01 - ITB 2027-01 WA2302 Specifications Contract Documents.pdf
PDF 2 MB Posted
- Attached to
- 12-Inch Willow Creek Waterline Parts 1 & 2
- Solicitation number
- ITB 2027-01
- Issued by
- Johnson County, Texas
About this file
12-Inch Willow Creek Waterline Parts 1 & 2
This is an Invitation to Bid (ITB) specifications and contract document for a waterline infrastructure project in Texas. The project encompasses approximately 1,900 linear feet of 12-inch waterline installation along with associated components, fittings, and accessories. The specifications document outlines the technical requirements, materials standards, and construction methodologies required for the successful completion of this waterline infrastructure improvement. The solicitation appears to be structured in two parts, allowing for phased bidding or separate contract awards for different segments of the project.
The document serves as the primary technical reference for potential bidders, detailing the engineering specifications, quality standards, and performance requirements necessary for the waterline installation. Bidders are expected to review all specifications thoroughly to ensure their proposed materials and construction methods meet the stated requirements. No specific response deadline, bid due date, site visit schedule, pre-bid meeting information, or contract award date is indicated in the file summary provided. The contracting jurisdiction and funding sources are not explicitly detailed in the available documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR THE CONSTRUCTION OF
City of Burleson Rev. 3/7/2024
12-INCH WILLOW CREEK WATERLINE PARTS 1 & 2
PROJECT #: WA2302
FOR THE
CITY OF BURLESON, TEXAS
CAPITAL ENGINEERING DEPARTMENT
OCTOBER 2026
Part 1 Plans and Special Provisions Section 6.1 & 11B.1 Part 2 Plans and Special Provisions Section 6.2 & 11B.2 General Specifications – All Other Sections Engineer-of-Record: George Farah, PE Engineer-of-Record: Andrea Taylor, PE Engineer-of-Record: Travis N. Attanasio, PE Date: Date: Date:
Firm: Alan Plummer and Associates, Inc. Firm: Mycoskie & Associates, Inc. Firm: N/A Firm No.: 13 Firm No.: 2759 Firm No.: N/A
October 14, 2026
Travis Attanasio Seal
Travis Attanasio Stamp
Travis Attanasio Stamp
Rev. 3/7/2024
TABLE OF CONTENTS
SECTION NUMBER SUBJECT OF SECTION
1 Notice to Bidders
2 Instructions for Bidders
3 Prevailing Wage Rates for Municipal Construction in Burleson, Texas
4 Out of State Contractor Compliance to State Law
5 Affidavit Against Prohibited Acts
5A Conflict of Interest (example Form 1295)
5B Offeror Acknowledgment
6 Proposal
6A Subcontractor List
7 Contract
8 Performance Bond
9 Payment Bond
10 Maintenance Bond
10A Post Construction Forms
10A.1 Consent of Surety Company to Full Release of
Retainage
10A.2 Contractor’s Affidavit of Final Payment
11A Special Provisions- Paving and Drainage
Specifications
11B Special Provisions – Water and Sanitary Sewer
Specifications
12 General Notes/Plans/Standard Details
Section No. 1
Invitation to Bid
CITY OF BURLESON
ITB 2027-01 12-Inch Willow Creek Water Line Looping Improvements Parts 1 & 2
Notice is hereby given that the City of Burleson is seeking proposals for 12-Inch Willow Creek Water Line Looping Improvements Parts 1 & 2 (WA2302). The deadline for submission is November 12, 2026 at 2:00PM CST. The bid opening will be virtual at 3:00PM. A link for the bid opening will be provided via Euna. A non-mandatory pre-bid meeting will be held October 28, 2026 at 10:00AM CDT.
The project includes: Approximately 1,900-linear feet of 12-inch waterline and associated components, fittings, and accessories. The Project has an expected duration of 180 calendar days.
Specifications and Contract Documents for this project shall be available for viewing and download in electronic (PDF) format at the City’s e-procurement system, Euna https://burlesontx.bonfirehub.com/login (registration is required) at no cost beginning October 17, 2026.
Any interpretations, corrections, clarifications, or changes to this Invitation to Bid will be issued via addendum. Addenda will be posted in Euna. It is the responsibility of the respondent to monitor the Bonfire website for addenda. Proposers shall acknowledge receipt of each addendum by submitting a signed copy with their submission. Oral explanations will not be binding.
