02-0J5404 Curb Ramps, Culvert Replacement including Trenchless, and HMA Overlay
Solicitation number
02-0J5404
Issued by
Shasta County, California

About this file

This is a Notice to Bidders and Special Provisions document issued by the California Department of Transportation (Caltrans) for a construction project in Siskiyou County on State Route 3 near Yreka. The project involves curb ramps, culvert replacement including trenchless installation, and hot mix asphalt (HMA) overlay work extending from 0.6 mile north of Juniper Drive to 0.2 mile north of North 5th Street (Post Mile R48.6/54.2). Bids open on Tuesday, January 5, 2027, and must be submitted electronically via the Bid Express website by 2:00 p.m. on that date. The project requires either a Class A contractor license or a combination of Class C licenses (C-12, C-42). Contractors must bid on a cost-plus-time basis, with work completion required between 110 and 120 working days. The bid item list contains 129 items including temporary traffic control, erosion control measures, drainage facility work, asphalt surfacing, concrete work, curb ramps, guardrails, pavement markings, and electrical systems. The estimated project cost is $8,800,000, and bidders must submit security equal to at least 10 percent of their bid.

The contract includes a Small Business Enterprise (SBE) participation goal requirement of 5 percent, with no Disadvantaged Business Enterprise (DVBE) contract goal established, though DVBE participation is encouraged. Prevailing wage requirements apply to this project, as determined by the California Department of Industrial Relations. The contract includes various special provisions addressing safety, environmental compliance, railroad coordination with Central Oregon & Pacific Railroad (Genesee & Wyoming), coordination with the Shasta River Water Users Association and irrigation sprinkler line owners, and strict fire prevention requirements given the project's location in a freeze-thaw area. Special time constraints restrict drainage channel work to May 15 through October 15 and require maintained pavement access during the third weekend in September for the Montague Hot Air Balloon Fair and third weekend in May for the Siskiyou Scenic Bicycle Tour. Lane closure restrictions apply to the conventional highway, with specific requirements for reversing control and maximum closure lengths varying by post mile. A designated safety representative meeting specific certifications and experience requirements is mandatory, and the contractor must comply with all applicable federal permits including Army Corps of Engineers Nationwide Permit No. 3 and California Regional Water Quality Control Board Water Quality Certification.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids open Tuesday, January 5, 2027 Dated November 16, 2026 OSD

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

NOTICE TO BIDDERS

AND

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY IN SISKIYOU COUNTY IN AND

NEAR YREKA FROM 0.6 MILE NORTH OF JUNIPER DRIVE TO 0.2 MILE

NORTH OF NORTH 5TH STREET

In District 02 On Route 3 Under

Bid book dated November 16, 2026 Standard Specifications dated 2026

Project plans approved August 11, 2026 Standard Plans dated 2026

Identified by Contract No. 02-0J5404

02-Sis-3-R48.6/54.2 Project ID 0219000134

SPECIAL NOTICES

• See sections 2 and 3 for contractors' registration requirements.

• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.

• See section 2 for submittal requirements for DVBE quotes and Non–Small Business

Subcontractor Preference.

• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).

• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.

• The flagging and temporary traffic control requirements have been revised. See sections 7-

1.03, 7-1.04, and 12.

• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.

• See sections 1-1.06, 1-1.07B, 2-1.23, 2-1.24, 2-1.33B(3), 5-1.13D, and 5-1.13F for “Small

Business Enterprise Participation Goal Requirement” and “Small Business and Non-Small Business Subcontractor Preferences.”

Contract No. 02-0J5404 i

TABLE OF CONTENTS

NOTICE TO BIDDERS

BID ITEM LIST

SPECIAL PROVISIONS

ORGANIZATION

DIVISION I GENERAL PROVISIONS

1 GENERAL

2 BIDDING

5 CONTROL OF WORK

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

8 PROSECUTION AND PROGRESS

9 PAYMENT

DIVISION II GENERAL CONSTRUCTION

10 GENERAL

11 WELDING

12 TEMPORARY TRAFFIC CONTROL

13 WATER POLLUTION CONTROL

14 ENVIRONMENTAL STEWARDSHIP

15 EXISTING FACILITIES

DIVISION III EARTHWORK AND LANDSCAPE

19 EARTHWORK

21 EROSION CONTROL

DIVISION V SURFACINGS AND PAVEMENTS

36 GENERAL

39 ASPHALT CONCRETE

DIVISION VII DRAINAGE FACILITIES

70 MISCELLANEOUS DRAINAGE FACILITIES

71 EXISTING DRAINAGE FACILITIES

DIVISION VIII MISCELLANEOUS CONSTRUCTION

73 CONCRETE CURBS AND SIDEWALKS

DIVISION IX TRAFFIC CONTROL DEVICES

81 MISCELLANEOUS TRAFFIC CONTROL DEVICES

83 RAILINGS AND BARRIERS

84 MARKINGS

DIVISION X ELECTRICAL WORK

86 GENERAL

87 ELECTRICAL SYSTEMS

DIVISION XI MATERIALS

ii

90 CONCRETE

iii

STANDARD PLANS LIST

The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.

