01_Final_Permit.pdf
PDF 4 MB Posted
- Attached to
- CDBG-DR HS019 Construction-Alger Rd Bridge Replacement and Jefferson Ave Pipe Culvert Rehab
- Solicitation number
- PD 25-26.084
- Issued by
- Escambia County, Florida
About this file
This is a final environmental permit issued by the Florida Department of Environmental Protection (FDEP) Northwest District on May 12, 2026, authorizing Escambia County to install a 2-inch gas line along the Eastern Right-of-Way of Alger Road in Century, Florida. The permit approves installation of approximately 130 linear feet of liquefied petroleum or natural gas pipeline via horizontal directional bore (HDB) crossing Mill Creek, a Class III Florida waterbody, at the Alger Road Bridge location in Section 5, Township 5 North, Range 30 West. The project involves tying the new gas line into existing infrastructure on either side of the crossing. The regulatory review was approved under Florida Administrative Code Rule 62-330.453, and the permit must be exercised within five years from the April 21, 2026 notice of intent date. The permit does not qualify for federal authorization under the State Programmatic General Permit VI-R1, and the applicant must obtain separate authorization from the U.S. Army Corps of Engineers if required. Water quality certification has been granted with conditions under Section 401 of the Clean Water Act, and the issuance constitutes a finding of consistency with Florida's Coastal Zone Management Program.
The permit grants authorization for activities subject to general conditions outlined in Rule 62-330.405, Florida Administrative Code, and specific conditions in Rule 62-330.453, including requirements for directional drilling operations. All work areas, including entrance and exit pits, drill rigs, tanks, pumps, and staging areas, must be located within uplands. The permittee must submit contractor information at least 48 hours prior to drilling commencement and maintain equipment for drilling fluid containment and cleanup. A minimum depth of cover equal to the greater of five feet or five times the maximum encased diameter must be maintained. Should a drilling fluid frac-out or spill occur in wetlands or surface waters, the permittee must report to FDEP within 24 hours and notify the Florida Fish and Wildlife Conservation Commission if the spill affects waters accessible to federally or state-listed aquatic species. Additional conditions require compliance with erosion and sediment control standards, protection of listed species including manatees and marine turtles, and immediate notification of any killed or injured species to the FWC Hotline.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA DEPARTMENT OF
Environmental Protection
Northwest District
160 W. Government Street, Suite 308 Pensacola, Florida 32502-5794
Ron DeSantis Governor
Jay Collins
Lt. Governor
Alexis A. Lambert Secretary
May 12, 2026
Escambia County c/o Joy Blackmon, Escambia County Director of Engineering 3363 W Park Pl Pensacola, FL 32505 jdblackmon@myescambia.com
File No. 0469957-003-EG/17, Escambia County
Dear Joy Blackmon:
On April 21, 2026, we received your notice of intent to use a General Permit (GP), pursuant to Rule 62-330.453, Florida Administrative Code (F.A.C.) to install a 2 inch gas line associated along the Eastern Right of-Way Alger Road for a total span of 130 ft and will tie into the existing gas line on either side of the crossing. All activities take place, within Mill Creek, a Class III Florida waterbody. The project is located at Alger Road Bridge, Century, Florida, Section 5, Township 5 North, Range 30 West, Escambia County.
Your intent to use a general permit has been reviewed by Department staff for three types of authorizations: (1) regulatory authorization, (2) proprietary authorization (related to state-owned submerged lands), and (3) federal authorization. The authority for review and the outcomes of the reviews are listed below. Please read each section carefully.
Your project did not qualify for the federal authorization; therefore, additional authorization may be required prior to commencement of the proposed activity. This letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. Please refer to the specific section(s) dealing with that portion of the review below for advice on how to proceed.
If you change the project from what you submitted, the authorization(s) granted may no longer be valid at the time of commencement of the project. Please contact us prior to beginning your project if you wish to make any changes.
1. Regulatory Review – Approved Based on the forms, drawings, and documents revised with your notice, it appears that the project meets the requirements for the General Permit under Rule 62-330.453, F.A.C. Any activities performed under a general permit are subject to general conditions required in Rule 62-330.405, F.A.C. (attached), and the specific conditions of Rule 62-330.453, F.A.C. (attached). Any mailto:jdblackmon@myescambia.com
File Name: Alger Road Gas Line Bore File No: 0469957-003-EG/17 deviations from these conditions may subject the permittee to enforcement action and possible penalties.
Please be advised that the construction phase of the GP must be completed within five years from the date the notice to use the GP was received by the Department. If you wish to continue this GP beyond the expiration date, you must notify the Department at least 30 days before its expiration.
Authority for review- Part IV of Chapter 373, F.S., Title 62, F.A.C. and in accordance with the operating agreements executed between the Department and the water management districts, as referenced in Chapter 62-113, F.A.C.
2. Proprietary Review – Not Required The activity does not appear to be located on sovereign submerged lands, and does not require further authorization under Chapter 253 of the Florida Statutes, or Chapters 18-20 or 18-21 of the Florida Administrative Code.
3. Federal Review- Not Included Your proposed activity as outlined in your application and attached drawings does not qualify for Federal authorization pursuant to the State Programmatic General Permit VI-R1.
SEPARATE permit(s) or authorization may be required from the U.S. Army Corps of Engineers.
Authority for review - an agreement with the USACOE entitled “Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General Permit”, Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act.
3.2 Coastal Zone Management Consistent
Issuance of this authorization also constitutes a finding of consistency with Florida's Coastal Zone Management Program, as required by Section 307 of the Coastal Zone Management Act.
