01A-ADW Window Wash Final Drawing Package.pdf
PDF 3 MB Posted
- Attached to
- ATCT Cab Window Defogger System at Joint Base Andrews (ADW) Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00480
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00480-0001 (6).pdf | ||
| 01-ADW Window Wash Scope of Work (SOW).pdf | ||
| 02-WageDeterminationMD20220044.txt | TXT text file | |
| 697DCK-22-R-00480 (4).pdf | ||
| 03-PastPerformanceQuestionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
ENGINEERING SERVICES
SURV./WEATHER
ATCT
CAB LEVEL PLAN
ATCT CAB DEFOGGER SYSTEM
MDJOINT BASE ANDREWSCAMP SPRINGS
KH
PROJECT ENGINEER MGR: ENGINEERING - CENTER B
05/03/2022 19006446
ADW-19006446-E100
a d w -1
-e
.d g n
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U
IO
-e
/1
/2
:2
:0
A
M P lo tt e b y
V
-C
E
G -E
D
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
IS
DN
CAB
HATCH
FLOOR
DT#19856
SCALE: 1/2" = 1'-0"E100
SHOWN HERE FOR CLARITY
PANEL LPE-B ON JUNCTION LEVEL
SHOWN HERE FOR CLARITY
PANEL PPE-B ON JUNCTION LEVEL
PANEL PPE-B OR LPE-B
IN JUNCTION LEVEL TO EITHER
POWER WIRING / CONDUIT RUN
VALVES
CATWALK RAILING TO SOLENOID
IN JUNCTION LEVEL THEN ALONG
CONTROL WIRING / CONDUIT RUN
DOWN TO JUNCTION LEVEL
WIRING / CONDUIT RUN
POWER AND CONTROL
SEE DWG. M800
CONTROL PANEL,
DEFOGGER
SELF CONTAINED
SCALE: 1/2" = 1'-0"
5'1' 2'01'
ON DWG. P101
CONTINUED
adw-19006446-e100
2022-05-17T09:44:01-0400
SANDRA L PIETTRO
2022-05-17T08:43:53-0400
KEITH H HOOD
COVER SHEET, DRAWING INDEX, AND VICINITY MAP
ADW-19006446-G001
-g
-g
:1 lo tt e
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
AVIA
I
LAR
TRAT
SI
NI
CAMP SPRINGS MARYLAND
ADW ATCT CAB DEFOGGER SYSTEM
DRAWING NO. DRAWING TITLE
GENERAL:
ADW-19006446-G001
PLUMBING:
ADW-19006446-P621
ADW-19006446-P600
ADW-19006446-P500
ADW-19006446-P101
ADW-19006446-P100
ADW-19006446-P001
MECHANICAL:
ADW-19006446-M800
ELECTRICAL:
ADW-19006446-E100
COVER SHEET, DRAWING INDEX, AND VICINITY MAP
PIPING SCHEMATIC DETAILS
PLUMBING DETAILS
EQUIPMENT SCHEDULES
CAB LEVEL PLAN SHOWING CATWALK
JUNCTION LEVEL PLAN
SYMBOLS AND GENERAL NOTES
CONTROL PANEL LAYOUT
VICINITY MAP
NOT TO SCALE
adw-19006446-g001
2022-05-17T09:41:18-0400
SANDRA L PIETTRO
2022-05-17T08:40:44-0400
KEITH H HOOD
ADW-19006446-M800
-m
-m
:5 lo tt e
OPERATION SEQUENCE:
SWITCH PANEL NOTES:
OPERATING INSTRUCTIONS
(TYP.)
RED INDICATOR LIGHT
LIGHT (TYP.)
GREEN INDICATOR
1/8" LETTERS (TYP.)
PUSH BUTTON (TYP.)
MOMENTARY CONTACT
(TYP.)
1/4" LETTERS
CAB WINDOW DEFOGGER
ZONE 1 ZONE 2
READY IN USE
ZONE 3STOPALL ZONESZONE 5
ZONE 4
OTHER ZONES ARE ORIENTED FROM THE PERSPECTIVE OF THE USER.
CENTER WASH BUTTON OPERATES THE ZONE IN FRONT OF THE USER AND THE
THE CONTROL PANEL AND THE ZONES SHALL BE COORDINATED SO THAT THE TOP
REPRESENTATIVE AND CONSOLE ELECTRONICS LAYOUT.
COORDINATE PANEL INSTALLATION LOCATION WITH CONTRACTING OFFICER
BE INSTALLED ON THE CAB EXTERIOR.
MINIMUM) SHALL BE MOUNTED IN A WEATHER PROOF CONTROL BOX WHICH SHALL
24 VOLT TRANSFORMER, RELAYS, WIRING AND TERMINAL STRIP (14 CONNECTION
ALL SWITCH PANEL COMPONENTS SHALL BE COMMERCIAL GRADE QUALITY.
PLATE.
LETTERING. FACE PLATE SHALL BE MOUNTED ON A 3/32" THICK ALUMINUM MOUNTING
PANEL FACE SHALL BE GENERAL GRADE LAMINATED PLASTIC WITH ENGRAVED
BE SIMILAR.
SPRINKLER HEADS LABELED SIDE 1 SHALL BE ZONE 1. ZONES 2 THROUGH 5 SHALL
CIRCUIT AND SWITCH FOR EACH ZONE AS INDICATED ON THE PLUMBING DRAWINGS.
CONTROL DIAGRAM AND SWITCH PANEL SHOWN ARE TYPICAL. PROVIDE SEPARATE
8.
7.
6.
5.
4.
3.
2.
1.
ONCE THE DEFOGGING SYSTEM IS READY FOR OPERATION THE GREEN "READY" LIGHT WILL BE ILLUMINATED.
TO STOP THE DEFOGGING SYSTEM AT ANY TIME PRESS THE "STOP" BUTTON.
THE SYSTEM WILL AUTOMATICALLY WASH EACH ZONE IN SEQUENCE.
TO DEFOG ALL ZONES PRESS THE "ALL ZONES" BUTTON.
AT THE END OF THE DEFOGGING CYCLE ANOTHER ZONE MAY BE SELECTED FOR DEFOGGING.
WHEN THE CYCLE IS COMPLETE THE GREEN "READY" LIGHT WILL BE ILLUMINATED.
DEFOGGING WILL START ON AN INTERNAL TIMER.
THE RED "IN USE" LIGHT WILL ILLUMINATE TO INDICATE ACTIVATION.
PRESS DESIRED ZONE BUTTON (1, 2, 3, 4 OR 5) TO BEGIN DEFOGGING THAT SIDE.
ENSURE THAT GREEN "READY" LIGHT IS ILLUMINATED.
THE DEFOGGER SYSTEM AND THE DOMESTIC WATER BOOSTER PUMP SYSTEM.
DEFOGGER SYSTEM. NO CONTROLS INTERCONNECTION IS REQUIRED BETWEEN
THE DEFOGGER SYSTEM AND WILL PROVIDE CONSTANT INLET PRESSURE TO THE
THE DOMESTIC WATER BOOSTER PUMP SHALL OPERATE INDEPENDENTLY FROM
SHALL TURN OFF WHEN COMPLETED.
THE "IN USE" LIGHT INDICATES THE SYSTEM IS PROCESSING COMMANDS AND
READY MODE.
THE "STOP" BUTTON SHALL STOP ALL OPERATION AND RETURN THE SYSTEM TO
DELAY BETWEEN EACH ZONE.
SECOND PERIOD (ADJUSTABLE THROUGH PROGRAMMING) WITH A 15 SECOND
DEPRESSION OF 'DEFOG ALL' BUTTON SHALL SEQUENCE EACH ZONE FOR A 20
SHALL OPERATE FROM INDEPENDENT CONTROLS.
CHEMICAL FEED SYSTEM SHALL ALSO OPERATE. THE CHEMICAL FEED PUMP
ONLY ONE ZONE SHALL OPERATE AT A TIME. WHEN ANY ZONE IS ACTIVATED, THE
(ADJUSTABLE THROUGH PROGRAMMING).
ITS RESPECTIVE WINDOW ZONE INDEPENDENTLY, FOR A PERIOD OF 20 SECONDS
DEFOGGING OF THAT ZONE. EACH PUSH BUTTON (ZONES 1-5) SHALL OPERATE
WHEN IN READY MODE, DEPRESSING ANY ZONE BUTTON SHALL INITIATE TIMED
SHALL RETURN TO STANDBY.
PROGRAMMING) FOLLOWING LAST OPERATION, AFTER WHICH THE SYSTEM
READY MODE SHALL BE MAINTAINED FOR 5 MINUTES (ADJUSTABLE THROUGH
SYSTEM SHALL REMAIN IN STANDBY MODE UNTIL 'ON' BUTTON IS PRESSED.
M800 adw-19006446-m800
2022-05-17T09:44:22-0400
SANDRA L PIETTRO
2022-05-17T08:44:04-0400
KEITH H HOOD
SYMBOLS AND GENERAL NOTES
ADW-19006446-P001
-p lo tt e
T-X
RPZ BFP
CW
CFP-X
DW
TEST DRINKING WATER PRIOR TO PERFORMING ANY WORK.
PROVIDE INSULATION FOR ALL DOMESTIC COLD WATER PIPING PER SPECIFICATIONS.
DO NOT PLACE PIPING ABOVE ELECTRICAL, COMMUNICATIONS, DATA EQUIPMENT OR ELECTRICAL PANELS.
INSPECTION.
COPPER, AND TOTAL COLIFORMS. TESTING SHALL BE CONDUCTED PRIOR TO THE CONTRACTOR ACCEPTANCE
UPON COMPLETED DEFOGGER SYSTEM INSTALLATION, CAB DRINKING WATER SHALL BE TESTED FOR PH, LEAD, BACK-SIPHONAGE EXISTS.
PROVIDE APPROPRIATE BACKFLOW PREVENTING DEVICE IN LOCATIONS WHERE POSSIBILITY OF
STAINLESS STEEL AISI 304, OR AISI 316.
TO SUPPORT OR INSTALL ANY EXTERIOR EQUIPMENT, PIPE, CONDUIT, BOX OR OTHER DEVICE SHALL BE
ALL HARDWARE, INCLUDING CLAMPS, BOLTS, NUTS, WASHERS, STRUTS, ANCHOR BOLTS, ANGLES, ETC. USED
SLOPE DRAINAGE PIPING AT MINIMUM 1/8" PER FOOT IN DIRECTION OF FLOW.
AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ADDITIONAL EXPENSE TO THE GOVERNMENT.
COORDINATE PIPING WITH DUCTWORK, ELECTRICAL, STRUCTURAL AND FIRE PROTECTION. MAKE OFFSETS
CONTRACT DOCUMENTS PRIOR TO INSTALLATION OF EQUIPMENT.
DOCUMENTS PRIOR TO ORDERING. PROVIDE WRITTEN VERIFICATION OF COORDINATION WITH ELECTRICAL
COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH ELECTRICAL CONTRACT
REQUIRED CODE CLEARANCES PRIOR TO ANY PROCUREMENT, FABRICATION OR INSTALLATION.
SHALL BE PROVIDED FOR REVIEW AND APPROVAL SHOWING SPACE FOR ACCESS, EGRESS, MAINTENANCE AND
EQUIPMENT SIZES SHOWN ARE BASED UPON TYPICAL MANUFACTURER EQUIPMENT AVAILABLE. SHOP DRAWINGS
UNDER THOSE CIRCUMSTANCES.
WITH ANY CONSTRUCTION, FABRICATION, OR MATERIAL/EQUIPMENT PURCHASE WHICH WOULD BE UNUSABLE
ATTENTION OF THE FAA CONTRACTING OFFICER REPRESENTATIVE FOR RESOLUTION BEFORE PROCEEDING
DIFFER FROM THOSE SHOWN ON THESE DRAWINGS. ANY SUCH DEVIATIONS SHALL BE BROUGHT TO THE
FABRICATION OR PURCHASE OF MATERIALS AND ASSEMBLIES. THERE MAY EXIST FIELD CONDITIONS WHICH
BASIS FOR MANY OF THESE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO
THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY, AND PREVIOUS RECORD DRAWINGS FORM THE
BEFORE ORDERING OR INSTALLING ANY MATERIALS OR EQUIPMENT.
DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL SIZES, MATERIALS, TEMPERATURE AND PRESSURE RATINGS
ALL THE CONTRACT DOCUMENTS AND COORDINATE BETWEEN ALL TRADES PRIOR TO SUBMITTING SHOP
ALL NECESSARY EQUIPMENT, APPURTENANCES AND CONTROLS. THE CONTRACTOR SHALL CAREFULLY REVIEW
(DO NOT SCALE FOR LOCATIONS). IT IS INTENDED THAT A COMPLETE PLUMBING SYSTEM BE PROVIDED WITH
THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS
A PRE-BID SITE VISIT IS MANDATORY FOR ALL CONTRACTORS INTERESTED IN BIDDING THIS PROJECT.
LEGEND
SURFACTANT TANK
REDUCED PRESSURE ZONE BACKFLOW PREVENTER
CHEMICAL FEED PUMP
UNION
FLOW SWITCH
RISE IN PIPING
DROP IN PIPING
PRESSURE GAUGE
DEGOGGER WATER PIPING
DOMESTIC COLD WATER PIPING
HEAVY LINE
NEW WORK AS SHOWN
13.
12.
11.
10.
9.
PLUMBING GENERAL NOTES:
adw-19006446-p001
2022-05-17T09:41:29-0400
SANDRA L PIETTRO
2022-05-17T08:41:20-0400
KEITH H HOOD
ADW-19006446-P100
lo tt e
WALKWAY
DN
UP
NOTES:
THE SHUTOFF VALVE IN A LOCATION APPROVED BY THE SSC.
GRADE REFLECTIVE ALUMINUM SIGN INDICATING THE LOCATION OF
CONTRACTOR SHALL FABRICATE AND INSTALL A 12" X 9" 3M ENGINEER
BY ORDERING A SOLID COVER FOR T-1 CAPABLE OF PUMP MOUNTING.
STACK CFP-1 ABOVE T-1 AND TP-1 UTILIZING UNISTRUT FRAMING OR
EXISTING WALL MOUNTED EQUIPMENT. THE CONTRACTOR SHALL
THERE IS A 53-7/8 INCH HEIGHT RESTRICTION IN THIS AREA DUE TO
THE SSC WILL PERFORM THE NECESSARY ABATEMENT.
THE CONTRACTOR SHOULD THEN COORDINATE WITH THE SSC.
TILES AS WELL AS VARIABLE SPEED CONTROLLER WALL MOUNTING.
MOUNTING WHICH MAY INVOLVE DRILLING THROUGH ASBESTOS
A WORK REQUEST REVIEW FORM (WRR) FOR BP-1 FLOOR
THE FAA PROJECT ENGINEER OR RESIDENT ENGINEER WILL FILE
ROOM
JUNCTION
SHAFT
DUCT
RETURN
HATCH
FLOOR
TAP INTO EXISTING 3/4 INCH COPPER COLD WATER SUPPLY LINE
TO PIPING SCHEMATIC ON DWG. P621 FOR PIPING RUN
PIPING RUNS ARE NOT SHOWN FOR CLARIFY. PLEASE REFER
NEW 1-INCH COLD WATER SUPPLY TO DEFOGGER SYSTEM.
(SEE NOTE 2)
TP-1 PLATFORM, T-1 TANK, AND CFP-1 PUMP STACKED
TO PIPING SCHEMATIC ON DWG. P621 FOR PIPING RUN
PIPING RUNS ARE NOT SHOWN FOR CLARIFY. PLEASE REFER
NEW 1-INCH COLD WATER SUPPLY TO DEFOGGER SYSTEM.
AQUAVAR VARIABLE SPEED CONTROLLER (SEE NOTE 1)
AND BACKFLOW PREVENTER. SEE PIPING SCHEMATIC ON DWG. P621
TAP INTO EXISTING 2-INCH DRAIN PIPE TO DRAIN DEFOGGER SYSTEM
BELOW CATWALK
DRAIN FROM DEFOGGER SYSTEM THROUGH NEW PENETRATION
SCALE: 3/8" = 1'-0"
4' 6'2'02'
SCALE: 3/8" = 1'-0"P100
(SEE NOTE 1)
BOOSTER PUMP BP-1 AND 2-GALLON PRESSURE TANK STACKED
VALVE IN THIS LOCATION (SEE NOTE 3)
NEW 1-INCH DEFOGGER SUPPLY PIPING. INSTALL MANUAL SHUTOFF
CONTINUED ON DWG. P101
adw-19006446-p100
2022-05-17T09:41:43-0400
SANDRA L PIETTRO
2022-05-17T08:42:16-0400
KEITH H HOOD
ADW-19006446-P101
:4 lo tt e
SLO
PE
L
L
SLOPESLOPE
HEAD (TYP OF 5)
DEFOGGER SPRINKLER
PATTERN (TYP OF 5)
SPRINKLER SPRAY
SEE NOTE 2
1" DW SUPPLY LINE,
(BELOW) IN NEW PIPE SLEEVE THRU WALL
SLEEVE THRU WALL & 1" DRAIN LINE
1" DW LINE (TOP) IN EXISTING PIPE
SEE DWG. P100 FOR CONTINUATION
JUNCTION EQUIPMENT ROOM,
1" DW & 1" DRAIN LINES IN
LINE, SEE NOTE 2
1" DW SUPPLY
1" DW LINE
SUPPORTS AROUND CATWALK.
2. RUN SUPPLY LINE ALONG INSIDE HANDRAIL
1. SEE DRAWING P621 FOR PIPING SCHEMATIC.
SCALE: 1/2" = 1'-0"
5'1' 2'01'
SCALE: 1/2" = 1'-0"P101
CAB
CATWALK
ATW
ALK
AT
W
ALK
adw-19006446-p101
2022-05-17T09:42:11-0400
SANDRA L PIETTRO
2022-05-17T08:42:52-0400
KEITH H HOOD
EQUIPMENT SCHEDULES
ADW-19006446-P500
lo tt e
INTERLOCK WITH SYSTEM FLOW SWITCH AS INDICATED.
PACKAGED FEED PUMP UNIT.
WITH VARIABLE FREQUENCY DRIVE.
PUMP MOTOR SHALL BE INVERTER-DUTY MOTOR AND RATED FOR USE
208V/1PH/60HZ.
PUMP MOTOR 208V/3PH/60HZ AND VARIABLE SPEED CONTROLLER
SET CONTROLS TO MAINTAIN 60 PSI AT HIGHEST FIXTURE.
MOUNTED CONTROLLER AND PRESSURE TANK.
PACKAGED VARIABLE SPEED STAINLESS STEEL PUMP UNIT WITH WALL
FLOOR MOUNTED SPILL CONTAINMENT DRUM PLATFORM.1
PROVIDE SURFACTANT TANK WITH 10 GALLONS OF SURFACTANT. SURFACTANT SHALL BE ZEP PRODUCT 1558.
PROVIDE ACCUMULATING TANK PLATFORM TP-1 SUPPORT UNDER TANK.
SECURE TO STRUCTURAL WALL WITH TANK RESTRAINT SYSTEM.
PROVIDE RIGID COVER.
VERTICAL FLOOR MOUNT CHEMICAL FEED TANK.
LOCATIONMARK REMARKSBASIS OF DESIGNSERVES
2 31T-1
CAPACITY
(GAL)
DIMENSIONS
DIA / HEIGHT
SURFACTANT TANK SCHEDULE
MODEL 40375
PULSAFEEDER
14.5" / 25"15
EQUIPMENT ROOM
JUNCTION
CAB DEFOGGER
MARK REMARKS
ACCUMULATING TANK PLATFORM SCHEDULE
TP-1 25"x25"x5.5" 12 GAL.
MODEL 28653
ECOPOLYBLEND
LxWxH
DIMENSIONS
CAPACITY
CONTAINMENT
(JUSTRITE)
BASIS OF DESIGN
MARK TYPE BASIS OF DESIGNSERVES
REMARKS
BOOSTER PUMP SCHEDULE
BP-1 WATER SERVICE 10 1 3 4
(GPM)
RATE
FLOW
(PSI)
PRESSURE
BOOST
HP
MOTOR
SERVICE
ELECTRICAL
CLOSE COUPLED END SUCTION
MODEL 1AB2LB1035
GOULDS AQUAVAR
MARK TYPE BASIS OF DESIGNSERVES
USED
LIQUID
SERVICE
ELECTRICAL
REMARKS
CHEMICAL FEED PUMP SCHEDULE
CFP-1 CAB DEFOGGER SURFACTANT SOLUTION 115V/1PH/60HZ
(GPH)
RATE
FLOW
0.25
(PSI)
MAX.
150ELECTRONIC METERING PUMP
LB02
PULSATRON
adw-19006446-p500
2022-05-17T09:42:56-0400
SANDRA L PIETTRO
2022-05-17T08:43:07-0400
KEITH H HOOD
PLUMBING DETAILS
ADW-19006446-P600
lo tt e
BEND RADIUS
PIPE DIA. RMINIMUM RADIUS
1/2"
3/4"
1" 4"
2-1/4"
3"
PIPE SEGMENT.
SOLDER FITTING FOR CONNECTION TO NEXT
CONNECTION TO NEXT PIPE SEGMENT.
STRAIGHT SECTION AT END OF BEND FOR
MINIMUM BEND RADIUS AS SHOWN IN CHART.
WALL.
TUBE COLLAPSE OR BUCKLING OF INTERIOR
IN A CONSISTENT, UNIFORM MANNER. AVOID
MANUFACTURER'S INSTRUCTIONS. MAKE BEND
TOOL AND IN ACCORDANCE WITH COPPER TUBING
FORM BENDS USING APPROPRIATE TUBE BENDING
DRAWINGS.
PIPE SIZE AND GRADE AS INDICATED ON
JACKET IF REQUIRED
INSULATION
PIPE WATERTIGHT BOTH SIDES OF WALL
PIPE AND MAKE AIRTIGHT AND
CAULK AND SEAL ALL AROUND
PIPE SLEEVE THROUGH EXTERIOR WALL DETAIL
P600
CUSTOM BENDS IN COPPER TUBING
P600 adw-19006446-p600
2022-05-17T09:43:10-0400
SANDRA L PIETTRO
2022-05-17T08:43:29-0400
KEITH H HOOD
PIPING SCHEMATIC DETAILS
ACTA CAB DEFOGGER SYSTEM
ADW-19006446-P621
:5 lo tt e
CATWALK FLOOR
1"
FS
CV
CV
EQUIPMENT ROOM
2" DRAIN PIPE IN JUNCTION
1" DRAIN LINE TO EXISTING
NEW PIPE SLEEVE
EXISTING PIPE SLEEVE
FLOOR SLAB
NC - NOTE 4
SOLENOIDS
IN CONDUIT. SEE DETAIL 2/P621
ALL CONTROL WIRING TO BE
PERIMETER
CATWALK HANDRAIL
1" PIPE AROUND
CAB CONSOLE
LOCATED IN
CONTROL PANEL
CONTROL PANEL TRANSFORMER
SOLENOID VALVES
SOURCE
PANEL
POWER
(NOTE 1)
NOZZLES TYP
SPRINKLER
RISER (TYP)
1" SPRINKLER
TANK (T-1)
SURFACTANT
TP-1
UNION (TYP)
NOTE 2 (TYP)
STRAINER, SEE
BV, SEE NOTE 6
WITH SSC
LOCATION
COORDINATE
HOSE BIBB
CW SUPPLY LINE
EXISTING 3/4"
(BP-1)
BOOSTER PUMP
SEE DRAWING M800 FOR CAB DEFOGGER CONTROL PANEL.
SEE DRAWING P500 FOR EQUIPMENT SCHEDULE.
RUN DRAIN LINE TO 2-INCH DRAIN PIPE IN JUNCTION EQUIPMENT ROOM.
BRONZE BALL.
SOLDER ENDS. BLOW OUT PROOF STEM, TFE SEATS, FREE FLOATING CHROME PLATED
BALL VALVE (BV) SHALL BE FULL PORT DESIGN (3-PIECE) BRONZE BODY WITH THREADED OR
FLOW SWITCH - MCDONNELL-MILLER FS5-1.
FOR ALL SOLENOID VALVES. PROVIDE 3 SPARE SOLENOID VALVES FOR FUTURE MAINTENANCE.
FOR MAIN VALVE WHICH IS NORMALLY OPEN. PROVIDE WEATHER PROOF SOLENOID COILS
MINIMUM OPERATING PRESSURE. ALL SOLENOID VALVES ARE NORMALLY CLOSED EXCEPT
24 VOLT SOLENOID VALVES - RED HAT 8210G002 24 DC. VALVE SHALL HAVE ZERO PSI
PRESSURE GAUGE - ASME B40.1.
STRAINER - MUELLER NO. 11.
PROVIDE 5 SPARE SPRINKLER NOZZLES FOR FUTURE MAINTENANCE .
AND LOCKING FRICTION COLLARS. ALL PARTS SHALL BE BRASS OR STAINLESS STEEL.
ADJUSTABLE ARC AND ADJUSTABLE DIFFUSER PIN FOR DISTANCE, DISTRIBUTION CONTROL,
COVERING A 25 FT. RADIUS AT 40 PSI WITH A DISCHARGE RATE OF 3.8 GPM WITH INFINITELY
SPRINKLER NOZZLE SHALL BE MODEL 25PJDA-C, AVAILABLE FROM RAIN BIRD, CAPABLE OF
LIST OF EQUIPMENT
SYSTEM OPERATION
ZONE.
FOR NORMAL OPERATION, THE ZONE VALVES SHALL BE CLOSED, EXCEPT FOR THE ACTIVATED
RESPECTIVELY.
SHALL ACTIVATE/DEACTIVATE THE SURFACTANT PUMP (CFP-1) BASED ON FLOW / NO FLOW
SURFACTANT (SURFACE TENSION REDUCER) FROM TANK IS INJECTED. THE FLOW SWITCH
WATER SHALL FLOW THROUGH BACKFLOW PREVENTER AND THEN THROUGH TEE WHERE
PIPING (TYP)
EXISTING 3/4" CW
PRESSURE TANK
2 GALLON
VFD CONTROLLER
SENSOR
STRAINER
PREVENTER WITH
RPZ BACKFLOW
FOR SPRINKLER NOZZLE TYPE
SEE NOTE 1 THIS SHEET
FIELD ADJUST AS NECESSARY,
ADJUSTABLE SPRAY PATTERN,
LOCKOUT (TYP OF 5)
SWING JOINT WITH
3/4" STAINLESS STEEL
HEX BUSHING
SS 3/4" X 1/2"
FOR SOLENOID
HOFFMAN BOX
AROUND CATWALK
1" DW SUPPLY LINE
1" DW SUPPLY LINE
PUMP (CFP-1)
CHEMICAL FEED
SEE NOTE 5
FLOW SWITCH,
HOFFMAN A12106CHQRFG
WATERPROOF JUNCTION BOX
ELECTRICAL DETAIL ELEVATION
P621
PIPING SCHEMATIC DETAIL
CAB DEFOGGER SYSTEM ELEVATION
BV
SEE NOTE 7
DRAIN LINE,
BV BV 1"
REGULATOR, SET AT 40 PSIG
ADJUSTABLE PRESSURE
NOTE 3
SEE NOTE 7
1" DRAIN LINE,
PIPE SLEEVE
EXISTING
NEW PIPE SLEEVE
CLOSED
NORMALLY
DRAIN VALVE
NORMALLY OPEN
MAIN VALVE
S S
S S S
1" DW SUPPLY RISER
CAB PERIMETER)
(TYP. ALL OTHER AROUND
HOFFMAN A443 JNM
REQUIRED SIZE
HUB - COORDINATE
TYPICAL G.E.
TOWARD FLOOR BELOW
FACE REMOVABLE COVERS
A664 JNM
HOFFMAN
(TYP)
TO SOLENOID VALVE
FLEXIBLE CONDUIT
1/2" LIQUID - TITE
PERIMETER
AROUND CAB
RIGID CONDUIT
3/4" GALVANIZED
1 1/4" CONDUIT
HOFFMAN A12106CHQRFG
WATERPROOF JUNCTION BOX.
CAB WINDOW
CATWALK FLOOR
JUNCTION EQUIPMENT ROOM
1" DW SUPPLY LINE FROM
9.
adw-19006446-p621
2022-05-17T09:43:38-0400
SANDRA L PIETTRO
2022-05-17T08:43:42-0400
KEITH H HOOD
File details come from the government source that posted it. Updated .