A3A Abbreviations (Sheet 1 of 3)

A3B Abbreviations (Sheet 2 of 3)

A3C Abbreviations (Sheet 3 of 3)

A10A Legend - Lines and Symbols (Sheet 1 of 5)

A10B Legend - Lines and Symbols (Sheet 2 of 5)

A10C Legend - Lines and Symbols (Sheet 3 of 5)

A10D Legend - Lines and Symbols (Sheet 4 of 5)

A10E Legend - Lines and Symbols (Sheet 5 of 5)

A20A Pavement Markers and Traffic Lines - Typical Details

A20B Pavement Markers and Traffic Lines - Typical Details

A20D Pavement Markers and Traffic Lines - Typical Details

A20E Traffic Lines - Typical Details for Contrast Striping

A24B Pavement Markings - Arrows and Symbols

A24C Pavement Markings - Symbols and Numerals

A24D Pavement Markings - Words

A24E Pavement Markings - Words

A24F Pavement Markings - Crosswalks

A24G Pavement Markings - Yield Lines, Limit Lines, and Wrong Way Details

A62A Excavation and Backfill - Miscellaneous Details

A62D Excavation and Backfill - Concrete Pipe Culverts

A62E Excavation and Backfill - Cast-In-Place Reinforced Concrete Box and Arch Culverts

A62F Excavation and Backfill - Metal and Plastic Culverts

A73A Object Markers

A73B Markers

A73C Delineators, Channelizers, and Barricades

A77L2 Midwest Guardrail System - Standard Railing Section (Steel Post with Notched Wood or Notched Recycled Plastic Block)

A77M1 Midwest Guardrail System - Standard Hardware

A77N2 Midwest Guardrail System - Steel Post and Block Details

A77N3 Midwest Guardrail System - Typical Line Post Embedment and Hinge Point Offset Details

A77N4 Midwest Guardrail System - Typical Height Measurement, Dike Positioning, and Delineation Details iv

A77N5 Minor Concrete Vegetation Control - Guardrail System

A77N5A Minor Concrete Vegetation Control - Guardrail System - Narrow Vegetation Control Installation

A77N6 Minor Concrete Vegetation Control - Guardrail System for Terminal System End Treatments

A77N7 Minor Concrete Vegetation Control - Guardrail System at Structure Approach

A77N11 Minor Concrete Vegetation Control - Guardrail System - Miscellaneous Details

A77Q1 Midwest Guardrail System - Typical Layouts for Structure Approach

A77Q4 Midwest Guardrail System - Typical Layouts for Structure Departure

A77R4 Midwest Guardrail System - Typical Layouts for Roadside Fixed Objects

A77R8 Midwest Guardrail System - Typical Layouts for Roadside Fixed Objects

A77T2 Midwest Guardrail System - Buried Post End Anchor (Type B-F)

A79A1 Transition Railing (Type AGT)

A79A3 Transition Railing (Type AGT) Details

A79B1 Transition Railing (Type AGT) to Bridge Railings without Sidewalks

A87A Curbs and Driveways

A87B Hot Mix Asphalt Dikes

A88A Curb Ramp Details

A88B Curb Ramp and Island Passageway Details

A90B Accessible Parking On-Street

P51 Edge Drain Outlet and Vent Details

P74 Pavement Edge Treatments

P75 Pavement Edge Treatments - Overlays

D72A CIP Drainage Inlets - Types OS, OL and GOL

D72B CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D72C CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D72E CIP Drainage Inlets - Types GO and GDO

D72F CIP Drainage Inlet Notes

D72G CIP Drainage Inlet Tables

D73A Precast Drainage Inlets - Types OS, OL and GOL

D73B Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D73C Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6

D73E Precast Drainage Inlets - Types GO and GDO

D73F Precast Drainage Inlet Notes

D73G Precast Drainage Inlet Tables

D74 Drainage Inlet Details v

D77A Grate Details No. 1

D77B Grate Details No. 2

D78A Gutter Depressions

D79 Precast Reinforced Concrete Pipe - Direct Design Method

D79A Precast Reinforced Concrete Pipe - Direct Design Method

D94A Metal and Plastic Flared End Sections

D94B Concrete Flared End Sections

D97A Corrugated Metal Pipe Coupling Details No. 1 - Annular Coupling Band, Bar and Strap, and Angle Connections

D97C Corrugated Metal Pipe Coupling Details No. 3 - Helical and Universal Couplers

D97D Corrugated Metal Pipe Coupling Details No. 4 - Hugger Coupling Bands

D97E Corrugated Metal Pipe Coupling Details No. 5 - Standard Joint

D97H Reinforced Concrete Pipe or Non-Reinforced Concrete Pipe - Standard and Positive Joints

H1 Landscape and Erosion Control Symbols

H52 Rolled Erosion Control Product

T1A Temporary Crash Cushion - Sand Filled (Unidirectional)

T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)

T1B Temporary Crash Cushion - Sand Filled (Bidirectional)

T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)

T3C Temporary Barrier System (Cross Bolt)

T3D Temporary Barrier System (Cross Bolt)

T3E Temporary Barrier System (Cross Bolt)

T3F Temporary Barrier System (Cal F-23)

T3F2 Temporary Barrier System (Cal F-23)

T3G Temporary Barrier System (Staking or Anchoring)

T3G2 Temporary Barrier System (Staking or Anchoring)

T9 Traffic Control System Tables for Lane and Ramp Closures

T13 Traffic Control System with Reversible Control on Two Lane Conventional Highways

T13B Traffic Control System - Two Lane Conventional Highways

T17 Traffic Control System for Moving Lane Closure on Two Lane Highways

T20 Traffic Control System - Construction Work Zone Speed Limit Reduction Details

T21 Traffic Control System - Construction Work Zone Speed Limit Reduction Twenty- Four Hours a Day 7 Days a Week (24/7)

T22 Traffic Control System for Construction Work Zone Speed Limit Reduction on Two Lane Conventional Highways

T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and Pedestrian Detour vi

T32 Temporary Pedestrian Access Routes - Typical Sidewalk/Crosswalk Closure and Pedestrian Detour

T51 Temporary Water Pollution Control Details (Temporary Silt Fence)

