Statement of Work.docx
DOCX document 53 KB Posted
- Solicitation number
- 00879
About this file
This is a Statement of Work for the procurement of MSHA-approved portable, inflatable refuge alternative devices for the Pittsburgh Mining Research Division (PMRD) facility under the Centers for Disease Control and Prevention, Department of Health and Human Services.
The vendor must deliver two fully equipped portable inflatable refuge alternative training devices—one from Strata and one from Chembio—representing currently approved U.S. industry standards, plus one fully equipped operational portable inflatable refuge alternative device from either manufacturer. All devices must meet MSHA requirements for use in underground coal mines and support seam heights exceeding 54 inches. Each device must sustain life support for at least 24 occupants for 96 hours and comply with 30 CFR Part 7, Subpart L sections 7.506-7.508 regarding breathable air components, air monitoring, and harmful gas removal. The vendor is additionally responsible for delivering the units to the PMRD facility and providing comprehensive instruction to PMRD staff on proper operation and training protocols for mining personnel. The requisition also requires all associated documentation necessary for safe operation of both the training and operational devices. This is currently a pre-solicitation notice issued for informational purposes only, and no quotes should be submitted at this time.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Title: Bruceton Mines’ Inflatable Refuge Alternatives Upgrade:
FY27 Procurement of Refuge Alternative and Expectation Trainers
Period of performance of this contract is: No later than nine months after contract award. Comment by Lindsey, Marcus (CDC/OCOO/OFR/OAS): The PoP will be updated as a date range at time of award. Recommend removing this for now, and just giving an estimated date range.
SECTION 1 – BACKGROUND
The Pittsburgh Mining Research Division (PMRD) of the National Institute for Occupational Safety and Health (NIOSH) operates the Safety Research Coal Mine (SRCM) and Experimental Mine (EM) to conduct research and provide facilities for incident response exercises in this unique environment. The charter of these facilities is to improve worker safety and health. Currently the SRCM has a semi-operable and out-of-date portable, inflatable refuge alternative. The current device does not provide real world capabilities and no longer aligns with devices currently deployed out in the field.
To provide a real-world platform as well as training units that represent currently deployed devices, PMRD will acquire and install in the SRCM/EM, two portable refuge alternative trainers and a portable, inflatable refuge alternative that will support at least 24 individuals.
Currently there are two manufacturers in the US who provide portable, inflatable refuge alternatives that are certified by MSHA as meeting US mining regulations: Chembio and Strata. The vendor shall provide a trainer from each manufacturer. The vendor shall also provide an operational unit from either manufacturer.
SECTION 2 – PURPOSE/OBJECTIVE
The purpose of this contract is to:
1. Obtain a portable, inflatable refuge alternative trainer from each of the MSHA certified manufacturer.
2. Replace and upgrade the mine’s existing portable, inflatable refuge alternative to reflect current underground coal mine state and federal regulations.
3. Ensure PMRD staff are proficient with trainer/inflatable refuge alternative deployment and operation to the point that the staff can instruct other miners in the proper deployment and operation of the devices.
The project will include three Contract Line Items (CLI). Each CLI will have three tasks, that will be completed over a fixed period most convenient to NIOSH and its mine staff. The contractor shall provide:
Contract Line-Item Number (CLIN) 1: Chembio Portable, Inflatable Refuge Alternative Trainer
· Task 1 – One Chembio inflatable portable refuge alternative trainer.
· Task 2 – Transport the trainer to the PMRD facility.
· Task 3 – Provide training and training material to get PMRD personnel to the instructor level.
Contract Line-Item Number (CLIN) 2: Strata Portable, Inflatable Refuge Alternative Trainer
· Task 4 – One Strata inflatable, portable refuge trainer.
· Task 5 – Transport the trainer to the PMRD facility.
· Task 6 – Provide training and training material to get PMRD personnel to the instructor level.
Contract Line-Item Number (CLIN) 3: Chembio/Strata Portable, Inflatable Refuge Alternative
· Task 7 – One portable, inflatable operational refuge alternative.
