02-0J81U4 RHMA_ Concrete Barrier_ and Corrugated Steel Pipe Culvert.pdf
PDF 1 MB Posted
- Solicitation number
- 02-0J81U4, Fed #NH-0058(647)
- Issued by
- Shasta County, California
About this file
This Notice to Bidders and Special Provisions document is issued by the California Department of Transportation (Caltrans) for construction work on State Highway 5 in Shasta and Siskiyou Counties near Dunsmuir. The project involves RHMA (hot mix asphalt), concrete barrier installation, and corrugated steel pipe culvert work, extending from 0.6 mile north of Sims Road Undercrossing to 0.2 mile south of Siskiyou Avenue Overcrossing. Bids are scheduled to open on Thursday, January 7, 2027, with the contract identified as 02-0J81U4 under Project ID 0226000122, a Federal-Aid Project (NH-0058(647)). The bid book is dated November 9, 2026, with project plans approved on June 17, 2026. The document references 2025 Standard Specifications and Standard Plans, and includes detailed bid item listings and special provisions for construction management.
The special provisions address multiple regulatory and operational requirements including contractors' registration, potential claim submissions via the Department's Internet system, DVBE quotes and Non-Small Business Subcontractor Preference submissions, diesel-fueled vehicle compliance documentation, Buy America/Build America requirements for manufactured products, environmental product declarations for materials, certified payroll record submissions using LCPtracker Pro, and revised flagging and temporary traffic control requirements. The document contains extensive standard plans for various construction elements including concrete barriers (Types 60K, 60M, 60MP, 60MC, 60MS, 60MG, 60MGF), drainage facilities, guardrail systems, traffic control systems, and erosion control measures. Additional provisions address water pollution control, environmental stewardship, earthwork, dust palliatives, erosion control, asphalt concrete work, concrete structures, reinforcement, electrical work, and traffic control devices. No specific pricing, award date, or contract term information is provided in this notice document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids open Thursday, January 7, 2027 Dated November 9, 2026 OSD
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
AND
SPECIAL PROVISIONS
FOR CONSTRUCTION ON STATE HIGHWAY IN SHASTA AND SISKIYOU
COUNTIES AT AND NEAR DUNSMUIR FROM 0.6 MILE NORTH OF SIMS ROAD
UNDERCROSSING TO 0.2 MILE SOUTH OF SISKIYOU AVENUE
OVERCROSSING
In District 02 On Route 5
Under Bid book dated November 9, 2026 Standard Specifications dated 2025
Project plans approved June 17, 2026 Standard Plans dated 2025
Identified by Contract No. 02-0J81U4
02-Sha,Sis-5-58.0/67.0,0.0/2.7 Project ID 0226000122
Federal-Aid Project
NH-0058(647)
SPECIAL NOTICES
• See sections 2 and 3 for contractors' registration requirements.
• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.
• See section 2 for submittal requirements for DVBE quotes and Non–Small Business
Subcontractor Preference.
• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.
• See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy
America/Build America for manufactured products.
• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.
• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).
• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.
• The flagging and temporary traffic control requirements have been revised. See sections 7-
1.03, 7-1.04, and 12.
• See section 14-11.14 for changes to the management of treated wood waste.
Contract No. 02-0J81U4 i
TABLE OF CONTENTS
NOTICE TO BIDDERS
BID ITEM LIST
SPECIAL PROVISIONS
ORGANIZATION
DIVISION I GENERAL PROVISIONS
1 GENERAL
2 BIDDING
5 CONTROL OF WORK
6 CONTROL OF MATERIALS
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
8 PROSECUTION AND PROGRESS
9 PAYMENT
DIVISION II GENERAL CONSTRUCTION
10 GENERAL
11 WELDING
12 TEMPORARY TRAFFIC CONTROL
13 WATER POLLUTION CONTROL
14 ENVIRONMENTAL STEWARDSHIP
15 EXISTING FACILITIES
DIVISION III EARTHWORK AND LANDSCAPE
18 DUST PALLIATIVES
19 EARTHWORK
21 EROSION CONTROL
DIVISION V SURFACINGS AND PAVEMENTS
36 GENERAL
39 ASPHALT CONCRETE
DIVISION VI STRUCTURES
51 CONCRETE STRUCTURES
52 REINFORCEMENT
56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES
60 EXISTING STRUCTURES
DIVISION VII DRAINAGE FACILITIES
71 EXISTING DRAINAGE FACILITIES
DIVISION VIII MISCELLANEOUS CONSTRUCTION
80 FENCES
DIVISION IX TRAFFIC CONTROL DEVICES
83 RAILINGS AND BARRIERS
ii
84 MARKINGS
DIVISION X ELECTRICAL WORK
86 GENERAL
87 ELECTRICAL SYSTEMS
DIVISION XI MATERIALS
90 CONCRETE
iii
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.