3.3 Water Quality Certification Granted With Conditions
This permit also constitutes a granted with conditions water quality certification under Section 401 of the Clean Water Act, 33 U.S.C. Section 1341. Pursuant to Rule 62-330.062, F.A.C. State Water Quality Certification is granted when an activity meets all the terms and conditions of a general permit under Rule 62-330.052, F.A.C., and the applicable Rules 62-330.401 through 62- 330.635, F.A.C.
Additional Information Please retain this general permit. The activities may be inspected by authorized state personnel in the future to ensure compliance with appropriate statutes and administrative codes. If the activities are not in compliance, you may be subject to penalties under Chapter 373, F.S., and Chapter 18-14, F.A.C.
NOTICE OF RIGHTS
This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until further order of the Department. Because the administrative hearing process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application.
Petition for Administrative Hearing A person whose substantial interests are affected by the Department’s action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information:
(a) The name and address of each agency affected and each agency’s file or identification number, if known;
(b) The name, address, any e-mail address, any facsimile number, and telephone number of the petitioner, if the petitioner is not represented by an attorney or a qualified representative; the name, address, and telephone number of the petitioner’s representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner’s substantial interests will be affected by the agency determination;
(c) A statement of when and how the petitioner received notice of the agency decision;
(d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate;
(e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency’s proposed action;
(f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency’s proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and
(g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency’s proposed action.
The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing.
Time Period for Filing a Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been mailto:Agency_Clerk@dep.state.fl.us duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant Rule 62- 110.106(10)(a).
The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver will not apply to persons who have not received written notice of this action.
Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department’s action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time.
Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon.
Mediation Mediation is not available in this proceeding.
FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275, F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when this order is filed with the Clerk of the Department.
Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department.
mailto:Agency_Clerk@dep.state.fl.us
EXECUTION AND CLERKING
Executed in Pensacola, Florida.
STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Una Cole Environmental Manager
Enclosures:
62-330.453, FAC, 2 pages General Conditions for All General Permits, Ch. 62-330.405, F.A.C., 3 pages Project Drawings, 4 pages
CERTIFICATE OF SERVICE
The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons:
Russell Sullivan, FDEP, Russell.Sullivan@FloridaDEP.gov Una Cole, FDEP, Una.Cole@FloridaDEP.gov Chris Bickham, FDEP, Chris.Bickham@FloridaDEP.gov Joy Blackmon, Escambia County Director of Engineering, jdblackmon@myescambia.com Ashton Shell, Consultant, ashell@teamues.com Selina Browne, Consultant, sbrowne@teamues.com Emily Harmon, Consultant, eharmon@teamues.com Escambia County, jtkirsche@myescambia.com, bdschneider@myescambia.com, trday@myescambia.com
FILING AND ACKNOWLEDGMENT
FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department Clerk, receipt of which is hereby acknowledged.
May 12, 2026 Clerk Date mailto:Russell.Sullivan@FloridaDEP.gov mailto:Una.Cole@FloridaDEP.gov mailto:Chris.Bickham@FloridaDEP.gov mailto:jdblackmon@myescambia.com mailto:ashell@teamues.com mailto:sbrowne@teamues.com mailto:eharmon@teamues.com mailto:jtkirsche@myescambia.com mailto:bdschneider@myescambia.com mailto:trday@myescambia.com
62-330.453 General Permit for Installation, Maintenance, Repair, and Removal of Utility Lines.
(1) A general permit is granted for the installation, maintenance, repair, and removal of underground utility lines, cable, conduit, or pipeline transmitting electricity, communication signals, potable water, raw water, reclaimed water, domestic wastewater, propane gas or natural gas.
(2) For the purposes of this general permit:
(a) “Directional drilling” means the linear or curvilinear excavation of a tunnel or conduit, in any direction, through the use of drilling equipment that can change direction during excavation; this also includes borehole reaming and pulling following primary drilling.
(b) “Jack-and-bore” means the linear, primarily lateral excavation of a tunnel, typically between excavated subgrade pits, through use of drilling equipment and encasement which is advanced under mechanical force, and includes similar methods commonly termed as “microtunneling.”
(c) “Frac-out” means any release of drilling fluid or slurry which results in above-grade discharge of drilling fluid or slurry or significant loss of such fluid or slurry into the surrounding parent material.
(3) This general permit is limited as follows:
(a) No work occurs within Outstanding Florida Waters, Aquatic Preserves, or Class I waters.
(b) The installation of conduit or pipeline to drain wetlands or other surface waters is not authorized.
(c) Prior to work, existing pipelines shall be evacuated of substances which, if released, could result in a violation of state water quality standards.
(d) The maximum width of the disturbed corridor in wetlands shall not exceed 30 feet.
(e) The total area of forested wetland disturbance shall not exceed 0.5 acre per ten miles of cable, conduit, or pipeline.
(f) Minor above-grade improvements may be constructed in uplands under this general permit, but shall be limited to vents, valves, meter assemblies, relays, junction boxes, pads or similar structures that are directly connected to the utility line, do not create discharges, and which cumulatively comprise no more than 100 square feet of impervious surfaces per mile of utility line.
