Sunday. Approximately 60% of the scope of work can be completed during these hours.

1.13 The remaining 40% of the work corresponds to painting work located in occupied, high traffic and/or congested areas. All painting work for these areas shall be performed by the Contractor during the late-night hours, from 5:00 p.m. to 5:00 a.m. central time. If the duration of the work in these areas extends beyond one work night, the Contractor shall temporarily secure the area and remove all debris and equipment until the next working period.

1.14 Storage of materials at the job site is not allowed. Temporary storage may be provided to the

Contractor, at the sole discretion of the Airport ETAM Authorized Representative.

1.15 The Contractor’s equipment shall not impede the normal operation of the Airport and/or adversely impact Airport’s Tenants or users. No scaffolding, ladders, lifts or other equipment used for the painting project shall be allowed to remain erect or standing in the work area outside the normal work hours, unless prior written approval has been granted by the Airport ETAM

Authorized Representative.

1.16 Some painting work will be required to be performed in secure areas; therefore, the Contractor’s personnel shall be required to obtain security badges under the security badge issuance procedure authority.

1.17 The Contractor shall notify the Airport ETAM Authorized Representative immediately, verbally and in writing, of all damage and/or discrepancies that they identify at the job site prior to the start of the work, as well as any personal injury or property damage that occurs while performing work.

1.18 The Contractor shall provide “wet paint” signs to protect newly painted finishes one day after completion of the paint, the Contractor shall remove and properly discard of all signs.

1.19 The Contractor shall remove all equipment, empty cans, rags, rubbish and or discarded paint materials from the job site. All trash and debris will be disposed of by the Contractor, off-site, in accordance with all applicable federal, state, local laws and regulations and Airport guidelines.

1.20 The Contractor shall report to the Airport ETAM Representative any work that requires the performance of tasks not listed or specified under this Contract. At no time shall work beyond the scope be performed without prior written approval of the Airport ETAM Representative.

1.21 Warranty – In addition to any other warranties required, the Contractor warrants that work performed under this Contract conforms to the Contract requirements and is free of any defect in equipment, material, design, or workmanship furnished or performed by the Contractor or any subcontractor or supplier of any tier. This warranty shall continue for a period of one (1) year from the date the Airport takes possession.

1.22 Quality Control – The Contractor shall implement an effective Quality Control Program within thirty

(30) days of the Notice to Proceed date and have a copy available to present to the Airport

ETAM Representative upon request at any time during the term of the Contract.

1.22.1 As part of the Quality Control plan the Contractor shall develop and implement on the job sites written Spill Control and Containment Plan listing materials used, personnel protective equipment requirements, notification procedures, site redemption procedures and personnel training procedures to be used in the event of a spill in accordance with regulations.

1.23 Permits, Royalties, and Licenses – The Contractor shall, at its own expense, be responsible for obtaining all licenses, and permits which are necessary to fulfill all the required work under this

Contract.

1.23.1 The Contractor shall be responsible to obtain and pay the costs of any royalties and licenses for any patented or copyrighted items used in the performance of the work.

1.24 Should any question arise as to the meaning and intent of this Contract, the question shall, prior to any other action or resort to any other legal remedy be referred to the Airport’s Procurement and

Materials Management Department who shall decide the true meaning and intent of the Contract.

1.25 Failure by the Airport personnel to discover or reject services which are unacceptable and not in accordance with the Contract shall not be deemed an acceptance thereof nor a waiver of the

Airport’s right to proper execution of the Contract or any part of it by the Contractor.

2 AIRPORT STANDARD SERVICE LEVEL

2.1 Definition: The Airport’s standard service level required under this Contract is defined as “the performance of all exterior and interior painting work/tasks covered under this Contract as stated in the Specifications/Scope of Work”.

2.2 Contractor and its Subcontractor(s) shall maintain the Airport’s standard quality of service level at all times. The Airport reserves the right to perform quality assurance inspections or surveys. Should these inspections or surveys indicate other than an acceptable quality level; the Contractor shall take immediate and appropriate corrective action to raise quality to the Airport standard service level.

3 AIRPORT SECURITY PROCEDURES

3.1 Contractor’s employees performing work at DFW Airport shall have in their possession a valid security badge with Escort (E) designation privileges and at least one employee per crew per job to have Non-Movement (NM) on their badge.

3.2 The Contractor shall be responsible for, at its own expense, obtain the proper security clearance, fingerprint, training, badges, and custom seal required to access the restricted areas of the Airport, including the Air Operations Area (AOA).

