010000 - GENERAL REQUIREMENTS.pdf
PDF 201 KB Posted
- Attached to
- Z2DA--442-21-704 EHRM Next Gen WIFI Federal contract opportunity
- Solicitation number
- 36C25923R0061
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25923R0061 0001.docx | DOCX document | |
| S22- 852.219-75 LOS Certificaiton.docx | DOCX document | |
| OIT-InfrastrucStdTelecomSpaces_Ver3_1.pdf | ||
| Attachement 02_Bldg 13.pdf | ||
| Attachement 02_Bldg 8.pdf | ||
| Attach 03 VA OEHRM Site Infrastructure Requirements - 2_0.pdf | ||
| 270511 - REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS.pdf | ||
| 013526 - SAFETY REQUIREMENTS.pdf | ||
| Attachment 01_Cheyenne VAMC Access Points.pdf | ||
| Attachement 02_Bldg 7.pdf | ||
| 013323 - SHOP DRAWINGS_PRODUCT DATA_SAMPLES.pdf | ||
| 013216-15 - PROJECT SCHEDULES.pdf | ||
| 078400 - FIRESTOPPING.pdf | ||
| Attachement 02_Bldg 5.pdf | ||
| 36C25923R0061_1.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| Attachement 02_Bldg 6.pdf | ||
| Attachement 02_Bldg 1.pdf | ||
| 271000 - CONTROL_COMMUNICATION AND SIGNAL WIRING.pdf | ||
| 270533 - RACEWAYS FOR BOXES AND COMMUNICATIONS SYSTEMS.pdf | ||
| 017419 - CONSTRUCTION WASTE MANAGEMENT.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM
3/25/2021
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for project as required by Scope of Work, drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the CO and COR.
C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, Installation of Power Outlets.
B. ITEM 2, Installation of Data Drops.
C. ITEM 3, Installation of Equipment and/or Mounting Hardware.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
01 00 00 -2
2. Before starting work the General Contractor shall give one week’s notice to the
Contracting Officer so that security arrangements can be provided for the employees.
This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the
Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General
Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the
Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
01 00 00 -3
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
D. Motor Vehicle Restrictions
1. Contractor to park in employee parking areas designated by they COR.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
C. Working space and space available for storing materials shall be as determined by the COR .
D. Workers are subject to rules of Medical Center applicable to their conduct.
E. Execute work in such a manner as to interfere as little as possible with work being done by others.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
01 00 00 -4
G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR . All such actions shall be coordinated with the COR or Utility Company involved:
H. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.
3. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of
Veterans Affairs so that Medical Center operations will continue during the construction period.
4. The Contractor is required to discontinue his work sufficiently in advance of Easter
Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.
01 00 00 -5
5. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout building.
2. Shall note any discrepancies between drawings and existing conditions at site.
3. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by
Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and
"CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
2. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place
01 00 00 -6 shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed shall be disposed of as follows:
1. Items not reserved and identified by COR as VA property, shall become property of the
Contractor and be removed by Contractor from Medical Center.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (FAR 52.236-9): N/A
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work.
Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.
Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.)
disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
01 00 00 -7
1.11 PHYSICAL DATA – SOIL CONDITIONS: N/A
1.12 PROFESSIONAL SURVEYING SERVICES: N/A
1.13 LAYOUT OF WORK: N/A
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled.
B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the
Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for
Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the
Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor. This point of contract will be
01 00 00 -8 located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service Requirements: Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
1.16 USE OF ROADWAYS: N/A
1.17 RESIDENT ENGINEER'S FIELD OFFICE: N/A
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT: N/A
1.19 TEMPORARY USE OF EXISTING ELEVATORS: N/A
1.20 TEMPORARY USE OF NEW ELEVATORS: N/A
1.21 TEMPORARY TOILETS: N/A
1.22 AVAILABILITY AND USE OF UTILITY SERVICES: N/A
1.23 NEW TELEPHONE EQUIPMENT: N/A
1.24 TESTS
A. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
1.25 INSTRUCTIONS: N/A
1.26 GOVERNMENT-FURNISHED PROPERTY
A. The Government shall deliver to the Contractor, the Government-furnished property shown on the Scope of Work attached listing.
B. Equipment furnished by Government to be installed by Contractor will be furnished to
Contractor at the Medical Center.
C. Contractor shall be prepared to receive this equipment from Government.
1. Storage space for equipment will be provided by the Government and the Contractor shall be prepared to unload and store such equipment therein upon its receipt at the
Medical Center.
01 00 00 -9
D. Notify Contracting Officer in writing, 60 days in advance, of date on which Contractor will be prepared to receive equipment furnished by Government. Arrangements will then be made by the Government for delivery of equipment.
1. Immediately upon delivery of equipment, Contractor shall arrange for a joint inspection thereof with a representative of the Government. At such time the Contractor shall acknowledge receipt of equipment described, make notations, and immediately furnish the Government representative with a written statement as to its condition or shortages.
2. Contractor thereafter is responsible for such equipment until such time as acceptance of contract work is made by the Government.
E. Completely assemble and install the Government furnished equipment in place ready for proper operation in accordance with specifications and drawings.
1.27 RELOCATED EQUIPMENT: N/A
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT: N/A
1.29 CONSTRUCTION SIGN: N/A
1.30 SAFETY SIGN
A. Provide a Safety Sign where directed by COR.
B. Maintain sign and remove it when directed by COR.
1.31 PHOTOGRAPHIC DOCUMENTATION: N/A
1.32 FINAL ELEVATION DIGITAL IMAGES: N/A
1.33 HISTORIC PRESERVATION: N/A
1.34 VA TRIRIGA CPMS: N/A
- - - E N D - - -
| SECTION 01 00 00 GENERAL REQUIREMENTS |
| GENERAL |
| 1.1 SAFETY REQUIREMENTS |
| 1.3 STATEMENT OF BID ITEM(S) |
| 1.5 CONSTRUCTION SECURITY REQUIREMENTS |
| 1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10) |
| 1.7 ALTERATIONS |
| 1.8 DISPOSAL AND RETENTION |
| 1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (FAR 52.236-9): n/a |
| 1.10 RESTORATION |
| 1.11 PHYSICAL DATA – SOIL CONDITIONS: n/a |
| 1.12 PROFESSIONAL SURVEYING SERVICES: n/a |
| 1.13 LAYOUT OF WORK: n/a |
| 1.14 AS-BUILT DRAWINGS |
| 1.15 WARRANTY MANAGEMENT |
| 1.16 USE OF ROADWAYS: n/a |
| 1.17 RESIDENT ENGINEER'S FIELD OFFICE: n/a |
| 1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT: n/a |
| 1.19 TEMPORARY USE OF EXISTING ELEVATORS: n/a |
| 1.20 TEMPORARY USE OF NEW ELEVATORS: n/a |
| 1.21 TEMPORARY TOILETS: n/a |
| 1.22 AVAILABILITY AND USE OF UTILITY SERVICES: n/a |
| 1.23 NEW TELEPHONE EQUIPMENT: n/a |
| 1.24 TESTS |
| 1.25 INSTRUCTIONS: n/a |
| 1.26 GOVERNMENT-FURNISHED PROPERTY |
| 1.27 RELOCATED EQUIPMENT: n/a |
| 1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT: n/a |
| 1.29 CONSTRUCTION SIGN: n/a |
| 1.30 SAFETY SIGN |
| 1.31 PHOTOGRAPHIC DOCUMENTATION: n/a |
| 1.32 FINAL ELEVATION Digital Images: n/a |
| 1.33 HISTORIC PRESERVATION: n/a |
| 1.34 VA TRIRIGA CPMS: n/a |
File details come from the government source that posted it. Updated .