010000_General Requirements.pdf

PDF 195 KB Posted

Attached to
Old Dental Abatement at Castle Point VAMC
Solicitation number
36C24225Q0624
Issued by

About this file

This document is a General Requirements section (Section 01 00 00) for a Design-Abate Asbestos Hazards project at the VA Medical Center Castle Point, focusing on Building 16, Old Dental Clinic. The project involves comprehensive site preparation, including demolition and removal of existing structures, with a specific focus on asbestos and lead hazard abatement. Key requirements include strict security protocols, with contractors required to comply with VA security management programs, obtain proper identification, and restrict unauthorized access.

The document outlines detailed provisions for site operations, including utility service management, temporary use of mechanical and electrical equipment, and specific guidelines for site access and coordination. Contractors must adhere to stringent security measures such as obtaining badges, receiving prior approval for site entry, and prohibiting photography without written permission. The project emphasizes maintaining Medical Center operations while conducting abatement work, with careful attention to utility services, equipment use, and minimizing disruption to existing facilities. The base bid work encompasses demolition, asbestos and lead hazard abatement, removal of existing structures, and containment construction.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Medical Center Castle Point VA Project No. 620A4-23-219 Design-Abate Asbestos Hazards 8/12/2024 Building 16, Old Dental Clinic 100% Submission

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Abatement of Building 16 Old Dental Clinic as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the Medical Center IH Officer.

C. Offices of Mabbett & Associates, Inc., as Abatement

Consultant, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, BASE BID Work includes demolition and abatement of asbestos and lead hazards, necessary removal of existing structures and containment construction and certain other items.

01 00 00 -2

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees.

This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The

01 00 00 -3

General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

01 00 00 -4

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of

“sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.

Access shall be restricted to picking up and dropping off materials and supplies.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The

Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or

01 00 00 -5 conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems

(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical

Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, 01 00 00 -6 electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the

Contractor.

C. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;

so that they are completely behind the finished surfaces.

D. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

E. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of

VA Supply Service, of areas of buildings in which

01 00 00 -7 alterations occur and areas which are anticipated routes of access.

1.8 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on

Medical Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.9 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by

COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, 01 00 00 -8

Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the

Government. Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced

01 00 00 -9 with identical replacements, at no additional cost to the

Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.10 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

