C O N S T R U C T I O N
S T A T E M E N T O F W O R K
For
VGLZ 212027
Repair Storm Sewer 340 District – George Ave
6 May 2021
STATEMENT OF WORK (SOW)
2 | P a g e
Project Date: May 6, 2021
Project Title: Repair Storm Sewer 340 District
Project Number: VGLZ212027
Project Engineer: Brian McMenemy
Project Inspector: Brian McMenemy
1.0 GENERAL INSTALLATION REQUIREMENTS
1.1. Scope: The Contractor shall provide all personnel, equipment, tools, materials, supervision and quality control necessary to excavate, remove existing piping and associated electric pump equipment and install a drainage pipe between storm sewer segments as outlined in this Statement of Work (SOW). The Contractor shall perform in accordance with standards specified in the contract.
1.2. Background: An underground section of storm sewer piping has sustained significant damage from tree root penetration. The tree root penetration has caused the pipe to crack and collapse; thus impeding drainage and causing above-ground flooding. The underground section of pipe consists of clay piping and is approximately 400 feet in length. It is desired that the damaged section of storm sewer piping be replaced so normal drainage can be restored.
1.3. Period of Performance: Services shall be completed within 60 days of the contract award.
1.4. General Information:
1.4.1. Quality Control (QC): The Contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with (IAW) this SOW.
The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. A written copy of the contractor’s QCP shall be furnished to the Contracting Officer (KO) at the pre-performance meeting.
Records of the contractor’s quality inspections shall be maintained for the life of the contract and made available to for Government inspection as requested. After acceptance of the QCP, the Contractor shall obtain the KO’s acceptance in writing of any proposed changes to the QCP.
1.4.1.1. Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality levels / defect rates.
1.4.1.2. The Contractor shall ensure that timely and effective corrective action is obtained for all deficiencies identified by the Government. All deficiency responses shall include identification of the root cause of the deficiency to preclude reoccurrence and an analysis of the quality program’s effectiveness in the area of deficiency.
3 | P a g e
1.4.2. Recognized Holidays: The Contractor is not required to work during Federal Holidays. The following are recognized US Holidays.
1.4.2.1. New Year’s Day - January 1
1.4.2.2. Martin Luther King Jr.’s Birthday - Third Monday in January
1.4.2.3. Washington’s Birthday - Third Monday in February
1.4.2.4. Memorial Day - Last Monday in May
1.4.2.5. Independence Day - July 4th
1.4.2.6. Labor Day - First Monday in September
1.4.2.7. Columbus Day - Second Monday in October
1.4.2.8. Veterans Day - November 11th
1.4.2.9. Thanksgiving Day - Last Thursday in November
1.4.2.10. Christmas Day - December 25th
1.4.3. Place and Performance of Services: The Contractor shall perform the services required under this contract within core operating hours, which are 7:00 am until 4:30 pm Eastern Standard Time, Monday through Friday, except on recognized US holidays or when the Government facility / installation is closed due to local or national emergencies, administrative closures, or similar Government-directed facility/installation closings. Performance shall be in locations as illustrated on the Project Drawings provided within the contract. The Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined herein.
1.4.3.1. The Contractor may request permission to work outside these working hours by obtaining approval from the KO at no additional cost to the Government (includes weekends and extended daily working hours). Overtime and/or weekend, or holiday work typically involves internal extra costs to the Government and generally is not approved unless determined to be absolutely necessary to sustain mission critical facilities.
1.4.3.2. Unscheduled gate closures by the Selfridge Security Forces may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted nor prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by Contractor personnel are subject to search pursuant to applicable regulations.
Any moving violation of any applicable motor vehicle regulation may result in the termination of the Contractor employee’s installation driving privileges.
1.4.3.3. The contractor’s employees shall become familiar with and obey regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter the restricted areas when required to do so and only upon prior approval. All Contractor employees shall carry proper identification with them at all times. The Contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.
1.4.3.4. Base entry: The Contractor and Contractor employees shall comply with all base traffic regulations. Award of this contract does not create a right to have access to any military installation.