· Task 8 – Transport the Refuge alternative to the PMRD facility.
· Task 9 – Provide training and training material to get PMRD personnel to the instructor level.
SECTION 3 – SCOPE OF WORK
The work to be completed in this contract includes CLINs 1 through 3, with each CLIN broken down into 3 tasks. These tasks are necessary to have the devices ready for inspection at the vendor’s site, transportation to the PMRD facility and training PMRD staff in the deployment, operation and instruction techniques for the trainers and deployable device.
Contract Line Item Number (CLIN) 1: Chembio Portable, Inflatable Refuge Alternative Trainer
· Task 1 – One Chembio inflatable portable refuge alternative.
· Task 2 – Transport the trainer to the PMRD facility.
· Task 3 – Provide training and training material to get PMRD personnel to the instructor level.
Task 1 – Vendor Site Acceptance Testing Provide one (1) Chembio portable, inflatable refuge alternative trainer for inspection that is representative of the manufacturer’s current MSHA approved portable, inflatable underground coal refuge alternative. The non-deployed physical dimensions shall not exceed: Maximum Height x Width x Length = 60” high x 84” wide x 200” long.
The deployed physical dimensions shall not exceed: Maximum Height x Width = 5’ high x 16’ wide.
Task 2 – Transport The vendor shall be responsible for the transportation of the Chembio trainer to the Pittsburgh Mining Research Divion.
Task 3 – Training The vendor shall provide the appropriate training material and instruction for the Chembio trainer.
The level of instruction and training material shall be of sufficient detail to allow PMRD staff to instruct other mining community members in the safe and effective use of the Chembio trainer.
Contract Line-Item Number (CLIN) 2: Strata Portable, Inflatable Refuge Alternative Trainer
· Task 4 – One Strata inflatable, portable refuge trainer.
· Task 5 – Transport the trainer to the PMRD facility.
· Task 6 – Provide training and training material to get PMRD personnel to the instructor level.
Task 4 – Vendor Site Acceptance Testing Provide one (1) Stata portable, inflatable refuge alternative trainer for inspection that is representative of the manufacturer’s current MSHA approved portable, inflatable underground coal refuge alternative. The non-deployed physical dimensions shall not exceed: Maximum Height x Width x Length = 60” high x 84” wide x 200” long.
The deployed physical dimensions shall not exceed: Maximum Height x Width = 5’ high x 16’ wide.
Task 5 – Transport The vendor shall be responsible for the transportation of the Strata trainer to the Pittsburgh Mining Research Divion.
Task 6 – Training The vendor shall provide the appropriate training material and instruction for the Strata.
The level of instruction and training material shall be of sufficient detail to allow PMRD staff to instruct other mining community members in the safe and effective use of the Strata trainer.
Contract Line-Item Number (CLIN) 3: Chembio/Strata Portable, Inflatable Refuge Alternative
· Task 7 – One portable, inflatable operational refuge alternative.
· Task 8 – Transport the Refuge alternative to the PMRD facility.
· Task 9 – Provide training and training material to get PMRD personnel to the instructor level.
Task 7 – Vendor Site Acceptance Testing Provide one (1) Chembio or one (1) Stata portable, inflatable refuge alternative for inspection that is representative of the manufacturer’s current MSHA approved portable, inflatable underground coal refuge alternative. The non-deployed physical dimensions shall not exceed: Maximum Height x Width x Length = 60” high x 84” wide x 200” long.
The deployed physical dimensions shall not exceed: Maximum Height x Width = 5’ high x 16’ wide.
Task 8 – Transport The vendor shall be responsible for the transportation of the inflatable refuge alternative to the Pittsburgh Mining Research Division.
Task 9 – Training The vendor shall provide the appropriate training material and instruction for the operational inflatable refuge alternative.
The level of instruction and training material shall be of sufficient detail to allow PMRD staff to instruct other mining community members in the safe and effective use of the refuge alternative.