RSP A3A Abbreviations (Sheet 1 of 3)
RSP A3B Abbreviations (Sheet 2 of 3)
RSP A3C Abbreviations (Sheet 3 of 3)
A10A Legend - Lines and Symbols (Sheet 1 of 5)
A10B Legend - Lines and Symbols (Sheet 2 of 5)
A10C Legend - Lines and Symbols (Sheet 3 of 5)
A10D Legend - Lines and Symbols (Sheet 4 of 5)
A10E Legend - Lines and Symbols (Sheet 5 of 5)
A20A Pavement Markers and Traffic Lines - Typical Details
A20B Pavement Markers and Traffic Lines - Typical Details
A20C Pavement Markers and Traffic Lines - Typical Details
A20D Pavement Markers and Traffic Lines - Typical Details
A20E Traffic Lines - Typical Details for Contrast Striping
A20F Pavement Markers and Traffic Lines - Typical Details
A20G Exit Ramp with Enhanced Pavement Markers for Wrong Way Details
A24A Pavement Markings - Arrows
A24B Pavement Markings - Arrows and Symbols
A24C Pavement Markings - Symbols and Numerals
A24D Pavement Markings - Words
A24G Pavement Markings - Yield Lines, Limit Lines, and Wrong Way Details
A40B Shoulder Rumble Strip Details - Ground-In Indentations
A40E Rumble Strip Placement at Freeway Exit Ramps, Freeway Entrance Ramps, and Intersections
A40J Combined Recessed Traffic Stripe and Rumble Strip Details
A40K Rumble Strip Placement for Paved Medians
A62A Excavation and Backfill - Miscellaneous Details
A62C Limits of Payment for Excavation and Backfill - Bridge
A62F Excavation and Backfill - Metal and Plastic Culverts
A62G Excavation and Backfill - Precast Reinforced Concrete Box Culvert
A63A Portable Concrete Barrier (Type 60K)
A63B Portable Concrete Barrier (Type 60K)
A73A Object Markers iv
A73B Markers
A73C Delineators, Channelizers and Barricades
RSP A76A Concrete Barrier Type 60M
RSP A76AB Concrete Barrier Type 60M Details
A76AC Concrete Barrier Type 60M Transition to Concrete Barrier Type 50
RSP A76BA Concrete Barrier Type 60MP
A76BM Concrete Barrier Type 60M with Small Pole
A76BO Concrete Barrier Types 60M and 60MS with Small Pole Transition Details
A76BP Concrete Barrier Type 60MC with Small Pole
A76BR Concrete Barrier Types 60MC and 60MSC with Small Pole Transition Details
A76D Concrete Barrier Type 60MG
A76E Concrete Barrier Type 60MG
A76F Concrete Barrier Type 60MGF
A76G Concrete Barrier Type 60MS
A76HB Concrete Barrier Type 60MS to Transition Railing (Type AGT)
A76K Concrete Barrier - Wildlife Passageway (Type MM)
A77N5 Minor Concrete Vegetation Control - Guardrail System
A77N5A Minor Concrete Vegetation Control - Guardrail System - Narrow Vegetation Control Installation
A77N6 Minor Concrete Vegetation Control - Guardrail System for Terminal System End Treatments
A77N7 Minor Concrete Vegetation Control - Guardrail System at Structure Approach
A77P1 Midwest Guardrail System - Typical Layouts for Embankments
A77P2 Midwest Guardrail System - Typical Layouts for Embankments
A77P3 Midwest Guardrail System - Typical Layouts for Embankments
A77P4 Midwest Guardrail System - Typical Layouts for Embankments
A77P5 Midwest Guardrail System - Typical Layouts for Embankments
A77P6 Midwest Guardrail System - Typical Layouts for Embankments
RSP A77Q1 Midwest Guardrail System - Typical Layouts for Structure Approach
A77Q3 Midwest Guardrail System - Typical Layouts for Structure Approach
A77Q4 Midwest Guardrail System - Typical Layouts for Structure Departure
A77Q5 Midwest Guardrail System - Typical Layouts for Structure Departure
RSP A77S1 Midwest Guardrail System - End Anchor Assembly (Type SFT - M)
A77S2 Midwest Guardrail System - Rail Tensioning Assembly
A77S3 Metal Railing Anchor Cable and Anchor Plate Details
A77T1 Metal Railing End Anchor Assembly (Type CA) v
A77T2 Midwest Guardrail System - Buried Post End Anchor (Type B-F)
A77T3 Midwest Guardrail System - Buried Post End Anchor (Type B-S)
RSP A79A1 Transition Railing (Type AGT)
A79A3 Transition Railing (Type AGT) Details
A79B1 Transition Railing (Type AGT) to Bridge Railings without Sidewalks
A87B Hot Mix Asphalt Dikes
D71 Drainage Inlet Markers
D72E CIP Drainage Inlets - Types GO and GDO
D72F CIP Drainage Inlet Notes
D72G CIP Drainage Inlet Tables
D73B Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D73C Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D73E Precast Drainage Inlets - Types GO and GDO
D73F Precast Drainage Inlet Notes
D73G Precast Drainage Inlet Tables
D74 Drainage Inlet Details
D75A Steel Pipe Inlets
D75B Concrete Pipe Inlets
D75C Pipe Inlets - Ladder and Trash Rack Details
D77A Grate Details No. 1
D77B Grate Details No. 2
D78C Inlet Depressions - Hot Mix Asphalt Shoulders
D83A Precast Reinforced Concrete Box Culvert
D83B Precast Reinforced Concrete Box Culvert - Miscellaneous Details
D84 Box Culvert Wingwalls - Types A, B and C
D87A Corrugated Metal Pipe Downdrain Details
D87C Cable Anchorage System
D87D Overside Drains
D89A Pipe Culvert Headwalls - Straight and "L"
D89B Pipe Culvert Headwalls - Straight and "L"
D94A Metal and Plastic Flared End Sections
D97A Corrugated Metal Pipe Coupling Details No. 1 - Annular Coupling Band, Bar and Strap, and Angle Connections
D97C Corrugated Metal Pipe Coupling Details No. 3 - Helical and Universal Couplers
D97D Corrugated Metal Pipe Coupling Details No. 4 - Hugger Coupling Bands vi
D97E Corrugated Metal Pipe Coupling Details No. 5 - Standard Joint
D97F Corrugated Metal Pipe Coupling Details No. 6 - Positive Joint
D97G Corrugated Metal Pipe Coupling Details No. 7 - Downdrain
D97I Corrugated Polyvinyl Chloride Pipe with Smooth Interior - Standard and Positive Joints
D98A Slotted Corrugated Steel Pipe Drain Details
D98B Slotted Corrugated Steel Pipe Drain Details
D98D Slotted Plastic Pipe Drain Details
D98F Slotted Pipe Grate Extension Details
D98G Grated Line Drain Details No. 1 - Polymer Concrete, 4" Nominal Width
RSP D98J Grated Line Drain Details No. 4 - Connection to Existing Drainage Structure