3.3 Badging and AOA Permit Fees are identified at the following web site Microsoft Word - SOC FY26 -Original-Final .docx reference pages 36 and 37.

3.4 The Contractor, its subcontractors, and all their employees shall be subject to and shall, at all times, conform with all rules, regulations, policies, and procedures pertaining to security at the Dallas Fort Worth International Airport. Any violations or disregard for rules, regulations, or policies may be cause for immediate termination of Contract.

3.5 The Contractors’ and Subcontractor(s) employees shall surrender their badge upon termination of employment or Contract, whichever occurs first. DFW Airport badges are the property of the DFW Airport Board and must be surrendered upon request by a law enforcement agency, sponsoring authority, or DFW Airport Access Control Office. Failure to surrender a DFW Airport badge may lead to charges of theft of property and unauthorized use of governmental issued identification media.

4 AIRPORT BOARD FURNISHED PROPERTY

4.1 Hot/cold water and electricity will be provided from existing outlets, with the exception of work performed at remote areas of the Airport where no connections are available.

4.2 The Airport shall have no obligation to fund and provide equipment such as high reach lifts, or bucket trucks, unless the situation contains extraordinary restrictions or requirements not ordinarily present in a typical painting job at a major Airport. In such a case, the Contractor shall notify the Airport in advance of the specific equipment needed, the time period it is required and its cost. The Contractor shall not proceed to lease, rent, or otherwise acquire such equipment until receiving written approval from the Airport ETAM Representative.

5 CONTRACTOR FURNISHED EQUIPMENT, SUPPLIES, TOOLS, AND MATERIALS

5.1 As directed by the Airport ETAM Representative, the Contractor shall schedule the delivery of its and its subcontractor(s) equipment, supplies, tools and materials during times and locations that will cause minimum disruption and inconvenience to the Airport operations. Unless otherwise directed in writing by the Airport ETAM Representative, all such deliveries shall be made during the hours of 7:00 a.m. and 3:30 p.m. central time. The Contractor shall notify the Airport ETAM Representative both verbally and in writing of all deliveries twenty-four (24) hours prior to the scheduled delivery. All deliveries by or to the Contractor or its subcontractor at the Airport job site shall only be made to the loading docks(s) associated with each building or locations approved in advanced by the Airport ETAM Representative.

https://assets.ctfassets.net/m2p70vmwc019/2ZzvQLPUVRCbJ0Ee5ps2BT/3ab5d3c49b2c9e67fb69f337353c9ff9/FY_2026_Schedule_of_Charges.pdf https://assets.ctfassets.net/m2p70vmwc019/2ZzvQLPUVRCbJ0Ee5ps2BT/3ab5d3c49b2c9e67fb69f337353c9ff9/FY_2026_Schedule_of_Charges.pdf

5.2 Electrical Supplies/Equipment: All electrical extension cords shall be properly sized for the equipment load and placed away from vehicular or pedestrian traffic. All connections between the extension cords and related equipment (e.g., tools, machine, or additional extension cords) shall be tightly fastened with no exposed electrical contacts. All extension cords shall have and use a proper electrical grounding pipe. Power tools and/or extension cords used in damp areas shall be plugged into a Ground Fault Circuit Interrupter (CFCI) switch to immediately shutdown when a short to ground is detected.

5.3 Man Lifts: Contractors provided lifts shall be equipped with a flashing yellow beacon light and fire extinguisher. All lifts to be used on the job site shall be approved in writing by the Airport ETAM Representative at least seven (7) days prior to their intended use by the Contractor on the job site.

5.3.1 The Contractor must submit to the Airport ETAM Representative documentation that demonstrates, to the satisfaction of the Airport, that the Contractor’s personnel who will be operating the lifts are certified and experienced in operating the equipment safely.

5.3.2 In the event of a Contractor provided lift equipment failure and/or malfunction, the Contractor shall provide a replacement lift within one (1) working day so as not to delay scheduled completion of the work. The Contractor shall assure that the use, safe operation and/or servicing of these lifts are in compliance with all applicable requirements including but not limited to; ANSI/SAIA A92.6- 2014, or its latest version, for Self-Propelled Elevating Work Platforms.

5.4 Scaffolding: All scaffolding provided by the Contractor to perform painting services under this Contract shall be in compliance with ANSI 10.8-2001, and 29 CFR1910.28, or its latest version.

