01-0J9304 Paving_ Cold Plane AC Pavement_ Drainage_ and Delineation.pdf
PDF 1 MB Posted
- Solicitation number
- 01-0J9304, Fed #ST-P029(159)
- Issued by
- Lake County, California
About this file
This is a Notice to Bidders and Special Provisions document issued by the California Department of Transportation (Caltrans) for a construction project in Lake County on State Routes 29 and 53. The project involves paving, cold plane asphalt concrete pavement removal, drainage system improvements, and delineation work on approximately 11.9 to 23.6 post miles near Lower Lake, from Coyote Creek Bridge to Diener Drive/Road 543. Bidders must hold either a Class A contractor license or a Class C-12 license. Bids will be accepted on a cost-plus-time basis with a minimum bid of 100 working days and maximum of 140 working days. Electronically sealed bids are due by 2:00 p.m. on Wednesday, January 6, 2027, through the Bid Express website. The project includes 131 bid items ranging from lead compliance planning and traffic control systems to asphalt paving, drainage work, guardrail systems, and pavement markings, with estimated quantities including 126,000 square yards of cold plane asphalt, 30,400 tons of rubberized hot mix asphalt, and extensive traffic control and erosion control measures. The estimated project cost is $14,400,000, and this is a federal-aid project (ST-P029(159)) with one trainee or apprentice required under the federal training program.
Prevailing wage requirements apply to all work performed under this contract, with rates established by the California Director of Industrial Relations and the United States Secretary of Labor, whichever is higher. Bidders must submit security equal to at least 10 percent of their bid amount. The contractor must designate an on-site safety representative meeting specific Cal/OSHA certifications and experience requirements. Special provisions address prompt payment to subcontractors within seven days of progress payments, Buy America compliance for manufactured products and construction materials, environmental product declarations for hot mix asphalt and concrete, and management of unregulated earth material containing lead discovered on the site. The contractor must comply with water pollution control requirements, erosion control measures, and fire prevention protocols, including furnishing fire equipment and maintaining a pickup truck with operator for fire control during high fire danger periods. Additional requirements include contractor-supplied biological oversight, temporary traffic control coordination with coincident projects, dispute resolution board provisions, and compliance with Department-furnished materials including traffic signal components to be picked up at the Caltrans Ukiah Maintenance Yard at least four weeks before installation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids open Wednesday, January 6, 2027 Dated November 9, 2026 OSD
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
AND
SPECIAL PROVISIONS
FOR CONSTRUCTION ON STATE HIGHWAY IN LAKE COUNTY NEAR LOWER
LAKE ON ROUTE 29 FROM COYOTE CREEK BRIDGE TO DIENER
DRIVE/ROAD 543 AND ON ROUTE 53 AT ROUTE 29
In District 01 On Route 29,53 Under
Bid book dated November 9, 2026 Standard Specifications dated 2025
Project plans approved August 21, 2026 Standard Plans dated 2025
Identified by Contract No. 01-0J9304
01-Lak-29,53-11.9/23.6,0.0 Project ID 0119000123
Federal-Aid Project
ST-P029(159)
SPECIAL NOTICES
• See sections 2 and 3 for contractors' registration requirements.
• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.
• See section 2 for submittal requirements for DVBE quotes and Non–Small Business
Subcontractor Preference.
• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).
• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.
• The flagging and temporary traffic control requirements have been revised. See sections 7-
1.03, 7-1.04, and 12.
• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.
• See section 14-11.14 for changes to the management of treated wood waste.
• See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy
America/Build America for manufactured products.
• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.
Contract No. 01-0J9304 i
TABLE OF CONTENTS
NOTICE TO BIDDERS
BID ITEM LIST
SPECIAL PROVISIONS
ORGANIZATION
DIVISION I GENERAL PROVISIONS
1 GENERAL
2 BIDDING
5 CONTROL OF WORK
6 CONTROL OF MATERIALS
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
8 PROSECUTION AND PROGRESS
9 PAYMENT
DIVISION II GENERAL CONSTRUCTION
10 GENERAL
12 TEMPORARY TRAFFIC CONTROL
13 WATER POLLUTION CONTROL
14 ENVIRONMENTAL STEWARDSHIP
15 EXISTING FACILITIES
DIVISION III EARTHWORK AND LANDSCAPE
19 EARTHWORK
20 LANDSCAPE
21 EROSION CONTROL
DIVISION IV SUBBASES AND BASES
26 AGGREGATE BASES
DIVISION V SURFACINGS AND PAVEMENTS
36 GENERAL
37 SEAL COATS
39 ASPHALT CONCRETE
DIVISION VIII MISCELLANEOUS CONSTRUCTION
73 CONCRETE CURBS AND SIDEWALKS
DIVISION IX TRAFFIC CONTROL DEVICES
81 MISCELLANEOUS TRAFFIC CONTROL DEVICES
83 RAILINGS AND BARRIERS
84 MARKINGS
DIVISION X ELECTRICAL WORK
86 GENERAL
87 ELECTRICAL SYSTEMS
ii
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.