POSTED THIS the 16th day of October 2026, in the Burleson City Hall, 141 West Renfro, Burleson, Texas.
October 17, 2026 October 24, 2026 Cleburne Times Review https://burlesontx.bonfirehub.com/login
Section 2
Instructions to Bidders
SECTION 2
INSTRUCTIONS TO BIDDERS
1. PROPOSAL:
1.1 The Proposal is included in these Bidding Documents; additional copies may be obtained from the City of Burleson, hereinafter called
"OWNER”.
1.2 All blanks on the proposal shall be completed electronically.
a. Bidder may use the original proposal forms included in these bid documents or the Bidder may substitute a computer-generated proposal for the original proposal included in these bid documents.
The substitute submittal shall be word-for-word as written in the original proposal contained herein. The Bidder shall also sign the Substitute Proposal.
b. If the Substitute Proposal changes the intent of a bid item or contains an error in the quantities, unit prices, or extension of prices, the OWNER may reject the bid submitted.
c. The Bid price of each item on the form shall be stated in words and numerals. Words take precedence in case of a conflict. In the case of a conflict between the unit price indicated and the extended amount shown, the unit indicated multiplied by the state quantity shall govern.
1.3 The President or a Vice President (or other corporate officer accompanied by evidence of authority to sign) shall execute bids by corporations in the corporate name and the corporate seal shall be affixed and attested by the Secretary or an Assistant Secretary. The corporate address and state of incorporation shall be shown below the signature.
1.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title shall appear under the signature and at the official address of the partnership shall be shown below the signature.
1.5 All names shall be typed or printed below the signature.
1.6 The bid shall contain an acknowledgement of receipt of all Addenda
(the numbers of which must be filled in on the Proposal).
1.7 The address and telephone number for communications regarding the bid shall be shown.
1.8 The bid shall be complete with prices stated for all alternates. The
Bidder should be aware that the OWNER, to stay within the OWNER’s
Instructions to Bidders available funds could adjust the scope of the project. Alternates selected and revisions to limits of construction and resulting quantity adjustments will be identified in the Notice of Award and will be adjusted in the proposal contained in the executed contract.
2. SUBMISSION OF BIDS:
It shall be the Bidder's responsibility for the electronic delivery of his proposal at the proper place by the time stated in the Notice to Bidders. The mere fact that a proposal was dispatched will not be considered. Proposals must be submitted at http://burlesontx.bonfirehub.com. The BIDDER shall acknowledge receipt of any addenda.
3. BID SECURITY:
Each submission must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of the Bidder’s total bid price. Unless otherwise approved in writing by the City, the surety company underwriting the bond shall be authorized to transact surety business in the State of Texas and shall be listed on the most current U.S. Department of the Treasury Circular 570 in an underwriting limitation at least equal to the penal sum of the bond. The Bid Bond must be submitted electronically with the proposal; original Bid Bonds must be sent to the address listed below.
Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the successful Bidder fails to execute and return the Contract Documents within 15 days after the Notice of Award conveying same, City may consider Proposer to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City’s exclusive remedy in the event Bidder is deemed to have defaulted.
4. PERFORMANCE, PAYMENT AND MAINTENANCE BONDS:
Additionally, the successful Bidder must furnish the Bonds described in the Instructions to Bidders section of this ITB within fifteen (15) business days after the City issues a notice of intent to award, and before commencing any work. The original Bonds shall be delivered to:
ITB 2027-01 Bond Submission 141 W. Renfro Burleson, Texas 76028 Attn: Andrea Anderson
5. QUALIFICATION OF BIDDERS:
All Bidders on this project must be qualified to perform work as outlined within the contract documents. The City of Burleson Department of Capital Engineering will http://burlesontx.bonfirehub.com/
Instructions to Bidders verify the work history and qualifications. The following subcontractors must also be qualified if applicable to the project: water and sewer, paving, storm drain, excavation and parkway and median landscape work (includes seeding, sod, irrigation and tree and shrubbery planting). Bidders must be familiar with the North Central Texas Council of Governments (NCTCOG) Standard Specifications for Public Works Construction, latest edition, and the construction methods, Standards and related Ordinances of the City of Burleson.