5.5 Ladders: Unless otherwise directed by the Airport ETAM Representative, the Contractor shall use ladders that utilize rubber shoes floor protectors to perform all painting work under this Contract.

Protection pads shall be used by the Contractor to prevent ladders from marring building surfaces. Direct pressure against glass and painted aluminum panels shall be avoided. While on the roof, no equipment ladders, tools, scaffolding, or metal containers are to make direct contact with the roofing membrane. The contractor shall provide and utilize, for the protection of the roof surface, one or more layers of plywood (1/2” minimum thickness). Care must be taken while placing and securing plywood on roof so as not to harm the membrane.

5.6 High Pressure Washer: High pressure washing equipment shall produce sufficient pressure to remove all loose paint, chalking, grease, dirt, and other contaminates that would otherwise prevent paint adhesion. Remote areas of the Airport: Water and electrical power will not be available at remote areas at the Airport. Contractor shall provide pressure-blasting equipment that is self-contained, including the ability to carry a water supply. Water supply shall be made available for filling the tank.

5.7 Wastewater: Contractor shall be responsible for the collection and disposal of all wastewaters generated while performing work under this Contract. Contractor shall coordinate disposal activities with DFW Airport Board Environment Affairs Department.

5.8 Spray painting equipment: Spray painting shall be authorized by the Airport ETAM Representative, prior to any spray-painting work beginning.

6 GENERAL PERFORMANCE

6.1 Competency: The Contractor and subcontractor’s personnel shall be knowledgeable in the trade fields required to perform all tasks required under this Contract in a safe manner to reflect satisfactory standards of employee competency.

6.2 Communication: The Contractor shall provide on-site, for all work performed at the Airport, a supervisor and/or lead able to communicate clearly and understandably (both verbally and in writing) in the English language

6.3 Worker’s clothing shall be a standard uniform consisting of long pants, a short sleeve or long sleeve shirt, or a tee shirt.

6.3.1 Shorts are not permitted.

6.3.2 Shirts should be clean, presentable and with the Contractor’s company name clearly displayed on the shirt.

6.4 The Contractor and its subcontractor’s employees shall not disturb any items (i.e., furniture, documents, materials, supplies, equipment, etc.) in any area of the job sites, unless directed otherwise by the ETAM Representative.

6.5 The Contractor shall adhere to and perform all tasks required under this Contract in the time and with the frequency requirements established in the Specifications.

7 SAFETY

7.1 The Contractor shall provide 100% fall protection above six (6) feet, when required to perform any services under this Contract at high areas. This is critical to the safety of this Contract and shall be strictly enforced. Noncompliance will result in the worker(s) being removed from the project.

7.2 Contractor shall be responsible for all injury to persons or damage to property that occurs as a result of the Contractor’s negligence.

7.3 The Contractor shall assume responsibility on the job site for the actions of all its and its subcontractor(s) personnel who are associated with performing the work required under this Contract and shall take all adequate measures to prevent bodily injury to all workers, and also to prevent damage to the Airport Board property.

7.4 The Contractor shall take proper safety and health precautions to protect the work, its workers, the public, and the property of others.

7.5 The Contractor and its subcontractor(s) shall provide and ensure that workers performing work under this Contract wear the proper and applicable safety devices and apparel.

7.6 All barricades, warning signs and protective equipment to restrict areas shall be in accordance with federal, state, and local codes. Barricades shall not be lower than four (4) feet in height with support no farther than eight (8) feet apart.

7.7 The Airport shall have the right to inspect all job site areas for safety violations at its discretion, direct the Contractor to make immediate improvement of conditions and/or procedures, and/or stop work if other hazards are deemed to exist. Notwithstanding any provisions to the contrary, the Airport shall not be obligated to make an equitable adjustment for any work stoppage that results from safety hazards created by the Contractor or its subcontractor(s).

7.8 In the event the Airport should elect to stop work due to any job site safety hazard caused by the Contractor or its subcontractor(s), after the Contractor has been notified and provided ample time to correct, the Contractor shall bear all costs for eliminating the hazard(s) and shall not be granted compensation for the work stoppage. The Contractor shall pay any and all additional expenses resulting from this action.

7.9 It shall be the responsibility of the Contractor to immediately notify the ETAM Representative if the job site is visited by an official authorized to enforce any regulatory requirements including but not limited to OSHA.

