01 - A001_IUID Marking Plan_23-00958_v2.pdf

PDF 226 KB Posted

Attached to
20MM F-15E Ammunition Structure Assembly Container Federal contract opportunity
Solicitation number
SPRWA1-24-R-0003
Issued by
Defense Logistics Agency Aviation

About this file

This document is a Contract Data Requirements List (DD Form 1423-1) that specifies the Item Unique Identification (IUID) Marking Plan for a 20MM F-15E Ammunition Structure Assembly Container under Contract FD2060-23-00958.

The key details are: The contractor, General Dynamics-OTS, is required to submit an IUID Marking Plan for part number 10029110 within 45 days of contract award. The government has 15 days to accept/reject the plan and provide comments, after which the contractor has 10 days to incorporate changes. The plan must be delivered in editable electronic format to the specified government representatives. The Marking Plan is required to be approved within 90 days of contract award. Distribution of the plan is limited to the U.S. Government and its contractors. The estimated total price and price group are not provided.

View the file

Other files for this federal contract opportunity

Other files attached to 20MM F-15E Ammunition Structure Assembly Container, newest first.
File Type Posted
02 - A002_IUID Verification Report_23-00958_v2.pdf PDF
05 - Transportation Data_23-00958.pdf PDF
SPRWA1-24-R-0003 (25 Mar 24).pdf PDF
03 - Packaging Requirements_23-00958.pdf PDF
04 - Special Packaging Instructions_F012982522.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: A
TDP:
TM:
OTHER: MGMT
DSYSTEMITEM: F-15 Ammo Contrainer Structure Assembly
E_CONTRACTPR_NO: FD2060-23-00958
FCONTRACTOR:
1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: Item Unique Identification (IUID) Marking Plan
3_SUBTITLE: (P/N 10029110)
4_AUTHORITY_Data_Acquisit: DI-MGMT-81803
5_CONTRACT_REFERENCE: Per Contract
6_REQUIRING_OFFICE: AFSC 409 SCMS/GUME
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: C
10_FREQUENCY: 1 TIME
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Blk 16
13_DATE_OF_SUBSEQUENT_SUB: See Blk 16
addressee1:
draft1:
reg1:
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4: PM
draft4: 1
reg4: 0
repro4: 1
addressee5: See BLK 16
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7: Engineer
draft7: 1
reg7: 0
repro7: 1
addressee8: See BLK 16
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10: WAWF
draft10: 1
reg10: 0
repro10: 1
addressee11: See BLK 16
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 3
total_repro: 3
16_REMARKS: BLK 7: The contractor shall submit Marking Plan with a letter of transmittal. Submit invoice in WAWF, DoDAAC SPRWA1 <https://wawf.eb.mil/>, after submittal of final Marking Plan to account for all previously submitted.

BLK 8: Approval will be required within 90 days of Contract Award.

BLK 9: DISTRIBUTION C. Distribution authorized to U.S. Government Agencies and their contractors due to critical technology as 9 April 2012. Other requests for this document shall be referred to 409 SCMS/GUEA, 235 Byron Street, Suite 19A, RAFB, GA 31098-1670.

BLK 12 and 13: Initial submission shall be due within 45 days of Contract Award. The government has 15 days to accept/reject and provide comments. The contractor shall have 10 days to incorporate changes.

BLK 14: Reproducible documents (text, drawings, tables, charts, graphic packages used to create figures, and other type documents) shall be delivered in an appropriate, applicable and editable format (AutoCAD, ProE, Microsoft Visio, and compatible Microsoft Office 2007 products) on a CD-ROM, FTP, or via electronic mail to the PM/COR, and Engineer, A final approved copy shall be delivered in an editable format and PDF.

PM: Janet M. Harvey email: janet.harvey.3@us.af.mil

Engineer: Rickey C. Moore email: rickey.moore@us.af.mil

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
of_pages: 1
Reset:
reg38t: 0
2024-03-13T13:04:23-0400
MOORE.RICKEY.C.1249718579
2024-03-13T15:10:01-0400
GROVES.SCOTT.B.1279744817
Text15: 3-13-2024
Text16: 13 Mar 24
Text10: Date: 20240313
Text12: DMO Signature
2024-03-13T14:48:52-0400
FISKE.ROBERT.R.1260632872
Text11: Control Number
Text6:
Text1: 24.03.13.001b

File details come from the government source that posted it. Updated .