Decommission Of Bisley Tower 2 12445023Q0039

US Department of Agriculture (USDA)

Statement of Work

Sabana Field Research Station

Luquillo, PR

June 16, 2023

Contents Project

General Information

1.0 Scope of Work

Contractor Requirements

2.0 Technical Requirements / Tasks

*Photographs: Existing site condition photos are included for information only

3.0 Government Furnished

4.0 Deliverables / Schedule

5.0 Travel

6.0 Contractor’s Key Personnel

7.0 Security Requirements

8.0 Data Rights

9.0 Section 508 – Electronic and Information Technology Standards

Project

General Information

1.0 Scope of Work

The project is located at the El Yunque National Forest in Luquillo, PR. The existing Bisley Tower-2 communications tower was demolished by Hurricane Maria and it is no longer in use. This project will remove and dispose of all remaining debris and tower remnants.

Contractor Requirements

2.0 Technical Requirements / Tasks

A. Work Site Location: Latitude N18°18’48.98”, Longitude W65°44’34.24”, altitude 416 feet.

B. Bidders are strongly encouraged to visit the site prior to submitting proposal. Bidders are responsible to verify all site conditions, dimensions, and product requirements prior to submitting a proposal.

C. All work must be coordinated and approved by the Contracting Officer’s Representative or designee.

D. All work shall take place Monday through Friday between 8:00 AM and 4:30 PM, unless otherwise authorized by the Contracting Officer.

E. Site is accessed by vehicle to the end of Bisley Road. From there, contractor’s crew shall hike through a steep, slippery, narrow footpath to the site. Crew shall walk and carry out all debris as noted above.

Vehicles are not allowed on the footpath. Coordinate access to the Bisley road with the Contracting Officer’s Representative or designee.

*Photographs: Existing site condition photos are included for information only.

3.0 Government Furnished

Not applicable.

4.0 Deliverables / Schedule

Key Deliverables

Item No.

Deliverable Objective Due

1 A 100% Disposal of Debris

Provide the necessary personnel, materials and equipment to remove and dispose of all remaining debris and tower remnants.

Normally within one weeks (5 days) of contractor receiving the request.

Daily Follow up, as needed.

5.0 Travel

Not applicable.

6.0 Contractor’s Key Personnel

Not applicable.

7.0 Security Requirements

Not applicable.

8.0 Data Rights

Not applicable.

9.0 Section 508 – Electronic and Information Technology Standards Not Applicable. No technology will be acquired.

Project
General Information
1.0 Scope of Work
Contractor Requirements
2.0 Technical Requirements / Tasks
*Photographs: Existing site condition photos are included for information only.
3.0 Government Furnished
4.0 Deliverables / Schedule
5.0 Travel
6.0 Contractor’s Key Personnel
7.0 Security Requirements
8.0 Data Rights
9.0 Section 508 – Electronic and Information Technology Standards