- - - E N D - - -

GENERAL
1.1 SAFETY REQUIREMENTS
1.1 SPEC WRITER NOTES:
1.1 1. In paragraph below change title, "GENERAL CONSTRUCTION" as necessary to reflect project title, such as A/C, Sewers, etc.
1.1 2. Unit-price items will only be used when their use is directed by the Project Manager. When using unit-price items insert FAR clause 52.215-26 in the contract specifications.
1.1
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.1 SPEC WRITER NOTE: Modify following article to suit the project. Coordinate with Medical Center.
1.1
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.1 //An unlimited//A limited// number of //(2 to 5)// permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.
1.1 SPEC WRITER NOTE: Coordinate editing with facility Safety Manager/Officer at VA medical facilities. Edit subparagraphs C, E, G, H, M, P and Q carefully as they directly relate to interim life safety measures required in or adjacent to construction...
1.1
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
1.1 SPEC WRITER NOTE: Use following Subparagraph O on existing cemetery projects only.
1.1
1.1 Coordination of Construction with Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate with the Cemetery Director, through the COR, in arra...
1.1 The Contractor is required to discontinue his work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing bur...
1.1 Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.
1.1 SPEC WRITER NOTE: Include the following references to Supply Representative only on STATION LEVEL PROJECTS.
1.1
1.7 ALTERATIONS
1.1 DISPOSAL AND RETENTION
1.1 Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1.1 Reserved items which are to remain property of the Government are // identified by attached tags // or // noted on drawings or in specifications // as items to be stored. Items that remain property of the Government shall be removed or dislodged f...
1.1 Items not reserved shall become property of the Contractor and be removed by Contractor from // Medical Center // Cemetery //.
1.1 Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the...
1.1 SPEC WRITER NOTE: Use the following subparagraph only when there are existing PCB transformers or capacitors to be removed and disposed of by the Contractor. Verify the need for this subparagraph with the Team Electrical Engineer.
1.1
1.1 //PCB Transformers // and Capacitors // : The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers // and capacitors // . The transformers // and capacitors // shall be taken out of service and handled in...
1.1 Copies of the following listed CFR titles may be obtained from the Government Printing Office:
1.1 40 CFR 261 Identification and Listing of Hazardous Waste
1.1 40 CFR 262 Standards Applicable to Generators of Hazardous Waste
1.1 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
1.1 40 CFR 761 PCB Manufacturing, Processing, Distribution in Commerce, and use Prohibitions
1.1 49 CFR 172 Hazardous Material tables and Hazardous Material Communications Regulations
1.1 49 CFR 173 Shippers - General Requirements for Shipments and Packaging
1.1 49 CRR 173 Subpart A General
1.1 49 CFR 173 Subpart B Preparation of Hazardous Material for Transportation
1.1 49 CFR 173 Subpart J Other Regulated Material; Definitions and Preparation
1.1 TSCA Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7//
1.1 SPEC WRITER NOTE: Tailor or delete the following Article and paragraphs if the scope of work encompasses only interior work.
1.1
1.1 //PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
1.1 The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required unde...
1.1 The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shal...
1.1 Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instru...
1.1 SPEC WRITER NOTE: Use following paragraph when the disturbed area on the site exceeds one acre. Confirm with the Project Manager.
1.1
1.1 Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under ...
1.1 Designating areas for equipment maintenance and repair;
1.1 Providing waste receptacles at convenient locations and provide regular collection of wastes;
1.1 Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
1.1 Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
1.1 Providing adequately maintained sanitary facilities. //
1.1 RESTORATION
1.1 Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric ...
1.1 Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new wo...
1.1 At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communica...
1.1 Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDI...
1.1 SPEC WRITER NOTE: Check with Project Director to determine if soil report is available at the Medical Center. Delete if not exterior work.
1.1
1.1 //PHYSICAL DATA – SOIL CONDITIONS
1.1 Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1.1 SPEC WRITER NOTE: Insert name and address of testing facility performing the soils investigation work.
1.1
1.1 The indications of physical conditions on the drawings and in the specifications are the result of site investigations by ____________________________________________________.
1.1 (FAR 52.236-4)
1.1 Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.
1.1 A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical Center, _____________________________________ and shall be considered part of the contract documents.
1.1 Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs...
1.1 //PROFESSIONAL SURVEYING SERVICES
1.1 A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land...
1.1 SPEC WRITER NOTE: Delete inapplicable portions of above and following article. Do not include for small additions to buildings, such as stairways, etc. For one story construction omit the words enclosed in paragraph 1.14, D, by // ---- //.
1.1
1.1 //LAYOUT OF WORK
1.1 The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own...