(g) Installation, maintenance, repair, and removal activities performed via trenching or methods other than directional drilling or jack-and-bore, are subject to the following special conditions:
1. The maximum width of the excavated trench shall not exceed eight feet, with temporary spoil storage banks not to exceed ten feet in width;
2. For a trench with a top width greater than three feet in herbaceous wetlands, the upper layer of the soil horizon shall initially be scraped and segregated into a spoil bank that is separated from the spoil bank resulting from the excavation of the trench for the utility line. The upper layer of the soil horizon shall be replaced as the last step of restored grades to facilitate natural revegetation;
3. Trenching in surface waters shall be limited to wetlands, artificial waters, and residential canal systems; and
4. Temporary spoil banks shall contain breaches that prevent impoundment or restriction of surface water flows;
(h) Installation, maintenance, repair, and removal conducted using directional drilling or jack-and-bore methods are subject to the following special conditions:
1. The maximum outside diameter of the cable, conduit or pipeline, including encasement, shall not exceed 30 inches.
2. A minimum depth of cover, equal to the greater of either five feet, or five times the maximum encased diameter of the utility line to be installed, shall be maintained between the top of the utility line and casing and the soil surface or submerged bottom of any wetland or waterbody being crossed.
3. All work areas associated with directional drilling or jack-and-bore activities, including entrance and exit pits, drill rigs, tanks, pumps, drilling fluid mixing and settling pits, dewatering systems and staging areas for pipe, cables, and drill string, shall be located within uplands.
4. The use of drilling fluids shall not cause or contribute to a violation of state ground water quality criteria or standards, as defined in chapter 62-520, F.A.C.
5. The permittee shall, at least 48 hours prior to commencement of any directional drilling or jack-and-bore activities, submit to the agency the name, as registered with the Florida Department of State, and all-hours telephone contact information of all contractors responsible for drilling and for containment and cleanup in the event of a drilling fluid frac-out or spill.
6. The contractor shall, at all times during directional drilling activities, maintain appropriate equipment and materials in a readily-accessible location and condition, to effectively contain and clean up a drilling fluid frac-out or spill.
7. The permittee or the permittee’s contractor shall, at all times during directional drilling activities, ensure that appropriately-trained personnel monitor downhole equipment position, drilling fluid circulation and pressures, and actively monitor the entire utility line route for surface frac-out of drilling fluids.
8. Drilling activities shall be discontinued and the drilling fluid or slurry shall be contained using appropriate methods as soon as possible, in the event of a drilling fluid frac-out or spill. Removal of drilling fluid or slurry from wetlands and other surface waters shall be initiated and completed in the most expeditious manner practicable. Removed drilling fluid shall be contained or disposed of in an appropriate upland location. Any frac-out or spill of drilling fluid into wetlands or other surface waters shall be reported to Agency staff within 24 hours following detection of the spill or frac-out.
(i) Utilities must be located a minimum of 14 feet below the authorized depth of a federal navigation channel.
Rulemaking Authority 373.026(7), 373.043, 373.118(1), 373.406(5), 373.4131, 373.414(9), 373.418, 403.805(1) FS. Law Implemented 373.118(1), 373.406(5), 373.413, 373.4131, 373.414(9), 373.416, 373.418, 403.814(1) FS. History–New 10-3-95, Formerly 62-341.453, Amended 10-1-13, 6-1-18.
62-330.405 General Conditions for All General Permits
The following general permit conditions are binding upon the permittee and are enforceable under chapter 373, F.S. These conditions do not apply to the general permit for stormwater management systems under section 403.814(12), F.S.
(1) The general permit is valid only for the specific activity indicated. Any deviation from the specified activity and the conditions for undertaking that activity shall constitute a violation of the permit and may subject the permittee to enforcement action and revocation of the permit under chapter 373, F.S.
(2) The general permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations prior to the start of any construction, alteration, operation, maintenance, removal or abandonment authorized by this permit; and it does not authorize any violation of any other applicable federal, state, local, or special district laws (including, but not limited to, those governing the “take” of listed species).
(3) The general permit does not convey to the permittee or create in the permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the general permit.
(4) The general permit does not relieve the permittee from liability and penalties when the permitted activity causes harm or injury to: human health or welfare; animal, plant or aquatic life;
or property. It does not allow the permittee to cause pollution that violates state water quality standards.
(5) Section 253.77, F.S., provides that a person may not commence any excavation, construction, or other activity involving the use of state-owned or other lands of the state, the title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund without obtaining the required consent, lease, easement, or other form of authorization authorizing the proposed use. Therefore, the permittee is responsible for obtaining any necessary authorizations from the Board of Trustees prior to commencing activity on state-owned lands.
(6) The authorization to conduct activities under a general permit may be modified, suspended or revoked in accordance with chapter 120, F.S., and section 373.429, F.S.
(7) The general permit is not transferable to a new third party. To be used by a different permittee, a new notice to use a general permit must be submitted in accordance with rule 62- 330.402, F.A.C. Activities constructed in accordance with the terms and conditions of a general permit are automatically authorized to be operated and maintained by the permittee and subsequent owners in accordance with subsection 62-330.340(1), F.A.C. Any person holding the general permit, persons working under the general permit, and owners of land while work is conducted under the general permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to sale, conveyance, or other transfer of ownership or control of the permitted project, activity, or the real property at which the permitted project or activity is located.
(8) Upon reasonable notice to the permittee, Agency staff with proper identification shall have permission to enter, inspect, sample and test the permitted system to ensure conformity with the plans and specifications approved by the general permit.
(9) The permittee shall maintain any permitted project or activity in accordance with the plans submitted to the Agency and authorized in the general permit.
(10) A permittee’s right to conduct a specific activity under the general permit is authorized for a duration of five years.
(11) Activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards. Performance-based erosion and sediment control best management practices shall be implemented and maintained immediately prior to, during, and after construction as needed to stabilize all disturbed areas, including other measures specified in the permit to prevent adverse impacts to the water resources and adjacent lands. Erosion and sediment control measures shall be installed and maintained in accordance with the State of Florida Erosion and Sediment Control Designer and Reviewer Manual (Florida Department of Environmental Protection and Florida Department of Transportation, June 2007), available at https://www.flrules.org/Gateway/reference.asp?No=Ref-04227, and the Florida Stormwater Erosion and Sedimentation Control Inspector’s Manual (Florida Department of Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, July 2008), available at http://publicfiles.dep.state.fl.us/DEAR/Stormwater_Training_Docs/erosion-inspectors-manual.pdf.