The Mine Safety and Health Administration (MSHA) regulates underground coal mine refuge alternatives primarily under 30 CFR Part 7, Subpart L (§7.501–7.510) and operational requirements in 30 CFR §75.1506. These regulations define the technical specifications for design, performance, and operational capability of refuge alternatives (RAs) used when miners cannot escape during an emergency. Below is a structured list of the key technical specifications for the operational refuge alternative in this contract.
MSHA Technical Specifications for Underground Coal Mine Refuge Alternatives Comment by Lindsey, Marcus (CDC/OCOO/OFR/OAS): Would these be considered the salient characteristics for what you need in the inflatable. Because I am not sure I can do a brand name request for 2 different items. So I will need to characteristic of it and what is vital so we can make the decision from there.
1. Purpose and Functional Requirement The portable, inflatable refuge alternative must provide a life-sustaining environment for miners trapped underground when escape is impossible.
It must support occupants for a defined duration of 96 hours and protect them from hazards such as explosions, fires, toxic gases, and oxygen depletion.
2. Occupancy and Space Requirements Minimum internal space is specified to ensure survivability.
Floor space: Minimum: 15 ft² per person (1.4 m²) Volume requirements are dependent on seam height. For the purposes of this contract the seam height is 60 inches. Therefore, the volume per person of the operational inflatable refuge alternative shall be 60 ft³.
| Mining Height |
| Volume per Person |
| ≤36 in |
| 30 ft³ |
| >36–42 in |
| 37.5 ft³ |
| >42–48 in |
| 45 ft³ |
| >48–54 in |
| 52.5 ft³ |
| >54 in |
| 60 ft³ |
Airlock volume may be included in calculations if waste is disposed of outside the refuge.
3. Structural Performance Requirements The refuge structure must withstand mining hazards:
i. Explosion resistance: Must be designed to withstand 15 psi overpressure for 0.2 seconds before deployment.
ii. Fire resistance: Must be designed to withstand exposure to 300°F (149°C) flash fire for 3 seconds.
The tests listed in 30 CFR 7.505 b 2-5 are not required to verify these requirements.
Materials:
· Must be non-combustible or MSHA-approved materials.
· Must resist puncture, tearing, and deployment damage.
Deployment: Must be fully deployable within 10 minutes without tools by trained miners.
4. Life-Support Duration The Refuge alternatives must sustain occupants for:
· 96 hours (4 days) without outside support
· 24 hours minimum if additional supplies are staged for resupply.
Life-support systems include:
· breathable air
· CO₂ removal
· temperature control
· water and food supplies
5. Environmental Controls Temperature: Apparent temperature must not exceed 95°F (35°C) at full occupancy.
Noise: Interior noise must not exceed 85 dBA continuous level.
Gas monitoring
· Ability to measure outside gas concentrations without exposing occupants.
6. Breathable Air System The inflatable refuge alternative system must provide:
· Oxygen supply
· CO₂ removal
· Gas monitoring capability These are regulated under:
· §7.506 (breathable air components) Comment by Lindsey, Marcus (CDC/OCOO/OFR/OAS): Shouldn’t this have a CFR reference like below.
· §7.507 (air monitoring)
· §7.508 (harmful gas removal) These requirements may include:
· compressed oxygen cylinders
· chemical oxygen generation
· lithium hydroxide or soda lime scrubbers.
7. Entry and Isolation Airlock requirement: A multi-use airlock must isolate the refuge interior from the mine atmosphere. The Airlock must:
· support maximum occupancy cycling
· accommodate a stretcher.
Positive-pressure systems may substitute if they maintain isolation.
8. Internal Equipment and Provisions Required internal equipment includes:
· Lighting sufficient for tasks
· Human waste containment system
· First aid supplies
· Repair tools and spare parts
· Fire extinguisher suitable for gas removal chemicals
9. Electrical Safety Electrical components exposed to mine atmosphere must be:
· Intrinsically safe, or
· Permissible MSHA-approved equipment.
10. Storage and Packaging Component storage containers must be:
· airtight
· waterproof
· rodent-proof
· labeled with expiration dates and instructions.