H52 Rolled Erosion Control Product
T1A Temporary Crash Cushion - Sand Filled (Unidirectional)
T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)
T1B Temporary Crash Cushion - Sand Filled (Bidirectional)
T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)
T3C Temporary Barrier System (Cross Bolt)
T3D Temporary Barrier System (Cross Bolt)
T3E Temporary Barrier System (Cross Bolt)
T3F Temporary Barrier System (Cal F-23)
T3F2 Temporary Barrier System (Cal F-23)
T3G Temporary Barrier System (Staking or Anchoring)
T3G2 Temporary Barrier System (Staking or Anchoring)
T4 Temporary Traffic Screen
T4A Temporary Traffic Screen (Cross Bolt)
T4B Temporary Traffic Screen (Cal F-23)
T9 Traffic Control System Tables for Lane and Ramp Closures
T10 Traffic Control System for Lane Closure on Freeways and Expressways
T10A Traffic Control System for Lane Closure on Freeways and Expressways
T11A Traffic Control System for Changeable Lane Closure on Multilane Conventional Highways and Expressways
RSP T12 Traffic Control System for Half Road Closure on Multilane Conventional Highways and Expressways
RSP T13 Traffic Control System with Reversible Control on Two Lane Conventional Highways
RSP T13B Traffic Control System - Two Lane Conventional Highways
RSP T13C Traffic Control System - Two Lane Conventional Highways
T14 Traffic Control System for Ramp Closure vii
T18 Traffic Control System - Construction Work Zone Speed Limit Reduction on Freeways and Expressways
RSP T24 Mobile Barrier System
RSP T25 Mobile Barrier System
T26 Temporary Automated End of Queue Warning System Type 1 (Queue <= 3.5 Miles)
T27 Temporary Automated End of Queue Warning System Type 2 (Queue <= 7.5 Miles)
T51 Temporary Water Pollution Control Details (Temporary Silt Fence)
T56 Temporary Water Pollution Control Details (Temporary Fiber Roll)
T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)
T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
B0-5 Bridge Details
B6-21 Joint Seals (Maximum Movement Range = 2")
B7-8 Deck Drainage Details
B9-2 Structure Approach - Type R (30)
B11-47 Cable Railing
B11-81 Concrete Barrier Type 842 Details No. 1
RSP B11-82 Concrete Barrier Type 842 Details No. 2
B11-82A Concrete Barrier Type 842 Details No. 3
RS1 Roadside Signs - Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2
RS4 Roadside Signs - Typical Installation Details No. 4
S82 Roadside Laminated Sign - Single or Multiple Panel (Type B, 1" Thick)
S83 Roadside Laminated Sign - Single or Multiple Panel (Type B, 2-1/2" Thick)
S86 Laminated Panel Details (Extrusions for Type A, B, and H Panels)
S89 Roadside Sign - Formed Single Sheet Aluminum Panel
S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape
S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape
S95 Roadside Single Sheet Aluminum Signs, Diamond Shape
ES-1A Electrical Systems (Legend)
ES-1B Electrical Systems (Legend)
ES-1C Electrical Systems (Legend)
ES-2D Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - A Series) viii
ES-5A Electrical Systems (Loop Detectors)
ES-5B Electrical Systems (Detectors)
ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details)
ES-6E Electrical Systems (Lighting Standard, Types 30 and 31)
ES-6F Electrical Systems (Lighting Standard, Slip Base Plate)
ES-7M Electrical Systems (Signal and Lighting Standard, Details No. 1)
ES-7N Electrical Systems (Signal and Lighting Standard, Details No. 2)
RSP ES-7O Electrical Systems (Signal and Lighting Standard, Details No. 3)
ES-8A Electrical Systems (Non-Traffic Pull Box)
ES-8B Electrical Systems (Traffic Pull Box)
ES-9A Electrical Systems (Structure Pull Box Installations)
ES-9C Electrical Systems (Structure Pull Box)
ES-9D Electrical Systems (Structure Pull Box Installations)
ES-11 Electrical Systems (Foundation Installations)
ES-13A Electrical Systems (Splice Insulation Methods Details)
ES-13B Electrical Systems (Kinking and Banding Detail)
CANCELED STANDARD PLANS LIST
The 2025 standard plan sheets listed below are canceled and not applicable to this contract.
Plan No. Date Canceled Plan No. Date
Canceled Plan No. Date Canceled
P8 04-20-26
NOTICE TO BIDDERS
Bids open Thursday, January 7, 2027
Dated November 9, 2026
General work description: RHMA, concrete barrier, and corrugated steel pipe culvert.
The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON
STATE HIGHWAY IN SHASTA AND SISKIYOU COUNTIES AT AND NEAR DUNSMUIR FROM 0.6
MILE NORTH OF SIMS ROAD UNDERCROSSING TO 0.2 MILE SOUTH OF SISKIYOU AVENUE
OVERCROSSING.
District-County-Route-Post Mile: 02-Sha,Sis-5-58.0/67.0,0.0/2.7
Contract No. 02-0J81U4
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-12.
Federal-aid project no.:
NH-0058(647)
For the Federal training program, the number of trainees or apprentices is 14.
Bids must be on a cost+time basis.
Complete the work within the number of working days bid.
Do not bid less than 255 working days and not more than 360 working days.
The estimated cost of the project is $67,000,000.
The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.
The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.
For bid results go to:
https://ppmoe.dot.ca.gov/cc
Select Electronic Bidding under the Bidding tab.
District office addresses are provided in the Standard Specifications.
Present bidders' inquiries to the Department and view the Department's responses at:
https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.
Submit your bid with bidder's security equal to at least 10 percent of the bid.
Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.
If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.
The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.
Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.
Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.