4 | P a g e
1.4.3.5. Retrieving Identification Media: The Contractor shall retrieve all identification media, including vehicle passes, from employees who depart for any reason before the contract expires (i.e. terminated for cause, retirement, etc.) and upon completion of all work of the contract. Contractor shall turn in all retrieved media to the Pass and Identification Office.
1.4.3.6. Employees with Criminal Records: Employee’s with criminal records shall be identified on an individual basis to the KO.
1.4.3.7. Employee Training: The Contractor is responsible for providing a fully trained and qualified workforce. Therefore, except as otherwise indicated, the Contractor shall train, qualify and certify personnel for specific job tasks to be performed at the contractors own expense. Records of training, qualification and certification shall be maintained by the Contractor and made available for Government review upon request.
1.4.4. Security Requirements: The contractor, the contractor’s employee’s and all subcontractors are subject to, and shall abide by and comply with, all relevant statues, ordinances, laws and regulations of the United States (including Executive Orders of the President) and any state (or other public authority now or hereafter lawfully enforced).
1.4.4.1. COMSEC/IT Security: All communications with DoD organizations are subject to communications security (COMSEC) review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the Contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information.
1.4.4.2. Base Access / Security: Prior to access to this installation the Contractor shall provide a list to the KO of Contractor employees that include the employee’s:
full name, date of birth, driver’s license number, state of issue, gender and race. The Contractor shall submit a revised list to the KO whenever changes occur (for example, for a new hire and when / if an employee is terminated)
1.4.4.2.1 Contractor and Contractor personnel shall comply with Selfridge
ANGB registration requirements for company and privately owned vehicles on Government property. Entry authorizations and vehicle registrations must be renewed as required by the Selfridge Pass and Identification Office.
1.4.4.2.2 Vehicles: Contractor personnel are subject to random personnel and vehicle searches. If Contractor personnel refuse to be searched, they will be denied access to the base. Denial of entry to personnel who refuse to be searched, or detention of personnel found to be in possession of contraband, may result in loss of base driving privileges, debarment from the base, or other administrative action.
5 | P a g e
1.4.4.2.3 Contractor personnel are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may lose base driving privileges, debarment from the base, or other administrative action. Contractor personnel wishing to operate a privately owned vehicle at Selfridge ANGB and must comply with base registration requirements.
1.4.4.2.4 Weapons, Firearms and Ammunition: Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned or privately-owned vehicles while on Selfridge ANGB.
1.4.4.3. Antiterrorism: Contractor shall adhere to installation guidance and operational plans concerning the antiterrorism program. Attend required meetings as identified by the installation’s antiterrorism office. Participate in installation random antiterrorism measure (RAM) program for surveillance and protection of the infrastructure. Report results of RAMs to the installation antiterrorism office. Initiate actions directed by the installation commander during changes to force protection conditions to increase surveillance and protection of infrastructure. Immediately notify base security forces on any suspicious events.
1.4.4.4. Contractor shall not enter any restricted area without the prior approval of the KO and without being accompanied by a proper security escort.
1.4.4.5. Physical Security: The Contractor shall be responsible for safeguarding all
Government property and controlled forms, if provided for Contractor use.
The Contractor shall ensure at the end of each work period, all Government facilities, equipment, and materials are secured, to include turning off all lights and water, turning down the heat, and securing all facility doors and windows.
1.4.4.6. Access and General Protection/Security Policy and Procedures. This standard language is for Contractor employees with an area of performance within Government controlled installation, facility, or area. The Contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The Contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in Contractor security matters or processes.
1.4.4.7. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), 6 | P a g e applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.4.4.8. AT Level I Training. This standard language is for Contractor employees with an area of performance within a Government controlled installation, facility or area. All Contractor employees, to include sub-Contractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected Contractor employee and sub-Contractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil
1.4.6. Safety/Environmental: The Contractor shall comply with all federal and state OSHA requirements and standards, technical orders, regulations, and referenced publications as published in the OSHA 29 CFR. The Contractor shall comply with the highest degree of safety protection where any disagreements exist. The Contractor shall comply with the US Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1. Additionally, the Contractor shall comply with installation regulations governing safety and fire prevention, IAW SANGBI 32-7, Fire Protection Program. The KO, Base Civil Engineer (BCE) or designated representative, Ground Safety, Safety, and Security Police may issue an order to the Contractor or employee(s) to stop all or part of the contractor’s work until all violations are corrected. Bio-environmental Engineering personnel, who notice violation of OSHA or local standards, will notify the KO who has the authority to stop all or part of the contractor’s work. The Contractor shall not be excused for unsatisfactory performance that may result from a stop work order.