7.10 The Contractor shall inspect all powered equipment daily before operations for signs of wear as well as potential safety hazards. The Contractor shall immediately remove from the job site all equipment, including extensions cords which are potentially unsafe, damaged, inoperable and/or do not meet the manufacturers operation specifications.

7.11 The Contractor shall never leave power equipment unattended without disconnecting them from their power source.

7.12 The Contractor shall immediately notify the ETAM Representative in both verbally and in writing of any accident on the job site that is related to the performance of the scope of work that involve bodily injury or damage to property and shall include information related to whom to contact and all specifics of the follow-up written notice.

7.13 Any damages caused by the Contractor, subcontractor, or their employees to the Airport’s property shall be properly repaired or replaced by the Contractor, to the satisfaction of the ETAM Representative, at the Contractor’s expense.

8 REGULATORY AND ENVIRONMENTAL PROVISIONS

8.1 General

8.1.1 The Contractor, subcontractor(s), and its employees performing work under this Contract shall comply with all applicable federal, state, and local law as well as all Airport Policies and Procedures.

8.1.2 All regulatory infractions, which are incurred by the Contractor while fulfilling the requirements of this Contract, shall be immediately reported by the Contractor to the Airport’s ETAM Representative.

8.1.3 The Contractor shall use on the job site only chemicals and products which shall effectively fulfill the requirements described in this Contract and that shall have the least adverse impact on the environment, do not exceed the volatile organic chemical (VOC) limitations rule(s) published by the U.S. Environmental Protection Agency (EPA) and comply with all applicable regulatory requirements.

8.2 Asbestos Containing Materials/Lead Based Paint

8.2.1 Prior to commencing any painting activities, the Airport’s Environmental Department will conduct an asbestos inspection of the facility to identify the presence of asbestos containing materials (ACM) in the work areas. Facilities constructed prior to 1978 should be presumed to have paint containing lead in their construction.

8.2.2 In the event that ACM or Lead Based Paint (LBP) is found at a facility where painting services are being provided, the Contractor shall stop work immediately and notify the ETAM Representative as soon as possible of its findings. The Contractor shall not, at any time, wash, disturb, remove, scrape or sand ACM or painting containing lead.

8.2.3 Removal of ACM and/or LBP materials containing lead-based paint shall not be part of the Contract scope of work; however, the Contractor is responsible for ensuring that any worker performing painting services under this Contract shall have Asbestos (29 CFR 1926.1101) and Lead (29 CFR 1926.62) Awareness training meeting OSHAs Constriction Standards.

8.3 Hazardous Materials

8.3.1 Contractor shall comply with all laws relating to regulated and/or hazardous materials on the job sites or related to the Contractor’s activities at the job sites.

8.3.2 The Contractor shall not manage, use or store regulated and/or hazardous materials at the job sites without prior approval of the ETAM Representative. Only materials which are reasonable in quantity and necessary to accomplish the scope of work may be considered by the ETAM Representative. The Contractor shall not dispose or treat any regulated and/or hazardous materials on the job sites or surrounding lands or water.

8.3.3 The Contractor shall provide the ETAM Representative with a written list of regulated and/or hazardous materials with the quantities that are intended to be used prior to commencing each painting work.

8.3.4 Materials containing the following asbestos minerals shall not be used into/onto any structure on the Airport property; Chrysotile, Amosite, Crocidolite, Tremolite, Anthophyllite, and Actinolite.

8.4 Contractor’s Responsibility for Environmental Costs and Damages

8.4.1 The Contractor shall be fully responsible and solely liable without limitation, at the Contractor’s sole cost and expense for any environmental costs and damages caused by the Contractor’s regulated and/or hazardous materials, including, but not limited to:

8.4.1.1 Corrective action of the Contractor’s regulated and/or hazardous materials as directed by any governmental agency, as required by any law, or as necessary to prevent or eliminate any nuisance, trespass, waste or diminution in the value of the job sites or as necessary to avoid any impairment of the Authority’s ability to use the job sites for Airport purposes upon expiration or termination of this Contract.