Department of Transportation
BID ITEM LIST
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM LUMP SUM
0002 080060 LEVEL 2 CRITICAL PATH METHOD
SCHEDULE
LS LUMP SUM LUMP SUM
0003 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM LUMP SUM
0004 090205 DISPUTE RESOLUTION BOARD ON-SITE
MEETING
EA 6 7,500.00 45,000.00
0005 090210 HOURLY OFF-SITE DISPUTE-
RESOLUTION-BOARD-RELATED TASKS
HR 120 250.00 30,000.00
0006 100100 DEVELOP WATER SUPPLY LS LUMP SUM LUMP SUM
0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM LUMP SUM
0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM LUMP SUM
0009 120101 TRAFFIC CONTROL SUPERVISOR DAY 180
0010 120105 AUTOMATED WORK ZONE INFORMATION
SYSTEM
LS LUMP SUM LUMP SUM
0011 013804 STATIONARY IMPACT ATTENUATOR
VEHICLE (LS)
LS LUMP SUM LUMP SUM
0012 120120 TYPE III BARRICADE EA 21
0013 120149 TEMPORARY PAVEMENT MARKING
(PAINT)
SQFT 1,370
0014 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 268,000
0015 120165 CHANNELIZER (SURFACE MOUNTED) EA 2,780
0016 010413 PORTABLE RADAR SPEED FEEDBACK
SIGN SYSTEMS (LS)
LS LUMP SUM LUMP SUM
0017 120300 TEMPORARY PAVEMENT MARKER EA 2,280
0018 120320 TEMPORARY BARRIER SYSTEM LF 89,000
0019 124010 TEMPORARY SHUTTLE SERVICE LS LUMP SUM LUMP SUM
0020 128652 PORTABLE CHANGEABLE MESSAGE
SIGN (LS)
LS LUMP SUM LUMP SUM
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0021 129108 TEMPORARY CRASH CUSHION TL-3 EA 40
0022 129150 TEMPORARY TRAFFIC SCREEN LF 2,030
0023 130100 JOB SITE MANAGEMENT LS LUMP SUM LUMP SUM
0024 130301 STORMWATER POLLUTION PREVENTION
PLAN
LS LUMP SUM LUMP SUM
0025 130312 PRE-STORM EVENT INSPECTION
REPORT
EA 15
0026 130323 DURING-AND POST-STORM EVENT
INSPECTION REPORT
DAY 50
0027 130331 STORMWATER ANNUAL REPORT EA 4 3,000.00 12,000.00
0028 130530 TEMPORARY HYDRAULIC MULCH
(BONDED FIBER MATRIX)
SQYD 18,000
0029 130620 TEMPORARY DRAINAGE INLET
PROTECTION
EA 50
0030 130640 TEMPORARY FIBER ROLL LF 6,500
0031 130680 TEMPORARY SILT FENCE LF 600
0032 130730 STREET SWEEPING LS LUMP SUM LUMP SUM
0033 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM LUMP SUM
0034 131103 WATER QUALITY SAMPLING AND
ANALYSIS DAY
EA 36
0035 131104 WATER QUALITY MONITORING REPORT EA 12
0036 131105 WATER QUALITY ANNUAL REPORT EA 3
0037 141120 TREATED WOOD WASTE LB 893,000
0038 146002 CONTRACTOR-SUPPLIED BIOLOGIST
(LS)
LS LUMP SUM LUMP SUM
0039 146007 INVASIVE SPECIES CONTROL LS LUMP SUM LUMP SUM
0040 018788 SALVAGE FLASHING ARROW SIGN (EA) EA 7
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0041 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM LUMP SUM
0042 190101 ROADWAY EXCAVATION CY 2,960
0043 190112 ROADWAY EXCAVATION (TYPE A) CY 800
0044 190185 SHOULDER BACKING TON 4,260
0045 192001 (F) - STRUCTURE EXCAVATION CY 405
0046 192025 (F) - STRUCTURE EXCAVATION
(CULVERT)
CY 1,402
0047 193001 (F) - STRUCTURE BACKFILL CY 316
0048 193004 (F) - STRUCTURE BACKFILL (CULVERT) CY 336
0049 193030 (F) - PERVIOUS BACKFILL MATERIAL CY 29
0050 014626 NATIVE BACKFILL CY 35
0051 194001 DITCH EXCAVATION CY 200
0052 198010 IMPORTED BORROW (CY) CY 490
0053 198230 GEOSYNTHETIC REINFORCEMENT,
PR1000
SQYD 4,510
0054 210010 MOVE-IN/MOVE-OUT (EROSION
CONTROL)
EA 2
0055 210212 DRY SEED (SQFT) SQFT 119,000
0056 037634 HYDRAULIC BIOTIC GROWTH MEDIUM SQFT 24,100
0057 210255 FIBER REINFORCED MATRIX (SQFT) SQFT 24,100
0058 210270 ROLLED EROSION CONTROL PRODUCT
(NETTING)
SQFT 17,900
0059 210280 ROLLED EROSION CONTROL PRODUCT
(BLANKET)
SQFT 119,000
0060 220101 FINISHING ROADWAY LS LUMP SUM LUMP SUM
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0061 260203 CLASS 2 AGGREGATE BASE (CY) CY 660
0062 375020 PARKING AREA SEAL TON 6
0063 390095 REPLACE ASPHALT CONCRETE
SURFACING
CY 3,600
0064 390132 HOT MIX ASPHALT (TYPE A) TON 8,220
0065 390137 RUBBERIZED HOT MIX ASPHALT (GAP
GRADED)
TON 73,300
0066 394060 DATA CORE LS LUMP SUM LUMP SUM
0067 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 240
0068 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1,040
0069 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 15,800
0070 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 29,400
0071 394090 PLACE HOT MIX ASPHALT
(MISCELLANEOUS AREA)
SQYD 180
0072 397005 TACK COAT TON 140
0073 398100 REMOVE ASPHALT CONCRETE DIKE LF 44,100
0074 398200 COLD PLANE ASPHALT CONCRETE
PAVEMENT
SQYD 84,500
0075 420203 GRIND EXISTING BRIDGE DECK SQYD 3,607
0076 510054 STRUCTURAL CONCRETE, BRIDGE
(POLYMER FIBER)
CY 447
0077 015318 STRUCTURAL CONCRETE, WINGWALL
(TYPE A)
CY 85
0078 510081 AGGREGATE BASE (APPROACH SLAB) CY 38
0079 510090 STRUCTURAL CONCRETE, BOX
CULVERT
CY 220
0080 510092 (F) - STRUCTURAL CONCRETE,
HEADWALL
CY 46
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0081 510094 (F) - STRUCTURAL CONCRETE,
DRAINAGE INLET
CY 323
0082 036910 STRUCTURAL CONCRETE, APPROACH
SLAB (TYPE R MODIFIED)
CY 376
0083 510502 (F) - MINOR CONCRETE (MINOR
STRUCTURE)
CY 2.2
0084 048717 PAVING NOTCH EXTENSION (MODIFIED) CF 268
0085 511111 DRILL AND BOND DOWEL (CHEMICAL
ADHESIVE) (LF)
LF 6,270
0086 511118 CLEAN EXPANSION JOINT LF 168
0087 519081 JOINT SEAL (MR 1/2") LF 332
0088 519091 JOINT SEAL (MR 1 1/2") LF 168
0089 520107 (F) - BAR REINFORCING STEEL (BOX
CULVERT)
LB 30,629
0090 048205 (F) - BAR REINFORCING STEEL (BRIDGE,
STAINLESS STEEL)
LB 118,500
0091 010124 (F) - BAR REINFORCING STEEL
(WINGWALL)
LB 14,815
0092 039112 (F) - BAR REINFORCING STEEL
(HEADWALL)
LB 337
0093 600001 PUBLIC SAFETY PLAN LS LUMP SUM LUMP SUM
0094 015978 REPAIR CULVERT JOINT EA 1
0095 600033 REMOVE UNSOUND CONCRETE CF 1,895
0096 600034 REMOVE POLYESTER CONCRETE
OVERLAY
SQFT 30,397
0097 600037 PREPARE CONCRETE BRIDGE DECK
SURFACE
SQFT 72,594
0098 600041 FURNISH POLYESTER CONCRETE
OVERLAY
CF 4,014
0099 600043 (F) - PLACE POLYESTER CONCRETE
OVERLAY
SQFT 40,137
0100 600115 BRIDGE REMOVAL (PORTION), LOCATION
A
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0101 600116 BRIDGE REMOVAL (PORTION), LOCATION
B
LS LUMP SUM LUMP SUM
0102 604100 GALVANIC ANODES EA 1,420
0103 610112 24" ALTERNATIVE PIPE CULVERT LF 7,880
0104 610201 18" ALTERNATIVE SLOTTED PIPE LF 61
0105 610300 (F) - CONCRETE BACKFILL (PIPE
TRENCH)
CY 14
0106 665012 12" CORRUGATED STEEL PIPE (.079"
THICK)
LF 20
0107 665018 18" CORRUGATED STEEL PIPE (.109"
THICK)
LF 300
0108 665025 24" CORRUGATED STEEL PIPE (.138"
THICK)
LF 7,400
0109 665033 30" CORRUGATED STEEL PIPE (.138"
THICK)
LF 120
0110 665038 36" CORRUGATED STEEL PIPE (.138"
THICK)
LF 640
0111 016787 18" X 30" CORRUGATED STEEL PIPE
ARCH (.109" THICK)
LF 90
0112 681132 GEOCOMPOSITE DRAIN SQFT 350
0113 690118 18" CORRUGATED STEEL PIPE
DOWNDRAIN (.109" THICK)
LF 73
0114 690125 24" CORRUGATED STEEL PIPE
DOWNDRAIN (.138" THICK)
LF 790
0115 692307 18" ANCHOR ASSEMBLY EA 2
0116 692309 24" ANCHOR ASSEMBLY EA 30
0117 702123 24" TO 18" CORRUGATED STEEL
ECCENTRIC REDUCER (.079" THICK)
EA 5
0118 703233 GRATED LINE DRAIN LF 47
0119 705015 24" STEEL FLARED END SECTION EA 11
0120 710102 ABANDON CULVERT (LF) LF 2,030
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0121 710110 ABANDON INLET EA 2
0122 710132 REMOVE CULVERT (LF) LF 10,500
0123 017113 REMOVE SLOTTED DRAIN (LF) LF 940
0124 018790 REMOVE DOWNDRAIN (LF) LF 610
0125 710150 REMOVE INLET EA 130
0126 710152 REMOVE HEADWALL EA 7
0127 710190 RELOCATE OVERSIDE DRAIN LF 80
0128 710196 ADJUST INLET EA 52
0129 710206 ADJUST OVERSIDE DRAIN EA 39
0130 710230 ADJUST SLOTTED DRAIN TO GRADE LF 970
0131 710240 MODIFY INLET EA 26
0132 710360 CLEANING, INSPECTING, AND
PREPARING CULVERT (LF)
LF 3,770
0133 710370 SAND BACKFILL CY 160
0134 710384 24" CURED-IN-PLACE PIPELINER LF 1,980
0135 710388 30" CURED-IN-PLACE PIPELINER LF 580
0136 710390 36" CURED-IN-PLACE PIPELINER LF 760
0137 721431 CONCRETE (CONCRETE APRON) CY 1
0138 723040 ROCK SLOPE PROTECTION (3/8 T, CLASS
VI, METHOD B) (CY)
CY 27
0139 723080 ROCK SLOPE PROTECTION (60 LB,
CLASS II, METHOD B) (CY)
CY 56
0140 723110 ROCK SLOPE PROTECTION (1/2 T, CLASS
VII, METHOD B) (CY)
CY 36
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0141 729011 ROCK SLOPE PROTECTION FABRIC
(CLASS 8)
SQYD 300
0142 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 51,980
0143 801110 4' WIRE MESH GATE EA 1
0144 801230 16' WIRE MESH GATE EA 1
0145 803100 RECONSTRUCT FENCE LF 50
0146 036950 WILDLIFE FENCE LF 2,130
0147 810180 DELINEATOR (CLASS 2) EA 890
0148 810190 GUARD RAILING DELINEATOR EA 410
0149 810250 PAVEMENT MARKER
(RETROREFLECTIVE-RECESSED)
EA 11,000
0150 038419 REMOVE MARKER (CULVERT) EA 160
0151 820110 MILEPOST MARKER EA 48
0152 820112 MARKER (CULVERT) EA 190
0153 037137 CONCRETE BARRIER MARKER EA 340
0154 015247 MARKER (DRAINAGE INLET) BARRIER EA 300
0155 820270 REMOVE ROADSIDE SIGN (WOOD POST) EA 120
0156 820300 REMOVE ROADSIDE SIGN (STRAP AND
SADDLE BRACKET METHOD)
EA 15
0157 820310 REMOVE ROADSIDE SIGN PANEL EA 86
0158 820320 REMOVE METAL POST EA 24
0159 820330 REMOVE ROADSIDE SIGN (STEEL POST) EA 56
0160 037363 SALVAGE ROADSIDE SIGN (TURNABLE
METAL POST)
EA 2
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0161 820620 RELOCATE ROADSIDE SIGN (METAL
POST)
EA 8
0162 820720 FURNISH LAMINATED PANEL SIGN (1"-
TYPE B)
SQFT 710
0163 820730 FURNISH LAMINATED PANEL SIGN (2 1/2"-
TYPE B)
SQFT 3,470
0164 820760 FURNISH SINGLE SHEET ALUMINUM
SIGN (0.080"-UNFRAMED)
SQFT 2,120
0165 820780 FURNISH SINGLE SHEET ALUMINUM
SIGN (0.063"-FRAMED)
SQFT 450
0166 820790 FURNISH SINGLE SHEET ALUMINUM
SIGN (0.080"-FRAMED)
SQFT 1,560
0167 820820 METAL (BARRIER MOUNTED SIGN) LB 2,970
0168 820840 ROADSIDE SIGN - ONE POST EA 120
0169 820850 ROADSIDE SIGN - TWO POST EA 13
0170 820860 INSTALL SIGN (STRAP AND SADDLE
BRACKET METHOD)
EA 21
0171 820900 INSTALL ROADSIDE SIGN PANEL ON
EXISTING POST
EA 83
0172 820920 INSTALL ROADSIDE SIGN (LAMINATED
WOOD BOX POST)
EA 25
0173 832006 MIDWEST GUARDRAIL SYSTEM (STEEL
POST)
LF 16,300
0174 832018 MIDWEST GUARDRAIL SYSTEM (8' STEEL
POST)
LF 34,000
0175 832070 VEGETATION CONTROL (MINOR
CONCRETE)
SQYD 2,970
0176 010160 CONCRETE BARRIER WILDLIFE
PASSAGEWAY (TYPE MM)
EA 14
0177 010609 CONCRETE BARRIER (TYPE 60MP
MODIFIED)
LF 1,120
0178 038223 CONCRETE BARRIER (TYPE 60MD
MODIFIED)
LF 375
0179 018789 REMOVE CONCRETE BARRIER (TYPE 50
MOD)
LF 3,950
0180 839521 (F) - CABLE RAILING LF 105
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0181 839544 TRANSITION RAILING (TYPE AGT) EA 25
0182 839576 END CAP (TYPE A) EA 18
0183 839580 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 55
0184 015299 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 46
0185 839588 BURIED POST END ANCHOR (TYPE B-F) EA 6
0186 839589 BURIED POST END ANCHOR (TYPE B-S) EA 16
0187 839640 CONCRETE BARRIER (TYPE 60M) LF 24,700
0188 839641 CONCRETE BARRIER (TYPE 60MA) LF 120
0189 839642 CONCRETE BARRIER (TYPE 60MC) LF 29,500
0190 839645 CONCRETE BARRIER (TYPE 60MG) LF 50
0191 839648 CONCRETE BARRIER (TYPE 60MGF) LF 160
0192 839649 CONCRETE BARRIER (TYPE 60MS) LF 85
0193 839653 CONCRETE BARRIER (TYPE 60MP) LF 66
0194 017970 CONCRETE BARRIER (TYPE 60M W/
SMALL POLE)
LF 120
0195 018792 RESET PORTABLE 60K BARRIER LF 1,540
0196 839745 (F) - CONCRETE BARRIER TRANSITION LF 320
0197 839746 (F) - CONCRETE BARRIER (TYPE 842) LF 94
0198 839749 (F) - CONCRETE BARRIER (TYPE 842
MODIFIED)
LF 749
0199 839752 REMOVE GUARDRAIL LF 49,300
0200 839761 SALVAGE GUARDRAIL LF 2,210
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0201 839765 RECONSTRUCT GUARDRAIL LF 2,760
0202 018791 REMOVE STEEL BARRIER LF 290
0203 839774 REMOVE CONCRETE BARRIER LF 51,900
0204 840515 THERMOPLASTIC PAVEMENT MARKING SQFT 1,820
0205 846030 REMOVE THERMOPLASTIC TRAFFIC
STRIPE
LF 243,000
0206 846051 12" RUMBLE STRIP (ASPHALT
CONCRETE PAVEMENT)
STA 2,230
0207 847104 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
(RECESSED)
LF 283,000
0208 847110 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
(RECESSED, BROKEN 36-12)
LF 120,000
0209 847112 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
(RECESSED, BROKEN 17-7)
LF 2,480
0210 847118 8" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
(RECESSED)
LF 460
0211 847123 12" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
(RECESSED)
LF 14,700
0212 847124 THERMOPLASTIC PAVEMENT MARKING
(ENHANCED WET NIGHT VISIBILITY)
(RECESSED)
SQFT 4,850
0213 847128 6" METHYL METHACRYLATE PAINT
TRAFFIC STRIPE
LF 6,650
0214 847138 6" METHYL METHACRYLATE PAINT
TRAFFIC STRIPE (BROKEN 36-12)
LF 3,330
0215 847196 CONTRAST STRIPE PAINT (2-COAT) LF 9,980
0216 870009 MAINTAINING EXISTING TRAFFIC
MANAGEMENT SYSTEM ELEMENTS
DURING CONSTRUCTION
LS LUMP SUM LUMP SUM
0217 870600 TRAFFIC MONITORING STATION SYSTEM LS LUMP SUM LUMP SUM
0218 018793 MODIFYING FLASHING ARROW SIGN
SYSTEMS
LS LUMP SUM LUMP SUM
0219 013863 MODIFYING ROADSIDE WEATHER
INFORMATION SYSTEMS
0220 872131 MODIFYING LIGHTING SYSTEMS LS LUMP SUM LUMP SUM
Item No.
Item Code
Item Description Unit of Measure
Estimated Quantity
Unit Price Item Total
0221 872135 MODIFYING TRAFFIC MONITORING
STATIONS
0222 999990 MOBILIZATION LS LUMP SUM LUMP SUM
SPECIAL PROVISIONS
ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.
Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.
Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.
DIVISION I GENERAL PROVISIONS
1 GENERAL
Add to section 1-1.01:
Bid Items and Applicable Sections Item code
Item description Applicable section
090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING 5
090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED
TASKS
010124 BAR REINFORCING STEEL (WINGWALL) 52
010160 CONCRETE BARRIER WILDLIFE PASSAGE (TYPE MM) 83
010413 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS) 12
010526 TEMPORARY ALTERNATIVE CRASH CUSHION (TL-3) 12
010609 CONCRETE BARRIER (TYPE 60 MP MODIFIED) 83
013804 STATIONARY IMPACT ATTENUATOR VEHICLE (LS) 12
013863 MODIFYING ROADSIDE WEATHER INFORMATION SYSTEMS 87
014626 NATIVE BACKFILL 19
015247 MARKER (DRAINAGE INLET) BARRIER 82
015299 ALTERNATIVE IN-LINE TERMINAL TL-3 83
015318 STRUCTURAL CONCRETE, WINGWALL (TYPE A) 51
015978 REPAIR CULVERT JOINT 60
016787 18" x 30" CORRUGATED STEEL PIP ARCH (0.109" THICK) 66
017113 REMOVE SLOTTED DRAIN (LF) 71
036910 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R MODIFIED) 51
036950 WILDLIFE FENCE 80
037137 CONCRETE BARRIER MARKERS 82
037363 SALVAGE ROADSIDE SIGN (TURNABLE METAL POST) 82
037634 HYDRAULIC BIOTIC GROWTH MEDIUM 21
038223 CONCRETE BARRIER (TYPE 60MD MODIFIED) 83
038419 REMOVE MARKER (CULVERT) 82
039042 12' X 12' PRECAST REINFORCED CONCRETE BOX CULVERT 51
039112 BAR REINFORCING STEEL (HEADWALL) 52
048205 BAR REINFORCING STEEL (BRIDGE, STAINLESS STEEL) 52
048717 PAVING NOTCH EXTENSION (MODIFIED) 51
018793 MODIFYING FLASHING ARROW SIGN SYSTEM 87
018791 REMOVE STEEL BARRIER 83
999990 MOBILIZATION 9
Add to section 1-1.09:
This project is in a freeze-thaw area.
2 BIDDING
Add between the 1st and 2nd paragraphs of section 2-1.06B:
The Department makes the following supplemental project information available:
Supplemental Project Information Means Description
Included in the Information Handout 1. PLAC - U.S. Army Corps of Engineers, 33 CFR Part 330, Nationwide Permit No.404, dated February 25,
2. PLAC - California Department of Fish and Wildlife
3. PLAC - California Regional Water Quality Control Board, Central Valley Region, Water Quality Certification, WDID No. 5A45CR00681, dated December 11, 2025
4. Tunnel Safety Order - Siskiyou County
5. Tunnel Safety Order - Shasta County
6. Longitudinal Pipeline Agreement-UPRR Project No.
0805564 (Railroad Coordination Requirements)
7. Longitudinal Pipeline Agreement-UPRR Project No.
0798309 (Railroad Coordination Requirements)
8. Longitudinal Pipeline Agreement-UPRR Project No.
0805568 (Railroad Coordination Requirements)
9. Work Plan Form
10. Project and Billing Form
11. RailPros Rates 2026 (cost summary sheet)
12. UPRR Guidelines for Track Monitoring (Railroad
Coordination Requirements)
13. UPRR Guidelines for Utility Potholing(Railroad
Coordination Requirements)
14. Geotechnical Design Report
15. TMS Element Operational Status Certified List
Available as specified in the Standard Specifications
1. Digital terrain model in 3D DGN or LandXML format
2. Alignments and profiles in LandXML format
3. Cross sections in 2D DGN and PDF format
4. Digital design model in LandXML format
5. Pavement smoothness data (.ppf)
6. Bridge as built drawings
Delete section 2-1.20.
Delete section 2-1.33B(2)(b).
5 CONTROL OF WORK
Delete section 5-1.13B.
Replace section 5-1.13E with:
5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.
Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.
Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:
1. Subcontractor’s or entity’s business name
2. Description of work performed
2.1. Bid item numbers or change order numbers
2.2. Written narrative of work performed
3. Value of work performed
4. Amount paid to subcontractor or entity
5. Withhold amount, if applicable
6. Explanation of withhold reasoning, if applicable
Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.
If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:
1. Value of the disputed work
2. Amount of the withhold being taken
3. Bid item numbers or change order numbers associated with the disputed work
4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated
5. Corrective actions to be taken for release of withheld amount
The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.
The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:
1. Withhold was not applied in good faith
2. Requested additional withhold documentation records were not provided
3. Payment information was not submitted through the prompt payment monitoring system
4. Required withhold notification was not provided
The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.
Replace section 5-1.15 with:
5-1.15 SAFETY REPRESENTATIVE
5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.
The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.
The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.
Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.
5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.
Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:
1. Name of the entity providing certification
2. Name of the individual receiving certification
3. Date when the certification was provided
4. Expiration date, if applicable
Submit a copy of the SSSP as an informational submittal:
1. At least 15 days before starting work
2. At least 48 hours before starting work whenever a revision is made to the SSSP
5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.
The safety representative must have one of the following certifications:
1. Certified Safety Professional from the Board of Certified Safety Professionals
2. Construction Health and Safety Technician from the Board of Certified Safety Professionals
3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals
4. Safety Trained Supervisor from the Board of Certified Safety Professionals
5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals
6. Associate Safety Professional from the Board of Certified Safety Professionals
7. Master Safety Professional from the National Association of Safety Professionals
8. Certified Safety Director from the National Association of Safety Professionals
5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:
1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry
2. Knowledge in the area of safety procedure for all types of work being performed on this project
3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA
Code of Regs safety requirements
The safety representative must have completed safety training and maintain valid certifications for:
1. First aid
2. Cardiopulmonary resuscitation
5-1.15E Duties and Responsibilities The safety representative must be available by:
1. Cellular telephone
2. Two-way radio
3. Mobile internet access
The safety representative must:
1. Develop the SSSP
2. Conduct the on-site new project orientation for each worker assigned to the project
3. Review the construction work plans for each subcontractor before starting work
4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring
5. Conduct weekly job site safety meetings
6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues
7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards
8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures
9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs
10. Report all incidents to the Engineer immediately, including the investigation of any close calls
When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.
If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.
You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.
Add to the end of section 5-1.20A:
During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:
Coincident or Adjacent Contracts
Contract no. County–Route–Post Mile Type of work
02-2J8404 SHA-005-45.85/57.87 ITS
02-3J5704 SHA-005-56.70/66.50 Drainage Culverts
02-2J8604 SHA-005-61.75 Bridge Deck Replacement
02-2J7704 SIS-005-0.00/69.29 Curve Warning Signs
Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.
Add to the end of section 5-1.20B(1):
The Department will communicate with PLAC agencies unless communication between you and the PLAC agency is authorized.
Replace section 5-1.20H with:
5-1.20H Railroad Flagging 5-1.20H(1) General 5-1.20H(1)(a) Summary Section 5-1.20H includes specifications for providing railroad flagging services at the railroad location shown. The project involves work on or in the near vicinity of railroad property between RMP 312.0- 322.87, Valley subdivision, involving the Union Pacific Railroad Company (UPRR) Project number 0805564, 0798309, 0805568.
Comply with the documents titled “Railroad Coordination Requirements” in the Informational Handout.
See section 5-1.20C for any additional railroad requirements.
5-1.20H(1)(b) Definitions Not Used
5-1.20H(1)(c) Submittals Submit weekly logs identifying railroad flaggers’ names, hours flagged and date of flagging. Submit each week’s log by the following Monday. The Department will notify you within 5 business days if there is disagreement with the weekly log information
Submit copies of the railroad flagging company’s invoices and proof of your payments. The Department will not compensate you without receiving the required documentation.
Prior to requesting Contract acceptance, submit a notarized confirmation statement from each flagging service company used that states they have no outstanding billing due and have received payment for their services on this project. The Department does not provide Contract acceptance when there are unpaid flagging services remaining.
5-1.20H(1)(d) Quality Assurance Not Used
5-1.20H(2) Materials Not Used
5-1.20H(3) Construction 5-1.20H(3)(a) General Notify the Engineer and UPRR representative of the following:
1. The date and time of mandatory preconstruction meeting
2. Your notice to proceed with the work, provided a minimum of 30 days in advance of work to be performed within the railroad right of way
3. Work or equipment to be located within 25 feet of or above a railroad track, a minimum of 45 days in advance of such work
The contact information for the UPRR representative for this project is found in the Information Handout.
Meet with the Engineer and UPRR representative at a mandatory preconstruction meeting to be held a minimum of 21 days prior to the start of jobsite activities. Discuss the work to be performed including your means and methods. Discuss requirements for coordination and scheduling railroad flagging, including notifications of potential changes in scheduled work.
Within the notification of work in proximity of the railroad, include the type of work to be performed and equipment to used. You will be notified by the railroad representative of flagging requirements, including number of flaggers required within 30 days of your notification. You are responsible to notify the Engineer, UPRR representative and railroad flagging company of changes in your work to be performed that may change flagging needs. These notifications must be made a minimum of 10 days in advance of the changed work.
Comply with the railroad’s published policy found at https://www.up.com/cs/groups/public/@uprr/@realestate for scheduling railroad flagging.
Securing flagging services will not relieve you of your responsibilities or liabilities pertaining to UPRR.
Comply with the Railroad Coordination Requirements of the Information Handout.
5-1.20H(3)(b) Flagging Services Unless otherwise provided in writing by the UPRR representative, railroad flagging services will be required when your personnel or equipment will be:
1. Within 25 feet of a railroad track
2. Operating above a railroad track
3. Operating in the vicinity of the railroad track that may affect railroad operations, such as crane usage
4. Creating an intrusion into the track zone that creates an extraordinary hazard to railroad traffic
5. Operating in proximity to the railroad, as described in your notice to the railroad representative, that requires assigned flagging services as deemed necessary by the UPRR representative
You must coordinate flagging services with the UPRR representative, flagging services subcontractor, and the Engineer, for your work that may require railroad flagging. Include the following information on each notification, submittal or written correspondence with UPRR:
1. Railroad or highway DOT #
2. Railroad milepost
3. Railroad subdivision
4. UPRR folder number
The railroad representative will make the final decision of flagging needs based on your description of your work activities, personnel and equipment in your notification and actual field operations. If your operations are delayed because an insufficient number of flagging personnel are scheduled due to description of work in the notification not aligning with actual field operations, you will be responsible for your delay costs.
You must comply with requirements for flagging services as identified within the Contractor’s Right of Entry Agreement issued by UPRR. You are responsible for any costs associated with failure to comply with these requirements. If UPRR or the flagging service bills you for expenses incurred for your failure to comply, you must pay such bills within 30 days of bill receipt. The Department does not reimburse those costs incurred for your failure to comply.
You are responsible for direct and timely payment of undisputed flagging services provided by the UPRR approved railroad flagging subcontractor. The Department reimburses you these costs upon your submittal of required documentation and proof of your payment.
The Engineer and UPRR representative will monitor your operations for compliance with required flagging services. Failure to comply with flagging service requirements may result in your removal from railroad property until you demonstrate compliance intent. If additional flagging requirements are instituted by UPRR due to your noncompliance, you will bear responsibility for compliance with the additional requirements including additional direct cost and indirect cost impacts. The Department does not reimburse your additional costs.
It is anticipated this project will require approximately 5 days of railroad flagging service.
Select a flagging service subcontractor from the following list of UPRR approved railroad flagging companies:
1. RailPros, email: mail:UP.info@railpros.com, phone: (877) 315-0513, ext. 116
2. National Railroad Safety Services, email: UP.request@nrssinc.net, phone: (877) 984-6777
5-1.20H(3)(c) Railroad Operations Normal train operations over the crossing or through the project consists of 11 freight trains and 2 passenger trains daily with a maximum timetable speed of 25 mph. Specific details regarding train operations may be obtained by consulting with the UPRR Manager of Track Maintenance (MTM) Guy Holleman by phone at 530-604-7656, gdhollem@up.com.
5-1.20H(4) Payment Payment for flagging services will be compensated under section 9-1.05.
6 CONTROL OF MATERIALS
Add to end of section 6-1.01:
If you fail to submit the form for materials subject to Buy America, the Department may:
1. Withhold from the next progress payment
2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products
Replace section 6-1.03B with:
6-1.03B Submittals 6-1.03B(1) General Not Used
6-1.03B(2) Work Plan For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:
1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under…
This is the start of the file's text. The full file is on GovTribe.