6. BIDDERS KNOWLEDGE OF CONDITIONS:
6.1 Prior to submission of a proposal, bidders shall make a thorough inspection of the site of work and a thorough examination of the plans and specifications, and shall become informed as to the nature of the work, labor conditions, federal, state and local Laws and Regulations, and all other matters that may affect the cost, progress, performance and time of completion of the Work.
6.2 Bidder shall notify OWNER of all conflicts, errors or discrepancies in the Contract Documents.
6.3 Bidder shall pay particular attention to providing methods of ingress and egress to adjacent private and public properties, procedures for protection existing improvements and disposition of all materials to be removed.
6.4 Information and data reflected in the Contract Documents with respect to underground facilities at or contiguous to the site is based upon information and data furnished to OWNER by owners of such underground facilities or other, and OWNER does not assume responsibility for the accuracy or completeness thereof.
6.5 The lands upon which the work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment not provided by OWNER, are to be obtained and, if necessary, paid by Contractor.
6.6 The submission of a bid will constitute an incontestable
representation by Bidder that Bidder has complied with every requirement of the Article 6, that without exception the bid is premised upon performing and furnishing the work required by the Contract Documents and such means, method, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the work.
Instructions to Bidders
7. AVAILABILITY OF UTILITY SERVICES
OWNER shall not make available or guarantee any utility services to the Contractor such as (but not all inclusive) water, sewer, electricity, gas, or telephone for performance of his work in this contract. Contractor shall be solely responsible for completing all requirements, make all arrangements, and make all payments as necessary to procure any utility services necessary to complete the work as prescribed in this contract.
8. INTERPRETATION OF DOCUMENT:
If any person contemplating submitting a bid is in doubt as to the meaning of any part of the plans, specifications, or other proposed contract documents, they may submit to the OWNER a written request for an interpretation thereof at least five (5) days prior to opening of bids. The person submitting the request will be responsible for its prompt delivery.
Any interpretation of these documents will be made only by addendum duly issued. Only questions answered by formal written Addenda are to be binding. Oral interpretations or clarification will be without legal effect. The OWNER will not be responsible for any other explanations or interpretations.
9. STANDARD SPECIFICATIONS:
9.1 All work for this project including but not limited to all grading, utility and paving improvements described in this Proposal and Construction Drawings shall be done in accordance with the
STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION as issued by the North Central Texas Council of Government (NCTCOG); the latest edition with any revisions as may be modified by the special conditions of this Contract.
9.2 Asphaltic concrete and standard concrete pavement improvements done within TxDOT right of way, shall be done in accordance with the
STANDARD SPECIFICATIONS FOR CONSTRUCTION OF
HIGHWAYS, STREETS, AND BRIDGES as issued by The Texas Department of Transportation; the latest edition with any revisions as may be modified by the special conditions of this Contract.
10. AWARD OF CONTRACT:
10.1 OWNER reserves the right to reject any bid, to waive any and all informalities and to negotiate contract amendments with the successful Bidder, and the right to disregard all nonconforming, non-responsive, unbalanced or conditional bids. Also, OWNER reserves the right to reject the bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to
Instructions to Bidders that Bidder, whether because the bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard of criteria established by OWNER. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the correct multiplication. Discrepancies between the unit price in words and the unit price in figures will be resolved in favor of the price in words. Discrepancies between the indicated sum of a column of figures and the correct sum therefore will be resolved in favor of the correct sum.
10.2 In evaluating bids, OWNER will consider the qualifications of the
Bidder, whether or not the bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the bid form or prior to the Notice of Award.
11. ALTERNATE BIDS:
No bids for alternate work items shall be submitted except as shown on the Proposal. The OWNER reserves the right to choose either the base bid or alternate bid whichever is most advantageous to the OWNER. There will be no adjustments to unit prices bid due to the OWNER’S choice of alternate bids.