T53 Temporary Water Pollution Control Details (Temporary Cover)

T56 Temporary Water Pollution Control Details (Temporary Fiber Roll)

T57 Temporary Water Pollution Control Details (Temporary Check Dam)

T58 Temporary Water Pollution Control Details (Temporary Construction Entrance)

T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)

T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T65 Temporary Water Pollution Control Details (Temporary High-Visibility Fence)

RS1 Roadside Signs - Typical Installation Details

RS2 Roadside Signs - Wood Post - Typical Installation Details

RS4 Roadside Signs - Typical Installation - Miscellaneous Details

RS5 Roadside Sign - PSST Post - Typical Installation Details No. 1

RS6 Roadside Sign - PSST Post - Typical Installation Details No. 2

S93 Framing Details for Framed Single Sheet Aluminum Signs - Rectangular Shape

S94 Roadside Framed Single Sheet Aluminum Signs - Rectangular Shape

ES-1A Electrical Systems (Legend)

ES-1B Electrical Systems (Legend)

ES-1C Electrical Systems (Legend)

ES-3C Electrical Systems (Controller Cabinet Foundation and Pad Details)

ES-5A Electrical Systems (Loop Detectors)

ES-5B Electrical Systems (Detectors)

ES-8B Electrical Systems (Traffic Pull Box)

ES-13A Electrical Systems (Splice Insulation Methods Details)

CANCELED STANDARD PLANS LIST

The standard plan sheets listed below are canceled and not applicable to this contract.

Plan No. Date Canceled Plan No. Date

Canceled Plan No. Date Canceled

No Canceled Standard Plans

NOTICE TO BIDDERS

Bids open Tuesday, January 5, 2027

Dated November 16, 2026

General work description: Curb ramps, culvert replacement including trenchless, and HMA overlay.

The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON

STATE HIGHWAY IN SISKIYOU COUNTY IN AND NEAR YREKA FROM 0.6 MILE NORTH OF

JUNIPER DRIVE TO 0.2 MILE NORTH OF NORTH 5TH STREET.

District-County-Route-Post Mile: 02-Sis-3-R48.6/54.2

Contract No. 02-0J5404

The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-12, C-42.

The Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation.

The SBE Contract goal is 5 percent.

Bids must be on a cost+time basis.

Complete the work within the number of working days bid.

Do not bid less than 110 working days and not more than 120 working days.

The estimated cost of the project is $8,800,000.

The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.

The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.

For bid results go to:

https://ppmoe.dot.ca.gov/cc

Select Electronic Bidding under the Bidding tab.

District office addresses are provided in the Standard Specifications.

Present bidders' inquiries to the Department and view the Department's responses at:

https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries

Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.

Submit your bid with bidder's security equal to at least 10 percent of the bid.

Under Govt Code § 14835 et seq. and 2 CA Code of Regs § 1896 et seq., the Department gives preference to certified small businesses and non–small businesses who commit to 25 percent certified small business participation.

Under Pub Cont Code § 6107, the Department gives preference to a "California company," as defined, for bid comparison purposes over a nonresident contractor from any state that gives or requires a preference to be given to contractors from that state on its public entity construction contracts.

Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.

The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.

Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.

Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.

Department of Transportation

BID ITEM LIST

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM

0002 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM

0003 090200 DISPUTE RESOLUTION ADVISOR ON-SITE

MEETING

EA 4

0004 090207 HOURLY OFF-SITE DISPUTE-RESOLUTION-

ADVISOR-RELATED TASKS

HR 10

0005 100100 DEVELOP WATER SUPPLY LS LUMP SUM

0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM

0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM

0008 010413 PORTABLE RADAR SPEED FEEDBACK SIGN

SYSTEMS (LS)

LS LUMP SUM

0009 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM

0010 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM

0011 013357 AUTOMATED FLAGGER ASSISTANCE DEVICE LS LUMP SUM

0012 130100 JOB SITE MANAGEMENT LS LUMP SUM

0013 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM

0014 130312 PRE-STORM EVENT INSPECTION REPORT EA 15

0015 130323 DURING-AND POST-STORM EVENT INSPECTION

REPORT

DAY 45

0016 130331 STORMWATER ANNUAL REPORT EA 3

0017 130530 TEMPORARY HYDRAULIC MULCH (BONDED

FIBER MATRIX)

SQYD 2,300

0018 130570 TEMPORARY COVER SQYD 2,300

0019 130610 TEMPORARY CHECK DAM LF 100

0020 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 7

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0021 130640 TEMPORARY FIBER ROLL LF 9,800

0022 130650 TEMPORARY GRAVEL BAG BERM LF 480

0023 130680 TEMPORARY SILT FENCE LF 2,400

0024 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 4

0025 130730 STREET SWEEPING LS LUMP SUM

0026 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM

0027 131103 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 24

0028 131104 WATER QUALITY MONITORING REPORT EA 15

0029 131105 WATER QUALITY ANNUAL REPORT EA 2

0030 141120 TREATED WOOD WASTE LB 6,940

0031 146002 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS LUMP SUM

0032 146007 INVASIVE SPECIES CONTROL LS LUMP SUM

0033 018014 REMOVE PLANTER EA 6

0034 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 810

0035 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM

0036 190101 ROADWAY EXCAVATION CY 2,140

0037 190185 SHOULDER BACKING TON 1,620

0038 198206 SUBGRADE ENHANCEMENT GEOTEXTILE,

CLASS A1

SQYD 3,630

0039 208449 POP-UP SPRINKLER ASSEMBLY EA 6

0040 208594 (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY

LINE)

LF 34

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0041 210212 DRY SEED (SQFT) SQFT 22,800