1.4.6.1. Accident prevention and safety practices on contractual work under the jurisdiction of the Contracting Officer are the responsibilities of the Contractor concerned. The Contractor shall brief all employees on proper safety and accident reporting. The Contractor shall provide all occupational health services to his employees. Contractor employees shall be instructed to notify the contractor’s Contract Manager of potential or existing occupational health hazards that require attention.
1.4.6.2. Liability. The Contractor hereby agrees to release the Government (to include its officer, enlisted personnel, agents, and employees) from any liability for any loss, damage, or injury sustained by the Contractor or his employees during the performance of this contract. The Contractor also agrees to indemnify the Government for any loss, damage, or injury to Government personnel or agents or other third parties, provided such loss to the Government is caused by the negligence of the Contractor or his personnel while performing this contract.
1.4.6.3. Hazardous Materials (HM) Handling. The Contractor shall comply with all federal, state, local and Selfridge ANGB regulations concerning the use, storage, and reporting of any HM used, or planned to be used in the
7 | P a g e contractor’s operations. The Contractor shall provide to Selfridge ANGB, a list of any HM to be used via Selfridge ANGB Form 23. The list shall be submitted to the KO prior to the start of work requiring HMs and prior to bring the HM onto Selfridge ANGB. The list shall identify each HM including a product name and manufacturer if available, a quantity of material that will be used, disposal procedures and a copy of each material’s Safety Data Sheets (SDS). The Contractor shall also maintain a copy of all SDS used in the performance of this contract. Where applicable, the Contractor shall use environmentally safe products in the course of completion of the project. The Contractor shall be responsible for the safe handling of all potentially HMs while on Selfridge ANGB. In the case of a release of a HM into the environment, the Contractor shall initiate clean up and make all notifications as outlined in the Selfridge ANGB Spill Plan. If base personnel are involved in clean-up operations, the contractor’s responsibility will include the reimbursement of all costs incurred by the Government to include supplies, man-hours, and disposal of the waste. Any spills must be reported to 127 Environmental Management (EM) Office as soon as possible or within 24 hours.
1.4.6.3.1. Handling, Storage and Disposal of Hazardous Waste (HW). All
HW shall be handled and stored in strict compliance with federal, state and, local regulations. Contractors will be held fully liable for any negligence that results in a Notice of Violation or other penalty. HW will be defined as a solid or liquid waste which exhibits a characteristic such as flammability, corrosivity, reactivity, or toxicity, as identified in 40 CFR 261.10-261.35.
Any mixture of a solid or liquid waste and a listed HW is also considered a HW. It must be understood that proper management of any waste generated, hazardous or non-hazardous, shall and will be the responsibility of the contractor. Any Government owned shipment of HW shall be documented on a HW Manifest and signed by a Civil Engineering Environmental Office representative.
1.4.6.3.2. Contractors are required to report the amount of used and unused HM on-base at the beginning, mid-point, and end of the construction project. Contractors must also report any significant hazardous material type or quantity changes.
1.4.6.3.3. Any petroleum, oil, and lubricant required for project including storage, transportation, disposal, and utilization on Selfridge, must be in accordance with in Selfridge Design Standards (2017).
1.4.6.4. Solid Waste Disposal: All materials reused, recycled or disposed of in the course of a construction or demolition contract shall be quantified on the Air Force (AF) Form 72 (Solid Waste Disposal and Diversion Tracking Form) and must be completed in accordance with DoD Pollution Prevention Measure of Merit Memorandum (dated 1998-08-06). All non-hazardous solid waste materials including demolition and construction debris (concrete, piping, etc.) transferred off the installation must be accounted. Contractor
8 | P a g e personnel, to include any subcontractors, shall not dispose of any liquid nor solid wastes in Government dumpsters.