12. PROTEST PROCEDURE:
Protest Procedure: A Bidder that wishes to protest any aspect of this solicitation or the recommended award shall file a written protest with the Purchasing Manager. A protest of the solicitation terms, specifications, or evaluation criteria must be filed no later than the deadline for questions. A protest of a recommended award must be filed no later than five (5) business days after the City posts or issues notice of the recommended award. The protest must state the protester’s name and contact information, identify the solicitation, state the specific grounds and the relief requested, and attach supporting documentation. The Purchasing Manager will issue a written determination, which may be appealed in writing to the City Manager within five (5) business days. The City Manager’s determination is final. Filing a protest does not stay the procurement unless the City Manager so directs in writing.
13. EXECUTION OF CONTRACT
13.1 The successful Bidder shall execute the formal Contract Agreement and required Bonds to the OWNER within fifteen (15) days after the Notice of Award.
13.2 A Notice to Proceed authorizing the Contractor to commence work will be issued after the Contract Documents have been executed by the OWNER.
14. PROTECTION OF THE PUBLIC:
Instructions to Bidders
For protection and convenience of the public and emergencies, the successful Bidder shall furnish the OWNER with a telephone number at which the contractor can be contacted 24 hours a day during the entire construction period of this project. This telephone number shall be furnished to the OWNER in writing prior to the beginning of construction.
15. AFFIDAVIT AGAINST PROHIBITED ACTS:
It shall be the successful Bidder's responsibility to complete this affidavit (Section 5 of the Contract Documents) prior to execution of the Contract by the OWNER (City of Burleson). Failure to complete this form may prohibit the contractor's ability to secure the Contract.
16. WAGE RATES
Contractor shall pay no less than the general prevailing rates for the Project location as determined in accordance with statutory requirements. The minimum rates for various labor classifications as established by the OWNER are included in the contract documents.
17. SALES TAXES
The OWNER qualifies as an exempt entity as defined by the statues (Chapter 151.309) of the Tax Code of the State of Texas. The OWNER’s purchasing department will issue exemption certificates. Comply with all statues and rulings of the State Comptroller.
18. GOVERNING DOCUMENTS:
The Work shall conform to the requirements of these specifications and the details as shown therein. These contract documents are intended to be Primary. Requirements of any of the contract documents are as binding as if called for by all. In case of conflict between the referenced Specifications and the Special Provisions, the Special Provisions shall govern.
19. SOIL INVESTIGATION:
Investigation of soil and foundation conditions of the size and areas near the site is considered subsidiary to the paving portion of the work. A certified lab competent to do such investigations for subgrade stabilization shall be used to determine the amounts of cement or lime necessary for the structural ability of the roadway. It has been assumed to use the rate of 30# per square yard of lime or Portland cement as a minimum treatment, but the actual amount is to be verified by the lab prior to pavement work. A copy of the lab report shall be submitted to the OWNER for approval.
Instructions to Bidders
20. REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK:
All work that has been rejected or condemned shall be repaired, or if it cannot be repaired satisfactorily, it shall be removed and replaced at the contractor's expense. Defective materials shall be immediately removed from the site of the work. Work done without line and grade having been given, work done beyond the lines or not in conformity with the grades shown on the drawings or as given, save as herein provided, work done without proper inspection, or any extra or unclassified work done without written authority and prior agreement in writing as to prices, shall be done at the contractor's risk, and will be considered unauthorized, and at the option of the OWNER, may not be measured and paid for, and may be ordered removed at the contractor's expense. If the contractor fails to satisfactorily repair, replace or remove the rejected, condemned or unauthorized work or materials immediately upon receipt of written notice, the OWNER will have the authority to cause such remediation to be performed and to deduct the cost thereof from any monies due or to become due to the contractor.
21. TRENCH SAFETY:
21.1 A trench safety system must be provided for all trench excavations according to current OSHA requirements.
21.2 On all public projects bid by the OWNER (City of Burleson) or private projects to be constructed within right-of-way or easements to be conveyed to the City of Burleson, compliance with the current minimum Occupational Safety and Health Administration (OSHA) or other governmental agencies standards for trench safety will be required as part of the plans and specifications. Prior to start of construction a detailed trench safety system must be provided to the City by the contractor. This detailed trench safety system must meet all requirements by OSHA or other governmental agencies, and be designed and certified by a professional engineer licensed in the State of Texas.