8.4.1.2 Damages for injury or death to persons, or injury to property, the job sites and surrounding lands and waters arising out of the Contractor’s regulated and/or hazardous materials

8.4.1.3 Claims resulting from

8.4.1.3.1 Fines, costs, fees, assessments, taxes, penalties, demands, orders, directives, or any other requirements imposed in any manner by any governmental agencies asserting jurisdiction or under any law with respect to the Contractor’s regulated and/or hazardous materials

8.4.1.3.2 Costs and expenditures for correction action required as to the Contractor’s regulated and/or hazardous materials

8.4.1.3.3 Damages, costs, and expenditures for injury to natural resources resulting from the Contractor’s regulated and/or hazardous materials as required by applicable law

8.4.1.3.4 Compliance with laws regarding the generation, use, storage, transportation, treatment, management, or disposal of the Contractor’s regulated and/or hazardous materials

8.4.1.3.5 Any other liability related to the Contractor’s regulated and/or hazardous materials. While the Airport is not required to incur any costs, fees (including Attorney, consultant, and expert witness fees), or expenses for environmental compliance, or corrective action relating to the Contractor’s regulated and/or hazardous materials, should the Airport Board incur any such costs, expenses or fees due to the Contractor’s non-performance of its obligations under this Contract, the Contractor shall, within 30 days of demand, reimburse the Airport Board for said costs, expenses or fees.

8.4.2 Testing and assessment for regulated and/or hazardous materials may be performed by the Airport at its sole discretion, during reasonable business hours. The Airport personnel or its representatives or consultants may enter upon the job sites and perform tests, take measurements or samples, perform investigations or assessment which the Airport deems necessary in order to determine the presence of regulated and/or hazardous materials or to evaluate Contractor’s compliance with this agreement; however, nothing herein requires the Airport to conduct any such testing, measurement, investigation or assessment. The Airport shall give the Contractor a minimum of five (5) days’ written notice prior to conducting any such tests, investigations, or assessment, except no such notice is required under urgent or emergency conditions.

8.4.2.1 If any of the Contractor’s regulated and/or hazardous materials are detected that requires corrective action other than monitoring under this provision, or if any material is found to be in violation of any law or requirements of this provision are found by the Airport’s

Consultant, the fees and expenses of said Consultant shall be paid by the Contractor on demand by the Airport. This is in addition to the Contractor’s obligation to conduct all required corrective action of any of the Contractor’s regulated and/or hazardous material releases or suspected releases at the Contractor’s sole cost as provided herein.

8.4.3 All regulated and/or hazardous and/or carcinogenic materials transported or generated onto either job site by the Contractor must be properly disposed of by the Contractor in accordance with applicable federal, state, and local laws and regulations at no cost to the Airport.

8.5 Spill Contingency Plan

8.5.1 The Contractor shall provide protection on all nearby storm drains while performing work to ensure that no paint chips, chemicals, cleaning solutions, etc. enter the drainage systems.

8.5.1.1 Neither domestic drains nor storm drains on the job site shall be used to dispose of;

wastewater generated by high pressure blasting, gasoline, paint, thinners, hydraulic fluid, solvents, concentrated cleaning agents, or other regulated and/or hazardous materials.

8.5.2 In the event of a life-threatening spill, the Contractor shall call 911 immediately. Non-life-threatening spills shall be notified to the ETAM Representative and the Airport Integrated Operations Center (IOC): 972‑973‑3112.

8.5.3 The Contractor shall be responsible for all cleanups, site remediation, and disposal costs including hazardous waste response teams that may be required at the site. All procedures shall be in accordance with applicable federal, state, and local environmental and OSHA regulations.

8.5.4 Regulated and/or hazardous materials authorized by the ETAM Representative to be temporary stored on site during normal working hours, shall be placed in containment devices that are capable of containing 110 percent of the volume of the substance in the event of a spill.

8.5.5 The Contractor, under no circumstance, shall store any regulated and/or hazardous materials near neither sanitary drains nor storm drains.

9 PRODUCT SPECIFICATIONS

9.1 Job Site Ambient Conditions

9.1.1 The Contractor shall assess the job site conditions each day prior to beginning tasks scheduled for that day. Depending on the job site ambient condition on that day, if necessary, after notifying the ETAM Representative, the Contractor shall adjust the tasks scheduled accordingly to apply the following guidelines:

9.1.1.1 Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are and will remain until paint is completely cured between 50-degrees F (10-degree C) and 90-degree F (32-degree C)

9.1.1.2 Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are and will remain until paint is completely cured between 45-degree F (7-degree C) and 96-degree F (35-degree C)

9.1.1.3 Do not apply paint in snow, rain, fog, mist, when the relative humidity exceeds 85 percent, or at temperatures less than 5-degree F (3-degree C) above the dew point, or to damp or wet surfaces. No exterior paint shall be applied while the surface is damp, during cold or frosty weather, or when the temperature is likely to drop below freezing during the complete curing cycle of the applied finish

9.1.1.4 Painting may be performed during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits, specified by the manufacturer, during application and drying periods

9.1.1.5 Adhere strictly to all manufacturers' recommendations with respect to temperature and surface conditions set forth for a particular product unless otherwise approved in advance by the ETAM Representative. Nothing in this Statement of Work shall be deemed to reduce the requirements of these recommendations.

9.2 Paint and Related Manufacturers Products

9.2.1 Contractor shall provide a list of proposed products to be used in the performance of the scope of work.

9.2.1.1 The Contractor shall provide the Manufacturer’s Name, and Safety Data Sheets (SDS) for each product.

9.2.1.2 The Contractor shall provide information on the quality and characteristics of the paint and related material products.

9.2.1.3 DFW Airport has approved Sherman-Williams Commercial Grade products to meet the requirements of this contract. If the Contractor proposes other manufacturers products, they need to be approved by the DFW ETAM Representative. The DFW ETAM Representative’s decision is final.

9.2.1.4 Paint and related material products from other manufacturers meeting the same quality and characteristics as intended under this Contract can be submitted to ETAM Representative for review and approval.

9.2.1.5 DFW Airport reserves the right are approve or reject the use of any proposed items.

9.2.1.6 DFW Environmental Affairs Department EAD also has the right to not approve any items listed in the Contractor’s list of products.

9.3 Paint Products, Paint Materials Compatibility and Samples

9.3.1 Materials – Contractor shall provide high -quality new paint in manufacturer’s containers displaying product identification. Paint not meeting these standards will be rejected and if already applied, the Contractor shall re-paint the area at no additional cost to the Airport.

9.3.2 Material Compatibility – Contractor shall provide block fillers, primers, finish coat materials, and related materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by the manufacturer based on testing and field experience.

9.3.3 Colors – Contractor shall provide custom colors of the finished paint systems to match the ETAM Representative’s samples.

9.3.4 Referee Samples – Prior to the application of any finish coat the contractor shall provide the ETAM Representative with a paint supplier's referee sample card for all paint purchased to be applied at Dallas/Fort Worth International Airport. The referee sample shall be taken from the batch of paint as it is being canned and only after all final batch adjustments have been made.

The referee sample card shall be completed by the supplier and contain at a minimum, sample of actual product, date, color description and formula, manufacture, product number, type, and name.

9.4 Examine Substrates

9.4.1 Contractor shall examine conditions under which painting will be performed in compliance with the product manufacturers requirements. Surfaces receiving paint shall have been prepared in accordance with the paint manufactures recommended procedures as well as be thoroughly dry and clean before paint is applied.

9.4.2 Contractor shall do not begin to apply paint until unsatisfactory conditions have been corrected.

9.4.3 Contractor shall start of painting will be construed as the applicator's acceptance of the surface preparation and condition.

9.4.4 Contractor shall review other sections in which primers are provided to ensure compatibility of the total system for various substrates. Upon request from the ETAM Representative, furnish information on characteristics of finished materials to ensure use of compatible primers.

9.4.5 Contractor shall identify existing paint coating and notify the ETAM Representative prior to performing work about anticipated problems using the materials specified over substrates primed or painted by others.

9.5 General Preparation

9.5.1 The Contractor shall relocate movable objects, including but not limited to; chairs, tables, office furniture, file cabinets, appliances, boxes shelves, interfering with the work to be performed to a nearby location indicated by the ETAM Representative, at no additional cost to the Airport. After work has been completed and inspected by the ETAM Representative, all items relocated shall be returned to their original locations without damages.

9.5.2 All flooring, as well as all objects present or adjacent to the job site that do not require to be relocated, shall be covered with drop clothes to adequately protect them against damages.

9.5.3 Contractor shall protect work of other trades, whether being painted or not, against damage by painting.

9.5.4 Contractor shall remove hardware and hardware accessories, plates, machined surfaces, and similar items already installed that are not to be painted. Light fixtures shall be loosened and removed from contact with surface, covered and protected and reset upon completion. Following completion of painting operations in each space or area, have items reinstalled by workers skilled in the trades involved. If hardware and accessories can’t be removed before painting, they must be properly covered before painting.

9.5.5 Contractor shall perform minor remedial repairs such as caulking application and fill in and sanding holes, cracks, gouges, popped nails, dents and abrasions on plaster and drywall surfaces.