Regulation References
· 30 CFR Part 7 Subpart L (§7.501–7.510) – Approval requirements
· 30 CFR §7.504–7.508 – Technical specifications
· 30 CFR §7.505 – Structural requirements
· 30 CFR §75.1506 – Operational placement and capacity requirements
SECTION 4 – TASKS TO BE PERFORMED
CLIN 1: Chembio Portable, Inflatable Refuge Alternative Trainer Task 1: Provide one (1) Chembio portable, inflatable refuge alternative trainer for PMRD inspection that is representative of the manufacturer’s current MSHA approved portable, inflatable underground coal refuge alternative.
Task 2: Deliver the device to PMRD Task 3: Provide instruction and associated materials to PMRD staff on the device in order to make PMRD personnel proficient in device operation and miner training.
CLIN 2: Strata Portable, Inflatable Refuge Alternative Trainer
Task 1: Provide one (1) Strata portable, inflatable refuge alternative trainer for PMRD inspection that is representative of the manufacturer’s current MSHA approved portable, inflatable underground coal refuge alternative.
Task 5: Deliver the device to PMRD Task 6: Provide instruction and associated materials to PMRD staff on the device in order to make PMRD personnel proficient in device operation and miner training.
CLIN 3: Chembio/Strata Portable, Inflatable Refuge Alternative Task 7– Provide one (1) Chembio or one (1) Stata portable, inflatable refuge alternative for inspection that is representative of the manufacturer’s current MSHA approved portable, inflatable underground coal refuge alternative.
Task 8: Deliver the device to PMRD Task 9: Provide instruction and associated materials to PMRD staff on the device in order to make PMRD personnel proficient in device operation and miner training.
SECTION 5 – PLACE OF PERFORMANCE AND CONTRACT SUPPORT HOURS
SUBSECTION A – PLACE OF PERFORMANCE
This contract’s delivery and training will be performed entirely at a government facility located at:
NIOSH - Building 04 626 Cochrans Mill road Pittsburgh, PA 15236
SUBSECTION B – CONTRACT SUPPORT HOURS
The vendor will provide support/training from 8:00am to 4:30pm each day present. The contractor may travel on Mondays and Friday’s if necessary. The facility is open from 6:30am to 6:00pm. The mine will have support until 3pm unless notified.
SECTION 7 – TRAVEL
Onsite work will occur at 626 Cochrans Mill Road, Pittsburgh, PA 15236 during normal business hours. The contractor can travel during normal business hours if preferred. The contractor will notify the government at least two weeks ahead of time to determine the availability of the mine for delivery and training.
Travel will be in accordance with / and not to exceed the Federal Travel Regulation rates. Travel costs need to be approved in advance by the Contract Officer’s Representative (COR). The contractor shall be required to provide their travel policy to the Government for review. Comment by Lindsey, Marcus (CDC/OCOO/OFR/OAS): If travel is to be approved then there needs to be an additional CLIN that is devoted to just travel, and funded.
Travel does not include conferences. Conference Approval Management Systems (CAMS) approval is required in advance of any travel for conferences. If the need for conference travel occurs, the contract will be modified to separately add funding.
SECTION 8 – DELIVERABLES/REPORTING SCHEDULE
The contractor and NIOSH personnel will examine progress on tasks at the end of each task. The contractor will demonstrate all devices are fully functional prior to the completion of the contract.