RSP A3A Abbreviations (Sheet 1 of 3)
RSP A3B Abbreviations (Sheet 2 of 3)
RSP A3C Abbreviations (Sheet 3 of 3)
A10A Legend - Lines and Symbols (Sheet 1 of 5)
A10B Legend - Lines and Symbols (Sheet 2 of 5)
A10C Legend - Lines and Symbols (Sheet 3 of 5)
A10D Legend - Lines and Symbols (Sheet 4 of 5)
A10E Legend - Lines and Symbols (Sheet 5 of 5)
A20A Pavement Markers and Traffic Lines - Typical Details
A20B Pavement Markers and Traffic Lines - Typical Details
A20C Pavement Markers and Traffic Lines - Typical Details
A20D Pavement Markers and Traffic Lines - Typical Details
A20F Pavement Markers and Traffic Lines - Typical Details
A24A Pavement Markings - Arrows
A24B Pavement Markings - Arrows and Symbols
A24D Pavement Markings - Words
A24F Pavement Markings - Crosswalks
A40B Shoulder Rumble Strip Details - Ground-In Indentations
A40C Edge Line Rumble Strip Details - Ground-In Indentations
A40D Center Line Rumble Strip Details - Ground-In Indentations
A40E Rumble Strip Placement at Freeway Exit Ramps, Freeway Entrance Ramps, and Intersections
A40F Rumble Strip Placement at Intersections with Left Turn Pockets, Railroad Crossings, Private Roads, and Major Driveways
A40G Sinusoidal Rumble Strip Details - Ground-In Indentations
A40H Rumble Strip Placement with Gaps for Bicycles
A40J Combined Recessed Traffic Stripe and Rumble Strip Details
A40K Rumble Strip Placement for Paved Medians
A62A Excavation and Backfill - Miscellaneous Details
A62F Excavation and Backfill - Metal and Plastic Culverts
A63A Portable Concrete Barrier (Type 60K) iii
A63B Portable Concrete Barrier (Type 60K)
A73B Markers
A73C Delineators, Channelizers and Barricades
A77L2 Midwest Guardrail System - Standard Railing Section (Steel Post with Notched Wood or Notched Recycled Plastic Block)
A77L4 Midwest Guardrail System - Transition to Metal Beam Guardrail
A77M1 Midwest Guardrail System - Standard Hardware
A77N2 Midwest Guardrail System - Steel Post and Block Details
A77N3 Midwest Guardrail System - Typical Line Post Embedment and Hinge Point Offset Details
A77N4 Midwest Guardrail System - Typical Height Measurement, Dike Positioning, and Delineation Details
A77N5 Minor Concrete Vegetation Control - Guardrail System
A77N6 Minor Concrete Vegetation Control - Guardrail System for Terminal System End Treatments
A77N7 Minor Concrete Vegetation Control - Guardrail System at Structure Approach
A77N11 Minor Concrete Vegetation Control - Guardrail System - Miscellaneous Details
A77N12 Fiber or Rubber Mat Vegetation Control - Guardrail System
A77N14 Fiber or Rubber Mat Vegetation Control - Guardrail System for Terminal System End Treatments
A77P1 Midwest Guardrail System - Typical Layouts for Embankments
A77R6 Midwest Guardrail System - Typical Layouts for Roadside Fixed Objects
A77R7 Midwest Guardrail System - Typical Layouts for Roadside Fixed Objects
A77R8 Midwest Guardrail System - Typical Layouts for Roadside Fixed Objects
RSP A77S1 Midwest Guardrail System - End Anchor Assembly (Type SFT - M)
A77T2 Midwest Guardrail System - Buried Post End Anchor (Type B-F)
A78M3 Thrie Beam Barrier (Type M) - Post and Block Details
A78Q1 Thrie Beam Barrier (Type M) - End Anchors
RSP A79A1 Transition Railing (Type AGT)
A79A3 Transition Railing (Type AGT) Details
A79B1 Transition Railing (Type AGT) to Bridge Railings without Sidewalks
A87A Curbs and Driveways
A87B Hot Mix Asphalt Dikes
P70 Hot Mix Asphalt Paving (Longitudinal Tapered Notched Wedge Joint)
P74 Pavement Edge Treatments
P75 Pavement Edge Treatments - Overlays
P76 Pavement Edge Treatments - New Construction
D72B CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D72C CIP Drainage Inlets - Types G1, G2, G3, G4, G5 and G6 iv
D72E CIP Drainage Inlets - Types GO and GDO
D72G CIP Drainage Inlet Tables
D73B Precast Drainage Inlets - Types G1, G2, G3, G4, G5 and G6
D73D Precast Drainage Inlets - Types GT1, GT2, GT3 and GT4
D73E Precast Drainage Inlets - Types GO and GDO
D73F Precast Drainage Inlet Notes
D73G Precast Drainage Inlet Tables
D74 Drainage Inlet Details
D75A Steel Pipe Inlets
D75C Pipe Inlets - Ladder and Trash Rack Details
D77A Grate Details No. 1
D77B Grate Details No. 2
D87A Corrugated Metal Pipe Downdrain Details
D87B Plastic Pipe Downdrain Details
D87D Overside Drains
D94A Metal and Plastic Flared End Sections
D97A Corrugated Metal Pipe Coupling Details No. 1 - Annular Coupling Band, Bar and Strap, and Angle Connections
D97G Corrugated Metal Pipe Coupling Details No. 7 - Downdrain
D118 Ladder Details
H1 Landscape and Erosion Control Symbols
H51 Erosion Control Details - Fiber Roll and Compost Sock
H52 Rolled Erosion Control Product
T1A Temporary Crash Cushion - Sand Filled (Unidirectional)
T1A1 Temporary Crash Cushion - Sand Filled (Unidirectional)
T1B Temporary Crash Cushion - Sand Filled (Bidirectional)
T2 Temporary Crash Cushion - Sand Filled (Shoulder Installations)
T3C Temporary Barrier System (Cross Bolt)
T3D Temporary Barrier System (Cross Bolt)
T3E Temporary Barrier System (Cross Bolt)