(12) Unless otherwise specified in the general permit, temporary vehicular access within wetlands during construction shall be performed using vehicles generating minimum ground pressure to minimize rutting and other environmental impacts. Within forested wetlands, the permittee shall choose alignments that minimize the destruction of mature wetland trees to the greatest extent practicable. When needed to prevent rutting or soil compaction, access vehicles shall be operated on wooden, composite, metal, or other non-earthen construction mats. In all cases, access in wetlands shall comply with the following:
(a) Access within forested wetlands shall not include the cutting or clearing of any native wetland tree having a diameter four inches or greater at breast height;
(b) The maximum width of the construction access area shall be limited to 15 feet;
(c) All mats shall be removed as soon as practicable after equipment has completed passage through, or work has been completed, at any location along the alignment of the project, but in no case longer than seven days after equipment has completed work or passage through that location;
and
(d) Areas disturbed for access shall be restored to natural grades immediately after the maintenance or repair is completed.
(13) Barges or other work vessels used to conduct in-water activities shall be operated in a manner that prevents unauthorized dredging, water quality violations, and damage to submerged aquatic communities.
(14) The construction, alteration, or use of the authorized project shall not adversely impede navigation or create a navigational hazard in the water body.
(15) Except where specifically authorized in the general permit, activities must not:
(a) Impound or obstruct existing water flow, cause adverse impacts to existing surface water storage and conveyance capabilities, or otherwise cause adverse water quantity or flooding impacts to receiving water and adjacent lands; or
(b) Cause an adverse impact to the maintenance of surface or ground water levels or surface water flows established pursuant to section 373.042, F.S., or a Works of the District established pursuant to section 373.086, F.S.
(16) If prehistoric or historic artifacts, such as pottery or ceramics, projectile points, stone tools, dugout canoes, metal implements, historic building materials, or any other physical remains that https://www.flrules.org/Gateway/reference.asp?No=Ref-04227 could be associated with Native American, early European, or American settlement are encountered at any time within the project site area, the permitted project shall cease all activities involving subsurface disturbance in the vicinity of the discovery. The permittee or other designee shall contact the Florida Department of State, Division of Historical Resources, Compliance Review Section (DHR), at (850)245-6333, as well as the appropriate permitting agency office.
Project activities shall not resume without verbal or written authorization from the Division of Historical Resources. If unmarked human remains are encountered, all work shall stop immediately and the proper authorities notified in accordance with section 872.05, F.S.
(17) The activity must be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed, and must comply with any applicable District special basin and geographic area criteria.
(18) The permittee shall comply with the following when performing work within waters accessible to federally- or state-listed aquatic species, such as manatees, marine turtles, smalltooth sawfish, and Gulf sturgeon:
(a) All vessels associated with the project shall operate at “Idle Speed/No Wake” at all times while in the work area and where the draft of the vessels provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
(b) All deployed siltation or turbidity barriers shall be properly secured, monitored, and maintained to prevent entanglement or entrapment of listed species.
(c) All in-water activities, including vessel operation, must be shut down if a listed species comes within 50 feet of the work area. Activities shall not resume until the animal(s) has moved beyond a 50-foot radius of the in-water work, or until 30 minutes elapses since the last sighting within 50 feet. Animals must not be herded away or harassed into leaving. All onsite project personnel are responsible for observing water-related activities for the presence of listed species.
(d) Any listed species that is killed or injured by work associated with activities performed shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1(888)404-3922 and ImperiledSpecies@myFWC.com.
(e) Whenever there is a spill or frac-out of drilling fluid into waters accessible to the above species during a directional drilling operation, the FWC shall be notified at ImperiledSpecies@myfwc.com with details of the event within 24 hours following detection of the spill or frac-out.
(19) The permittee shall hold and save the Agency harmless from any and all damages, claims, or liabilities which may arise by reason of the construction, alteration, operation, maintenance, removal, abandonment or use of any activity authorized by the general permit.
(20) The permittee shall immediately notify the Agency in writing of any submitted information that is discovered to be inaccurate.
Rulemaking Authority 373.026(7), 373.043, 373.118(1), 373.406(5), 373.4131, 373.414(9), 373.4145, 373.418, 403.805(1) FS. Law Implemented 373.044, 373.118(1), 373.129, 373.136, 373.406(5), 373.413, 373.4131, 373.414(9), 373.4145, 373.416, 373.422, 373.423, 373.429, 403.814(1) FS. History–New 10-3-95, Amended 10-1-07, Formerly 62-341.215, Amended 10-1- 13, 6-1-18.
