This is a Project Manual prepared by the California Military Department, Facilities Engineering for the Bakersfield Readiness Center HVAC Controls Replacement project located at 2800 Gateway Avenue, Bakersfield, California 93301. The project requires the contractor to furnish and install all materials and labor to remove the existing Direct Digital Control (DDC) system and replace it with a new DDC system, including thermostats, Temperature Control Panels (TCP), timers, control valves, damper actuators, CO2 sensors in classrooms and conference rooms, a new computer, and a complete functional DDC system. The work must comply with 2019 California Building Codes and be accomplished in accordance with all drawings and specifications contained in the contract documents. Within fifteen calendar days after receiving the Notice to Proceed, the contractor must submit a complete scope of work with procedures and sequence for completion to the Project Manager for approval before commencing work. Material submittals must be submitted within ten working days after receiving the Proposed Contract for specification-identified materials, and submittals for "or equal" substitutions are required within fifteen days after the Contract Agreement date. The contractor is responsible for all permits, fees, site visits, and verification that quantities in the bid reflect actual work requirements. Working hours are limited to 8:00 a.m. to 4:30 p.m., Monday through Friday, with no work permitted on weekends or State or Federal holidays unless written approval is obtained from the Project Manager.

The contractor must maintain a competent, English-speaking foreman with authority to discard unsuitable materials and remove unsatisfactory workers. The Project Manual establishes comprehensive administrative requirements including preconstruction meetings, weekly contractor meetings, preinstallation conferences for each trade, and a contract closeout meeting. The contractor must provide monthly digital photographs in JPEG format showing construction progress from predetermined view locations, with a minimum of twenty photos weekly submitted on CD or DVD with the monthly invoice. All submittals require Government approval and must be processed through the Project Manager, with submissions limited to three copies of shop drawings, product data, test reports, and certificates. The contractor must provide as-built drawings in two full sets marked up in a neat and understandable manner upon completion and prior to issuance of a Certificate of Completion. The contract allows the Government to modify the contract scope provided the total dollar value of all changes does not exceed 25 percent of the contract price, with amounts exceeding this limitation requiring a written Supplemental Agreement. No specific pricing, contract value, award date, or contract term is provided in this Project Manual document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA MILITARY DEPARTMENT

CA Facilities Engineering

BAKERSFIELD READINESS CENTER

HVAC CONTROLS REPLACEMENT

BAKERSFIELD READINESS CENTER

2800 Gateway Avenue Bakersfield, California 93301

PROJECT MANUAL

MAY 2022

00 01 10 - 1

06EXXXX

Bakersfield Readiness Center – HVAC Controls Replacement

19 May 2022

SECTION 00 01 10

TABLE OF CONTENTS

00 01 00 Specification Cover 00 01 10 Table of Contents

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 28 00 Changes in the Work 01 30 00 Administrative Requirements 01 32 16.00 20 Small Project Construction Progress Schedules 01 33 00 Submittal Procedures 01 35 26 Governmental Safety Requirements 01 40 00 Quality Requirements 01 45 00.10 20 Quality Control for Minor Construction 01 50 00 Temporary Facilities & Controls 01 55 00 Final Facility Cleaning 01 60 00 Product Requirements 01 65 00 Product Delivery Requirements 01 70 00 Contract Close Out 01 73 29 Cutting and Patching 01 74 19 Construction Waste Management and Disposal 01 78 00 Closeout Submittals

DIVISION 23 – HEATING VENTILATING & AIR CONDITIONING

23 09 23 HVAC Controls

APPENDIX I – SUBMITTAL LOG

List of Required Submittals

01 11 00 - 1

SECTION 01 11 00

SUMMARY

PART 1 GENERAL

1 SCOPE

1.1 Furnish and Install all materials and labor required to provide the scope defined below at the Fairfield Readiness Center located in Bakersfield Readiness Center in Bakersfield, California as described herein in these specifications.

1.2 Remove DDC (Direct Digital Control system) and replace with new, replace all component of DDC system, including but not limited to existing thermostats, Existing TCP (Temperature Control Panels) and existing timers if any, all control valves actuators, all damper actuators, install new thermostat with Co2 sensors in all classrooms and conference rooms, provide new computer and a complete functional DDC per the attached specification.

1.3 Any materials that are suitable for recycling shall be recycled.

1.4 Accomplish all work in accordance with the drawings and specifications contained herein.

1.5 Accomplish all work in accordance with California Building Codes (2019 Editions).

1.6 Perform the above-mentioned work at the Bakersfield Readiness Center in Bakersfield, California, 93727.

2 CONTRACTING OFFICER’S REPRESENTATIVE

3 Wherever in these specifications the abbreviation COR is referenced, it shall be the same as if the term Contracting Officer's Representative is referenced.

4 ENGINEER/CONSTRUCTION INSPECTOR

4.1 Wherever the specifications direct the Contractor to the

ENGINEER/CONSTRUCTION INSPECTOR (ECI) for appropriate determination, the Contractor will direct his inquiries to the State Military Department, 9800 Goethe Road, P.O. Box 269101, Sacramento, California 95826, ATTN: CAFE-EN Quality Control. Phone: (916) 854-3546.