T3F Temporary Barrier System (Cal F-23)
T3F2 Temporary Barrier System (Cal F-23)
T3G Temporary Barrier System (Staking or Anchoring)
T3G2 Temporary Barrier System (Staking or Anchoring)
T9 Traffic Control System Tables for Lane and Ramp Closures v
T10 Traffic Control System for Lane Closure on Freeways and Expressways
T10A Traffic Control System for Lane Closure on Freeways and Expressways
RSP T13 Traffic Control System with Reversible Control on Two Lane Conventional Highways
RSP T13A Traffic Control System - Two Lane Conventional Highways
T15 Traffic Control System for Moving Lane Closure on Multilane Highways
T17 Traffic Control System for Moving Lane Closure on Two Lane Highways
T21 Traffic Control System - Construction Work Zone Speed Limit Reduction Twenty- Four Hours a Day 7 Days a Week (24/7)
T22 Traffic Control System for Construction Work Zone Speed Limit Reduction on Two Lane Conventional Highways
T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and Pedestrian Detour
T31 Temporary Pedestrian Access Routes - Typical Sidewalk Diversion Within Roadbed
T32 Temporary Pedestrian Access Routes - Typical Sidewalk/Crosswalk Closure and Pedestrian Detour
T33 Temporary Pedestrian Access Routes - Ramp
T34 Temporary Pedestrian Access Routes - Curb Ramp Options
T51 Temporary Water Pollution Control Details (Temporary Silt Fence)
T53 Temporary Water Pollution Control Details (Temporary Cover)
T54 Temporary Water Pollution Control Details (Temporary Erosion Control Blanket)
T55 Temporary Water Pollution Control Details (Temporary Erosion Control Blanket)
T56 Temporary Water Pollution Control Details (Temporary Fiber Roll)
T57 Temporary Water Pollution Control Details (Temporary Check Dam)
T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)
T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T65 Temporary Water Pollution Control Details (Temporary High-Visibility Fence)
RS1 Roadside Signs - Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2
RS4 Roadside Signs - Typical Installation Details No. 4
RS5 Roadside Sign-PSST Post-Typical Installation Details No. 1
RS6 Roadside Sign-PSST Post-Typical Installation Details No. 2
S82 Roadside Laminated Sign - Single or Multiple Panel (Type B, 1" Thick)
S83 Roadside Laminated Sign - Single or Multiple Panel (Type B, 2-1/2" Thick)
S84 Roadside Laminated Sign - Single or Multiple Panel (Type H, 2-1/2" Thick)
S89 Roadside Sign - Formed Single Sheet Aluminum Panel vi
S93 Framing Details for Framed Single Sheet Aluminum Signs, Rectangular Shape
S94 Roadside Framed Single Sheet Aluminum Signs, Rectangular Shape
S95 Roadside Single Sheet Aluminum Signs, Diamond Shape
ES-1A Electrical Systems (Legend)
ES-1B Electrical Systems (Legend)
ES-1C Electrical Systems (Legend)
ES-2D Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - A Series)
ES-3C1 Electrical Systems (Controller Cabinet Foundation and Pad Details)
ES-3C2 Electrical Systems (Controller Cabinet Foundation Details)
ES-4A Electrical Systems (Signal Head Mounting)
ES-4B Electrical Systems (Pedestrian Signal Heads)
ES-4C Electrical Systems (Signal Heads and Mountings)
ES-4D Electrical Systems (Signal Head Mounting)
ES-4E Electrical Systems (Signal Heads)
ES-5A Electrical Systems (Loop Detectors)
ES-5B Electrical Systems (Detectors)
ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details)
ES-5E Electrical Systems (Trench in Pavement and Piezoelectric Axle Sensor Details)
ES-6B Electrical Systems (Electrolier Anchorage and Grouting for Type 15 and Type 21, Barrier Rail Mounted)
ES-6E Electrical Systems (Lighting Standard, Types 30 and 31)
ES-6F Electrical Systems (Lighting Standard, Slip Base Plate)
ES-7A Electrical Systems (Signal and Lighting Standard, Type TS, and Type 2 Post)
ES-7B Electrical Systems (Signal and Lighting Standard, Type 1 and Equipment Identification Characters)
ES-7C Electrical Systems (Signal and Lighting Standard, Case 1 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 15' to 30')
ES-7E Electrical Systems (Signal and Lighting Standard, Case 3 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 15' to 45')
ES-7G Electrical Systems (Signal and Lighting Standard, Case 5 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 50' to 55')
ES-7J Electrical Systems (Flashing Beacon on a Type 1, Type 15-FBS, and Type 40 Standard)
ES-7M Electrical Systems (Signal and Lighting Standard, Details No. 1)
ES-7N Electrical Systems (Signal and Lighting Standard, Details No. 2)
RSP ES-7O Electrical Systems (Signal and Lighting Standard, Details No. 3)
ES-8A Electrical Systems (Non-Traffic Pull Box)
ES-8B Electrical Systems (Traffic Pull Box)
ES-11 Electrical Systems (Foundation Installations) vii
ES-13A Electrical Systems (Splice Insulation Methods Details)
ES-13B Electrical Systems (Kinking and Banding Detail)
ES-14B Electrical Systems (EMS and FBE Wiring Diagrams)
CANCELED STANDARD PLANS LIST
The 2025 standard plan sheets listed below are canceled and not applicable to this contract.