8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC)
2''G(STL) 2''G(STL)
2''G(STL) 2''G(STL) 2''G(STL)
GUARD RAIL ON
TOP OF CONCRETE
BLOCK HEADWALL
OHU
OHU
OHU OHU OHU OHU OHU OHU OHU
O H
U
O H
U
O H
U
OHU
OHU OHU
OHU
OHU
OHU
OHU
EM
S
A4
GAS
C4
C3
A5
A7
A8
B2
E5
E4
E3
F2
F3
F1
W 6''PVC
W 6''PVC 6''W (CI) 6''W (CI) 6''W (CI) 6''W (CI) 6''W (CI)
GUARD RAIL ON
TOP ON CONCRETE
BLOCK HEADWALL
BROKEN
CONCRETE
HEADWALL
EDGE OF W
ATER
EDGE OF WATER
SANITARY SEWER MANHOLE
TOP ELEVATION=75.56'
NORTH INVERT(HIGHER)=69.03'
NORTH INVERT(LOWER)=66.65'
SOUTH INVERT=66.75'
S 08°49'14" W 544.74'(F)
RIP RAP
RIP RAP
BM 25-06-17A
NAIL & DISK (No. 7916)
ELEVATION=75.19'
ALGER ROAD
(50' PUBLIC
RIGHT-OF-WAY)
BM 25-06-17B
NAIL & DISK (No. 7916)
ELEVATION=75.64'
EOP
EOP
EOP
EOP
EOP
EOP
UNNAMED CREEK
05-5N-30-2421-000-005
LEWIS DONNA F & HAMMAC
ALTON D & HAMMAC KENNETH E
8300 BLK N CENTURY BLVD
CENTURY, FL 32535
USE: VACANT RESIDENTIAL
05-5N-30-2423-000-002
STOKES GRACE
GRAHAM CRYSTAL DAWN
8221 CENTURY BLVD
CENTURY, FL 32535
USE: STORE, 1 STORY
05-5N-30-2406-000-001
SALAZAR ROLANDO R
8011 ALGER RD
CENTURY, FL 32535
USE: SINGLE FAMILY RESID
05-5N-30-2423-000-000
CARTER RONALD L & CARTER ROSA MITCHELL
8021 ALGER RD
CENTURY, FL 32535
USE: SINGLE FAMILY RESID
EAST RIGHT-OF-WAY
WEST RIGHT-OF-WAY
SPEED LIMIT
(25MPH)
DITCH
X
6" WOOD
PRIVACY FENCE
CONCRETE BLOCK
FOUNDATION
DIRT
DRIVEWAY
BROKEN ASPHALT
AND CONCRETE
RIP-RAP
6"W (PVC) INSIDE
STEEL CASING
62"x 31" CMP (LINED)
INV IN (W) = 68.90
INV OUT (E) = 67.19
18" CMP (LINED)
INV IN (W) = 68.45
INV OUT (E) = 68.14
55"x 32" CMP (LINED)
INV IN (W) = 69.02
INV OUT (E) = 68.31
55"x 32" CMP (LINED)
INV IN (W) = 69.13
INV OUT (E) = 68.65
UNNAMED CREEK
DIRECTION
OF FLOW
DIRECTION
OF FLOW
WETLAND LINES
FLAGGED BY UES
ON 04-16-2025
WETLAND LINES
FLAGGED BY UES
ON 04-16-2025
WETLAND LINES
FLAGGED BY UES
ON 04-16-2025
WETLAND LINES
FLAGGED BY UES
ON 04-16-2025
DITCH
CONCRETE RUBBLE
RIP-RAP
6''W (CI)
6''W (CI) 6''W (CI)
6''W (CI)
6''W (CI)
2''G(STL)
2''G(STL)
2''G (S
TL)
2''G(STL) 2''G(STL) 2''G(STL) 2''G(STL) 2''G(STL)
WOOD POST
(SLOPE = 0.40%)
WM
EM
S
A4
C4
C3
A5
A7
A8
B2
E5
E4
E3
F2
F3
F1
0+00 0+50 1+00 1+50 2+00
GAS
EOP
2025.084/.085 170001-021
SURVEY
NUMBER
PROJECT
NUMBER
FB
3-
, 2 5-
P
P.
2-
, 6 9-
-5 N
-3 0W
DRAWING
NUMBER
N U
M B
ER
R
EV
IS
IO
N
S
EM
D
D R
A W
N B
Y
D A
TE
A
PP
R
O V
ED
B
Y
M A
R C
H
D A
TE
FI
EL
D B
O O
K
PA
G
ES
D
EL
D A
TE
R
EG
. F
LA
. E N
G . N
O
D
ES
IG
N
ED
B
Y
W V
P, II
SI
G
N A
TU
R
E:
C H
EC
K
ED
B
Y
SE
C
TI
O
N
TO
W
N
SH
IP
R A
N G
E
PR
O
JE
C T
M A
N A
G
ER
TI
M
O
TH
Y C
A R
D
EN
D
IS
TR
IC
T:
SHEET OF
C D
B G
-D R
CE
NT
UR
Y
DR
AI
NA
GE
RO
AD
IM
PR
OV
EM
EN
TS
(H
SO
6D
ED
4-
-4
B- B5
-F
CC
F3
AG
F
C H
A N
G E
IN
C O
R
PO
R A
TI
O N
Ye llo w
H ig hL ig ht er
C H
EC
K
ER
R P) ed
P en
X -O ut t o D is ag rr ee o r
R em ar k)
O R
IG
IN
A
TO
R
Q
C or re ct
G re en H ig hl ig ht er
C ha ng e
(R ed
P en
PR
O
D U
C
TI
O N
C H
EC
K
IN
G C
O M
PL
ET
E, R
EA
D
Y
FO
R S
U B M
IT
TA
L R
EV
IE
W
R P)
O R
IG
IN
A
TO
R
R P)
PH
AS
E
RE
VI
EW
SI
GN
AT
UR
E:
D A
TE
D A
TE
D A
TE
D A
TE
R
EM
A R K I
N C O
R
PO
R A
TI
B lu e H ig hl ig ht er
V
ER
IF
IC
A
TI
O N
C H
EC
K
ER
Q
(B lu e H ig hl ig ht er
O R
IG
IN
A
TO
R V
ER
IF
IC
A
TI
re ct
Pi nk H ig hl ig ht er
D A
TE
D A
TE
D A
TE
D A
LE
E
. L O
N G
, P .E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d N a v a rr e
F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
GRAPHIC SCALE:
SCALE IN FEET
SCALE: 1" =
10 5 10 20 30
10'
MES
INC
N
C-101
A
LG
ER
R
O A
D B
R
ID
G E
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
LEGEND:
SET BENCHMARK