9.5.6 Contractor shall promptly clean any paint/material splattered to avoid permanent damage to surfaces or property.

9.6 Cleaning

9.6.1 The Contractor shall clean the substrates of substances that could impair the bond of the various coatings, remove oil and grease prior to cleaning before applying paint or other surface treatments. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.

9.6.2 When required, Contractor shall use high pressure blasting methods to prepare the surface to be painted. High pressure blasting shall not be performed in a manner that damages, removes or weakens the integrity of the existing substrate.

9.6.2.1 The Contractor shall collect all wastewater created by high pressure blasting.

9.6.2.2 Contractor shall furnish all collection containers and equipment.

9.6.2.3 Contractor shall clearly label storage containers with their contents.

9.6.2.4 The cost of collecting high pressure water shall be included in the power washing pricing.

9.6.2.5 Contractor shall coordinate with the ETAM Representative and DFW Airport Board Environment Affairs Department the dispose of all collected wastewater.

9.6.2.6 Contractor shall not pressure wash if there are water restrictions prohibiting such activity.

9.6.3 During water restriction periods the Contractor shall cease pressure washing activities. In lieu of pressure washing, the Contractor shall prepare the site by cleaning the area(s) to be painted with de-natured alcohol.

9.6.3.1 Contractor shall be responsible for the proper storage and disposal of rags used in connection with the de-natured alcohol cleaning process and shall take all the necessary precautions to avoid creating fire hazards.

9.7 Surface Preparation

9.7.1 Surfaces shall be prepared to be painted in accordance with the paint manufacturer’s instructions for each particular substrate condition. Provide barrier coats over existing incompatible primers, or paint coatings, or remove completely and re-prime. Notify ETAM Representative in writing about anticipated problems using the specified finish-coat materials with substrates primed by others.

9.7.2 Cementitious Materials – Contractor shall prepare concrete, concrete masonry block and mineral-fiber reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen, as required, to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.

9.7.2.1 No painting shall be performed on areas where concrete has been applied until such materials are thoroughly cured and dry. Paint shall not be applied until surface is thoroughly dry.

9.7.2.2 Contractor shall use abrasive blast-cleaning methods if recommended by the paint manufacturer. Abrasive blast cleaning shall not be performed unless approved by the ETAM Representative in writing.

9.7.2.3 Contractor shall determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces where moisture content exceeds that permitted in manufacturer's printed directions, but in no case paint plaster surfaces that have moisture content over thirteen (13) percent.

9.7.2.4 Contractor shall touch-up all suction spots or hot spots in cement after the application of the first coat and before applying the second coat to produce an even result in the finish coat.

9.7.2.5 Contractor shall clean concrete floors to be painted with a five (5) percent solution of muriatic acid or another etching cleaner. Flush the floor with clean water to remove acid, neutralize with ammonia, rinse, allow drying, and vacuuming before painting. Written approval from the ETAM Representative shall be required before any acid or etching cleaner is used.

9.7.3 Plaster and Drywall Surfaces – Chalk, dust, dirt, grease, and oils shall be removed.

9.7.3.1 Contractor shall inspect all surfaces and fill all dents, cracks, gouges, holes, popped nails, and abrasions with a plaster patching compound or spackle. No painting shall be performed on areas where plaster, spackle, or caulking has been applied until such materials are thoroughly cured and dry. Paint shall not be applied until surface is thoroughly dry.

9.7.3.2 Contractor shall not paint surfaces where moisture content exceeds that permitted in manufacturer's printed directions, but in no case paint plaster surfaces that have moisture content over thirteen (13) percent.

9.7.3.3 Contractor shall determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application.

9.7.3.4 Contractor shall touch-up all suction spots or hot spots in plaster or joint compound after the application of the first coat and before applying the second coat to produce an even result in the finish coat.

9.7.4 Wood – Surfaces shall be clean of dirt, oil, and other foreign substance with scrapers, mineral spirits, and sandpaper.

9.7.4.1 Contractor shall sand surfaces exposed to view, smooth and dust off.

9.7.4.2 Contractor shall scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried.

9.7.4.3 Contractor shall prime, stain, or seal wood to be painted immediately upon delivery. Prime edges, ends, faces, undersides, and backsides of all exterior and interior wood, wood trim, and mill wood, including cabinets, counters, cases, and paneling.

9.7.4.4 When transparent finish is required, Contractor shall back prime with spar varnish.

9.7.4.5 Contractor shall back prime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on backside.

9.7.4.6 Contractor shall seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat varnish or sealer immediately upon delivery.

9.7.5 Concealed Pressure Treated Wood – Products not totally encased by other construction.

9.7.5.1 Contractor shall clean and provide at least a primer coat of paint. This requirement includes, but is not limited to, blocking, particleboard, plywood, and oriented strand board.

Wood above ceilings, in ceiling plenums, in chases, and electrical and telephone mounting panels are included.

9.7.6 Ferrous Metals – Contractor shall clean ungalvanized ferrous metal surfaces that have not been shop coated, remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with recommendations of the Steel Structures Painting Council (SSPC).

9.7.6.1 Contractor shall blast steel surfaces clean as recommended by the paint system manufacturer and according to requirements of SSPC specification SSPC-SP 10.

9.7.6.2 Contractor shall treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming.

9.7.6.3 Contractor shall touch-up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by the paint manufacturer, and touch-up with the same primer as the shop coat.

9.7.6.4 Ungalvanized Surfaces – Contractor shall clean galvanized surfaces with non-petroleum-based solvents so that the surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.

9.8 Paint Material Preparation

9.8.1 Paint materials shall be carefully mixed and prepared according to manufacturer’s directions.

9.8.2 Contractor shall maintain mixing containers with maxing, applying paint in clean condition, free of foreign materials and residue.

9.8.3 Contractor shall stir material before application to produce a mixture of uniform density; stir as required during application. Remove surface film material, do not stir into material; remove fil and strain material, if necessary, before using.

9.8.4 Contractor shall not thin, adulterate, or otherwise change material except as recommended by the manufacturer. Use only thinners approved by the paint manufacturer and only within recommended limits.

9.9 Paint Application – Tools/Materials

9.9.1 Contractor shall apply all paints and coating by brush, roller, spray, or other applicators as indicated by the manufacturer.

9.9.1.1 Brushes – Contractor shall use brushes best suited for the material applied.

9.9.1.2 Rollers – Contractor shall use rollers of carpet, velvet back, or high-pile sheep’s wool, or as recommended by the manufacturer for the material and texture required.

9.9.2 Spray application of paints, except as herein specified, shall only be permitted after written approval by the ETAM Representative, when surfaces and materials are entirely suitable to this type of application as proven by on-the-job demonstration. Contractor use airless spray equipment with orifice size as recommended by the manufacturer for the material and texture required.

9.10 Application – Contractor shall adhere to the following:

9.10.1 Apply paint according to manufacturer's directions best suited for substrate and type of material being applied. All workmanship shall be of high quality, and all materials evenly spread and smoothly flowed on without runs or sags.

9.10.2 Do not paint over chalk, dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

9.10.3 Paint colors, surface treatments, and finishes as indicated in the schedules.

9.10.4 Provide finish coats that are compatible with primers used.

9.10.5 The number of coats and the film thickness required are the same regardless of the application method. Do not apply succeeding coats until the previous coat has cured, as recommended by the manufacturer. Sand between applications where sanding is required to produce a smooth, even surface according to the manufacturer's directions.

9.10.5.1 Apply additional coats if undercoats, stains, or other conditions show through final coat of paint until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners, receive a dry film thickness equivalent to that of flat surfaces.

9.10.6 The term-exposed surfaces include areas visible when a permanent or built-in fixture, convector covers, covers for finned tube radiation, grilles, and similar components are in place.

Extend coatings in these areas, as required, to maintain the system’s integrity and provide desired protection.

9.10.7 Paint surfaces behind movable equipment and furniture the same as similar surfaces. Before the final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only.

9.10.8 Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, non-specular black paint.

9.10.9 Paint equipment behind perforated panels, louvers, and grills when visible from public spaces, with a flat non-specular black paint.

9.10.10 Paint back sides of access panels and removable or hinged covers to match exposed surfaces.

9.10.11 Finish interior of wall and base cabinets and similar field-finished casework to match exterior.

9.10.12 Top, bottom, and edges of doors shall be finished as specified for the faces of the doors after they have been properly fitted.

9.10.13 Finish exterior doors on tops, bottoms, and side edges same as exterior faces.

9.10.14 Sand lightly between each succeeding enamel or varnish coat.

9.10.15 Omit primer on metal surfaces that have been shop-primed, and touch-up painted.

9.10.16 When tinting, tint each undercoat a lighter shade to facilitate identification…

This is the start of the file's text. The full file is on GovTribe.