Plan No. Date Canceled Plan No. Date
Canceled Plan No. Date Canceled
P8 04-20-26
NOTICE TO BIDDERS
Bids open Wednesday, January 6, 2027
Dated November 9, 2026
General work description: Paving, cold plane AC pavement, drainage, and delineation.
The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON
STATE HIGHWAY IN LAKE COUNTY NEAR LOWER LAKE ON ROUTE 29 FROM COYOTE CREEK
BRIDGE TO DIENER DRIVE/ROAD 543 AND ON ROUTE 53 AT ROUTE 29.
District-County-Route-Post Mile: 01-Lak-29,53-11.9/23.6,0.0
Contract No. 01-0J9304
The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
Federal-aid project no.:
ST-P029(159)
For the Federal training program, the number of trainees or apprentices is 1.
Bids must be on a cost+time basis.
Complete the work within the number of working days bid.
Do not bid less than 100 working days and not more than 140 working days.
The estimated cost of the project is $14,400,000.
The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.
The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.
For bid results go to:
https://ppmoe.dot.ca.gov/cc
Select Electronic Bidding under the Bidding tab.
District office addresses are provided in the Standard Specifications.
Present bidders' inquiries to the Department and view the Department's responses at:
https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.
Submit your bid with bidder's security equal to at least 10 percent of the bid.
Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.
If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.
The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.
Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.
Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.
Department of Transportation
BID ITEM LIST
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM
0002 090105 TIME-RELATED OVERHEAD (LS) LS LUMP SUM
0003 090205 DISPUTE RESOLUTION BOARD ON-SITE
MEETING
EA 4
0004 090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-
BOARD-RELATED TASKS
HR 20
0005 100100 DEVELOP WATER SUPPLY LS LUMP SUM
0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM
0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM
0008 013804 STATIONARY IMPACT ATTENUATOR VEHICLE
(LS)
LS LUMP SUM
0009 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 7,580
0010 120165 CHANNELIZER (SURFACE MOUNTED) EA 12
0011 010413 PORTABLE RADAR SPEED FEEDBACK SIGN
SYSTEMS (LS)
LS LUMP SUM
0012 120320 TEMPORARY BARRIER SYSTEM LF 700
0013 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM
0014 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM
0015 014105 ALTERNATIVE TEMPORARY CRASH CUSHION
TL-3
EA 4
0016 130100 JOB SITE MANAGEMENT LS LUMP SUM
0017 130201 WATER POLLUTION CONTROL PROGRAM LS LUMP SUM
0018 130500 TEMPORARY EROSION CONTROL BLANKET SQYD 500
0019 130505 MOVE-IN/MOVE-OUT (TEMPORARY EROSION
CONTROL)
EA 6
0020 130530 TEMPORARY HYDRAULIC MULCH (BONDED
FIBER MATRIX)
SQYD 500
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0021 130570 TEMPORARY COVER SQYD 500
0022 130610 TEMPORARY CHECK DAM LF 630
0023 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 47
0024 130640 TEMPORARY FIBER ROLL LF 1,000
0025 130650 TEMPORARY GRAVEL BAG BERM LF 6,560
0026 130680 TEMPORARY SILT FENCE LF 1,200
0027 130730 STREET SWEEPING LS LUMP SUM
0028 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM
0029 141120 TREATED WOOD WASTE LB 33,700
0030 146002 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS LUMP SUM
0031 146007 INVASIVE SPECIES CONTROL LS LUMP SUM
0032 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 2,350
0033 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM
0034 190101 ROADWAY EXCAVATION CY 330
0035 190185 SHOULDER BACKING TON 1,700
0036 198010 IMPORTED BORROW (CY) CY 200
0037 200002 ROADSIDE CLEARING LS LUMP SUM
0038 205033 GRAVEL MULCH SQFT 4,200
0039 210252 BONDED FIBER MATRIX (SQFT) SQFT 144,000
0040 210270 ROLLED EROSION CONTROL PRODUCT
(NETTING)
SQFT 18,000
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0041 210350 FIBER ROLLS LF 1,230
0042 210610 COMPOST (CY) CY 280
0043 260203 CLASS 2 AGGREGATE BASE (CY) CY 190
0044 374207 CRACK TREATMENT LNMI 15
0045 390095 REPLACE ASPHALT CONCRETE SURFACING CY 2,030
0046 390132 HOT MIX ASPHALT (TYPE A) TON 4,010
0047 390137 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 30,400
0048 391006 ASPHALT BINDER (GEOSYNTHETIC PAVEMENT
INTERLAYER)
TON 0.7
0049 393004 GEOSYNTHETIC PAVEMENT INTERLAYER
(PAVING FABRIC)
SQYD 580
0050 394060 DATA CORE LS LUMP SUM
0051 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 16,200
0052 394074 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 62
0053 394075 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 6,550