SET 1/2" DIA RED CAPPED IRON ROD (No. 7916) FOUND 1/2" DIA CAPPED IRON ROD (No. 0155)
FOUND 1/2" DIA CAPPED IRON ROD (ILLEGIBLE)
FOUND 1/2" DIA IRON ROD (UNNUMBERED)
FOUND 1" DIA IRON PIPE (UNNUMBERED)
DENOTES LINE SHOWN NOT TO SCALE
DENOTES WOOD UTILITY POLE
DENOTES GUY WIRE ANCHOR
DENOTES SINGLE SUPPORT SIGN
DENOTES MULTIPLE SUPPORT SIGN
DENOTES MAILBOX
DENOTES BORE
DENOTES TREE (SIZE AND TYPE)
DENOTES WETLAND FLAG (MARKED BY OTHERS)
DENOTES COMMUNICATIONS VAULT
DENOTES BURIED FIBER OPTIC CABLE MARKER
DENOTES FIRE HYDRANT
DENOTES SANITARY SEWER MANHOLE
DENOTES TEMPORARY BENCHMARK
DENOTES TELEPHONE PEDESTAL
DENOTES WATER METER
DENOTES WATER VALVE
DENOTES SPOT ELEVATION
DENOTES ELEVATION CONTOUR LINE
AT ONE FOOT INTERVALS
DENOTES BURIED TELEPHONE LINE
DENOTES SANITARY SEWER
DENOTES GAS LINE
DENOTES OVERHEAD UTILITIES
DENOTES WATER LINE
DENOTES GUARDRAIL
DENOTES TREE LINE
DENOTES WETLAND LINE
BFE DENOTES BASE FLOOD ELEVATION
BM DENOTES BENCHMARK
CMP DENOTES CORRUGATED METAL PIPE
DIA DENOTES DIAMETER
EL DENOTES ELEVATION
EOP DENOTES EDGE OF PAVEMENT
(F) DENOTES FIELD INFORMATION
(MFH) DENOTES MINIMAL FLOOD HAZARD
No. DENOTES NUMBER
RCP DENOTES REINFORCED CONCRETE PIPE
R/W DENOTES RIGHT-OF-WAY
DENOTES ASPHALT
DENOTES WETLANDS
DENOTES WATER BODY
DENOTES CONCRETE
DENOTES WETLAND BUFFER
+ 6.00
WV
WM
HYD
TP
CVCV
A1
S
A-4
FOC
PROPOSED LEGEND:
VALVE
CAP/PLUG
DOUBLE ROW OF SILT FENCING w/HAYBALES
HAY BALE
SANDBAG
FLOATING TURBIDITY CURTAIN
SOLID SLEEVE CONNECTION
FLUSH HYDRANT
ASPHALT
CONCRETE
RIP-RAP/GRAVEL
HB
SB
F
6''W (PVC)
OHU
6''SS (PVC)
4''G (PE)
BT
R
M
ES
I\
\1
1-
C D
B G
-D R C en tu ry D ra in ag e
D es ig n\
D W
G \S he et s\ A lg er R oa d
Pe rm it\
A lg er R oa d
Ex is tin g
C on di tio ns .d w g, /1
3/
:0 4:
P
M
8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC)
OHU
OHU
OHU OHU OHU OHU OHU
O H
U
O H
U
OHU OHU OHU
OHU
OHU
OHU
EM
S
A4
C4
C3
A5
A7
A8
B2
E5
E4
E3
F2
F3
F1
6''W (CI)
BROKEN
CONCRETE
HEADWALL
EDGE OF W
ATER
EDGE OF WATER
S 08°49'14" W 544.74'(F)
71 72
71 72
71 70
69 68
70 71 72
71 72
BM 25-06-17A
NAIL & DISK (No. 7916)
ELEVATION=75.19' BM 25-06-17B
NAIL & DISK (No. 7916)
ELEVATION=75.64'
UNNAMED CREEK
05-5N-30-2421-000-005
LEWIS DONNA F & HAMMAC
ALTON D & HAMMAC KENNETH E
8300 BLK N CENTURY BLVD
CENTURY, FL 32535
USE: VACANT RESIDENTIAL
05-5N-30-2423-000-002
STOKES GRACE
GRAHAM CRYSTAL DAWN
8221 CENTURY BLVD
CENTURY, FL 32535
USE: STORE, 1 STORY
SALAZAR ROLANDO R
8011 ALGER RD
CENTURY, FL 32535
USE: SINGLE FAMILY RESID
8021 ALGER RD
CENTURY, FL 32535
USE: SINGLE FAMILY RESID
EAST RIGHT-OF-WAY
WEST RIGHT-OF-WAY
DITCH
X
UNNAMED CREEK
DIRECTION
OF FLOW
DIRECTION
OF FLOW
WETLAND LINES FLAGGED
BY UES ON 04-16-2025
WETLAND LINES FLAGGED
BY UES ON 04-16-2025
WETLAND LINES FLAGGED
BY UES ON 04-16-2025
WETLAND LINES FLAGGED
BY UES ON 04-16-2025
DITCH
6''W (CI)
(SLOPE = 0.40%)
ALGER ROAD
(50' PUBLIC
RIGHT-OF-WAY)
SANITARY SEWER MANHOLE
TOP ELEVATION=75.56'
NORTH INVERT(HIGHER)=69.03'
NORTH INVERT(LOWER)=66.65'
SOUTH INVERT=66.75'
0+00 0+50 1+00 1+50 2+00
WM
F
2''G(STL) 2''G(STL) 2''G(STL) 2''G(STL)
2''G(STL)
2''G(STL)
2''G (S
TL)
2''G(STL) 2''G(STL) 2''G(STL) 2''G(STL) 2''G(STL)
2''G(STL) 2''G(STL)
HB
HB HBHB HB
HB HBHB HBHB HBHB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HBHB HB HB HB HB HB HB HB HB
H B
H B
H B
H B
H B
H B
HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB HB
HB
HB
H B
H B
H B
H B
H B
H B
H B
SC
ALE: 1" = 3'
SCALE: 1" = 10'
Profile View of Centerline
0+00 0+50 1+00 1+50 2+00
0+00 0+50 1+00 1+50 2+00
GRAPHIC SCALE:
SCALE IN FEET
SCALE: 1" =
10 5 10 20 30
10'
M
ES
IN
C
N
C-201
2025.084/.085 170001-021
SURVEY
NUMBER
PROJECT
NUMBER
FB
3-
, 2 5-
P
P.