0042 210252 BONDED FIBER MATRIX (SQFT) SQFT 37,300

0043 210280 ROLLED EROSION CONTROL PRODUCT

(BLANKET)

SQFT 22,200

0044 210610 COMPOST (CY) CY 380

0045 210630 INCORPORATE MATERIALS SQFT 37,300

0046 260203 CLASS 2 AGGREGATE BASE (CY) CY 1,480

0047 390025 SEGMENT CORRECTION EA 13

0048 390095 REPLACE ASPHALT CONCRETE SURFACING CY 830

0049 390132 HOT MIX ASPHALT (TYPE A) TON 11,200

0050 390136 MINOR HOT MIX ASPHALT TON 160

0051 394060 DATA CORE LS LUMP SUM

0052 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 50

0053 394075 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 2,400

0054 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 92

0055 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 49

0056 397005 TACK COAT TON 26

0057 398100 REMOVE ASPHALT CONCRETE DIKE LF 200

0058 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 24,600

0059 510094 (F) - STRUCTURAL CONCRETE, DRAINAGE

INLET

CY 10

0060 610103 12" ALTERNATIVE PIPE CULVERT LF 150

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0061 610108 18" ALTERNATIVE PIPE CULVERT LF 43

0062 610112 24" ALTERNATIVE PIPE CULVERT LF 300

0063 610121 36" ALTERNATIVE PIPE CULVERT LF 120

0064 610300 (F) - CONCRETE BACKFILL (PIPE TRENCH) CY 42

0065 039299 28" X 20" ALTERNATIVE PIPE ARCH CULVERT LF 96

0066 610504 42" X 29" ALTERNATIVE PIPE ARCH CULVERT LF 140

0067 018807 18" X 11" ELLIPTICAL REINFORCED CONCRETE

PIPE

LF 180

0068 650014 18" REINFORCED CONCRETE PIPE LF 520

0069 014913 48" WELDED STEEL PIPE TRENCHLESS

INSTALLATION METHOD

LF 210

0070 705031 48" STEEL FLARED END SECTION EA 2

0071 705204 18" CONCRETE FLARED END SECTION EA 11

0072 705307 12" ALTERNATIVE FLARED END SECTION EA 3

0073 705311 18" ALTERNATIVE FLARED END SECTION EA 2

0074 705315 24" ALTERNATIVE FLARED END SECTION EA 6

0075 705321 36" ALTERNATIVE FLARED END SECTION EA 2

0076 705380 28" X 20" ALTERNATIVE FLARED END PIPE ARCH

SECTION

EA 2

0077 705384 42" X 29" ALTERNATIVE FLARED END PIPE ARCH

SECTION

EA 1

0078 710102 ABANDON CULVERT (LF) LF 200

0079 710132 REMOVE CULVERT (LF) LF 1,260

0080 710150 REMOVE INLET EA 7

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0081 710167 REMOVE FLARED END SECTION (EA) EA 9

0082 710208 ADJUST FRAME AND COVER TO GRADE EA 2

0083 710366 CONCRETE INVERT PAVING CY 28

0084 710370 SAND BACKFILL CY 36

0085 018613 MINOR CONCRETE (CROSS GUTTER) CY 17

0086 730070 DETECTABLE WARNING SURFACE SQFT 340

0087 731502 MINOR CONCRETE (MISCELLANEOUS

CONSTRUCTION)

CY 2

0088 731504 MINOR CONCRETE (CURB AND GUTTER) CY 110

0089 731516 MINOR CONCRETE (DRIVEWAY) CY 28

0090 731521 MINOR CONCRETE (SIDEWALK) CY 110

0091 731623 MINOR CONCRETE (CURB RAMP) CY 25

0092 731780 REMOVE CONCRETE SIDEWALK (SQYD) SQYD 1,030

0093 731840 REMOVE CONCRETE (CURB AND GUTTER) LF 1,770

0094 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 1,841

0095 780270 LOWER AND RAISE FRAME AND COVER

(UTILITY)

EA 9

0096 810120 REMOVE PAVEMENT MARKER EA 770

0097 810180 DELINEATOR (CLASS 2) EA 150

0098 810250 PAVEMENT MARKER (RETROREFLECTIVE-

RECESSED)

EA 1,280

0099 820110 MILEPOST MARKER EA 11

0100 820113 TREATMENT BEST MANAGEMENT PRACTICE

MARKER

EA 4

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0101 037137 CONCRETE BARRIER MARKER EA 3

0102 820158 OBJECT MARKER (TYPE 2-V) (METAL POST) EA 32

0103 820270 REMOVE ROADSIDE SIGN (WOOD POST) EA 24

0104 820330 REMOVE ROADSIDE SIGN (STEEL POST) EA 28

0105 820760 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-UNFRAMED)

SQFT 390

0106 820780 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.063"-FRAMED)

SQFT 52

0107 820790 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-FRAMED)

SQFT 56

0108 820840 ROADSIDE SIGN - ONE POST EA 47

0109 820850 ROADSIDE SIGN - TWO POST EA 6

0110 832006 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 230

0111 832018 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 550

0112 832070 VEGETATION CONTROL (MINOR CONCRETE) SQYD 600

0113 833085 (F) - PIPE HANDRAILING LF 12

0114 048948 CONCRETE BARRIER TRANSITION

(STRUCTURE)

LF 60

0115 839544 TRANSITION RAILING (TYPE AGT) EA 4

0116 015299 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 6

0117 839588 BURIED POST END ANCHOR (TYPE B-F) EA 1

0118 015019 ALTERNATIVE CRASH CUSHION TL-3 EA 1

0119 839752 REMOVE GUARDRAIL LF 580

0120 846012 THERMOPLASTIC CROSSWALK AND PAVEMENT

MARKING (ENHANCED WET NIGHT VISIBILITY)