0054 394076 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 6,450
0055 394077 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3,620
0056 394090 PLACE HOT MIX ASPHALT (MISCELLANEOUS
AREA)
SQYD 450
0057 397005 TACK COAT TON 110
0058 398100 REMOVE ASPHALT CONCRETE DIKE LF 32,300
0059 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 126,000
0060 510094 (F) - STRUCTURAL CONCRETE, DRAINAGE
INLET
CY 2.8
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0061 610112 24" ALTERNATIVE PIPE CULVERT LF 280
0062 691902 10" FLUME DOWNDRAIN LF 40
0063 692003 8" ENTRANCE TAPER EA 11
0064 692005 12" ENTRANCE TAPER EA 2
0065 692007 18" ENTRANCE TAPER EA 6
0066 705311 18" ALTERNATIVE FLARED END SECTION EA 2
0067 705315 24" ALTERNATIVE FLARED END SECTION EA 3
0068 710118 REMOVE ENTRANCE TAPER EA 20
0069 710126 REMOVE OVERSIDE DRAIN EA 19
0070 710132 REMOVE CULVERT (LF) LF 280
0071 710138 REMOVE DOWNDRAIN (EA) EA 1
0072 710150 REMOVE INLET EA 1
0073 710167 REMOVE FLARED END SECTION (EA) EA 2
0074 710196 ADJUST INLET EA 21
0075 710204 ADJUST DOWNDRAIN EA 19
0076 710240 MODIFY INLET EA 11
0077 721431 CONCRETE (CONCRETE APRON) CY 0.8
0078 723060 ROCK SLOPE PROTECTION (300 LB, CLASS IV,
METHOD B) (CY)
CY 3.2
0079 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 4.9
0080 037265 MINOR CONCRETE (RETAINING CURB) CY 1.3
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0081 731504 MINOR CONCRETE (CURB AND GUTTER) CY 8
0082 731521 MINOR CONCRETE (SIDEWALK) CY 9
0083 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 891
0084 810130 REMOVE DELINEATOR EA 220
0085 810170 DELINEATOR (CLASS 1) EA 220
0086 810190 GUARD RAILING DELINEATOR EA 53
0087 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 5,130
0088 810250 PAVEMENT MARKER (RETROREFLECTIVE-
RECESSED)
EA 720
0089 820112 MARKER (CULVERT) EA 10
0090 820220 REMOVE MARKER EA 10
0091 820250 REMOVE ROADSIDE SIGN EA 82
0092 820490 RESET MARKER EA 1
0093 820750 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.063"-UNFRAMED)
SQFT 470
0094 820760 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.080"-UNFRAMED)
SQFT 210
0095 820780 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.063"-FRAMED)
SQFT 260
0096 820790 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.080"-FRAMED)
SQFT 260
0097 820840 ROADSIDE SIGN - ONE POST EA 66
0098 820850 ROADSIDE SIGN - TWO POST EA 14
0099 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET
METHOD)
EA 2
0100 820900 INSTALL ROADSIDE SIGN PANEL ON EXISTING
POST
EA 41
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0101 018000 GUARDRAIL SUPPORT SYSTEM SQFT 980
0102 832006 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 1,330
0103 832018 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 920
0104 832070 VEGETATION CONTROL (MINOR CONCRETE) SQYD 1,560
0105 839544 TRANSITION RAILING (TYPE AGT) EA 2
0106 839580 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 9
0107 015299 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 7
0108 839588 BURIED POST END ANCHOR (TYPE B-F) EA 1
0109 839745 (F) - CONCRETE BARRIER TRANSITION LF 30
0110 839752 REMOVE GUARDRAIL LF 2,740
0111 839772 ADJUST GUARDRAIL LF 4,580
0112 839774 REMOVE CONCRETE BARRIER LF 7
0113 840516 THERMOPLASTIC PAVEMENT MARKING
(ENHANCED WET NIGHT VISIBILITY)
SQFT 5,070
0114 840619 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY) (BROKEN
12-3)
LF 3,170
0115 840621 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY) (BROKEN
17-7)
LF 300
0116 840623 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY) (BROKEN
36-12)
LF 34,000
0117 846007 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
LF 242,000
0118 846009 8" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
LF 2,650
0119 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 152,000
0120 846034 REMOVE TRAFFIC STRIPE (HIGH-PRESSURE
WATER BLASTING)
LF 2,320
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0121 846035 REMOVE THERMOPLASTIC PAVEMENT
MARKING
SQFT 1,230
0122 846047 6" RUMBLE STRIP (ASPHALT CONCRETE
PAVEMENT-SINUSOIDAL)
STA 720
0123 846053 12" RUMBLE STRIP (ASPHALT CONCRETE
PAVEMENT-SINUSOIDAL)
STA 920
0124 847218 6" TRAFFIC STRIPE TAPE WITH CONTRAST
(WARRANTY)
LF 510
0125 847222 6" TRAFFIC STRIPE TAPE WITH CONTRAST
(WARRANTY) (BROKEN 36-12)
LF 150
0126 870009 MAINTAINING EXISTING TRAFFIC MANAGEMENT
SYSTEM ELEMENTS DURING CONSTRUCTION
LS LUMP SUM
0127 872133 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS LUMP SUM
0128 872135 MODIFYING TRAFFIC MONITORING STATIONS LS LUMP SUM
0129 872136 MODIFYING FLASHING BEACON SYSTEMS LS LUMP SUM
0130 872146 REMOVING FLASHING BEACON SYSTEMS LS LUMP SUM
0131 999990 MOBILIZATION LS LUMP SUM
SPECIAL PROVISIONS
ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.
Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.
Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.
DIVISION I GENERAL PROVISIONS
1 GENERAL
Add to section 1-1.01:
Bid Items and Applicable Sections Item code
Item description Applicable section
090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING 5
090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED
TASKS
013804 STATIONARY IMPACT ATTENUATOR VEHICLE (LS) 12
010413 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS) 12
014105 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 12
037265 MINOR CONCRETE (RETAINING CURB) 73
018000 GUARDRAIL SUPPORT SYSTEM 83
015299 ALTERNATIVE IN-LINE TERMINAL TL-3 83
2 BIDDING
Add between the 1st and 2nd paragraphs of section 2-1.06B:
The Department makes the following supplemental project information available:
Supplemental Project Information Means Description
Included in the Information Handout 1. PLAC - U.S. Army Corps of Engineers, Sacramento District, 2026 Nationwide Permit Summary No. 3a, dated June 04, 2025
2. PLAC - California Regional Water Quality Control Board, Central Valley Region, General Section 401 Water Quality Certification, WDID No.
5A17CR00200, dated June 25, 2025
3. PLAC - California Department of Fish and Wildlife, North Central Region 1602 Streambed Alteration Agreement, EPIMS Notification No. LAK-57517-R2, dated October 06, 2025
4. TMS Element Operational Status Certified List
5. Department-Furnished Materials and Expenses
Items Subject to Buy America Available as specified in the Standard Specifications
1. Digital terrain model in 3D DGN or LandXML format
2. Alignments and profiles in LandXML format
3. Cross sections in 2D DGN and PDF format
4. Digital design model in LandXML format
5. Pavement smoothness data (.ppf)
Delete section 2-1.20.
Delete section 2-1.33B(2)(b).
5 CONTROL OF WORK
Delete section 5-1.13B.
Replace section 5-1.13E with:
5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.
Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.
Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:
1. Subcontractor’s or entity’s business name
2. Description of work performed
2.1. Bid item numbers or change order numbers
2.2. Written narrative of work performed
3. Value of work performed
4. Amount paid to subcontractor or entity
5. Withhold amount, if applicable
6. Explanation of withhold reasoning, if applicable
Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.
If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:
1. Value of the disputed work
2. Amount of the withhold being taken
3. Bid item numbers or change order numbers associated with the disputed work
4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated
5. Corrective actions to be taken for release of withheld amount
The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.
The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:
1. Withhold was not applied in good faith
2. Requested additional withhold documentation records were not provided
3. Payment information was not submitted through the prompt payment monitoring system
4. Required withhold notification was not provided
The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.
Replace section 5-1.15 with:
5-1.15 SAFETY REPRESENTATIVE
5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.
The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.
The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.
Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.
5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.
Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:
1. Name of the entity providing certification
2. Name of the individual receiving certification
3. Date when the certification was provided
4. Expiration date, if applicable
Submit a copy of the SSSP as an informational submittal:
1. At least 15 days before starting work
2. At least 48 hours before starting work whenever a revision is made to the SSSP
5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.
The safety representative must have one of the following certifications:
1. Certified Safety Professional from the Board of Certified Safety Professionals
2. Construction Health and Safety Technician from the Board of Certified Safety Professionals
3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals
4. Safety Trained Supervisor from the Board of Certified Safety Professionals
5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals
6. Associate Safety Professional from the Board of Certified Safety Professionals
7. Master Safety Professional from the National Association of Safety Professionals
8. Certified Safety Director from the National Association of Safety Professionals
5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:
1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry
2. Knowledge in the area of safety procedure for all types of work being performed on this project
3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA
Code of Regs safety requirements
The safety representative must have completed safety training and maintain valid certifications for:
1. First aid
2. Cardiopulmonary resuscitation
5-1.15E Duties and Responsibilities The safety representative must be available by:
1. Cellular telephone
2. Two-way radio
3. Mobile internet access
The safety representative must:
1. Develop the SSSP
2. Conduct the on-site new project orientation for each worker assigned to the project
3. Review the construction work plans for each subcontractor before starting work
4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring
5. Conduct weekly job site safety meetings
6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues
7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards
8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures
9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs
10. Report all incidents to the Engineer immediately, including the investigation of any close calls
When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.
If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.
You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.
Add to the end of section 5-1.20A:
During the progress of the work under this Contract, work under the following contract may be in progress at or near the job site of this Contract:
Coincident or Adjacent Contracts
Contract no. County–Route–Post Mile Location Type of work
01-0L2204 Lak-29-17.6/18.0 Near Lower Lake Construct left-turn channelization
Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.
Add to the end of section 5-1.20B(1):
The Department will communicate with PLAC agencies unless communication between you and the PLAC agency is authorized.
Add to the end of section 5-1.32:
For work at the temporary construction easement, you must only close one driveway at a time.
Add between the 6th and 7th paragraph of section 5-1.43E(1)(a):
DRA and DRB meetings may be held either virtually or on-site at the job location upon mutual agreement by the Contractor, the Department, and the DRA or DRB.
DRA and DRB meetings include:
1. Initial project meeting
2. Progress meetings
3. Dispute meetings
On-site meetings are held at a physical location and include on-site time, travel time, transportation, lodging, and incidentals for each day or portion thereof.
Virtual meeting includes virtual meeting time, equipment, and incidentals for each hour or portion thereof, either all or part of the DRA and DRB members, with the following requirements:
1. Obtain authorization for virtual meeting 14 days before the meeting
2. Use of Webex, Zoom or MS Teams virtual platforms
Obtain authorization for DRA or DRB members before spending any time on DRA- or DRB- related tasks.
Hourly off-site DRA and DRB related tasks include reviewing the plans, specifications, evaluating positions, preparing recommendations, completing forms, or performing any other off-site DRA- or DRB-related tasks.
Replace section 5-1.43E(1)(i) with:
5-1.43E(1)(i) Payment Pay the DRA or each DRB member for meeting participation as follows:
1. $250 per hour for agreed hourly off-site DRA- or DRB-related tasks
2. For attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or
DRB-related tasks rate
3. $2,500 per day for each on-site meeting
Department does not pay for (1) DRA- or DRB-work performed after Contract acceptance or (2) cost of preparing for or attending ADR meetings.
The Department pays:
1. $250 per hour for agreed off-site DRA- or DRB-related tasks
2. For each DRA or DRB member attending a virtual off-site meeting with a limit of $1,000 per meeting at hourly off-site DRA-or DRB-related tasks rate
3. $2,500 per DRA on-site meeting
4. Up to $7,500 per DRB on-site meeting
Payment is full compensation for each meeting and off-site DRA- or DRB-related tasks.
The Department does not adjust the unit price for an increase or decrease in the quantity of:
1. DRA on site meeting
2. DRB on site meeting
3. Hourly off-site DRA- or DRB-related task
Within 60 days of receipt of Department's payment, submit copies of associated invoices and supporting documents in the form of a canceled check or bank statement for DRA- or DRB-payment verification.
6 CONTROL OF MATERIALS
Add to end of section 6-1.01:
If you fail to submit the form for materials subject to Buy America, the Department may:
1. Withhold from the next progress payment
2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products
Add to the beginning of section 6-1.02:
The Department furnishes you with:
1. Loop detector sensor units, switch packs, and isolators
2. Controller assemblies for traffic signals
3. Electronics assembly for battery backup systems as follows:
3.1. Inverter/charger unit
3.2. Power transfer relay
3.3. Manually-operated bypass switch
3.4. Battery harness
3.5. Utility interconnect wires
3.6. Battery temperature probe
3.7. Relay contact wires
The Department furnishes you with completely wired controller cabinets with auxiliary equipment and controller unit at CALTRANS UKIAH MAINTENANCE YARD, 90 W LAKE MENDOCINO DR, UKIAH CA 95482-3041. At least 4 weeks before you pick up the materials, inform the Engineer of what you will pick up and when you will pick it up.
Replace section 6-1.03B with:
6-1.03B Submittals 6-1.03B(1) General Not Used
6-1.03B(2) Work Plan For local material, such as rock, gravel, earth, structure backfill, pervious backfill, imported borrow, and culvert bedding, obtained from a (1) noncommercial source, or (2) source not regulated under California jurisdiction, submit a local material plan for each material at least 60 days before placing the material. The local material plan must include:
1. Certification signed by you and an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
I am aware local material from a noncommercial source or a source not regulated under CA jurisdiction must be sampled and analyzed for pH and lead and may require sampling and analysis under section 6-1.03B(3) for other constituents of concern based on the land use history. I am aware that local material sources must not contain ADL at concentrations greater than 80 mg/kg total lead or equal to or greater than 5 mg/L soluble lead as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II. I am aware that a maximum quantity of material may be excavated at the site based on the minimum number of samples taken before excavating at the site under section 6-1.03B(3).
2. Land use history of the local material location and surrounding property
3. Sampling protocol
4. Number of samples per volume of local material
5. QA and QC requirements and procedures
6. Qualifications of sampling personnel
7. Stockpile history
8. Name and address of the analytical laboratory that will perform the chemical analyses
9. Analyses that will be performed for lead and pH
10. Other analyses that will be performed for possible hazardous constituents based on:
10.1. Source property history
10.2. Land use adjacent to source property
10.3. Constituents of concern in the ground water basin where the job site is located
The plan must be sealed and signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State.
If the plan requires revisions, the Engineer provides comments. Submit a revised plan within 7 days of receiving comments. Allow 7 days for the review.
6-1.03B(3) Analytical Test Results At least 15 days before placing local material, submit analytical test results for each local material obtained from a noncommercial source or a source not regulated under CA jurisdiction. The analytical test results must include:
1. Certification signed by an engineer who is registered as a civil engineer in the State or a professional geologist licensed as a professional geologist by the State stating:
The analytical testing described in the local material plan has been performed. I performed a statistical analysis of the test results using the US EPA's ProUCL software with the applicable 95 percent upper confidence limit. I certify that the material from the local material source is suitable for unrestricted use at the job site, it has a pH above 5.0, does not contain soluble lead in concentrations equal to or greater than 5mg/l as determined by the Waste Extraction Test (WET) Procedures, 22 CA Code of Regs § 66261.24(a)(2) App II, does not contain lead in concentrations above 80 mg/kg total lead, is free from all other contaminants identified in the local material plan, and will comply with the job site's basin plan and water quality objectives of the RWQCB.