1.4.7. The Contractor shall comply with the requirements of the Air Force Affirmative Procurement Program and EPA’s Comprehensive Procurement Guideline and Recovered Materials Advisory Notice contained therein, and the installation Affirmative Procurement Program. Affirmative Procurement is the purchase of supplies and services containing post-consumer, recycled or recovered materials. The Contractor shall support the program by identifying, pursuing, and tracking the procurement of these items where applicable.
1.4.8. Special Qualifications:
1.4.8.1. All Contractor employees must read, write, speak, and understand English fluently.
1.4.8.2. All Contractor employees who operate motorized vehicles on SANGB shall possess a current state driver’s license.
1.4.9. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart
42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the contactor’s performance. At these meetings, the KO will apprise the Contractor of how the Government views the contractor’s performance and the Contractor shall apprise the Government of problems, if any, being experienced The Contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9.1. Government Observations and Inspections. Government personnel other than
KOs and CORs may occasionally observe contract operations. These personnel will not, however, interfere nor provide direction to the contractors’ performance.
1.4.10. Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the Contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, or the KO if a COR is not available, to resolve issues, receive directions and ensure adequate performance of services. The CM shall ensure that Contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure Contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10.1. The CM or alternate(s) shall be available during normal duty hours within
45 minutes of notification to meet on the installation with the COR or other Government personnel (designated by the KO). After normal duty hours, the manager or designated alternate(s) shall be available within one (1) hour of notification. The Contractor shall furnish, in writing to the KO, the names
9 | P a g e and phone numbers of the CM and alternate(s) not later than the contract pre-performance conference. The KO shall be notified immediately whenever changes are made.
1.4.10.2. Performance Evaluation Meetings. The KO will require the CM to meet with the KO, CS, COR, and other Government personnel as deemed necessary. These meetings shall be held weekly for the first month of the contract and monthly thereafter, or as determined by the KO. The purpose of these meetings is to establish a partnership to resolve issues. Written minutes of any such meeting shall be recorded in the contract and distributed to all interested parties.
1.4.11. Contractor Employees. The Contractor shall employ only personnel who meet or exceed minimum qualifications. Resumes/additional documentations for personnel proposed to fill the CM position shall be provided to the KO at the pre-performance conference. Documentation shall also be provided during the contract performance should any changed in personnel be made. The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the KO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
1.4.11.1. The contractor’s staff shall be fully qualified, professional, and customer service oriented. The Contractor shall ensure quality work performance IAW applicable standards and guidelines. Additionally, the Contractor is expected to be a partner with the base community in continuously improving the quality of programs and service offered to customers.
1.4.11.2 Identification of Contractor Employees: All Contractor personnel are required to identify themselves as such to avoid creating an impression that they are Government employees. Contractor personnel shall present a neat appearance and wear identification badges or uniforms distinguishing themselves as such. The badges/uniforms shall have the company name and employee name displayed.
1.4.12. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and Contractor employees shall not engage in any form of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract.
The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The Contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR subpart 22.17.
1.4. 13. Conservation of Utilities. The Contractor shall ensure employees practice utilities conservation. Service problems shall be immediately identified to the COR.
10 | P a g e
1.4.14. Coordination with Other Contractors. The Government may award other contracts or additional work not prescribed in this contract. The Contractor shall fully cooperate with other such contractors. The Contractor shall not commit or permit any act that will interfere with the performance of work by another contractor.
1.4.15. The Contractor may propose substitutions for the Government’s consideration for any equipment and software for any provided product(s) that may become available as a result of technical improvements, to include billing administration and processing services.
2.0 DEFINITIONS:
2.1. CERTIFIED TOPSOIL: Soil(s) with high organic content, low salts, high nutrient values and free of debris or any environmental contamination that exceeds residential Part 201 and Part 213 Cleanup Criteria and Risk based screening levels.
2.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.3. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
2.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor Contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.6. DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.7. HAZARDOUS MATERIAL (HM): Hazardous Material for the purpose of these standards shall mean any item:
2.7.1. That is a health hazard or physical hazard as defined in 29 CFR 1910.1200 and/or its disposal is regulated by EPA under 40 CFR.