21.3 A pay item is included in the plans and specifications for the trench safety system. Payment will be on a lump sum basis and will be full compensation for labor, tools, materials, equipment and incidentals necessary to complete the work, including the removal of the trench safety system and back-filling the trench. Pursuant to Texas law, the City of Burleson has adopted a trench safety policy, which is addressed in Section 11 of the Specifications. Each bidder should be familiar with Section 11 prior to submitting a bid.
22. BID TABULATION:
A tabulation of all bids will be available within five (5) working days of November 12, 2026.
https://burlesontx.bonfire.com/
Instructions to Bidders
23 ADDENDUM:
23.1 The OWNER reserves the right to issue addenda to the Plans, Proposal, Specifications, and Special Provisions. Addenda will be issued at https://burlesontx.bonfire.com
23.2 The Bidders will acknowledge the receipt of the addenda by submitting a signed copy of the addenda with the submission of their bid.
23.3 It shall be the Bidder's responsibility to ensure that they are aware of all addenda issued by the OWNER.
23.4 Upon receipt of the addenda, the Bidder shall acknowledge the receipt of the addenda in the appropriate spaces provided in the proposal.
23.5 Bids that have not properly acknowledged addenda will not be considered.
https://sam.gov/wage-determination/TX20260257/0
Prevailing Wage Rates for Municipal Construction in Texas
The following minimum rates have been determined by the City of Burleson, Texas, in accordance with the statutory requirements and prevailing local wages:
Prevailing Wage Rates for Municipal Construction in Texas
THE STATE OF TEXAS §
COUNTY OF JOHNSON §
AFFIDAVIT
BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared , who is known to me or who was proved to me on the oath of (name of person identifying the acknowledging person) or who was proved to me through
(description of identity card or other document issued by the federal or state government containing the picture and signature of the acknowledging person) to be the person whose name is subscribed to this affidavit; and being by me first duly sworn, upon oath stated as follows:
"My name is . I am of sound mind and capable of making this affidavit. "I am a for the which company entered into a contract on the day of , 20 , for construction related to the 12-Inch Willow Creek Water Line Looping Improvements Parts 1 & 2, and I am duly authorized on behalf of said company to hereby swear and affirm that all wages for labor on the above-referenced project are in strict compliance with the established prevailing wage rates as described in the contract documents for the referenced project, and all wages have been and will be paid and satisfied as the prevailing rates may change from time to time. Upon request by the City of Burleson, I shall allow a complete examination of the financial records relative to this project, including, but not limited to, cancelled checks, invoices and statements at any time, and allow the City of Burleson to interview any and/or all employees of the above said company or any and/or all employees of said Company's subcontractor or subcontractors. Also, I hereby agree on behalf of the above company, to be accountable for any and all penalties and/or fine provisions in accordance with the contract documents and relevant law.
AFFIANT
GIVEN UNDER MY HAND AND SEAL OF OFFICE this the day of 20
Notary Public In and For the State of Texas
Notary's Printed Name
My Commission Expires:
Travis Attanasio Highlight https://sam.gov/wage-determination/TX20260257/0 2/5
PLUM0146-003 05/01/2025
Rates Fringes
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION)........$ 41.28 12.16
SUTX2014-033 07/21/2014
Rates Fringes
TRUCK DRIVER: WATER TRUCK..........................$ 12.00 4.11
TRUCK DRIVER: SEMI-TRAILER TRUCK...................$ 12.50 0.00
TRUCK DRIVER: FLATBED TRUCK........................$ 19.65 8.57
TRUCK DRIVER: DUMP TRUCK...........................$ 12.39 1.18
TILE SETTER.........................................$ 12.00 0.00
TILE FINISHER.......................................$ 11.22 0.00
SPRINKLER FITTER (FIRE SPRINKLERS)..................$ 18.89 0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 18.63 0.65
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)....$ 18.25 3.02
