02-Appendix B - Cost Proposal Model.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Research Initiatives in Support of FHWA Bridges and Structures Programs: Call 4. 0
Solicitation number
693JJ3-23-BAA-0001-4
Issued by

About this file

This is a Cost Proposal Model template for use in Federal Highway Administration (FHWA) agreements, designed for prospective recipients to detail proposed costs for federal contracts and Broad Agency Announcements (BAAs).

The template provides two primary pricing models: a detailed Cost Proposal Model and a Time-and-Materials Price Model. The Cost Proposal Model breaks down costs into categories including personnel (with estimated hours and hourly rates across nine categories), fringe benefits, travel, equipment, supplies, contractual/consultants, and other direct costs, with provisions for calculating indirect charges (Facilities & Administrative rates). The Time-and-Materials Price Model accommodates up to 24 labor categories with task-based cost estimation across seven tasks, plus other direct costs including travel (airfare and per diem), materials, and miscellaneous costs (telephone, reproduction, delivery, computer, facilities). Both models culminate in total cost summaries. The template references BAA numbers 693JJ323BAA0001 and 693JJ319BAA0001, with an additional reference to Contract 693JJ3-18-D-000001. This template is specifically formatted for FHWA agreements and serves as a standardized tool for offerors to present cost proposals in a consistent format required by the federal contracting process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Model

COST PROPOSAL MODEL
THIS FORM IS FOR USE IN FHWA AGREEMENTS, AND IS USED BY PROSPECTIVE RECIPIENTS TO DETAIL PROPOSED COSTS
Name of OfferorProject Description

Home Office Address

Division(s) and Locations(s) Where Work is to be Performed BAA No. 693JJ323BAA0001

DETAIL DESCRIPTION OF COST ELEMENTS
a.PersonnelEstimated HoursRate/HourEst CostTotal Cost
Category 10$0$0
Category 20$0$0
Category 30$0$0
Category 40$0$0
Category 50$0$0
Category 60$0$0
Category 70$0$0
Category 80$0$0
Category 90$0$0
Total Personnel$0
b.Fringe Benefits
Fringe OverheadRate:0.00%$0
Total Fringe Benefits$0
c.TravelNbr TripsCost/TripEst Cost
Trip 1$0
Trip 2$0
Total Travel$0
d.EquipmentNbrUnit CostEst Cost
Item 1$0
Item 2$0
Total Equipment$0
e.SuppliesNbrUnit CostEst Cost
Item 1$0
Item 2$0
Total Supplies$0
f.Contractual/ConsultantsEst Cost
Item 1
Item 2
Total Contractual/Consultants$0
g.OtherNbrUnit CostEst Cost
Other 1$0
Other 2$0
Total Other$0
i.Total Direct Charge (a -h)$0
j.Indirect Charge (Facilities & Administrative (F&A))RateBasis
0.00%$0.00$0
k.Totals$0

Time-and-Materials Price Model

FHWA BAA No. 693JJ319BAA0001 - Time-and-Materials Price Model
Proposal Title:<insert title>

Period of Performance: <insert POP>

Direct Labor Cost EstimateDollars and Level-of-Effort by Task
Labor CategoryHoursRateExtendedTask #1234567Total
Labor Category 1- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 2- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 3- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 4- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 5- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 6- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 7- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 8- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 9- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 10- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 11- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 12- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 13- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 14- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 15- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 16- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 17- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 18- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 19- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 20- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 21- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 22- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 23- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Labor Category 24- 0$0.00$ - 0- 0- 0- 0- 0- 0- 0- 0- 0
Total Labor Cost- 0$ - 0Total Hours- 0- 0- 0- 0- 0- 0- 0- 0
Total Labor Cost$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Cost EstimateOther Direct Costs by Task
Travel
Total ODCs =$0.00Airfare$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Per Diem$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Materials$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUMMARY TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL HOURS- 0Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Misc. Costs
LABOR$ - 0Telephone$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
ODC$ - 0Reproduction$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL$ - 0Outside Repro.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Delivery$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Computer$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Facilities$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total By Task$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Price by Task $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ - 0

&"Arial,Bold"&12Contract Price Model FHWA Contract # 693JJ3-18-D-000001 PTG International, Inc.

Page &P of &N

File details come from the government source that posted it. Updated .