2.7.2. That is hazardous in accordance with DOT regulations under 49 CFR.
2.7.3. That is hazardous in accordance with the Dangerous Goods Regulations of the
International Air Transport Association.
2.7.4. That contains asbestos, mercury or polychlorinated biphenyls (PCBs).
11 | P a g e
2.7.5. That is magnetic and regulated under 49 CFR.
2.7.6. Any other substance listed as having characteristics of flammability, corrosivity, reactivity, toxicity, or contains any listed constituents, or be otherwise harmful to personnel and/or the environment.
2.8 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.9. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.10 QUALITY ASSURANCE (QA). The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.11. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.12. QUALITY CONTROL (QC). All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.13. SAFETY DATA SHEET (SDS): A summary of safety, health, environmental and emergency response information provided by the product manufacturer or distributor. The SDS contains information about the material hazards as required by the Hazard Communication Standard (HCS.)
2.14. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.15. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.16. WORK WEEK. Monday through Friday, unless specified otherwise.
3.0 GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT AND SERVICES
(GFP/M/E/S):
3.1. The Government will not provide GFP/M/E/S to the contractor.
3.2. Emergency Medical Services: For response to on-site emergencies, call 911, and indicate to the operator that you are located on Selfridge ANGB.
4.0. CONTRACTORFURNISHED PROPERTY, MATERIALS AND EQUIPMENT (CFP/M/E):
4.1. The Contractor shall furnish everything required to perform these services as indicated in Section 1.1.
4.2. VEHICLES: The Government will not provide vehicles for use on this contract. The vehicle shall be of a conservative color, shall be maintained in a safe and serviceable condition, and shall present a professional appearance at all times. Vehicles found to be unsafe or unable to function as designed
12 | P a g e shall be removed from the installation and replaced at the contractor’s expense. Vehicle repairs shall not be accomplished on base. All vehicles shall be registered, licensed, and insured at all times.
4.2.1. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicle and be maintained clean to present a neat, professional appearance.
4.3. EQUIPMENT LIST: The Contractor shall submit a complete list of equipment that will be used during the performance of this contract. This list shall be submitted with the contractor’s proposal.
5.0. REQUIREMENTS:
5.1. PRE-DEMOLITION PLANNING: Refer to the included project site sketch for approximate location of work.
5.1.1. Prior to beginning work the Contractor shall contact Selfridge Environmental Management Office to obtain most recent soil and/or groundwater analytical data for determining Contractor personnel risk exposures, if any.
5.1.2. Elevated noise levels in the area may exist as the worksite is within noise contours of aircraft operations, follow General Specs 01 35 13 (emphasis added to section 3.1.6.). The Contractor shall provide personal protective equipment to Contractor employees and subcontractors to eliminate hazards to personnel.
5.2. EXCAVATION & REMOVAL OF DEFECTIVE STORM SEWER COMPONENTS: The
Contractor shall excavate earth and debris, as necessary, to remove defective storm sewer piping.
5.2.1. The Contractor shall adhere to the following with regard to any ground disturbance activities:
5.1.2.1. Excess (non-contaminated) soils can be managed by backfilling native material or grading and seeding in the local vicinity or transporting to one of the on-site excess soil stockpile areas, in accordance with Soil Relocation Guidance for SANGB (dated 2018-10-24) and Selfridge Design Standards (2017).
5.1.2.2. Soil erosion permit, plan and best management practices (BMPs) must be established and maintained in accordance with Macomb County Macomb County Soil Erosion and Sedimentation Control Ordinance, adopted 16 August 2007 and Selfridge Design Standards (2017).
5.1.2.2.1. Selfridge Design Standards (2017) Soil Erosion sections identify the plan requirements, permit process and sequence of events for review approval, and issuance. Plans must be approved by a Professional Engineer prior to submittal to Macomb County.
5.1.2.3. Dust control for fugitive emissions must be included in soil erosion BMPs.
5.1.2.4. Any dewatering of non-contaminated groundwater or surface water infiltration will be discharged by pumping through a filter sock/dewatering bag and allowed to infiltrate into the surface vegetation and soils, in accordance with Selfridge Design Standards (2017).
13 | P a g e
Discharged water must not negatively affect surface vegetation or soils causing additional soil erosion and/or sediment transport (scouring).
Dewatering discharges into storm water catch basins, storm water conveyances (drains and/or ditches), and/or sanitary sewer shall not occur, and dewatered silts/sediments/sands must remain on-site and not cause erosion or carry sediments off-site.
5.1.2.4.1. When dewatering contaminated/impacted groundwater, follow General Specs 02 61 00 Removal and Disposal of Contaminated Soil and Removal and Disposal of Contaminated Media Supplement
5.1.2.5. Groundwater activities must be in accordance with Crock Wells and
Groundwater Wells Guidance for SANGB (dated 2002-05-03).
5.1.2.6. Prior to beginning work, the Contractor must complete a dig permit form
(AF 103). Completion of the AF 103 form includes, at a minimum: the Contractor obtaining names and signatures from representatives of all “organizations” listed on the AF 103 form. Additionally, the Contractor shall cooperate with all utility marking efforts by said organizations. The Contractor shall act with diligence and cooperate with organizational representatives to ensure all utilities are marked prior to work commencing.
5.1.2.7. Where compaction of earth material to a specified relative compaction is required, tests shall be performed in sufficient number to ensure that the specified relative compaction is obtained. Testing is the responsibility of the Contractor and performed at no additional cost to the government.
(See general specification 33 40 00, para. 3.6.5.)
5.2.2. The Contractor shall remove defective sections of the storm sewer as follows:
5.2.2.1. Remove concrete, asphalt soil and / or other debris, as necessary, to create a trench to access the defective 18” (I.D.) piping. The maximum width of the trench is: the outside diameter of the new pipe, plus 12 inches. (See general specification 33 40 00, para. 3.1.1.) The location of the defective piping onboard Selfridge ANGB can be identified by using included sketches.
5.2.2.2. Remove entirety of defective 18” (I.D.) pipe. This includes any pieces of pipe that may have broken loose due to root penetration or other damage to the pipe. The defective pipe run is approximately 348 feet long. The Contractor shall lawfully dispose of the defective piping and any other waste. Dumping into Government owned containers, such as dumpsters, is not an acceptable disposal method.
5.2.3. The Contractor shall clear the trench of debris:
5.2.3.1. The Contractor shall ensure the trench is free of vegetation roots prior to installing new piping. The Contractor is prohibited from using herbicide, or the like, to kill roots because the herbicide, or the like, may also kill the source of the roots (i.e. trees).
5.2.3.2. The Contractor shall dewater the trench if excessive water exists in the trench. Additionally, the Contractor shall excavate soft material, such as muck, if soft material exists in the trench. Excavation shall occur, only as necessary, until a firm earth material is exposed throughout the bottom of the trench. Firm earth material is defined as any earth
14 | P a g e material, such as firm soil, that will provide a firm base for bedding for the pipe. (See general specification 33 40 00, para. 3.1.3.) Any soft material, such as muck, that may be removed shall be replaced with sand. The sand shall be installed and compacted in 6 inch (compacted depth) lifts. The sand must be compacted to 95% of relative compaction as determined in accordance with ASTM D1557. Hand compaction is not allowed.
5.3. INSTALL NEW PIPING: The Contractor shall install new 18” (I.D.) storm sewer pipe comprised of the following:
5.3.1. The new 18” (I.D.) pipe shall be fully formed of High Density Poly Ethylene (HDPE) material.
5.3.2. When installing the new pipe, the Contractor must exercise care to ensure site debris, sludge nor silt enters the storm sewer network. These aforementioned materials could cause blockages, flooding and/or pollution within the storm sewer network.
5.3.3. The Contractor shall ensure 6 inches (in compacted depth) of sand, at a minimum, is installed as bedding for the new HDPE pipe. The sand bedding must be compacted to 95% of relative compaction as determined in accordance with ASTM D1557. Hand compaction is not allowed.
5.3.4. The Contractor shall install the new 18” (I.D.) HDPE pipe, on the sand bedding, such that the both ends of the pipe are installed and properly aligned to their respective manhole flow channels. The Contractor shall ensure the joints, connecting the pipe ends to the manhole flow channels, are watertight.
5.3.4.1. Prior to burying the newly installed piping, the Contractor shall perform and document a leak check, and coordinate all findings with the COR.
5.3.5. The Contractor shall install lifts of sand evenly on both sides of the new HDPE pipe. Each lift of sand shall not exceed 6 inches in compacted depth. (See general specification 33 40 00, para. 3.1.6.). Each lift of sand shall be compacted to 95% of relative compaction as determined in accordance with ASTM D1557. Hand compaction is not allowed. Lifts of sand shall be installed and compacted one-by-one until sand has uniformly reached an elevation of at least 12 inches (compacted) above the top center of the pipe (see applicable backfill cross section details).
5.4. RESTORE GROUND AND PROVIDE CLEAN UP: The Contractor shall restore the ground to approximate original site conditions.
5.4.1. Repair all areas to return ground to approximate original condition(s):
5.4.1.1. For areas of land where turfed traffic areas are to be restored, install uniform lift(s) of native material, not exceeding 1 foot in compacted depth, to form a final backfill region. Each native material lift shall be compacted to 92% of relative compaction as determined in accordance with ASTM D1557 (see general specification 31 20 00, section 3.5 (I) (3)) before proceeding to the next lift. Hand compaction is not allowed.
The final backfill region comprises the point where the initial backfill sand terminates, as illustrated in the applicable “backfill cross section” sketch, up to 4 inches below ground level.
15 | P a g e
5.4.1.1.1. The Contractor shall ensure that the earth restoration results in grade and slope, of the restored area, matching grade and slope of the existing surrounding turf traffic areas.
5.4.1.1.2. The Contractor shall form a 4 inch thick lift (compacted depth) of certified topsoil material over the compacted final backfill region.
5.4.1.1.3. Placed certified topsoil shall be stabilized immediately by:
(1) seeding complying with Selfridge Design Standards or MDOT Class A seed mix (2) installation of silt fence or other controls as specified on an approved soil erosion permit.
5.4.1.2. For areas of land where sidewalk(s) are to be restored, install uniform lift(s) of sand, not exceeding 1 foot in compacted depth, to form a subgrade region. Each lift of sand must be compacted to 95% relative compaction as determined in accordance with ASTM D1557 before proceeding to the next lift. Hand compaction is not allowed. The subgrade region comprises the point where the initial backfill sand terminates, as illustrated in the applicable “backfill cross section” sketch, up to approximately 4 inches below ground level.
5.4.1.2.1. The Contractor shall form and install 4 inch thick concrete slab(s) over the subgrade region as illustrated in the applicable “backfill cross section” sketch. The 4 inch thick concrete slab(s) must match cross section, grades, finish and jointing of existing structures, to include but not limited to:
adjacent curb(s) and sidewalk(s).
5.4.1.2.1.1. The Contractor shall ensure the 4 inch thick
concrete slab is reinforced with welded wire or formed bar mats when either of the following conditions occur: (1) it was obvious that the originally removed concrete (see section 5.2.2.1) was reinforced or (2) the new slab is an “odd-shaped slab” as defined by section 14-1.3.1 of UFC 3-250- 01.
5.4.1.2.1.2. The installed slab must have a minimum
compressive strength of 3500 PSI (25MPa) when installed.
. 5.4.1.2.2. The Contractor must ensure the surface restoration includes positive drainage.
5.4.1.3. For areas of land where roadway(s), parking lot(s) or curb(s) and gutter(s) will be restored, install uniform lift (s) of sand, not exceeding 1 foot in compacted depth, to form a subgrade region. Each lift of sand shall be compacted to 95% of relative compaction as determined in accordance with ASTM D1557 before proceeding to the next lift. Hand compaction is not allowed. The subgrade region comprises the point
16 | P a g e where the initial backfill sand terminates, as illustrated in the applicable “backfill cross section” sketch, up to approximately 10 inches below ground level.
5.4.1.3.1. The Contractor shall form a 6 inch thick lift of MDOT 21AA material over the compacted sand subgrade region. This will form the base course. This base course shall be compacted to 95% of relative compaction as determined in accordance with ASTM D1557. Hand compaction is not allowed.
5.4.1.3.1.1. For roadway(s) and parking lot(s) only:
5.4.1.3.1.1.1 Apply tack coat uniformly to all
vertical surfaces abutting or projecting into new, hot-mix, at a rate of 0.05 to 0.15 gallon per square yard. Allow tack coat to cure undisturbed before applying hot mix asphalt.
5.4.1.3.1.1.2 The Contractor shall place a 2.5
inch thick leveling course (compacted depth) of MDOT 13A material over the compacted MDOT 21AA base course. This will form the leveling course. MDOT 13A material, forming this leveling course, shall be spread at a minimum temperature of 250 degrees F and compacted before the MDOT 13A cools to 185 degrees F. The leveling course shall be compacted in the following three rolling phases, in order: (1) breakdown rolling, (2) intermediate rolling and (3) finish rolling. Further details and requirements for each rolling phase can be found in general specification 32 12 16, section 3.7. Hand compaction is not allowed. The leveling course shall be installed and compacted to level sags and fill depressions.
5.4.1.3.1.1.3. The Contractor shall place a 1.5
inch thick lift (compacted depth) of MDOT 13A material over the compacted MDOT 13A level course region. This will form the wearing course.
17 | P a g e
The wearing course shall be spread at a minimum temperature of 250 degrees F and compacted before the MDOT 13A cools to 185 degrees F. The wearing course shall be compacted in the following three rolling phases, in order: (1) breakdown rolling,
(2) intermediate rolling and (3) finish rolling. Further details and requirements for each rolling phase can be found in general specification 32 12 16, section 3.7. Hand compaction is not allowed.
5.4.1.3.1.2. For curb(s) and gutter(s) only:
5.4.1.3.1.2.1. The Contractor shall form and
install a new curb over the aggregate base region--as illustrated in the applicable “backfill cross section” sketch.
The formed and installed new curb section(s) shall match cross section, lines, grades, finish and jointing of adjacent existing curb(s) and sidewalk(s).
5.4.1.3.1.2.2. Where the new curb abuts
existing curb, rebar to be drilled 6” into existing curb, and epoxied, with Hilti ®, HIT- HY-200 or equivalent.
5.4.1.3.1.2.3. Rebar installed in curbs must be
grade 60 epoxy coated #4 bars
5.4.1.3.5. The Contractor shall ensure that surface repairs result in grade and slope, of the repaired area, matching grade and slope of the existing surrounding areas. The Contractor must ensure the surface repairs include positive drainage.
5.4.2. The Contractor must provide final clean up. This includes but is not limited to removal of debris, trash and any other waste generated by the Contractor during efforts to complete work described herein.
5.5. WARRANTY: Contractor shall provide a one-year warranty on workmanship of the entire project in addition to any manufacturer’s warranty on materials installed. The Contractor will provide any commercial warranty on materials or equipment included in the construction that exceeds this one-year, all-inclusive warranty. The commercial warranty will be issued to the Government.
18 | P a g e
6.0. DESIGN POLICY AND CRITERIA:
6.1. PROJECT CRITERIA: The project design shall conform to relevant codes and standards as set forth by the Department of Defense, Selfridge ANGB, Occupational Safety and Health Standards (OSHA) and Macomb Country (Michigan) Standards:
6.1.1. UFC 3-201-01, Civil Engineering
6.1.2. UFC 3-250-01, Pavement Design for Roads and Parking Areas.
6.1.3. Occupational Safety and Health Administration standards
6.1.4. Michigan Occupational Safety and Health Administration standards
6.1.5. Selfridge Design Standards (2017)
6.1.6. Procedures and Design Standards for Stormwater Management, Macomb County Public Works Commissioner, (effective October 1, 2020)
6.1.7. ASTM D2321, Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity Flow Applications.
6.1.8. ASTM D1557, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2700 kN-m/m3))1
6.2. DRAWINGS: The following drawings form part of this SOW:
6.2.1. Project Site
6.2.2. Demolition Plan
6.2.3. Utilities
6.2.4. Site / Installation Plan
6.2.5. Coupling Cross Section
6.2.6. Backfill Cross Section / Details