5 CONTRACTOR'S RESPONSIBILITY

5.1 Nothing contained in these specifications shall relieve the contractor from the responsibility of visiting the site, accurately measuring the work or otherwise insuring that the quantities used in preparing his bid are the actual quantities of the work to be accomplished under the contract. By submitting a bid the contractor confirms that he has visited the aforementioned site and verifies that the quantities used in preparing his bid are the actual quantities

01 10 00 -3

Bakersfield Readiness Center– HVAC Controls Replacement 19 May 2022 of the work to be accomplished under the contract.

5.2 The Contractor shall maintain a competent foreman, English speaking, to continuously supervise the work, with authority to discard unsuitable materials and remove unsatisfactory workmen from the project.

6 VEHICLE MOVEMENT

6.1 The following applies to all vehicles, except emergency vehicles responding to an emergency:

7 Vehicles shall observe posted speed limits on post at all times. Vehicles operated when in close proximity to military vehicles or buildings shall not exceed 5 MPH maximum.

8 Vehicles will not be backed without a ground guide.

9 All vehicles which do not require the engine to be running for contract purposes will have the ignition turned off and the parking brake set and the vehicle's transmission placed in park.

10 CONTRACTOR’S STORAGE AREA AND PERSONNEL

10.1 The COR will designate an area that the contractor may use as a storage area. The contractor shall contact the COR for information regarding parking areas to be used for contractors equipment and by contractor personnel and any restrictions that will be placed on contractor personnel while on the job site.

10.2 The Contractor shall maintain a clean site and prevent any materials removed or installed on site becoming FOD (Foreign Object Debris).

11 MATERIAL SUBMITTALS

11.1 Contractor shall submit to the Project Manager for approval, one (1) copy in writing, of a complete list of material submittals and equipment to accomplish the work specified.

11.2 Submittals shall comply with Section 01 33 00 of these specifications.

Transmit submittals (from Submittal List) on Submittal Log (the list and a blank log is provided after Section 01 33 00).

11.3 Project Manager must receive submittals for Specification identified materials (no substitutions permitted) within ten (10) working days after receiving the "Proposed Contract" for signature.

11.4 Receipt of Submittals that substitute an "or equal" are required within fifteen

(15) days after date of Contract Agreement.

11.5 Do not start work until Project Manager approves all project submittals, issues special instructions, and a "Notice of Award" is received from the Contracting Officer.

Bakersfield Readiness Center– HVAC Controls Replacement

12 APPROVAL OF PROCEDURES

12.1 The manufacturer's recommended installation procedures and these specifications, will serve as a basis for inspection and acceptance or rejection of actual installation procedures used on the work.

12.2 Project Drawings are valid for construction only when stamped, signed and approved for construction by the Architect/Engineer(s) of Record.

12.3 Project Specifications are valid for construction when:

12.4 The cover sheet is dated and signed by the Architect of record

12.5 ALL included Sections bear dates on or before that shown on the signed cover sheet.

13 ORDINANCES AND REGULATIONS

13.1 All work shall be accomplished in accordance with all local, State and Federal regulations. Permits and fees shall be the responsibility of the contractor at no additional cost to the Government.

14 WORKING HOURS

14.1 The work site will be available for contractor's activities from 8:00 a.m.

until 4:30 p.m. Monday through Friday. The site will not be available for contractor's activities on weekends and State or Federal holidays.

14.2 The Contractor shall receive written approval from the Project Manager before implementing any form of compressed or alternative work schedule.

14.3 Contractor shall schedule operations so as not to conflict with airfield operations.

15 SCHEDULING AND INSPECTION

15.1 Within fifteen (15) calendar days after receipt of Notice to Proceed, and before commencing work, the contractor shall submit in writing to the Project Manager for approval, the complete scope of work and the procedures and sequence required to complete the work.

15.2 The contractor shall work directly with the COR and ECI on work scheduling and inspection procedures prior to starting any work.

16 AS-BUILT DRAWINGS

16.1 The contractor shall provide one (2) full and accurate hardcopy sets of as-built drawings per Specification Sections 01 33 00 and 01 70 00, for the work accomplished by all trades for this contract marked up in a neat and understandable manner, submitted to the COR upon completion of the work and prior to issuance of a Certificate of Completion.

Bakersfield Readiness Center– HVAC Controls Replacement

PART 2 PRODUCTS

17 MATERIALS

17.1 All materials for use under this project shall meet or exceed the standards of quality hereinafter set forth and per Section 01 60 00.

PART 3 EXECUTION

18 QUALITY CONTROL

18.1 To insure proper project quality control and required record keeping, contractor shall comply with Section 01 45 00.10 20

19 CONTRACT CLOSEOUT

19.1 Contract closeout requires contractor compliance with Section 01 70 00.

END OF SECTION

01 26 13 – 1

SECTION 01 26 13

CHANGES IN THE WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Changes in the Plans and Specifications, requested in writing by the Contractor, which do not materially affect the Work and which are not detrimental to the Work or to the interests of the Agency, may be granted by the Contracting Officer’s Representative (COR). Nothing herein shall be construed as granting a right to the Contractor to demand acceptance of such changes.

B. The CMD may change the Plans and Specifications, character of the work, or quantity of work provided the total arithmetric dollar value of all such changes, both additive and deductive, does not exceed 25 percent of the contract price. Should it become necessary to exceed this limitation, the change shall be by written Supplemental Agreement between the Contractor and the CMD, unless both parties agree to proceed with the change by change order.

C. Change Orders shall be in writing and the state the dollar value of the change or establish the method of payment, any adjustment in the Contract time of completion, and when negotiated prices are involved, shall provide for the Contractor’s signature indicating acceptance.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 CHANGE ORDERS

A. No cost change orders:

1. Contract Documents are complementary; therefore, before starting each portion of

Work, carefully study and compare various Drawings, Specifications and any other Contract Documents, coordination drawings, shop drawings, prior correspondence or documentation relative to that portion of Work, as well as information furnished by

CMD.

2. Contractor and Subcontractors shall evaluate and take field measurements of any existing conditions related to that portion of Work and shall observe any conditions at site affecting Work.

3. Contractor and subcontractors acknowledge that all documents pertaining to Work has been examined, have examined character of site and any existing conditions, and are satisfied with nature of Work, and all other matters which can in any way affect Work.

4. In event of inconsistency between portions of Contract Documents or within Contract Documents; provide better quality or greater quantity of Work, and comply with more stringent requirement, either or both in accordance with Architect’s interpretation.

5. Any errors, inconsistencies or omissions discovered in Contract Documents shall be reported promptly to Architect as a properly prepared and timely RFI.

19 May 2022

6. Contractor and Subcontractors are not required to ascertain Contract Documents are in accordance with applicable laws, statutes, ordinances, codes, and rules and regulations, unless they bear upon construction means, methods, techniques or safety and health precautions, but any nonconformity discovered by or made known shall be reported promptly as a RFI.

7. If Contractor or Subcontractor fail to give such notice, and knowingly proceeds with Work affected by errors or omissions in Contract Documents, Contractor shall correct any such errors, inconsistencies, or omissions at no additional cost.

B. Contractor’s and Subcontractor’s Responsibilities:

1. When interpretation, clarification or explanation of portion of Construction Documents is needed by Contractor, Subcontractor, Vendor or Supplier, the request shall be processed through Contractor:

a. Review request for completeness, quality, proper referencing to drawing or specification section and reason submitted.

b. If request is not acceptable it shall be sent back to submitter with comments regarding reason for being returned.

c. Make every attempt to validate, resolve or respond to RFI by thoroughly researching and reviewing Contract Documents and field conditions.

d. Respond to RFI accordingly if review of RFI discloses a response or is related to coordination of construction or other issue not related to Contract Documents.

e. If unable to respond to request, it shall be restated in clear, concise, correct, complete and easily understood manner, and rewritten if necessary, additional information included if necessary, and only then submitted to Architect for response.

2. Request for interpretation, clarification or explanation of Contract Documents shall be submitted to CMD in writing:

a. List specific Contract Documents reviewed when seeking information being requested.

b. Reference all applicable Contract Drawings by sheet number, section, detail, room number, door number, etc., Specifications by section and paragraph number, and reference any other relevant documents.

c. The field titled "Regarding" on attached RFI form must be clear for future reference in reports or correspondence.

d. Clearly state request and provide Contract Document references and any additional information needed so request can be fully understood, including sketches, photos or other reference material.

e. Fully assess issues, suggest any reasonable solutions and include various factors, including potential costs, schedule impacts, if any, and recommendations which will aid in determining a solution or response. If a reasonable solution cannot be suggested, a statement to that effect should be so stated.

f. Indicate reason request is being submitted.

g. Any critical RFI’s requiring a rapid response shall clearly indicate such with an explanation as to why RFI is critical.

h. Priority for responses shall be indicated when multiple RFI’s are submitted within short period of time.

3. Copies of responses to RFI’s shall be distributed to all parties affected.

4. A response to RFI shall not be considered a notice to proceed with a change that may revise the Contract Sum or Contract Time, unless authorized by CMD in writing.

5. If response to RFI is determined incomplete, it shall be resubmitted with reason response is unacceptable and any necessary additional information within five (5) days of time of receipt of response to RFI.

6. If determined or believed that additional cost or time is involved because of clarifications, interpretations or instructions issued by Architect in response to a RFI, resubmit RFI within five (5) days of receipt of response with reason and alternate solution or suggestion for performing work at no additional cost. If no other solution is possible or desirable, submit Claim in accordance with the Contract Documents with in twenty-one (21) days of receipt of response to the RFI.

C. RFI Submittal Format:

1. Request for information shall be submitted to Architect on RFI form provided at end of this section, or form provided by Architect in electronic text file format, or in similar format acceptable to Architect:

a. RFI’s shall be assigned unique numbers in sequential order (1, 2, 3, 4, etc.).

b. A resubmitted RFI or a previously answered RFI requiring revising or further clarification shall be submitted using original RFI number proceeded by “.1” to indicate revision one of RFI (i.e.: RFI No. 34.1 for revision 1 to RFI No. 34).

c. RFI form shall be electronically filled out and emailed to Architect’s designated representative in text file format. Attachments shall be in electronic text or PDF file format. Photo attachments may be in JPG format.

D. Architect’s Response to Request for Information (RFI):

1. Clarifications, interpretations and decisions of Architect in response to RFI will be consistent with intent of and reasonably inferable from Contract Documents, and will be in writing, and if determined to be necessary by Architect, will be provided in form of drawings and other attachments or both.

2. When making such interpretations and initial decisions, Architect will endeavor to secure faithful performance by both CMD and Contractor, will not show partiality to either and will not be liable for results of interpretations or decisions so rendered in good faith.

3. Architect’s decisions on matters related to aesthetic effects will be final if consistent with intent expressed in Contract Documents.

4. Architect will not undertake to settle differences between Contractor, Subcontractors, trades suppliers, fabricator or manufacturer, or act as arbiter as to which Subcontractor, trade, supplier or manufacturer is to furnish or install various items indicated or required.

5. Architect shall provide responses to RFI’s with reasonable promptness, but will endeavor to respond within twenty-one (21) days from date of receipt:

a. If multiple RFI’s are submitted on same day or within a five (5) day period, review time may be extended by mutual agreement of parties

b. Architect will provide a written response to RFI if Architect believes response only involves an interpretation, clarification, supplemental information or orders a minor change in Work not involving an adjustment in Contract Sum or extension of Contract Time, and is not inconsistent with intent of Contract Documents, and shall be binding.

c. If Architect believes response may result in a change to Contract Sum or Contract Time, response will indicate that a change document will be issued for the response, and appropriate change document will be issued indicating changes to Contract Documents.

d. Architect will provide any additional or supplemental drawings, specifications or other information as Architect may deem necessary to facilitate response.

6. Architect may return RFI without response for following reasons:

a. Unclear.

b. Incomplete.

c. Detailed information not provided.

d. Is related to construction means, methods or techniques.

e. Is related to health or safety measures.

f. Is due to Contractor’s lack of adequate coordination

19 May 2022

g. Is considered a “Substitution Request.”

h. Is due to non-conformance.

i. Response is required by another party.

E. If requested information is available from careful study and comparison of Contract Documents, field conditions, other CMD-provided information, coordination drawings, or prior Project correspondence or documentation, Architect may invoice CMD as a change in services for costs involved in Architect’s review, analysis, responding and processing of such

RFI:

1. Contractor shall reimburse CMD for such costs.

01 30 00 - 1

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced.

The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements

Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

15 CFR 772 Definition of Terms

15 CFR 773 Special Licensing Procedures

1.2 SUBMITTALS

Government approval is required for submittals. Refer to section 01 33 00 Submittal Procedures for instruction.

1.3 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color 300 minimum resolution in [JPEG] file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures.

Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.

1.4 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by the contract, during the entire period of performance under this contract. Provide other insurance coverage as required by California state law.

01 30 00 - 2

1.5 FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING

MATERIALS

Accomplish all contract requirements of Section 02 82 00 Asbestos Remediation, assigned to the Private Qualified Person, Designated Competent Person, directly with a first tier subcontractor.

1.6 SUPERVISION

1.6.1 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.

1.6.2 Superintendent Qualifications

The project superintendent must have a minimum of 5 years’ experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

For routine projects where the superintendent is permitted to also serve as the Quality Control

(QC) Manager as established in Section 01 45 00.10.20 Quality Control, the superintendent must have qualifications in accordance with that section.

1.6.2.1 Duties

The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project. Project superintendent shall attend project meetings and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.

1.6.3.1 Project Manager Qualifications

The Project Manager must have a minimum 5 years’ experience as a Project Manager or Superintendent on projects of similar size and complexity.

1.6.4 Non-Compliance Actions

The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken.

No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.

01 30 00 - 3

1.7 MEETINGS

1.7.1 PRECONSTRUCTION MEETING

A. After award of the contract but prior to commencement of any work at the site. Project Manager will schedule and preside over meeting at the Project Site prior to Contractor occupancy.

B. Attendance Required: Project Manager, Architect/Engineer, Contractor, major Subcontractors, and Inspector of Record.

C. The meeting will be chaired by the Project Manager and minutes taken by the contractor.

D. Location, time and date will be site by the Project Manager.

E. The subjects to be reviewed include, but are not limited to:

1. Introduction.

2. Construction Coordination.

3. Correspondence.

4. Submittals.

5. Permits.

6. Dust Control.

7. Schedule.

8. Survey Control.

9. Contractor’s Representative.

10. Testing and Inspection.

11. Contractor Reporting Requirements.

12. Changes and Clarifications.

13. Clean-up.

14. As-Built Documents.

15. Prevailing Wage Requirements.

16. Environmental Protection, Plan and Procedures.

17. Temporary Facilities Construction.

18. Notice of Labor Disputes.

19. Progress Payments.

20. Site Regulations.

21. Security.

22. Operation and Maintenance Data.

23. Training Requirements.

24. General Discussion.

F. Project Manager: Record minutes and distribute copies to participants within two days after meeting, with one copies each to Architect/Engineer, and those affected by decisions made.

1.7.2 WEEKLY CONTRACTOR MEETINGS

A. Once a week during the Contract period, Contractor shall meet at the Work Site with the Project Manager.

B. Time and location of the meeting will be determined during the Preconstruction Conference.

01 30 00 - 4

C. The Contractor will serve as chairman and take minutes of meetings.

D. Topics for discussion will include schedule, requests for information, disputed items, Potential Change Order (PCO) and Change Order (CO) status, Quality control, submittals, exception notices, and other topics as required.

1.7.3 PREINSTALLATION CONFERENCES

A. Prime Contractor shall convene a preconstruction conference for items of Work contained in each Division of the Specifications, each trade within the Division, and each subcontractor within the Division.

1. Convene a preconstruction conference prior to commencing the Work of the

Section, trade, or subcontractor.

2. Require attendance of each subcontractor and each trade directly affecting or affected by the Work within the Division.

3. Convene additional conferences when required by individual Section.

4. Prepare an agenda, preside over the conference, and record minutes, and distribute copies within two days after the conference to participants, with two copies to the Project Manager.

5. Review conditions of installation, coordination, preparation, approved submittals, Contract Documents, and means and methods planned to be used to perform the Work.

ii. Within 15 days after Notice to Proceed, submit a proposed list of preconstruction conferences, and items of Work to be covered, for approval by the Project Manager.

1.7.4 CONTRACT CLOSEOUT MEETING

A. Schedule Project closeout meeting with sufficient time to prepare for requesting Substantial Completion. Preside over meeting and be responsible for minutes.

B. Attendance Required: Contractor, Project Manager, Inspector of Record and Architect/Engineer, and others appropriate to agenda.

C. Notify Facility Representative five days in advance of meeting date.

D. Minimum Agenda:

1. Start-up of facilities and systems.

2. Operations and maintenance manuals.

3. Testing, adjusting, and balancing.

4. System demonstration and observation.

5. Operation and maintenance instructions for Owner's personnel.

6. Contractor's inspection of Work.

7. Contractor's preparation of an initial "punch list."

8. Procedure to request Architect/Engineer inspection to determine date of

Substantial Completion.

9. Completion time for correcting deficiencies.

10. Inspections by authorities having jurisdiction.

11. Certificate of Occupancy and transfer of insurance responsibilities.

12. Partial release of retainage.

13. Final cleaning.

14. Preparation for final inspection.

15. Closeout Submittals:

01 30 00 - 5

a. Project record documents.

b. Operating and maintenance documents.

c. Operating and maintenance materials.

d. Affidavits.

16. Final Application for Payment.

17. Contractor's demobilization of Site.

18. Maintenance.

1.14 ELECTRONIC MAIL (E-MAIL) ADDRESS

Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Project Manager a single (only one) e-mail address for electronic communications from the Project Manager related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.

It is the Contractor's responsibility to make timely distribution of all Project Manager initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.

PART 2 PRODUCTS - Not Used

3.1 ALTERATION PROCEDURES

A. Employ skilled and experienced installer to perform alteration and renovation Work.

B. Remove unsuitable material not marked for salvage, including rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished Work.

C. Remove debris and abandoned items from area and from concealed spaces.

D. Prepare surface and remove surface finishes to permit installation of new Work and finishes.

E. Close openings in exterior surfaces to protect existing Work from weather and extremes of temperature and humidity.

F. Where new Work abuts or aligns with existing Work, provide smooth and even transition. Patch Work to match existing adjacent Work in texture and appearance.

G. Patch or replace portions of existing surfaces that are damaged, lifted, discolored, or showing other imperfections.

End of Section

01 32 16.00 20 - 1

SECTION 01 32 16.00 20

SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

1.1 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 Submittal Procedures:

A. Preconstruction Submittals

B. Baseline Construction Schedule

C. Monthly Updates

1.2 PRE-CONSTRUCTION SCHEDULE REQUIREMENT

Prior to the start of work, prepare and submit to the Project Manager a Baseline Design Schedule and Baseline Construction Schedule. The approval of a Baseline Construction Schedule is a condition precedent to:

a. The Contractor starting demolition work or construction stage(s) of the contract.

b. Processing Contractor's invoice(s) for construction activities/items of work.

c. Review of any schedule updates.

Submittal of the Baseline Design and Construction Schedule, and subsequent schedule updates, is understood to be the Contractor's certification that the submitted schedule meets the requirements of the Contract Documents, represents the Contractor's plan on how the work will be accomplished, and accurately reflects the work that has been accomplished and how it was sequenced (as-built logic).

1.3 SCHEDULE FORMAT

1.3.1 Project Schedule (NAS)

Use the critical path method (CPM) to schedule and control project activities. Prepare and maintain project schedules using Microsoft Project 2010. The scheduling software that will be utilized by the Government on this project is Microsoft Project 2010 by Microsoft, Inc.

Notwithstanding any other provision in the contract, schedules submitted for this project must be prepared using Microsoft Project. Submission of data from another software system where data conversion techniques or software is used to import into Microsoft Projects scheduling software is not acceptable and will be cause for rejection of the submitted schedule. Importing data into the scheduling program using data conversion techniques or third party software is cause for rejection of the submitted schedule.

Within 15 calendar days after approval of the Initial Schedule or approval of the final design for a design build project, submit to the Project Manager a final project schedule.

01 32 16.00 20 - 2

1.3.1.1 Activity Requirements

a. At a minimum, identify the following in the schedule:

(1) Design and Construction time for major systems and components

(2) Each activity assigned with its appropriate Responsibility Code

(3) Each activity assigned with its appropriate Phase and Area Codes

(4) Major submittals and submittal processing time

(5) Major equipment lead time

b. Build the Schedule as follows:

(1) Show design periods, submittals, Government review periods, material/equipment delivery, utility outages, on-site construction, inspection, testing, and closeout activities. Government and Contractor on-site work activities must be driven by calendars that reflect Saturdays, Sundays and all Federal Holidays as non-work days for 5-day work week calendars.6-day work week calendars must reflect Sundays and all Federal Holidays as non-work days. 7-day work week calendars must reflect all Federal Holidays as non-work days unless otherwise agreed to by the Project Manager. Total work hours/day for all defined calendars is set to 8 unless otherwise agreed upon.]

(2) With the exception of the Contract Award and End Contract milestone activities, use of open-ended activities is not allowed; each activity must have predecessor and successor ties. No activity must have open start or open finish (dangling) logic.

Minimize redundant logic ties. Once an activity exists on the schedule it must not be deleted or renamed to change the scope of the activity and must not be removed from the schedule logic without approval from the Project Manager.

While an activity cannot be deleted, where said activity is no longer applicable to the schedule but must remain within the logic stream for historical record, it can be changed to a milestone. Document any such change in the milestone's "Notebook," including a date and explanation for the change. The ID number for a deleted activity must not be re-used for another activity.

(3) Assign each activity its appropriate Responsibility Code and Area Code, indicating location and responsibility to accomplish the work indicated by the activity, Phase Code, and Work Location Code. Include anticipated tasks to be assigned Government responsibility.

(4) Date/time constraints or lags, other than those required by the contract, are not allowed unless approved by the Project Manager. Include as the last activity in the contract schedule, a milestone activity named "Contract Completion Date".

01 32 16.00 20 - 3

(5) Include the following Contract Milestones:

(a) Include as the first activity on the schedule a start milestone titled "Contract Award", which must have a Mandatory Start constraint equal to the Contract Award Date;

(b) Include Interim or Phased Completion Milestones required by the Contract or as approved by the Project Manager;

(c) Include Facility Turnover Planning Meeting Milestones;

(d) Include an unconstrained finish milestone on the schedule titled "Substantial Completion". Substantial Completion is defined as the point in time the Government would consider the project ready for beneficial occupancy wherein by mutual agreement of the Government and Contractor. Government use of the facility is allowed while construction access continues in order to complete remaining items (e.g. punch list and other close out submittals).

(e) Include an unconstrained finish milestone on the schedule titled "Projected Completion". Projected Completion is defined as the point in time the Government would consider the project complete. This milestone must have the Contract Completion Date (CCD) milestone as its only successor.

(f) Include as the last activity on the schedule a finish milestone titled "Contract Completion (CCD)" with constraint type "Must Finish No Later Than". Calculation of schedule updates must be such that if the finish of the "Projected Completion" milestone falls after the contract completion date, then negative float will be calculated on the longest path and if the finish of the "Projected Completion" milestone falls before the contract completion date, the float calculation must reflect positive float on the longest path. This milestone must be set to 5:00 pm.

(6) Provide lead time for major equipment.

1.3.1.2 Anticipated Weather Lost Work Days

Use the National Oceanic and Atmospheric Administration's (NOAA) Summary of Monthly

Normals report to obtain the historical average number of days each month with precipitation, using a nominal 30-year, greater than 2.5 mm 0.10 inch precipitation amount parameter, as indicated on the Station Report for the NOAA location closest to the project site as the basis for establishing a "Weather Calendar" showing the number of anticipated non-workdays for each month due to adverse weather, in addition to Saturdays, Sundays and all Federal Holidays as non-work days.

Use the following schedule of anticipated monthly non-work days due to adverse weather as the basis for establishing a "Weather Calendar" showing the number of anticipated non-workdays for each month due to adverse weather, in addition to Saturdays, Sundays and all Federal and State Holidays as non-work days.

01 32 16.00 20 - 4

MONTHLY ANTICIPATED ADVERSE WEATHER DELAYS

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

[2][_] [2][_] [2][_] [2][_] [2][_] [2][_] [2][_] [2][_] [2][_] [2][_] [2][_] [2][_]

Assign the Weather Calendar to any activity that could be impacted by adverse weather.

The Project Manager will issue a modification in accordance with the contract clauses, giving the Contractor a time extension for the difference of days between the anticipated and actual adverse weather delay if the number of actual adverse weather delay days exceeds the number of days anticipated for the month in which the delay occurs and the adverse weather delayed activities are critical to contract completion.

A lost workday due to weather conditions is defined as a day in which the Contractor cannot work at least 50 percent of the day on the impacted activity.

1.3.1.3 Activity Identification

a. Identify Government, Construction Quality Management (CQM), Construction activities planned for the project and other activities that could impact project completion if delayed.

b. Identify administrative type activity/milestones including pre-construction submittal and permit requirements prior to demolition or construction stage.

c. Create separate activities for each Phase, Area, Floor Level, and Location the activity is occurring.

d. Do not use construction category activity to represent non-work type reference (Such as, Serial Letter or Request for Information) in NAS.

e. Place non-work reference within P6 activity details notebook. Activity categories included in the schedule are specified below.

1.3.1.4 Responsibility Code

Assign each activity its appropriate Responsibility Code indicating responsibility to accomplish the work indicated by the activity, Phase Code and Work Location Code.

1.3.1.5 Microsoft Project 2010 Settings and Parameters

Use the following MS Project 2010 settings and parameters in preparing the Baseline Schedule:

a. The Network must have a minimum of 30 construction activities.

b. No on-site construction activity may have durations in excess of 20 working days.

c. Critical is defined as having zero days of Total Slack. Within the Baseline Schedule no more than 20 percent of the activities shall be critical.

01 32 16.00 20 - 5

d. Logic: include the following setting: File, Options, Schedule tab - Split in-progress tasks - must be selected.

e. Status Date gridline is displayed in the Gantt Chart view.

f. Task Type is set to Fixed Work for "boots-on-the-ground" construction activities.

g. Task Type is set to Fixed Duration for design activities, submittals, Government reviews, procurement, material/equipment delivery, and utility outages.

h. "Effort Driven" is turned ON for Fixed Duration tasks.

i. Time Periods established for the project are set to 8 Hrs/Day, 40 Hrs/Week and 20 days/month.

j. Week starts on Monday must be selected.

k. Default start time is set to 8am (0800).

l. Default end time is set to 5pm (1700).

1.3.1.7 Cost Loading Microsoft Project 2010 Schedules

Assign material, labor and equipment costs to their respective Construction Activities.

Assign material and equipment costs, for which payment will be requested in advance of installation, to their respective procurement activity (i.e. the material/equipment on-site activity). Evenly disperse overhead and profit to each activity over the duration of the project.

Cost loading must total to 100 percent of the value of the contract.

1.3.1.7.1 Software Settings

a. Resource Sheet

(1) Resource Name: Enter each code and resource for the project

(2) Type: Set to "Material"

(3) Material Label: Enter units of measurement for each resource

(4) Std. Rate: Enter unit cost for each resource

(5) Accrue at: Set to "Prorated"

b. Assigning Resources to Each Activity

(1) Select each activity in Gantt Chart

(2) Assign resources, Resource Tab

(3) Select each resource and enter the quantity of the units; then, assign the resource(s) to the activity

c. Baseline for Earned Value Calculation, File Tab, Options, Advanced, Default task Earned Value method: Set to "Physical % Complete" or as directed by the Project Manager.

01 32 16.00 20 - 6

1.3.1.7.2 Tabular Reports

1.3.1.7.2.1 Tracking Gantt Schedule with Cost Table

Submit a Tracking Gantt Schedule with each schedule update showing activity baseline cost, cost percent complete, and Budgeted Cost of Work Performed (BCWP), as directed by the Project Manager.

1.3.1.7.2.2 Earned Value Over Time Report

a. With each schedule submission, submit Earned Value Over Time Report S-Curves indicating Planned Value to the contract completion date based on projected early and late activity finish dates and Earned Value.

b. Revise Earned Value Over Time Report S-Curves when the contract is modified, or as directed by the Project Manager.

1.3.2 Bar Chart Schedule

The Bar Chart must, as a minimum, show work activities, submittals, Government review periods, material/equipment delivery, utility outages, on-site construction, inspection, testing, and closeout activities. The Bar Chart must be time scaled and generated using an electronic spreadsheet program.

1.3.3 Schedule Submittals and Procedures

Submit Schedules and updates in hard copy and on electronic media that is acceptable to the Project Manager. Submit an electronic back-up of the project schedule in an import format compatible with the Government's scheduling program.

1.4 SCHEDULE MONTHLY UPDATES

Update the Design and Construction Schedule at monthly intervals or when the schedule has been revised. Keep the updated schedule current, reflecting actual activity progress and plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed by the Project Manager.

a. Narrative Report: Identify and justify the following:

(1) Progress made in each area of the project;

(2) Longest Path: Include printed copy on 279 by 432 mm 11 by 17 inch paper, landscape setting;

(3) Date/time constraint(s), other than those required by the contract;

(4) Listing of changes made between the previous schedule and current updated schedule including: added or removed activities, original and remaining durations for activities that have not started, logic (sequence, constraint, lag/lead), milestones, planned sequence of operations, longest path, calendars or calendar assignments, and cost loading.

01 32 16.00 20 - 7

(5) Any decrease in previously reported activity Earned Amount;

(6) Pending items and status thereof, including permits, changes orders, and time extensions;

(7) Status of Contract Completion Date and interim milestones;

(8) Current and anticipated delays (describe cause of delay and corrective actions(s) and mitigation measures to minimize);

(9) Description of current and future schedule problem areas.

For each entry in the narrative report, cite the respective Activity ID and Activity Name, the date and reason for the change, and description of the change.

1.5 CONTRACT MODIFICATION

Submit a Time Impact Analysis (TIA) with each cost and time proposal for a proposed change. TIA must illustrate the influence of each change or delay on the Contract Completion Date or milestones. No time extensions will be granted nor delay damages paid unless a delay occurs which consumes all available Project Float, and extends the Projected Finish beyond the Contract Completion Date.

a. Each TIA must be in both narrative and schedule form. The narrative must define the scope and conditions of the change; provide start and finish dates of impact, successor and predecessor activity to impact period, responsible party, describe how it originated, and how it impacts the schedule. The schedule submission must consist of three native files:

(1) Fragnet used to define the scope of the changed condition

(2) Most recent accepted schedule update as of the time of the proposal or claim submission that has been updated to show all activity progress as of the time of the impact start date.

(3) The impacted schedule that has the fragnet inserted in the updated schedule and the schedule "run" so that the new completion date is determined.

b. For claimed as-built project delay, the inserted fragnet TIA method must be modified to account for as-built events known to occur after the data date of schedule update used.

c. TIAs must include any mitigation, and must determine the apportionment of the overall delay assignable to each individual delay. Apportionment must provide identification of delay type and classification of delay by compensable and non-compensable events. The associated narrative must clearly describe analysis methodology used, and the findings in a chronological listing beginning with the earliest delay event.

01 32 16.00 20 - 8

(1) Identify and classify types of delays as follows:

(a) Force majeure delay (e.g. weather delay): Any delay event caused by something or someone other than the Government (including its agents) or the Contractor, or the risk of which has not been assigned solely to the Government or the Contractor. If the force majeure delay is on the critical path, in absence of other types of concurrent delays, the Contractor is granted an extension of contract time, classified as a non-compensable event.

(b) A Contractor-delay: Any delay event caused by the Contractor, or the risk of which has been assigned solely to the Contractor. If the contractor-delay is on the critical path, in absence of other types of concurrent delays,

(c) Contractor is not granted extension of contract time, and classified as a non-compensable event. Where absent other types of delays, and having impact to project completion, provide a Corrective Action Plan, identifying plan to mitigate delay, to the Project Manager a Government-delay: Any delay event caused by the Government, or the risk of which has been assigned solely to the Government. If the Government-delay is on the longest path, in absence of other types of concurrent delays, the Contractor is granted an extension of contract time, and classified as a compensable event.

(2) Use functional theory to analyze concurrent delays, where: Separate delay issues delay project completion, do not necessarily occur at same time, rather occur within same monthly schedule update period at minimum, or within same as-built period under review. If a combination of functionally concurrent delay types occurs, it is considered Concurrent Delay, which is defined in the following combinations:

(a) Government-delay concurrent with Contractor-delay: Excusable time extension, classified non-compensable event.

(b) Government-delay concurrent with force majeure delay: Excusable time extension, classified non-compensable event.

(c) Contractor-delay concurrent with force majeure delay: Excusable

(3) A pacing delay, reacting to another delay (parent delay) equally or more critical than paced activity, must be identified prior to pacing. Project Manager will notify Contractor prior to pacing. Contractor must notify Project Manager prior to pacing.

Notification must include identification of parent delay issue, estimated parent delay time period, paced activity(s) identity, and pacing reason(s). Pacing Concurrency is defined as follows:

(a) Government-delay concurrent with Contractor-pacing: Excusable time extension, classified compensable event.

(b) Contractor-delay concurrent with Government-pacing: Inexcusable

01 32 16.00 20 - 9

1.6 3-WEEK LOOK AHEAD SCHEDULE

Prepare and issue a 3-Week Look Ahead schedule to provide a more detailed day-to-day plan of upcoming work identified on the Construction Schedule. Key the work plans to activity numbers when a NAS is required and update each week to show the planned work for the current and following two-week period. Additionally, include upcoming outages, closures, preparatory meetings, and initial meetings. Identify critical path activities on the Three-Week Look Ahead Schedule. The detail work plans are to be bar chart type schedules, maintained separately from the Construction Schedule on an electronic spreadsheet program and printed on 216 by 279 mm 8-1/2 by 11 inch sheets as directed by the Project Manager.

Activities must not exceed 5 working days in duration and have sufficient level of detail to assign crews, tools and equipment required to complete the work. Deliver three hard copies and one electronic file of the 3-Week Look Ahead Schedule to the Project Manager no later than 8 a.m. each Monday, and review during the weekly CQC Coordination or Production Meeting.

1.7 CORRESPONDENCE AND TEST REPORTS:

Correspondence (e.g., letters, Requests for Information (RFIs), e-mails, meeting minute items, Production and QC Daily Reports, material delivery tickets, photographs) must reference Schedule Activities that are being addressed. Test reports (e.g., concrete, soil compaction, weld, pressure) must reference Schedule Activities that are being addressed.

1.8 ADDITIONAL SCHEDULING REQUIREMENTS

Any references to additional scheduling requirements, including systems to be inspected, tested and commissioned, that are located throughout the remainder of the Contract Documents, are subject to all requirements of this section.

Not used.

Not used.

01 33 00 - 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

1.1 SUMMARY

1.1.1 Submittal Information

The Project Manager may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

1.1.2 Project Type

The Contractor's Quality Control (CQC) System Manager are to check and approve all…