1.1 (FAR 52.236-17)
1.1 Establish and plainly mark // center lines for each building and corner of column lines and/or addition to each existing building, // lines for each gravesite control monument, // and such other lines and grades that are reasonably necessary to pr...
1.1 Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points ...
1.1 Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor sl...
1.1 //During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting ...
1.1 Lines of each building and/or addition.
1.1 Elevations of bottoms of footings and tops of floors of each building and/or addition.
1.1 Lines and elevations of sewers and of all outside distribution systems.
1.1 SPEC WRITER NOTE: Use following for cemetery projects as required.
1.1
1.1 //Lines of grave plot documentation. //
1.1 Lines of elevations of all swales and interment areas.
1.1 Lines and elevations of roads, streets // and parking lots. //
1.1
1.1 SPEC WRITER NOTE: Use following Paragraph E on non-cemetery projects and use Paragraph E* on cemetery projects.
1.1
1.1
1.1 Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon compl...
1.1 Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial mon...
1.1 The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services". //
1.1 AS-BUILT DRAWINGS
1.1 The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
1.1 All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
1.1 Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the // COR // [Chief Engineer][Chief of Facilities Management] within 15 calendar days after each completed phase and after the ac...
1.1 Paragraphs A, B, & C shall also apply to all shop drawings.
1.1 WARRANTY MANAGEMENT
1.1 Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in // // at least 30 days before the planned pre-warranty conference, submit //one set// // // //four se...
1.1 Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
1.1 Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
1.1 Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems...
1.1 A list for each warranted equipment item, feature of construction or system indicating:
1.1 Name of item.
1.1 Model and serial numbers.
1.1 Location where installed.
1.1 Name and phone numbers of manufacturers and suppliers.
1.1 Name and phone numbers of manufacturers or suppliers.
1.1 Names, addresses and phone numbers of sources of spare parts.
1.1 Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
1.1 Starting point and duration of warranty period.
1.1 Summary of maintenance procedures required to continue the warranty in force.
1.1 Cross-reference to specific pertinent Operation and Maintenance manuals.
1.1 Organizations, names and phone numbers of persons to call for warranty service.
1.1 Typical response time and repair time expected for various warranted equipment.
1.1 The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
1.1 Procedure and status of tagging of all equipment covered by extended warranties.
1.1 Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
1.1 Performance & Payment Bonds: The Performance & Payment Bonds //must remain effective throughout the construction period// // //
1.1 In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction w...
1.1 In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
1.1 Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer...
1.1 Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. ...
1.1 Contractor’s Response to Construction Warranty Service Requirements:
1.1 Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of prioriti...
1.1 First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
1.1 Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
1.1 Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
1.1 The “Construction Warranty Service Priority List” is as follows:
1.1 SPEC WRITER NOTE: List below is not intended to be all inclusive of areas requiring attention for warranty services. List shall serve as a template only. Spec writer shall edit and alter list as needed to have Contractor to address warranty servic...
1.1
1.1 Code 1-Life Safety Systems
1.1 Fire suppression systems.
1.1 Fire alarm system(s).
1.1 Code 1-Air Conditioning Systems
1.1 Air conditioning leak in part of the building, if causing damage.
1.1 Air conditioning system not cooling properly.
1.1 Code 1 Doors
1.1 Overhead doors not operational, causing a security, fire or safety problem.
1.1 Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
1.1 Code 3-Doors
1.1 Overhead doors not operational.
1.1 Interior/exterior personnel doors or hardware not functioning properly.
1.1 Code 1-Electrical
1.1 Power failure (entire area or any building operational after 1600 hours).
1.1 Security lights.
1.1 Smoke detectors.
1.1 Code 2-Electrical
1.1 Power failure (no power to a room or part of building). Receptacle and lights not operational (in a room or part of building).
1.1 Code 3-Electrical
1.1 Exterior lights not operational.
1.1 Code 1-Gas
1.1 Leaks and pipeline breaks.
1.1 Code 1-Heat
1.1 Power failure affecting heat.
1.1 Code 1-Plumbing
1.1 Hot water heater failure.
1.1 Leaking water supply pipes
1.1 Code 2-Plumbing
1.1 Flush valves not operating properly
1.1 Fixture drain, supply line or any water pipe leaking.
1.1 Toilet leaking at base.
1.1 Code 3- Plumbing
1.1 Leaky faucets.
1.1 Code 3-Interior
1.1 Floors damaged.
1.1 Paint chipping or peeling.
1.1 Casework damaged.
1.1 Code 1-Roof Leaks
1.1 Damage to property is occurring.
1.1 Code 2-Water (Exterior)
1.1 No water to facility.
1.1 Code 2-Water (Hot)
1.1 No hot water in portion of building listed.
1.1 Code 3
1.1 All work not listed above.
1.1 Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit //two...
1.1
1.1
1.1 SPEC WRITER NOTE: Determine necessary paragraphs from below and delete non-applicable portions.
1.1
1.8 USE OF ROADWAYS
1.1 //When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations. //
1.1 //When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts...
1.1 SPEC WRITER NOTE: Before including COR Field Office, check with Project Director to determine if Medical Center can provide office space for the COR in an existing building. Note these facilities are typically only required for major projects or o...
1.1
1.1 //RESIDENT ENGINEER'S FIELD OFFICE
1.1 The Contractor shall, within fifteen (15) days after receipt of Notice to Proceed, provide where shown on the drawings a temporary field office, furniture, and two inch deep gravel surfaced area for use of the COR. Office and furniture shall be new.
1.1 The field office shall provide not less than // 67 square meters (720 gross square feet) // 134 square meters (1440 gross square feet) // of floor area in one unit. Installation of the office shall meet all local codes.
1.1 Provide office with two, 900 mm (three foot) wide exterior doors, including hardware and OSHA approved platform and stairs leading to grade.
1.1 Enclose the entire perimeter of the office from the floor to the ground and finish to match exterior. Provide R7 insulation and seal tight to ground with a painted 19 mm (3/4 inch) exterior grade plywood skirt.
1.1 Exterior finishes shall be manufacturer's standards.
1.1 Provide floor, wall, and roof with not less than R5 insulation.
1.1 Interior finishes shall consist of resilient flooring, plywood paneling or painted wallboard on walls, and acoustical tile ceilings. Interior doors may be either painted or stained.
1.1 Interior shall be subdivided with full height partitions to provide // one office, // two offices, // one sample room, // one toilet // two separate toilets //. Provide each space with 900 mm (three foot) wide door with master keyed locks. Section...
1.1 Provide 750 mm (2-1/2 feet) wide by 900 mm (3 feet) high operable windows; two in each room (none required in sample room), except provide only one 600 mm (2 foot) high window in toilet room(s). Window openings shall be fitted with security bars t...
1.1 Provide sufficient fluorescent lighting in each room to deliver 750 lux (70 foot-candles) of light at desk top height without the aid of daylight. Provide one light switch in each room.
1.1 Provide one duplex receptacle in each wall of each room. If a wall is 3.0 m (10 feet) long or more, provide two receptacles for each 3.0 m (10 feet), or portion thereof, of wall. Provide two duplex receptacles in low partition at secretary's desk.
1.1 The Contractor shall provide the following:
1.1 Electricity, hot and cold water, and necessary utility services (except telephone).
1.1 All necessary piping, power circuits network cabling, cat 5e or better cabling for phones and computers, electrical fixtures, lighting, and other items necessary to provide a habitable structure for the purpose intended. The number of network and ...
1.1 Thermostatically controlled, centralized heating and air conditioning system designed to maintain the temperature between 21 and 27 degrees C (70 and 80 degrees F) with 50 percent relative humidity maintained during the air conditioning season.
1.1 One water closet, lavatory, mirror, toilet paper dispenser, paper towel dispenser, soap dispenser, towel bar, and two-prong coat hooks for each toilet room.
1.1 SPEC WRITER NOTE: Verify with Project Manager.
1.1
1.1 //The contractor to install a suitable alarm system for the field office //.
1.1 Contractor shall, for the duration of the COR occupancy, provide the following:
1.1 Satisfactory conditions in and around the field office and parking area.
1.1 Maintenance of gravel surfaced area, including the area for parking, in an acceptable condition for vehicle and foot traffic at all times.
1.1 SPEC WRITER NOTE: Confirm with Project Manager as to who pays for utilities.
1.1
1.1 Maintenance of utility services.
1.1 SPEC WRITER NOTE: Delete following subparagraph 4 unless specifically instructed by the Project Manager to leave it in.
1.1
1.1 // Daily janitorial services and supplies (toilet paper, soap, etc.). //
1.1 Potable water, fuel and electric power for normal office uses, including lights, heating and air conditioning.
1.1 The Contractor shall provide the following new items:
1.1 SPEC WRITER NOTE: Use first list of furniture 67 square meters for 720 square foot office. Second list for 134 square meters (1440 square foot) office.
1.1
1.1 QUANTITY REQUIRED
1.1 //1 workstation with adjustable keying desk or drawer 738 mm H x 1.5 m W x 760 mm D (size 29-1/2" H x 60" W x 30" D)
1.1 1 Printer stand 663 mm H x 1.5 m W x 750 mm D (size 26-1/2" H x 60" W x 30" D)
1.1 3 Office desks, double pedestal
1.1 1 Conference table 900 mm x 1.8 m (size 3' x 6')
1.1 1 Plan table 1.2 m x 2.1 m (4' x 7')
1.1 3 Work tables 750 mm x 1.8 m (folding 30" x 72")
1.1 1 Office chair
1.1 4 Swivel chairs with arms
1.1 6 Conference chairs (armless & folding)
1.1 2 Arm Chairs
1.1 4 Lockable 5 drawer file cabinets, letter size
1.1 1 Drawing rack, with 12-750 mm (12-30 inch) "Plan Hold" drawing holders, freestanding
1.1 1 Shelves for sample room, 7 adjustable Shelves, 305 mm W x 900 mm L (12" W x 3' L)
1.1 3 Bookcases
1.1 1 Electric water cooler
1.1 1 Metal storage cabinet, 900 mm x 450 mm x 1.8 m (36" x 18" x 72") with six shelves
1.1 2 workstations with adjustable keying desk or drawer 738 mm H x 1.5 m W 750 mm D (size 29-1/2" H x 60" W x 30" D)
1.1 2 Printer stands 738 mm H x 1500 mm W x 750 mm D (size 29-1/2" H x 60" H x 30" D)
1.1 7 Office desks, double pedestal
1.1 2 Conference tables 900 mm x 1800 mm (size 3' x 6')
1.1 1 Plan table 1200 mm x 6 meters (4' x 20')
1.1 7 Work tables 750 mm x 1800 mm (folding 30" x 72")
1.1 2 Office chairs
1.1 7 Swivel chairs with arms
1.1 12 Conference chairs (armless and folding)
1.1 7 Arm chairs
1.1 8 Lockable 5 drawer file cabinets, letter-size
1.1 2 Drawing racks, each with 12-750 mm (12-30 inch) "Plan Hold" drawing holders, freestanding
1.1 7 Bookcases
1.1 1 Electric water cooler
1.1 4 Shelves for sample 900 mm x 450 mm x 1.8 m (36" x 18" x 72") high, 7 adjustable shelves//
1.1 SPEC WRITER NOTE: Delete following paragraph 0 if COR field office will not require relocating during the tenure of this contract.
1.1
1.1 COR field office and facilities shall be relocated once after its initial installation at the Contractor's expense. Relocation consists of moving the field office and facilities to a location within the VA site designated by the COR together with ...
1.1 SPEC WRITER NOTE: Check with the Project Manager to determine if field office (trailer) is to become property of the Government. This condition will usually occur on phased projects (projects involving more than one construction contract).
1.1
1.1 At the completion of all work, including the punch list, the COR field office and facilities shall become the property of the // Contractor and Contractor shall remove same, including utility connections, from the // Medical Center // Cemetery//. ...
1.1 The Contractor shall furnish floor plans for approval by the COR prior to furnishing the field office. //
1.9 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.1 SPEC WRITER NOTE: Use following Article whenever Contractor may or may not use existing elevators. Information must be secured from Medical Center as to whether elevator is for exclusive or temporary use of Contractor and between what hours it may...
1.1 //TEMPORARY USE OF EXISTING ELEVATORS
1.1 Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.
1.1 // Use of existing // elevator // elevators // for handling building materials and Contractor's personnel will be permitted subject to following provisions:
1.1 Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Contractor may use elevators Nos. _______ in Building Nos. ______ // for exclusive use // for daily use between the...
1.1 Contractor covers and provides maximum protection of following elevator components:
1.1 Entrance jambs, heads soffits and threshold plates.
1.1 Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
1.1 Finish flooring.
1.1 SPEC WRITER NOTE: Omit Paragraphs 1.18, A*, 4, 5, and 6 unless elevator is for exclusive use of Contractor and for not less than thirty days duration.
1.1
1.1 Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use...
1.1 If brake lining of elevators are excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining at the contractors expense.
1.1 All parts of main controller, starter, relay panel, selector, etc., worn or damaged during temporary use shall be removed and replaced with new parts at the contractors expense, if recommended by elevator inspector after elevator is released by Co...
1.1 Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer. //
1.1 SPEC WRITER NOTE: Following Article 1.19 should be used when Contractor is permitted to use new elevators.
1.1
1.1 //TEMPORARY USE OF NEW ELEVATORS
1.1 The Contractor and his personnel shall be permitted use of new elevator(s) subject to the following provisions:
1.1 Contractor shall make arrangements with the COR for use of elevator(s). Contractor may obtain elevator(s) for exclusive use.
1.1 Prior to the use of elevator(s), the Contractor shall have the elevator(s) inspected and accepted by an ASME accredited, certified elevator safety inspector. The acceptance report shall be submitted to the COR.
1.1 Submit to the COR the schedule and procedures for maintaining equipment. Indicate the day or days of the week and total hours required for maintenance. A report shall be submitted to the COR monthly indicating the type of maintenance conducted, ho...
1.1 The Contractor shall be responsible for enforcing the maintenance procedures as per VA and manufacturers recommendations and requirements.
1.1 During temporary use of elevator(s) all repairs, equipment replacement and cost of maintenance shall be the responsibility of the Contractor.
1.1 Personnel for operating elevator(s) shall not be provided by the Department of Veterans Affairs.
1.1 Contractor shall cover and provide maximum protection of the entire elevator(s) installation.
1.1 The Contractor shall arrange for the elevator company to perform operation of the elevator(s) so that an ASME accredited, certified elevator safety inspector can evaluate the equipment. The Contractor shall be responsible for any costs of the elev...
1.1 All elevator(s) parts worn or damaged during temporary use shall be removed and replaced with new parts at the contractor’s expense. This shall be determined by an ASME accredited certified elevator safety inspector after temporary use and before ...
1.1 Elevator shall be tested as required by the testing section of the elevator(s) specifications before acceptance by the Department of Veterans Affairs. The Contractor shall be responsible for all cost associated with testing and inspection. //
1.1 TEMPORARY TOILETS
1.1 SPEC WRITER NOTE: Check with the Project Manager to verify if any existing toilets can be used by contractor's workers.
1.1
1.1 Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean a...
1.1 *Contractor may have for use of Contractor's workers, such toilet accommodations as may be assigned to Contractor by // Medical Center // Cemetery //. Contractor shall keep such places clean and be responsible for any damage done thereto by Contra...
1.1 SPEC WRITER NOTE: Consult Project Manager for use of paragraph 1.21. Contractor shall furnish utilities from commercial sources for construction on new sites. When practical, Contractor shall furnish utilities from commercial sources for new build...
1.1
1.10 AVAILABILITY AND USE OF UTILITY SERVICES