ROOFER..............................................$ 15.70 0.58
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION............$ 24.00 2.71
PLUMBER (HVAC PIPE INSTALLATION ONLY)...............$ 19.33 3.57
PLASTERER...........................................$ 15.30 0.00
OPERATOR: ROLLER...................................$ 15.04 0.00
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND
CONCRETE)...........................................$ 18.44 0.00
OPERATOR: MECHANIC.................................$ 17.52 3.33
OPERATOR: LOADER...................................$ 12.89 1.19
OPERATOR: GRADER/BLADE.............................$ 12.95 0.00
OPERATOR: FORKLIFT.................................$ 14.20 0.00
OPERATOR: DRILL....................................$ 17.60 0.50
OPERATOR: BULLDOZER................................$ 18.29 1.31
OPERATOR: BOBCAT/SKID STEER/SKID LOADER............$ 13.93 0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 13.06 0.00
LABORER: LANDSCAPE AND IRRIGATION...................$ 10.00 0.00
LABORER: ROOF TEAROFF..............................$ 11.28 0.00
LABORER: PIPELAYER.................................$ 13.00 0.35
LABORER: MASON TENDER - CEMENT/CONCRETE............$ 10.80 0.00
LABORER: MASON TENDER - BRICK......................$ 10.50 0.00
LABORER: COMMON OR GENERAL.........................$ 11.91 2.64
IRONWORKER, REINFORCING.............................$ 12.19 0.00
INSTALLER - SIDING (METAL/ALUMINUM/VINYL)...........$ 15.77 0.00
HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY)......$ 22.18 6.48
GLAZIER.............................................$ 15.93 2.37
FORM WORKER.........................................$ 12.38 0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND
INSTALLATION OF ALARMS/SOUND AND COMMUNICATION
SYSTEMS.............................................$ 20.68 4.39
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)...............$ 14.88 2.15
ELECTRICIAN (ALARM INSTALLATION ONLY)...............$ 18.00 0.38
ELECTRICAL INSTALLER (SOUND AND COMMUNICATION
SYSTEMS ONLY)EXCLUDES WIRING........................$ 17.79 2.41
DRYWALL HANGER AND METAL STUD INSTALLER.............$ 16.20 3.40
DRYWALL FINISHER/TAPER..............................$ 16.24 3.94
CEMENT MASON/CONCRETE FINISHER......................$ 13.45 0.00
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND
METAL STUD INSTALLATION.............................$ 15.12 2.94
BRICKLAYER..........................................$ 20.18 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the https://sam.gov/wage-determination/TX20260257/0 3/5
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than SU , UAVG , SA , or SC denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
https://sam.gov/wage-determination/TX20260257/0 4/5
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the SA identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to https://sam.gov/wage-determination/TX20260257/0 5/5 davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
https://sam.gov/wage-determination/TX20260026/0 1/4
"General Decision Number: TX20260026 05/18/2026
State: Texas
Construction Types: Heavy
Counties: Texas Counties of Johnson, Parker and Tarrant
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
PLUM0146-002 01/01/2024
Rates Fringes
PLUMBER/PIPEFITTER..................................$ 38.28 12.81
SUTX1990-041 06/01/1990
Rates Fringes
TRUCK DRIVER........................................$ 7.34 0.00
REINFORCING STEEL SETTER............................$ 10.64 0.00
POWER EQUIPMENT OPERATORS: SCRAPER..................$ 10.00 0.00
POWER EQUIPMENT OPERATORS: MECHANIC.................$ 10.93 0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER.........$ 10.54 0.00
POWER EQUIPMENT OPERATORS: CRANE....................$ 13.16 3.30
POWER EQUIPMENT OPERATORS: BULLDOZER................$ 10.76 0.00
POWER EQUIPMENT OPERATORS: (BACKHOE)................$ 11.89 3.30
PIPELAYER...........................................$ 8.43 0.00
PAINTER.............................................$ 10.89 0.00
LABORERS: (UTILITY).................................$ 8.09 0.00
LABORERS: (COMMON)..................................$ 7.25 0.00
FORM SETTER.........................................$ 7.86 0.00
ELECTRICIAN.........................................$ 13.26 0.00
CONCRETE FINISHER...................................$ 9.81 0.00