2. Chain of custody of samples
3. Analytical results no older than 1 year
4. Statistical analysis of the data using US EPA’s ProUCL software with a 95 percent upper confidence limit
5. Comparison of sample results to hazardous waste concentration thresholds and the RWQCB's basin plan requirements and water quality objectives for the job site location
6-1.03B(4) Sample and Analysis Sample and analyze local material from a (1) noncommercial source or (2) a source not regulated under CA jurisdiction:
1. Before bringing the local material to the job site
2. As described in the local material plan
3. Under US EPA Test Methods for Evaluating Solid Waste, Physical/Chemical Methods (SW-846)
The sample collection must be designed to generate a data set representative of the entire volume of proposed local material.
Before excavating at the (1) noncommercial material source or (2) a source not regulated under CA jurisdiction, collect the minimum number of samples and perform the minimum number of analytical tests for the corresponding maximum volume of local material as shown in the following table:
Minimum Number of Samples and Analytical Tests for Local Material Maximum volume of imported borrow
(cu yd) Minimum number of samples and analytical tests
< 5,000 8
5,000–10,000 12 for the first 5,000 cu yd plus 1 for each additional 1,000 cu yd or portion thereof
10,000–20,000 17 for the first 10,000 cu yd plus 1 for each additional 2,500 cu yd or portion thereof
20,000-40,000 21 for the first 20,000 cu yd plus 1 for each additional 5,000 cu yd or portion thereof
40,000–80,000 25 for the first 40,000 cu yd plus 1 for each additional 10,000 cu yd or portion thereof
> 80,000 29 for the first 80,000 cu yd plus 1 for each additional 20,000 cu yd or portion thereof
Do not collect composite samples or mix individual samples to form a composite sample.
Analyze the samples using the US EPA's ProUCL software with a 95 percent upper confidence limit. All chemical analysis must be performed by a laboratory certified by the SWRCB's Environmental Laboratory Accreditation Program (ELAP).
The analytical test results must demonstrate that the local material:
1. Is not a hazardous waste
2. Has a pH above 5.0
3. Has an average total lead concentration, based upon the 95 percent upper confidence limit, at or below 80 mg/kg
4. Is free of possible contaminants identified in the local material plan
5. Complies with the RWQCB's basin plan for the job site location 6 Complies with the RWQCB's water quality objectives for the job site location
6-1.03C Local Material Management Do not place local material until authorized.
If the Engineer determines the appearance, odor, or texture of any delivered local material suggests possible contamination, sample and analyze the material. The sampling and analysis is change order work unless (1) hazardous waste is discovered or (2) the analytical test results indicate the material does not comply with section 6-1.03B(3).
Dispose of noncompliant local material at an appropriately permitted CA Class I, CA Class II or CA Class III facility. You are the generator of noncompliant local materials.
Replace section 6-1.04 with:
6-1.04 BUY AMERICA
6-1.04A General Buy America requirements do not apply to the following:
1. Tools and construction equipment used in performing the work.
2. Temporary work that is not incorporated into the finished project.
An article, material, or supply to be permanently incorporated in the project should only be classified into one of the following categories:
1. Iron or steel products
2. Manufactured products
3. Construction materials
4. Excluded materials
Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.
6-1.04B Crumb Rubber (Pub Res Code § 42703(d)) Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:
1. Produced in the United States
2. Derived from waste tires taken from vehicles owned and operated in the United States
6-1.04C Iron or Steel Products Iron or steel products must be melted and manufactured in the United States except:
1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials
2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized
Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.
All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.
6-1.04D Manufactured Products Manufactured products mean articles, materials, or supplies that have been:
1. Processed into a specific form and shape; or
2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies
Per 23 CFR 635.410, these products must be manufactured in the United States.
Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.
If an item is classified as an iron or steel product, a construction material, or an excluded material under the definitions set forth under this Buy America section, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under this Buy America section may include components that are construction materials, iron or steel products, or excluded materials.
Iron or steel used in precast concrete manufactured products or enclosures for Intelligent Transportation Systems (ITS) must meet the requirements of section 6-1.04C regardless of the amount used.
Iron or steel used in other manufactured products must meet the requirements of section 6-1.04C if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.
Furnish manufactured products to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to compliance with the 23 CFR 635.410 standard.
6-1.04E Construction Materials The following construction materials must be produced in the United States under standards in 2 CFR 184.6:
1. Non-ferrous metals
2. Plastic and polymer-based products such as:
2.1. Polyvinylchloride
2.2. Composite building materials
3. Glass
4. Fiber optic cable including drop cable
5. Optical fiber
6. Lumber
7. Engineered wood
8. Drywall
All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.
Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to compliance with the 2 CFR 184.6 standard.
Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.
6-1.04F Buy America Waiver for the De Minimis Costs for Manufactured Products and Construction Materials A De Minimis Costs waiver can waive the application of FHWA's Buy America requirements for manufactured products and construction materials under a single project when the total cost of non-compliant manufactured products and construction materials is no more than the lesser of $1,000,000 or 5 percent of the total…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .