(01) STRATTON SMP1 FY27 Hatch Renew - SOW - updated.pdf

PDF 84 KB Posted

Attached to
USCGC STRATTON HATCH RENEW
Solicitation number
70ZU0227Q0000200
Issued by
Not on record

About this file

This is a Statement of Work for the renewal of Raised Watertight Hatch 01-21-1 on the USCGC STRATTON (WMSL-752), a U.S. Coast Guard vessel. The contractor must remove and replace the existing 60" x 60" raised watertight hatch and associated coaming at the ship's homeport located at United States Coast Guard Base Alameda, 1 Eagle Road, Alameda, CA 94501. The Government will furnish the replacement hatch and coaming; the contractor is responsible for providing all necessary labor, supervision, tools, equipment, materials, safety controls, and services required for the work.

The contractor's scope includes removing the existing hatch and components, preparing and repairing the deck opening and surrounding structure, installing and welding the replacement hatch and coaming, and adjusting all latches, locks, sensors, supports, and related hardware. The contractor must comply with all applicable safety, hot-work, ammunition, welding, inspection, preservation, and environmental requirements while protecting adjacent shipboard equipment and spaces. Final deliverables include inspection and testing of the completed installation, including weld examination, alignment, watertightness, and operational testing, as well as restoration of affected insulation, sheathing, coatings, labels, nameplates, sensors, and security hardware. The Period of Performance is 30 November 2026 through 11 December 2026. No special security requirements are needed. Points of contact are LT Adrian Rubio (APM) at 657-944-8163 and LT Summer Gould (PE) at 206-827-5310. All technical drawings are available upon request from the technical librarian through the provided point of contact.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW for RWTH 01-21-1 Renew

USCGC STRATTON (WMSL-752)

1. This solicitation is to renew Raised Watertight Hatch 01-21-1 ON STRATTON

The Contractor shall provide all necessary labor, supervision, tools, equipment, materials, safety controls, and services to remove and replace RWTH 01-21-1 on STRATTON. The Government will furnish the replacement 60” x 60” hatch, including the associated coaming. The Contractor shall remove the existing hatch and associated components; prepare, repair, or modify the deck opening and surrounding structure as necessary; install and weld the replacement hatch and coaming; and adjust all latches, locks, sensors, supports, and related hardware to ensure proper fit, operation, and security.

The Contractor shall protect adjacent shipboard equipment and spaces; comply with all applicable safety, hot-work, ammunition, welding, inspection, preservation, and environmental requirements; and coordinate work with Coast Guard personnel. The Contractor shall inspect and test the completed installation, including weld examination, alignment, watertightness, and operational testing, and restore affected insulation, sheathing, coatings, labels, nameplates, sensors, and security hardware. The completed hatch must be structurally sound, watertight, properly secured, and fully operational.

2. Contractor is to perform work IAW WORK ITEM 1: RWTH 01-21-1, Renew

3. Vendor to Perform work at ships homeport:

• CGC STRATTON

UNITED STATES COAST GUARD BASE ALAMEDA

1 EAGLE ROAD ALAMEDA, CA 94501

4. All drawings are available upon request from the technical librarian. Vendor must submit drawing requests to provided POC.

5. Security requirements: No special security requirements needed.

6. POP: 30NOV26 - 11DEC26

7. POC:

APM PE

LT Adrian Rubio

657-944-8163

LT Summer Gould

206-827-5310