2-
, 6 9-
-5 N
-3 0W
DRAWING
NUMBER
N U
M B
ER
R
EV
IS
IO
N
S
EM
D
D R
A W
N B
Y
D A
TE
A
PP
R
O V
ED
B
Y
M A
R C
H
D A
TE
FI
EL
D B
O O
K
PA
G
ES
D
EL
D A
TE
R
EG
. F
LA
. E N
G . N
O
D
ES
IG
N
ED
B
Y
W V
P, II
SI
G
N A
TU
R
E:
C H
EC
K
ED
B
Y
SE
C
TI
O
N
TO
W
N
SH
IP
R A
N G
E
PR
O
JE
C T
M A
N A
G
ER
TI
M
O
TH
Y C
A R
D
EN
D
IS
TR
IC
T:
SHEET OF
C D
B G
-D R
CE
NT
UR
Y
DR
AI
NA
GE
RO
AD
IM
PR
OV
EM
EN
TS
(H
SO
6D
ED
4-
-4
B- B5
-F
CC
F3
AG
F
C H
A N
G E
IN
C O
R
PO
R A
TI
llo w
H ig hL ig ht er
C H
EC
K
ER
ed
P en
X -O ut t o D is ag rr ee o r
R em ar k)
O R
IG
IN
A
TO
R
Q re ct
G re en H ig hl ig ht er
C ha ng e
(R ed
P en
PR
O
D U
C
TI
O N
C H
EC
K
IN
G C
O M
PL
ET
E, R
EA
D
Y
FO
R S
U B M
IT
TA
L R
EV
IE
W
R P)
O R
IG
IN
A
TO
R
R P)
PH
EW
SI
GN
AT
UR
E:
D A
TE
D A
TE
D A
TE
D A
TE
R
EM
A R K I
N C O
R
PO
R A
TI
lu e H ig hl ig ht er
V
ER
IF
IC
A
TI
O N
C H
EC
K
ER
Q e H ig hl ig ht er
O R
IG
IN
A
TO
R V
ER
IF
IC
A
TI
re ct
Pi nk H ig hl ig ht er
D A
TE
D A
TE
D A
TE
D A
LE
E
. L O
N G
, P .E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d N a v a rr e
F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
A
LG
ER
R
O A
D B
R
ID
G E
P
LA
N A
N D
P R
O
FI
LE
EX. 8" SS (PVC)
SHEET PILE WALLSHEET PILE WALL
EX. 8" SS (PVC)
EXISTING
MANHOLE
INSTALL PERIMETER SILT FENCING
(TYPE IV WIRE BACKED) ALONG THE
ROW WITHIN THE WORK AREA. SILT
FENCING WILL BE BACKED w/HAY
BALES ADJACENT TO WETLAND AREAS.
INSTALL FLOATING
TURBIDITY CURTAIN.
INSTALL FLOATING
TURBIDITY CURTAIN.
PROPOSED CONCRETE
BRIDGE (27'-1" L x 23 W)
INSTALL:
130LF ~ 2" LDPE HORIZONTAL
DIRECTIONAL BORE
RAISE MANHOLE RING
AND COVER TO GRADEBEGIN ASPHALT
STA 0+16
BEGIN APPROACH
STA 0+70.92
BEGIN BRIDGE
STA 0+86
END BRIDGE
STA 1+13.83
END APPROACH
STA 1+28.92
END ASPHALT
STA 1+79
PROPOSED: CONCRETE BRIDGE
(27'-10"L x 22'-11"w)
PROPOSED
BRIDGE
PROPOSED
APPROACH SLAB
PROPOSED
APPROACH SLAB
PROPOSED
ROAD ℄
EXISTING
ROAD ℄
EXISTING
ROAD ℄
PROPOSED
ROAD ℄
PROPOSED 2"G (STEEL)
PROPOSED 2"G (STEEL)
PROPOSED 2"G (PE)
INSTALLED VIA
HORIZONTAL
DIRECTIONAL BORE
10' MIN
DHW: 72.50
OHW: 69.96
NHW: 71.23
PROPOSED 2"G (PE)
INSTALLED VIA
HORIZONTAL
DIRECTIONAL BORE
LEGEND AREAS VOLUMES
WETLAND IMPACT
1,766 SQFT 4,121 CUFT
RIP-RAP
1,951 SQFT
BEDDING STONE
1,951 SQFT
TEMPORARY DITCH IMPACT
215 SQFT
WALL CAP WALL CAP
INSTALL PERIMETER SILT FENCING
(TYPE IV WIRE BACKED) ALONG THE
ROW WITHIN THE WORK AREA. SILT
FENCING WILL BE BACKED w/HAY
BALES ADJACENT TO WETLAND AREAS.