SQFT 850

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0121 847104 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

(RECESSED)

LF 63,400

0122 847108 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

(RECESSED, BROKEN 12-3)

LF 3,120

0123 847114 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

(RECESSED, BROKEN 18-12)

LF 1,970

0124 847118 8" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

(RECESSED)

LF 360

0125 847126 THERMOPLASTIC CROSSWALK AND PAVEMENT

MARKING (ENHANCED WET NIGHT VISIBILITY)

(RECESSED)

SQFT 1,550

0126 847128 6" METHYL METHACRYLATE PAINT TRAFFIC

STRIPE

LF 380

0127 847196 CONTRAST STRIPE PAINT (2-COAT) LF 380

0128 870600 TRAFFIC MONITORING STATION SYSTEM LS LUMP SUM

0129 999990 MOBILIZATION LS LUMP SUM

SPECIAL PROVISIONS

ORGANIZATION

Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.

Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.

Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.

DIVISION I GENERAL PROVISIONS

1 GENERAL

Add to section 1-1.01:

Bid Items and Applicable Sections Item code

Item description Applicable section

090200 DISPUTE RESOLUTION ADVISOR ON-SITE MEETING 5

090207 HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED

TASKS

010413 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS) 12

013357 AUTOMATED FLAGGER ASSISTANCE DEVICE 12

018014 REMOVE PLANTER 15

039299 28” X 20” ALTERNATIVE PIPE ARCH CULVERT 61

018807 18" X 11” ELLIPTICAL REINFORCED CONCRETE PIPE 65

014913 48” WELDED STEEL PIPE TRENCHLESS INSTALLATION METHOD 70

018613 MINOR CONCRETE (CROSS GUTTER) 73

037137 CONCRETE BARRIER MARKER 82

048948 CONCRETE BARRIER TRANSITION (STRUCTURE) 83

015299 ALTERNATIVE IN-LINE TERMINAL TL-3 83

015019 ALTERNATIVE CRASH CUSHION TL-3 83

Add to the table in the 1st paragraph of section 1-1.06:

SBE Small Business Enterprise

Add to section 1-1.07B:

small business enterprise: Small business or small business for the purpose of public works, as certified by the Department of General Services, Office of Small Business and DVBE Services, and as defined in Govt Code § 14835 et seq. and 2 CA Code of Regs § 1896 et seq.

Add to section 1-1.09:

This project is in a freeze-thaw area.

2 BIDDING

Add between the 1st and 2nd paragraphs of section 2-1.06B:

The Department makes the following supplemental project information available:

Supplemental Project Information Means Description

Included in the Information Handout 1. PLAC - U.S. Army Corps of Engineers, Non- Reporting, Nationwide Permit No.3, dated March 15,

2. PLAC - California Regional Water Quality Control Board, North Coast Region, Water Quality Certification, WDID No. 1A25171WNSI, dated March 9, 2026

3. Water Quality Monitoring Plan

4. PLAC - California Department of Fish and Wildlife, 1602 Streambed Alteration Agreement, No. EPIMS- SIS-64030-R1, dated March 18, 2026

5. PLAC - City of Montague Department of Public Works Encroachment Permit, dated January 6, 2026

6. PLAC - Siskiyou County Department of Public Works Encroachment Permit, No. 25-105-D1-O, dated December 15, 2025

7. Railroad Coordination Requirements

8. Foundation Recommendation for Concrete Barrier

Transition at Shasta River Bridge, dated February 26, 2026

9. Geotechnical Design Report, dated October 24,

10. Aerially Deposited Lead Site Investigation Report, dated December 16, 2025

11. Tunnel Safety Order, dated November 17, 2025, and Amendment, dated August 19, 2026

12. CDFW Aquatic Invasive Species Decontamination Protocol 2022

13. Semipermanent Reference Points

14. Form DOT OCR-0003 (NEW 04/2024) Final Report -

Utilization of Small Business Enterprises Available as specified in the Standard Specifications

1. Digital terrain model in LandXML format

2. Alignments and profiles in LandXML format

3. Cross sections in 2D DGN and PDF format

4. Digital design model in LandXML format

5. Design features for project design in DWG format

6. Pavement smoothness data (.ppf)

7. Bridge as built drawings

Add to the end of section 2-1.10:

Failing to adequately provide this information may require the bidder to self-perform the work, consistent with Public Contract Code § 4106.

Replace section 2-1.23 with:

2-1.23 SMALL BUSINESS ENTERPRISE PARTICIPATION GOAL REQUIREMENT

2-1.23A General Section 2-1.23 applies if an SBE participation goal requirement is shown on the Notice to Bidders.

The SBE participation goal requirement is in addition to any DVBE goal shown on the Notice to Bidders and the DVBE requirements in section 2-1.22.

Make work available to SBEs and select work parts consistent with the available SBEs, including subcontractors, suppliers, service providers, and truckers.

Meet the SBE participation goal requirement shown on the Notice to Bidders. A bid that demonstrates an SBE participation commitment less than the SBE participation goal requirement is nonresponsive.

Each listed SBE must be certified as a small business or small business for the purpose of public works by 5:00 p.m. on the bid opening date. The complete application and any required substantiating documentation must be received by the Department of General Services by 5:00 p.m. on the bid opening date.

The Department of General Services determines whether an SBE was certified on the bid opening date.

The Department of Transportation confirms an SBE’s certification status.

2-1.23B SBE Submittals Submit SBE information under section 2-1.33.