CLIN 1:
| CLIN |
| Task |
| Deliverable |
| Quantity/Format |
| Due Date |
| Deliver To |
| 1 | |
| 1 | |
| One portable Chembio refuge alternative trainer. | |
| One new Chembio portable refuge alternative trainer. | |
| End-of-contract minus 3 weeks | Comment by Lindsey, Marcus (CDC/OCOO/OFR/OAS): This is not a realistic due date. You should look to have this completed within 90 to 180 days of award as an example. This should be changed for all CLINs that have this date structure. |
| Ready to ship at vendor site for inspection | Comment by Lindsey, Marcus (CDC/OCOO/OFR/OAS): Should this not be NIOSH-PMRD as well |
| 1 |
| 2 |
| Delivery to PMRD of the Chembio trainer |
| Deliver device. |
| End-of-contract minus 1 week |
| NIOSH-PMRD |
| 1 |
| 3 |
| Operation Training and Train the Trainer instruction |
| Site delivery of instruction at the PMRD facility. |
| End-of-contract minus one day |
| NIOSH-PMRD |
CLIN 2:
| CLIN |
| Task |
| Deliverable |
| Quantity/Format |
| Due Date |
| Deliver To |
| 2 |
| 1 |
| One Strata portable refuge alternative trainer. |
| One new Stata portable refuge alternative trainer. |
| End-of-contract minus 3 weeks |
| Ready to ship at vendor site for inspection |
| 2 |
| 2 |
| Delivery to PMRD of Strata trainer |
| Deliver device. |
| End-of-contract minus 1 week |
| NIOSH-PMRD |
| 2 |
| 3 |
| Operation Training and Train the Trainer instruction |
| Site delivery of instruction at the PMRD facility. |
| End-of-contract minus one day |
| NIOSH-PMRD |
CLIN 3:
| CLIN |
| Task |
| Deliverable |
| Quantity/Format |
| Due Date |
| Deliver To |
| 3 | |
| 1 | |
| One MSHA compliant inflatable portable refuge alternative | |
| One new portable refuge alternative. | |
| End-of-contract minus 3 weeks | |
| Ready to ship at vendor site for inspection | Comment by Lindsey, Marcus (CDC/OCOO/OFR/OAS): Same as above |
| 3 |
| 2 |
| Delivery to PMRD of one operational portable inflatable refuge alternative |
| Deliver device. |
| End-of-contract minus 1 week |
| NIOSH-PMRD |
| 3 |
| 3 |
| Operation Training and Train the Trainer instruction |
| Site delivery of instruction at the PMRD facility. |
| End-of-contract minus one day |
| NIOSH-PMRD |
Section 508 and Accessibility Requirements Part A – Provision Reference HHSAR 352.239-73[8] Electronic Information and [Communication] Technology Accessibility Notice.
[(Deviation)] [(a) Any offeror responding to this solicitation must comply with established HHS Information and Communication Technology (ICT) accessibility standards. Information about Section 508 is available at https://www.hhs.gov/web/section-508/index.html.
(b) The Section 508 accessibility standards applicable to this solicitation are stated in the clause at 352.239-79 Information and Communication Technology Accessibility. In order to facilitate the Government’s determination whether proposed ICT supplies, products, platforms, information, and documentation meet applicable Section 508 accessibility standards, offerors must submit an appropriate HHS Section 508 Accessibility Conformance Checklist (see https://www.hhs.gov/web/section-508/accessibility-checklists/index.html) or an Accessibility Conformance Report (ACR) (based on the Voluntary Product Accessibility Template (VPAT) see https://www.itic.org/policy/accessibility/vpat), in accordance with the completion instructions. The purpose of the checklists and conformance reports are to assist HHS acquisition and program officials in determining whether proposed ICT supplies, products, platforms, information, and documentation conform to applicable Section 508 accessibility standards. Checklists and ACRs evaluate—in detail—whether the ICT conforms to specific Section 508 accessibility standards and identifies remediation efforts needed to address conformance issues.
(c) If an offeror claims its supplies or services meet applicable Section 508 accessibility standards, and it is later determined by the Government, i.e., after award of a contract or order, that supplies, products, platforms, information, documentation, or services support delivered do not conform to the described accessibility standards, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the Contractor at its expense.
(d) In order to facilitate the Government's determination whether proposed ICT supplies meet applicable Section 508 accessibility standards, offerors must submit an Accessibility Conformance Report, in accordance with its completion instructions and tailored to the requirements in the solicitation. The purpose of the Report is to assist HHS acquisition and program officials in determining whether proposed ICT supplies conform to applicable Section 508 accessibility standards. The template allows offerors or developers to self-evaluate their supplies and document, in detail, whether they conform to a specific Section 508 accessibility standard, and any underway remediation efforts addressing conformance issues. Instructions for preparing the Template are available at https://www.section508.gov/.
(e) Additionally, offerors must provide enough information to assist the Government in determining that the ICT services conform to Section 508 accessibility standards, including any underway remediation efforts addressing conformance issues.
(f) Respondents to this solicitation must identify any inability to conform to Section 508 requirements. If an offeror claims its supplies or services meet applicable Section 508 accessibility standards, and it is later determined by the Government, i.e., after award of a contract or order, that supplies or services delivered do not conform to the described accessibility standards, remediation of the supplies or services to the level of conformance specified in the contract will be the responsibility of the Contractor at its expense.
(g) Items delivered as electronic content must be accessible to HHS acceptance criteria. Checklist for various formats are available at http://508.hhs.gov/. Materials, other than items incidental to contract management, that are final items for delivery should be accompanied by the appropriate checklist, except upon approval of the Contracting Officer or Contracting Officer’s Representative.
(End of provision)] Part B - Clause 352.239-74[9] Electronic, Information, and Communication Technology Accessibility.
[(Deviation)]
(a) Pursuant to Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794d), as amended by the Workforce Investment Act of 1998, all information and communication technology (ICT) supplies, products, platforms, information, documentation, and services, or support developed, acquired, maintained or delivered under this contract or order must comply with the Revised 508 Standards, which are located at 36 C.F.R. 1194.1 and Appendices A, B, and C, and are available at https://www.access-board.gov/ict/. Information about Section 508 is available at https://www.hhs.gov/web/section-508/index.html.
(b) Additional Section 508 accessibility standards applicable to this contract or order are identified as follows:
205 WCAG 2.0 Level A & AA Success Criteria 302 Functional Performance Criteria 402 Closed Functionality 403 Biometrics 404 Preservation of Information Provided for Accessibility 405 Privacy 406 Standard Connections 407 Operable Parts 408 Display Screens 409 Status Indicators 410 Color Coding 411 Audible Signals 502 Inoperability with Assistive Technology 503 Applications 504 Authoring Tools 602 Support Documentation 603 Support Services If it is determined by the Government that ICT supplies, products, platforms, information, documentation, and services support provided by the Contractor do not conform to the described accessibility standards in the contract, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the Contractor at its own expense.
(c) In the event of a modification(s) to this contract or order, which adds new ICT supplies or services or revises the type of, or specifications for, supplies, products, platforms, information, documentation, or services support, the Contracting Officer shall require that the Contractor submit a completed HHS Section 508 Accessibility Conformance Checklist (see https://www.hhs.gov/web/section-508/accessibility-checklists/index.html) or an Accessibility Conformance Report (ACR) (based on the Voluntary Product Accessibility Template (VPAT) see https://www.itic.org/policy/accessibility/vpat), and any other additional information necessary to assist the Government in determining that the ICT supplies or services conform to Section 508 accessibility standards. If it is determined by the Government that ICT supplies, products, platforms, information, documentation, and services support provided by the Contractor do not conform to the described accessibility standards in the contract, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the Contractor at its own expense.
(d) If this is an Indefinite-Delivery type contract, a Blanket Purchase Agreement or a Basic Ordering Agreement, the task/delivery order requests that include ICT supplies, products, platforms, information, documentation, or services support will define the specifications and accessibility standards for the order. In those cases, the Contractor shall be required to provide a completed HHS Section 508 Accessibility Conformance Checklist (see https://www.hhs.gov/web/section-508/accessibility-checklists/index.html) or an ACR (based on the VPAT see https://www.itic.org/policy/accessibility/vpat), and any other additional information necessary to assist the Government in determining that the ICT supplies, products, platforms, information, documentation, or services support conform to Section 508 accessibility standards. If it is determined by the Government that ICT supplies and services provided by the Contractor do not conform to the described accessibility standards in the provided documentation, remediation of the supplies, products, platforms, information, documentation, or services support to the level of conformance specified in the contract will be the responsibility of the Contractor at its own expense.
(e) The contractor shall identify to the Contracting Officer any perceived exception or exemption to Section 508 requirements for review by the agency Section 508 Program.