21'-10" CLEAR
ABUTMENT FACE
OF SHEET PILE
R
M
ES
I\
\1
1-
C D
B G
-D R C en tu ry D ra in ag e
D es ig n\
D W
G \S he et s\ A lg er R oa d
Pe rm it\
A lg er R oa d
Pr op os ed
.d w g, /1 3/
:0
3:
VE
TI
C
AL
S
C
AL
E:
HORIZONTAL SCALE: 1"=10'
STA 1+00.00
0 10 20 300-10-20-30
VE
R
TI
C
AL
S
C
AL
E:
HORIZONTAL SCALE: 1"=10'
STA 0+55.00
0 10 20 30 400-10-20-30-40
VE
R
TI
C
AL
S
C
AL
E:
HORIZONTAL SCALE: 1"=10'
STA 1+45.00
0 10 20 30 400-10-20-30-40
C-201
2025.084/.085 170001-021
SURVEY
NUMBER
PROJECT
NUMBER
FB
3-
, 2 5-
P
P.
2-
, 6 9-
-5 N
-3 0W
DRAWING
NUMBER
N U
M B
ER
R
EV
IS
IO
N
S
EM
D
D R
A W
N B
Y
D A
TE
A
PP
R
O V
ED
B
Y
M A
R C
H
D A
TE
FI
EL
D B
O O
K
PA
G
ES
D
EL
D A
TE
R
EG
. F
LA
. E N
G . N
O
D
ES
IG
N
ED
B
Y
W V
P, II
SI
G
N A
TU
R
E:
C H
EC
K
ED
B
Y
SE
C
TI
O
N
TO
W
N
SH
IP
R A
N G
E
PR
O
JE
C T
M A
N A
G
ER
TI
M
O
TH
Y C
A R
D
EN
D
IS
TR
IC
T:
SHEET OF
C D
B G
-D R
CE
NT
UR
Y
DR
AI
NA
GE
RO
AD
IM
PR
OV
EM
EN
TS
(H
SO
6D
ED
4-
-4
B- B5
-F
CC
F3
AG
F
C H
A N
G E
IN
C O
R
PO
R A
TI
llo w
H ig hL ig ht er
C H
EC
K
ER
ed
P en
X -O ut t o D is ag rr ee o r
R em ar k)
O R
IG
IN
A
TO
R
Q re ct
G re en H ig hl ig ht er
C ha ng e
(R ed
P en
PR
O
D U
C
TI
O N
C H
EC
K
IN
G C
O M
PL
ET
E, R
EA
D
Y
FO
R S
U B M
IT
TA
L R
EV
IE
W
R P)
O R
IG
IN
A
TO
R
R P)
PH
EW
SI
GN
AT
UR
E:
D A
TE
D A
TE
D A
TE
D A
TE
R
EM
A R K I
N C O
R
PO
R A
TI
lu e H ig hl ig ht er
V
ER
IF
IC
A
TI
O N
C H
EC
K
ER
Q e H ig hl ig ht er
O R
IG
IN
A
TO
R V
ER
IF
IC
A
TI
re ct
Pi nk H ig hl ig ht er
D A
TE
D A
TE
D A
TE
D A
LE
E
. L O
N G
, P .E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d N a v a rr e
F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
A
LG
ER
R
O A
D B
R
ID
G E
C R
O S
S S
EC
TI
O N
S
EXISTING
GRADE
EXISTING
GRADE
EXISTING
GRADE
EX. 8" SS (PVC)
PROPOSED
2"G (PE)
EX. 8" SS (PVC)
PROPOSED
2"G (PE)
PROPOSED
2"G (PE)
EX. 8" SS (PVC)
DHW: 72.50
OHW: 69.96
NHW: 71.23
℄ A
LG
ER
R
D
℄ A
LG
ER
R
D
℄ A
LG
ER
R
D
EA
ST
W
ET
LA
ND
L
IN
E
W
ES
T W
ET
LA
ND
L
IN
E
EA
ST
R
OW
W
ES
T
RO
W
FINISHED
GRADE
FINISHED
GRADE
FINISHED
GRADE
PROPOSED
6"W (PVC)
PROPOSED
6"W (PVC)
PROPOSED
6"W (PVC)
EA
ST
R
OW
W
ES
T
RO
W
EA
ST
R
OW
W
ES
T
RO
W
TRAFFIC
RAILING
(TYP)
4:1 MAX
TIE-BACK4:1 MAX
TIE-BACK
W
ES
T W
ET
LA
ND
L
IN
E
4:1 MAX
TIE-BACK
4:1 MAX
TIE-BACK
BEDDING
STONE
RIP-RAP
R
M
ES
I\
\1
1-
C D
B G
-D R C en tu ry D ra in ag e
D es ig n\
D W
G \S he et s\ A lg er R oa d
Pe rm it\
A lg er R oa d
Pr op os ed
.d w g, /1 3/
:0
3:
| May 12, 2026 |
| Clerk Date |
| 62-330.405 General Conditions for All General Permits |
| 02 Drawings.pdf |
| Alger Road Permit Drawings 03-13-2026.pdf |
| 20 Alger Road Existing Conditions-01 Alger Road Existing |
| Sheets and Views |
| 01 Alger Road Existing |
| 25 Alger Road Proposed-02 Alger Plan and Profile |
| Sheets and Views |
| 02 Alger Plan and Profile |
| 25 Alger Road Proposed-03 Alger Cross Sections |
| Sheets and Views |
| 03 Alger Cross Sections |
File details come from the government source that posted it. Updated .