For the SBE participation goal requirement, submit the following:

1. Completed Small Business Enterprise – Commitment form. Failure to submit the completed form by 4 p.m. on the 4th business day after bid opening may result in a nonresponsive bid.

2. Copy of the quote for each SBE shown on the Small Business Enterprise – Commitment form that describes the type and dollar amount of work shown on the form. Quotes are not required for work that will be completed by SBE prime bidders. Failure to submit a copy of the quote for each SBE listed on the Commitment form by 4 p.m. on the 4th business day after bid opening may result in disallowance of the SBE’s participation.

3. Completed Small Business Enterprise – Confirmation form from each SBE listed on the Commitment form. The form for each SBE is required to establish that the SBE will be participating in the Contract for the type and dollar amount of work shown on the form. Failure to submit completed Confirmation forms for each SBE listed on the Commitment form by 4 p.m. on the 4th business day after bid opening may result in disallowance of the SBE’s participation.

4. If an SBE is participating as a joint venture partner, submit a copy of the joint venture agreement.

The Department may contact you and SBEs to clarify quotes and supporting documentation.

If you elect, at time of bid, to pursue the optional small business or non-small business preference, see section 2-1.24 for the requirements arising from your request for the preference. SBE participation listed to meet the SBE participation goal requirement should not be listed for the preference.

Replace section 2-1.24 with:

2-1.24 SMALL BUSINESS AND NON–SMALL BUSINESS SUBCONTRACTOR PREFERENCES

2-1.24A General Section 2-1.24 applies to a non-federal-aid contract.

The Department applies small business preferences and non–small business preferences under Govt Code § 14835 et seq. and 2 CA Code of Regs § 1896 et seq.

Any contractor, subcontractor, supplier, or service provider who qualifies as a small business or small business for the purpose of public works is encouraged to apply for certification as an SBE by submitting its application to the Department of General Services, Office of Small Business and DVBE Services.

The Department of General Services determines whether an SBE was certified on the bid opening date.

The Department of Transportation confirms an SBE’s certification status before applying the small business or non-small business preference.

Contract award is based on the total bid, not the reduced bid.

Pursuant to Govt Code § 14838, SBE participation listed on the Small Business Enterprise – Commitment form used to meet the SBE participation goal requirement should not be listed on the Certified Small Business Listing for the Non-Small Business Preference form. Listing the same SBE participation on both the Small Business Enterprise – Commitment form and on the Certified Small Business Listing for the Non-Small Business Preference form may result in disallowance of the SBE’s participation toward the small business or non-small business preference.

2-1.24B Small Business Preference The Department allows a bidder certified as an SBE by the Department of General Services, Office of Small Business and DVBE Services, a preference if:

1. Bidder submitted a completed Request for Small Business Preference or Non–Small Business Preference form with its bid

2. Low bidder did not request the preference or is not certified as a small business

The Bidder's signature on the Request for Small Business Preference or Non–Small Business Preference form certifies that the Bidder is certified as an SBE at the date and time of bid or has submitted a complete application to the Department of General Services. The complete application and any required substantiating documentation must be received by the Department of General Services by 5:00 p.m. on the bid opening date.

The small business preference is a reduction for bid comparison in the total bid submitted by the small business contractor by the lesser of the following amounts:

1. 5 percent of the verified total bid of the low bidder

2. $50,000

If the Department determines that a certified small business bidder is the low bidder after the application of the small business preference, the Department does not consider a request for non–small business preference.

2-1.24C Non–Small Business Subcontractor Preference At time of bid, the Department allows a bidder not certified as an SBE by the Department of General Services, Office of Small Business and DVBE Services, the option of requesting the non-small business subcontractor preference. If a bidder elects to pursue that option at the time of bid, the bidder is required to meet the corresponding commitment.

For the non-small business subcontractor preference, submit the following:

1. Completed Request for Small Business Preference or Non–Small Business Preference form with your bid

2. Completed Certified Small Business Listing for the Non–Small Business Preference form which shows you are subcontracting at least 25 percent to certified SBEs

Each listed SBE must be certified as a small business or small business for the purpose of public works by 5:00 p.m. on the bid opening date. The complete application and any required substantiating documentation must be received by the Department of General Services by 5:00 p.m. on the bid opening date.

Failure to submit a completed Certified Small Business Listing for the Non–Small Business Preference form by 4 p.m. on the 4th business day after bid opening will result in a nonresponsive bid.

The non–small business subcontractor preference is a reduction for bid comparison in the total bid submitted by the non–small business contractor requesting the preference by the lesser of the following amounts:

1. 5 percent of the verified total bid of the low bidder

2. $50,000

Replace the table in the 1st paragraph of section 2-1.33B(3)(b)(ii) with:

Bid Form Submittal Schedule for a Non-Federal-Aid Contract with a DVBE Goal

Form Submittal deadline

Bid to the Department of Transportation Time of bid except for the public works contractor registration number for a joint-venture contract

For a joint-venture contract, copy of the Bid to the Department of Transportation as submitted at the time of bid with the public works contractor registration number

10 days after bid opening

Subcontractor List Time of bid In-Use Off-Road Diesel-Fueled Vehicle List 10 days after bid opening Small Business/DVBE/DBE Certification Status Time of bid Opt Out of Payment Adjustments for Price Index Fluctuationsa Time of bid

Certified DVBE Summary No later than 4 p.m. on the 4th business day after bid opening

California Company Preference Time of bid

Small Business Enterprise – Commitment No later than 4 p.m. on the 4th business day after bid opening

Small Business Enterprise – Confirmation No later than 4 p.m. on the 4th business day after bid opening

Request for Small Business Preference or Non– Small Business Preferencea Time of bid

Certified Small Business Listing for the Non– Small Business Preferencea

No later than 4 p.m. on the 4th business day after bid opening aSubmit only if you choose the option or preference.

Replace the table in the 1st paragraph of section 2-1.33B(3)(c)(ii) with:

Bid Form Submittal Schedule for a Non-Federal-Aid Contract without a DVBE Goal

Form Submittal deadline

Bid to the Department of Transportation Time of bid except for the public works contractor registration number for a joint-venture contract

For a joint-venture contract, copy of the Bid to the Department of Transportation as submitted at the time of bid with the public works contractor registration number

10 days after bid opening

Subcontractor List Time of bid In-Use Off-Road Diesel-Fueled Vehicle List 10 days after bid opening Small Business/DVBE/DBE Certification Status Time of bid Opt Out of Payment Adjustments for Price Index Fluctuationsa Time of bid

California Company Preference Time of bid

Certified DVBE Summaryb No later than 4 p.m. on the 4th business day after bid opening

Small Business Enterprise – Commitment No later than 4 p.m. on the 4th business day after bid opening

Small Business Enterprise – Confirmation No later than 4 p.m. on the 4th business day after bid opening

Request for Small Business Preference or Non– Small Business Preferencea Time of bid

Certified Small Business Listing for the Non– Small Business Preferencea

No later than 4 p.m. on the 4th business day after bid opening aSubmit only if you choose the option or preference.

bSubmit only if you obtain DVBE participation or you are the apparent low bidder, 2nd low bidder, or 3rd low bidder and you choose to receive the specified incentive.

5 CONTROL OF WORK

Replace section 5-1.13D with:

5-1.13D Non-Small Business Preference 5-1.13D(1) General Section 5-1.13D applies to a non-federal-aid contract when you have obtained a non-small business subcontractor preference under section 2-1.24.

Use each SBE as shown on the Certified Small Business Listing for the Non-Small Business Preference form unless you receive authorization for a substitution under section 5-1.13D(3).

Maintain records of subcontracts and agreements made with each SBE. Include in the records:

1. SBE subcontract or agreement

2. Name and business address of each business

3. Proof of each payment made to an SBE

Upon reasonable notice and during normal business hours, permit access to the SBE premises for the purpose of:

1. Interviewing employees.

2. Inspecting and copying books, records, accounts, and other material that may be relevant to a matter under investigation.

Upon work completion, complete a Final Report – Utilization of Small Business Enterprise form and submit within 10 days of Contract acceptance. The Department withholds the greater of 10 percent of the SBE work amount or $10,000 until the form is submitted. The Department releases the withhold upon submission of the completed form. If additional payments are made to an SBE after submittal of the completed form, submit an updated form to reflect such payments.

5-1.13D(2) Commercially Useful Function SBEs must perform a commercially useful function under 2 CA Code Regs § 1896.15 when performing tasks listed on the Certified Small Business Listing for the Non-Small Business Preference form and as a Department authorized substitute SBE. The SBE’s value of work will only count toward the non-small business preference if the SBE performs a commercially useful function under 2 CA Code Regs § 1896.15.

Provide written notification to the Engineer at least 15 days in advance of each SBE’s initial performance of work on the Contract. Include the SBE’s name, contract work to be performed, and the location, date, and time of where the SBE’s work will take place.

Monitor each SBE’s performance of a commercially useful function throughout their duration of work on the Contract. Maintain supporting documentation of commercially useful function related records. Provide copies of the following to the Department within 5 business days of a specific SBE request:

1. Subcontract or agreement with the SBE

2. Purchase orders

3. Bills of lading

4. Invoices

5. Proof of payment

You and your SBEs must submit any commercially useful function related records and documents within 5 business days of Department request such as:

1. Proof of ownership or lease and rental agreements for equipment

2. Tax records

3. Employee rosters

4. Certified payroll records

5. Inventory rosters

Notify the Engineer immediately if you believe an SBE may not be performing a commercially useful function.

Failure to submit requested records and documents, or failure of an SBE to perform a commercially useful function, will be a violation of these specifications. Such violations will result in referral to the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

5-1.13D(3) Substitutions Substitution of an SBE may be requested for the reasons listed in Pub Cont Code § 4107. The Department will consider your SBE substitution request under 2 CA Code Regs § 1896.10. The substitute must be another SBE.

The requirement that an SBE be certified by the bid opening date does not apply to SBE substitutions after contract award.

Include in your substitution request:

1. Copy of the written notice issued to the SBE with proof of delivery

2. Copy of the SBE response to the notice

3. Your explanation of the reason for the substitution request

4. Names and certification numbers of the listed SBE and the proposed substitute SBE

5. Description of the work to be performed including dollar amount or percentage of overall contract the proposed substitute SBE will perform

6. If an SBE substitution cannot occur, written justification and the steps that were taken to try to acquire a new SBE and how that non-small business preference portion of the Contract will be fulfilled

Upon receipt of the substitution request, the listed SBE will be notified by the Department of the substitution request. The listed SBE will have 5 business days to respond. Where the listed SBE objects to the substitution, the Department will schedule a hearing.

If the Department authorizes your SBE substitution request, it will do so in writing.

Work performed by a firm other than the listed SBE or authorized substitute will be a violation of these specifications. Such violations will result in notification of the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

Replace section 5-1.13E with:

5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.

Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.

Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:

1. Subcontractor’s or entity’s business name

2. Description of work performed

2.1. Bid item numbers or change order numbers

2.2. Written narrative of work performed

3. Value of work performed

4. Amount paid to subcontractor or entity

5. Withhold amount, if applicable

6. Explanation of withhold reasoning, if applicable

Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.

If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:

1. Value of the disputed work

2. Amount of the withhold being taken

3. Bid item numbers or change order numbers associated with the disputed work

4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated

5. Corrective actions to be taken for release of withheld amount

The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.

The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:

1. Withhold was not applied in good faith

2. Requested additional withhold documentation records were not provided

3. Payment information was not submitted through the prompt payment monitoring system

4. Required withhold notification was not provided

The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.

Replace section 5-1.13F with:

5-1.13F Small Business Enterprise Participation Goal Requirement 5-1.13F(1) General Section 5-1.13F applies to a non-federal-aid contract if an SBE participation goal requirement is shown on the Notice to Bidders.

Use each SBE as shown on the Small Business Enterprise – Commitment form unless you receive authorization for a substitution under section 5-1.13F(3).

Maintain records of subcontracts and agreements made with each SBE. Include in the records:

1. SBE subcontract or agreement

2. Name and business address of each business

3. Proof of each payment made to an SBE

Upon reasonable notice and during normal business hours, permit access to the SBE premises for the purpose of:

1. Interviewing employees.

2. Inspecting and copying books, records, accounts, and other material that may be relevant to a matter under investigation.

Upon work completion, complete a Final Report – Utilization of Small Business Enterprise form and submit within 10 days of Contract acceptance. The Department withholds the greater of 10 percent of the SBE work amount or $10,000 until the form is submitted. The Department releases the withhold upon submission of the completed form. If additional payments are made to an SBE after submittal of the completed form, submit an updated form to reflect such payments.

5-1.13F(2) Commercially Useful Function SBEs must perform a commercially useful function under 2 CA Code Regs § 1896.15 when performing tasks listed on the Small Business Enterprise – Commitment form and as a Department authorized substitute SBE. The SBE’s value of work will only count toward the SBE participation goal requirement if the SBE performs a commercially useful function under 2 CA Code Regs § 1896.15.

Provide written notification to the Engineer at least 15 days in advance of each SBE’s initial performance of work on the Contract. Include the SBE’s name, contract work to be performed, and the location, date, and time of where the SBE’s work will take place.

Monitor each SBE’s performance of a commercially useful function throughout their duration of work on the Contract. Maintain supporting documentation of commercially useful function related records. Provide copies of the following to the Department within 5 business days of a specific SBE request:

1. Subcontract or agreement with the SBE

2. Purchase orders

3. Bills of lading

4. Invoices

5. Proof of payment

You and your SBEs must submit any commercially useful function related records and documents within 5 business days of Department request such as:

1. Proof of ownership or lease and rental agreements for equipment

2. Tax records

3. Employee rosters

4. Certified payroll records

5. Inventory rosters

Notify the Engineer immediately if you believe an SBE may not be performing a commercially useful function.

Failure to submit requested records and documents, or failure of an SBE to perform a commercially useful function, will be a violation of these specifications. Such violations will result in referral to the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

5-1.13F(3) Substitutions Substitution of an SBE may be requested for the reasons listed in Pub Cont Code § 4107. The Department will consider your SBE substitution request under 2 CA Code Regs § 1896.10. The substitute must be another SBE.

The requirement that an SBE be certified by the bid opening date does not apply to SBE substitutions after contract award.

Include in your substitution request:

1. Copy of the written notice issued to the SBE with proof of delivery

2. Copy of the SBE response to the notice

3. Your explanation of the reason for the substitution request

4. Names and certification numbers of the listed SBE and the proposed substitute SBE

5. Description of the work to be performed including dollar amount or percentage of overall contract the proposed substitute SBE will perform

6. If an SBE substitution cannot occur, written justification and the steps that were taken to try to acquire a new SBE and how that SBE participation goal requirement portion of the Contract will be fulfilled

Upon receipt of the substitution request, the listed SBE will be notified by the Department of the substitution request. The listed SBE will have 5 business days to respond. Where the listed SBE objects to the substitution, the Department will schedule a hearing.

If the Department authorizes your SBE substitution request, it will do so in writing.

Work performed by a firm other than the listed SBE or authorized substitute will be a violation of these specifications. Such violations will result in notification of the Department of General Services, and you may be subject to sanctions under Govt Code § 14842 et seq.

Replace section 5-1.15 with:

5-1.15 SAFETY REPRESENTATIVE

5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.

The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.

The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.

Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.

5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.

Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:

1. Name of the entity providing certification

2. Name of the individual receiving certification

3. Date when the certification was provided

4. Expiration date, if applicable

Submit a copy of the SSSP as an informational submittal:

1. At least 15 days before starting work

2. At least 48 hours before starting work whenever a revision is made to the SSSP

5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.

The safety representative must have one of the following certifications:

1. Certified Safety Professional from the Board of Certified Safety Professionals

2. Construction Health and Safety Technician from the Board of Certified Safety Professionals

3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals

4. Safety Trained Supervisor from the Board of Certified Safety Professionals

5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals

6. Associate Safety Professional from the Board of Certified Safety Professionals

7. Master Safety Professional from the National Association of Safety Professionals

8. Certified Safety Director from the National Association of Safety Professionals

5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:

1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry

2. Knowledge in the area of safety procedure for all types of work being performed on this project

3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA

Code of Regs safety requirements

The safety representative must have completed safety training and maintain valid certifications for:

1. First aid

2. Cardiopulmonary resuscitation

5-1.15E Duties and Responsibilities The safety representative must be available by:

1. Cellular telephone

2. Two-way radio

3. Mobile internet access

The safety representative must:

1. Develop the SSSP

2. Conduct the on-site new project orientation for each worker assigned to the project

3. Review the construction work plans for each subcontractor before starting work

4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring

5. Conduct weekly job site safety meetings

6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues

7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material…