CARPENTER...........................................$ 10.40 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is https://sam.gov/wage-determination/TX20260026/0 https://sam.gov/wage-determination/TX20260026/0 2/4 like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than SU , UAVG , SA , or SC denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was https://sam.gov/wage-determination/TX20260026/0 3/4 updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The SU identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
SU wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The SA identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the SA identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or https://sam.gov/wage-determination/TX20260026/0 4/4 by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
https://sam.gov/wage-determination/TX20260294/0 1/4
"General Decision Number: TX20260294 05/18/2026
State: Texas
Construction Types: Highway
Counties: Texas Counties of Collin, Dallas, Delta, Denton, Ellis, Grayson, Hunt, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
SATX2025-007 11/15/2023
Rates Fringes
WORK ZONE BARRICADE SERVICER........................$ 18.01 0.00
WELDER..............................................$ 23.72 0.00
TRUCK DRIVER, TRANSIT-MIX...........................$ 21.97 0.00
TRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER.$ 23.22 0.00
TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK......$ 22.64 0.00
TRUCK DRIVER, SINGLE AXLE...........................$ 20.60 0.00
TRUCK DRIVER LOWBOY FLOAT...........................$ 25.57 0.00
TELECOMMUNICATION TECHNICIAN........................$ 23.14 0.00
SPREADER BOX OPERATOR...............................$ 23.59 0.00
SMALL SLIPFORM MACHINE OPERATOR.....................$ 25.09 0.00
SIGN ERECTOR........................................$ 18.01 0.00
SERVICER............................................$ 24.86 0.00
SCRAPER OPERATOR....................................$ 21.54 0.00
ROLLER OPERATOR, OTHER..............................$ 18.60 0.00
ROLLER OPERATOR, ASPHALT............................$ 20.35 0.00
REINFORCING STEEL WORKER............................$ 23.50 0.00
RECLAIMER/PULVERIZER OPERATOR.......................$ 22.17 0.00
PIPELAYER...........................................$ 22.46 0.00
PAVEMENT MARKING MACHINE OPERATOR...................$ 22.35 0.00
OFF ROAD HAULER.....................................$ 23.70 0.00
MOTOR GRADER OPERATOR, ROUGH........................$ 24.90 0.00
MOTOR GRADER OPERATOR, FINE GRADE...................$ 27.09 0.00
MILLING MACHINE OPERATOR............................$ 20.94 0.00
MECHANIC............................................$ 27.44 0.00
LOADER/BACKHOE OPERATOR.............................$ 23.22 0.00
LABORER, UTILITY....................................$ 19.32 0.00
LABORER, COMMON.....................................$ 18.01 0.00
FRONT END LOADER OPERATOR, OVER 3 CY................$ 22.56 0.00
FRONT END LOADER OPERATOR, 3 CY OR LESS.............$ 20.93 0.00
FOUNDATION DRILL OPERATOR, TRUCK MOUNTED............$ 29.86 0.00
FOUNDATION DRILL OPERATOR, CRAWLER MOUNTED..........$ 29.25 0.00
FORM SETTER, PAVING & CURB..........................$ 20.89 0.00
FORM BUILDER/SETTER, STRUCTURES.....................$ 22.50 0.00
FLAGGER.............................................$ 14.80 0.00
EXCAVATOR OPERATOR, OVER 50,000 POUNDS..............$ 25.34 0.00
EXCAVATOR OPERATOR, 50,000 POUNDS OR LESS...........$ 25.08 0.00
ELECTRICIAN.........................................$ 36.10 0.00
CRAWLER TRACTOR OPERATOR............................$ 24.06 0.00
CRANE OPERATOR, LATTICE BOOM OVER 80 TONS...........$ 33.55 0.00
https://sam.gov/wage-determination/TX20260294/0 https://sam.gov/wage-determination/TX20260294/0 2/4
CRANE OPERATOR, LATTICE BOOM 80 TONS OR LESS........$ 29.90 0.00
CRANE OPERATOR, HYDRAULIC 80 TONS OR LESS...........$ 31.32 0.00
CONCRETE SAW OPERATOR...............................$ 20.34 0.00
CONCRETE PAVEMENT FINISHING MACHINE OPERATOR........$ 24.07 0.00
CONCRETE FINISHER, PAVING AND STRUCTURES............$ 22.48 0.00
BROOM OR SWEEPER OPERATOR...........................$ 18.01 0.00
ASPHALT RAKER.......................................$ 19.87 0.00
ASPHALT PAVING MACHINE OPERATOR.....................$ 22.52 0.00
ASPHALT DISTRIBUTOR OPERATOR........................$ 24.40 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .