007 2022-11-03 NOAA REVIEW SET (3).pdf
PDF 8 MB Posted
- Solicitation number
- 1333MF25Q0045
About this file
These documents comprise a preliminary design package for a wastewater treatment system upgrade at the NOAA/NMFS Ted Stevens Marine Research Institute in Juneau, Alaska. The project involves removing the existing ozone disinfection system and replacing it with a new UV disinfection system, as well as replacing 50 and 20 micron filters with a sand filter vessel for the domestic wastewater treatment plant. The design set includes detailed civil, process, electrical, and demolition plans for modifying the facility's wastewater treatment infrastructure, with specific focus on the post-treatment room and domestic wastewater system.
Key technical components include installing three RZ163-11 inline Hydro-Optic UV disinfection systems with 1.7 kW lamps, six-inch magnetic flowmeters, butterfly and ball valves, and a new Sta-Rite sand filter. The electrical drawings indicate the upgrade will involve modifying existing electrical panels, specifically panel ELH1, to accommodate the new UV system with 20A 3-pole breakers and surge protection devices. The project is part of a permit renewal package (Permit No. AK0053236) and is designed to improve the facility's wastewater treatment capabilities while maintaining compliance with existing environmental regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 032 Sol_1333MF25Q0045 (rev).pdf | ||
| 023 WDOL-5685 22-May-2025.pdf | ||
| 032 Sol_1333MF25Q0045.pdf | ||
| 023 WH-1313.pdf | ||
| 002 SON_UV Upgrade Installation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.tetratech.com
CLIENT INFORMATION:PROJECT LOCATION:
PROJECT DESCRIPTION / NOTES:
Tt PROJECT No.: CLIENT PROJECT No.:
ISSUED:
NOAA/NMFS - TED STEVENS MARINE RESEARCH INSTITUTE
2022 PERMIT RENEWAL PACKAGE FOR ADPES
PERMIT NO. AK0053236
17109 POINT LENA LOOP RD.
JUNEAU, AK 99801
200-18865-22001
NOAA FISHERIES - TSMRI
17109 POINT LENA LOOP RD.
JUEAU, AK 99801
217 SECOND STREET, SUITE 207
JUNEAU, AK 99801
MAIN: (907) 586-6400 FAX: (907) 463-3677
REMOVAL OF THE EXISTING OZONE DISINFECTION SYSTEM AND REPLACEMENT
WITH A NEW UV DISINFECTION SYSTEM FOR THE SEAWATER PROCESS.
REMOVAL OF THE 50 MICRON AND 20 MICRON FILTERS TO THE DOMESTIC WWTP
AND REPLACEMENT WITH A SAND FILTER VESSEL TO INTERNAL OUTFALL 002
PERMITTED BY ADEC PERMIT AK0053236
11-01-2022 NOAA REVIEW SET
LOCATION MAP:
GENERAL NOTES
N
PROJECT SITE
TED STEVENS MARINE
RESEARCH INSTITUTE
UNIVERSITY OF
ALASKA FAIRBANKS
PT LENA LOOP ROAD
OCEAN VIEW DRIVE
G
LACIER HIG
HW
AY
DOWNTOWN JUNEAU
APPROX 16 MILES SOUTH
SEAWATER INTAKE
SYSTEM PUMP
HOUSE
OUTFALL 001
OUTFALL 002
PROJECT
VICINITY
1. ALL WORK SHALL BE IN CONFORMANCE WITH APPLICABLE LAWS, REGULATIONS AND CODES, INCLUDING BUT NOT LIMITED TO
STATE OF ALASKA 18 AAC 72 AND NSF STANDARD NO. 40.
2. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE BASED ON PREVIOUS SITE SURVEYS AND RECORD DRAWINGS
PREPARED BY PND ENGINEERS (2005) AND TRYCK NYMAN HAYES (2006).
3. ALL ELEVATIONS ARE BASED ON A DATUM OF MEAN LOWER LOW WATER = 0.0. TIDAL RANGES AS FOLLOWS:
EXTREME HIGH WATER =+22.0 (USACE)
HIGH TIDE LINE =+20.3 (USACE JURISDICTIONAL LINE)
MEAN HIGHER HIGH WATER =+15.8
MEAN HIGH WATER =+14.8
MEAN LOWER LOW WATER = 0.0
LOWEST OBSERVED TIDE, 2015 = -4.3 (ESTIMATED)
4. EXISTING CONDITIONS SHALL BE VERIFIED BY THE NOAA AND ITS SUBCONTRACTORS AND ANY DISCREPANCIES SHALL BE IDENTIFIED TO THE ENGINEER BEFORE WORK BEGINS. VERTICAL CONTROL SHALL BE BASED ON TOP LID ELEVATION OF +67.08
AT THE NW CORNER OF THE BIOFILTER AX-100 UA.
5. BEFORE ANY EXCAVATION BEGINS, SUBCONTRACTORS SHALL ARRANGE FOR THE NOAA STAFF TO ASSIST WITH FIELD LOCATES OF ALL EXISTING UNDERGROUND UTILITIES, INCLUDING BUT NOT LIMITED TO, WATER, SEWER, STORM DRAINAGE, ELECTRICAL POWER AND COMMUNICATIONS. UTILITIES SHOWN ON DRAWINGS INDICATE THEIR EXISTENCE ONLY AND MAY NOT SHOW ACTUAL LOCATIONS OR DEPTHS. ADDITIONAL UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE DRAWINGS.
6. SUBCONTRACTORS SHALL IMPLEMENT ALL NECESSARY EROSION CONTROL AND STORM WATER MANAGEMENT PLANS AS REQUIRED TO COMPLY WITH APPLICABLE LAWS AND REGULATIONS. DURING CONSTRUCTION, ALL CONSTRUCTION VEHICLE ROUTES SHALL BE KEPT CLEAN OF MATERIAL DEPOSITS RESULTING FROM THE CONTRACTORS OPERATION. THE CONTRACTOR
SHALL ALSO CONTROL DUST ON THE PROJECT SITE AND HAUL ROUTES.
7. CONTRACTORS SHALL NOT STORE MATERIALS OR EQUIPMENT, OR OPERATE EQUIPMENT, ON ANY PORTIONS OF THE PROJECT SITE WITHOUT THE WRITTEN APPROVAL OF THE OWNER. SUBCONTRACTORS SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGE TO PROPERTY ASSOCIATED WITH THE CONSTRUCTION ACTIVITIES, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED
BY COMPACTION EFFORTS.
DRAWING INDEX
SHEET NO. DRAWING TITLE
GENERAL
G-001 TITLE SHEET, LOCATION MAP, AND DRAWING INDEX
G-002 DOMESTIC WASTEWATER SYSTEM DESIGN CRITERIA
CIVIL
C-001 CIVIL LEGEND
CA100 OVERALL SITE PLAN
PROCESS
D-001 PROCESS LEGEND
D-002 PROCESS GENERAL NOTES
DB101 DEMOLITION PLAN - DOMESTIC WASTEWATER SYSTEM
DB102 PROCESS PLAN - DOMESTIC WASTEWATER SYSTEM
DB301 DEMOLITION SECTION - DOMESTIC WASTERWATER SYSTEM FILTERS
DB302 SAND FILTER SYSTEM SECTION - DOMESTIC WASTEWATER SYSTEM
DB601 PROCESS FLOW DIAGRAM - DOMESTIC WASTEWATER SYSTEM
DC101 DEMO PLAN - POST TREATMENT ROOM
DC102 POST TREATMENT ROOM PLAN
DC301 UV DISINFECTION SYSTEM SECTION - POST TREATMENT ROOM
DC501 DEMOLITION DETAIL - OZONE SYSTEM
DC502 DEMOLITION DETAIL - OZONE SYSTEM
DC601 PROCESS FLOW DIAGRAM - POST TREATMENT ROOM
DC602 PROCESS FLOW DIAGRAM - POST TREATMENT ROOM
DC603 PROCESS FLOW DIAGRAM - POST TREATMENT ROOM
DC604 PROCESS EQUIPMENT SCHEDULE
ELECTRICAL
E-001 ELECTRICAL LEGEND
E-002 ELECTRICAL NOTES AND ABBREVIATIONS
EC101 ELECTRICAL DEMO PLAN-POST TREATMENT
EC102 ELECTRICAL POWER PLAN-POST TREATMENT ROOM
EC601 SINGLE LINE DIAGRAM POST TREATMENT
EC602 UV SYSTEM BLOCK DIAGRAM
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:1
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\G
D O
M
ES
TI
C
W
AS
TE
W
AT
ER
D
ES
IG
N
C R
IT
ER
IA
.D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
CURRENT DESIGN CURRENT DESIGN
G-002
D O
M
ES
TI
C
W
AS
TE
W
AT
ER
D
ES
IG
N
C R
IT
ER
IA
CMZ
RJM
MCH
CURRENT
MW-
B-
TV
TV
TV
FO
FO
T
TJ
TEL
TEL
TB
BM-
FH
WV
G
G
GV
EB
E
EJ
ELEC
EM
RR
ET
TSP
TS
FI
SI
FM
SM
ARS
CO
SCS
TFC
ILFC
SS
SV
FLAG
MB
MH-??
PM
P
R
TR
111.11
W
WV
SD
SDSD
WCS
DF
W W
WM
SPIG
SH
WELL
BORE MONITORING WELL
BORING
CABLE TV FLAG
CABLE TV JUNCTION BOX
CABLE TV BOX
COMMUNICATIONS DISH
FIBER OPTIC
FIBER OPTIC FLAG
TELECOMMUNICATIONS FLAG
TELECOMMUNICATIONS
JUNCTION BOX
TELEPHONE MANHOLE
TELEPHONE
TELEPHONE BOX
BENCHMARK
CONTROL POINT MONUMENT
CONTROL POINT
FIRE HYDRANT
WATER VALVE
GAS FLAG
GAS
GAS VALVE
ELECTRICAL BOX
ELECTRICAL POWER FLAG
ELECTRICAL JUNCTION BOX
BUILDING LIGHT
LIGHT POLE
ELECTRICAL MANHOLE
ELECTRICAL METER
POWER POLE
RAILROAD CROSSING MARKER
STREET LIGHT
ELECTRICAL TRANSFORMER
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL BOX
GUY WIRE
UTILITY POLE
FOUND IRON PIN
SET IRON PIN
FOUND MONUMENT
SET MONUMENT
PROPERTY SECTION CORNER
AIR RELIEF STRUCTURE
CLEANOUT
FORCEMAIN CURB STOP
FLUSHING CONNECTION
IN-LINE FLUSHING
CONNECTION
SANITARY SEWER MANHOLE
SANITARY SEWER PUMP DPLX
SANITARY SEWER PUMP SPLX
SANITARY SEWER VALVE
FLAG POLE
MAILBOX
MANHOLE UNKNOWN
PARKING METER
POST
PICNIC TABLE
ROCK
SIGN
TRASH CAN
BUSH
SPOT ELEVATION
DECIDUOUS TREE
EVERGREEN TREE
PALM TREE
STUMP
WATER
WATER VALVE
STORM DRAIN
STORM END SECTION / HEADWALL
STORM DRAIN MANHOLE
WATER CURB STOP
DRINKING FOUNTAIN
WATER FLAG
WATER MANHOLE
WATER METER
WATER SPIGOT
SPRINKLER HEAD
WELL
SYMBOLS EXISTING
FO
UTV
OT
UT
x x x x x x x x x x xx xx xx xx o o o o o o o o o o o o o o o o o o o
W
F
GS
G
OE
UE
SS
STM
4''STM
W
FIBER OPTIC
UNDERGROUND COMMUNICATION
OVERHEAD TELEPHONE
UNDERGROUND TELEPHONE
FIRE PROTECTION
FIRE PROTECTION UNDERGROUND
GAS/FUEL PIPE
NATURAL GAS PIPE
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
SANITARY SEWER
SANITARY SEWER (X")
FORCE MAIN
FORCE MAIN (X")
STEAM PIPE
STEAM PIPE (X")
STORM SEWER
STORM SEWER (X")
WATER
WATER (X")
UTILITIES > 18" (WHERE APPLICABLE)
4''SS
SD
8''SD
1''W
36''SD
UTILITIES
SITE
BUILDING OUTLINE
FENCE
FENCE WOOD
METAL FENCE
GUARDRAIL
FLOOD BOUNDARY
POND EDGE
RAILROAD TRACK
ASPHALT
BRICK
CONCRETE
GRAVEL
CURB AND GUTTER
ASPHALT SIDEWALK
CONCRETE SIDEWALK
GRAVEL SIDEWALK
MAJOR CONTOUR
MINOR CONTOUR
RETAINING WALL
ROCK RETAINING WALL
VEGETATION/TREE LINE
WETLAND BOUNDARY
FM
10''FM
LINETYPES EXISTING
EXISTING ASPHALT TO BE DEMOLISHED
EXISTING CONCRETE TO BE DEMOLISHED
EXISTING CONCRETE PAVEMENT
PROPOSED GRAVEL
WETLAND AREA
FEATURE HATCHING
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:4
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\C
-0
C
IV
IL
L
EG
EN
D .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
C-001
C
IV
IL
L
EG
EN
D
CMZ
RJM
U
SS
U
SS
USS
USS
U
SS
USS
USS
U
SS
USSUSS
USS
USS
US
S
USS
US
S
NSS
DFE
D
FE
W W
W
W
W
W W
W
W
W W
W W
SW
R
SWR
SWR
SWRSWRSWRSWR
Xref .\C-002 Plan View.dwg
NSS
NSS
OFFICE
LABORATORY
NEW WET LABS
FILTER
HOUSE
SHOP
SS
SW-FB
VAULT DRAIN
FSW
USW
TSW
FO
SWS
IU-FSW
U-USW
EXST WATER
MAIN
U-SS
U-WSW
U-SS
FSW
USW
U-SS
U-WSW
MARINE OUTFALL
PIPING SYSTEM
SEAWATER
INTAKE SYSTEM
FOUNDATION DRAIN
RD
NSS
EXISTING WATER MAIN
DOMESTIC WWTP (SITE
DESIGNATOR "B"). REFER
TO DBXXX SHEETS.
FUEL TANK
TO OUTFALL 001
OUTFALL 002
FUEL TANK
WOODEN HOUSING FOR
WEATHER PROTECTION
POST TREATMENT ROOM
(SITE DESIGNATOR "C").
REFER TO DCXXX SHEETS.
WETWELL / SEAWATER
PUMP HOUSE
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:0
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\C
A1
C
IV
IL
O
VE
R
AL
L
SI
TE
P
LA
N .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SCALE:
15' 30' 60'
1" = 30'
N
ABBREVIATIONS:
FD FOUNDATION DRAIN
FSW FILTERED SEAWATER
FO FUEL OIL
NSS NOAA SANITARY SEWER
⅊ PROPERTY LINE
SWFB SEAWATER FILTER BACKWASH
SWR SEAWATER SUPPLY
SWS SEAWATER RETURN
TSW TREATED SEAWATER
USS UNIVERSITY SANITARY SEWER
UWSW UNIVERSITY WASTEWATER
W POTABLE WATER SUPPLY
CA100
O
VE
R
AL
L
SI
TE
P
LA
N
CMZ
RJM
MCH
SITE DESIGNATORS:
A CIVIL SITE
B DOMESTIC WWTP BUILDING
C POST TREATMENT ROOM
(LABORATORY BASEMENT)
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:5
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
-0
P R
O C
ES
S
LE
G
EN
D
.D W
G
M O
R R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
PIPING LEGEND
N/A N/AN/A N/A N/A N/A N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A N/A N/A N/A N/A
N/AN/AN/AN/A
VALVES (MISC)
DIAPHRAGM VALVE (DV)
GLOBE VALVE (GLV)
THREE WAY VALVE (TWV)
VENTURI FLOWMETER
REDUCER
CENTRIFUGAL
PUMP
DIAPHRAGM
METERING PUMP
BLOWER
VACUUM
VERTICAL
TURBINE PUMP
CAPPED OR PLUGGED
QUICK CONNECT COUPLING
BAG FILTER
STORAGE TANK
AS IDENTIFIED
STRAINER
TANK
STORAGE TANK
AS IDENTIFIED
VAPOR SEAL
MP-2501
CARTRIDGE FILTER
INJECTOR
STORAGE TANK
AS IDENTIFIED
PERISTALTIC
METERING PUMP
TANK
TANK/PROCESS
AS IDENTIFIED
PUMPS & COMPRESSORS TANKS AND VESSELS EQUIPMENT TAGS
SAMPLE PORT
M
DRAIN
COMBINATION AIR VALVE (AVRV)
THREE WAY GLOBE VALVE (TWGV)
BALL CHECK VALVE (BCV)
BACK PRESSURE REGULATOR VALVE (BPR)
PRESSURE CONTROL VALVE (PCV)
SOLENOID CONTROL VALVE (SV)
3 WAY SOLENOID
NEEDLE VALVE (NV)
PRESSURE RELIEF VALVE (PRV)
FLUSH VALVE (FV)
VACUUM BREAKER VALVE (VBV)
AIR VENT VALVE (AV)
MECHANICAL EQUIPMENT
MAGNETIC FLOWMETER
ORIFICE PLATE
ANNUBAR
TURBINE FLOWMETER
FI
ROTAMETER
POSITIVE DISPLACEMENT
FLOWMETER
LEVEL SENSOR, FLOAT TYPE
NORMAL LIQUID LEVEL
ULTRASONIC LEVEL INSTRUMENT
MIXER
CALIBRATION COLUMN
PULSATION DAMPENER
Y STRAINER
BLIND FLANGE
M Z
MOTOR OPERATED
ACTUATOR WITH POSITIONER
S
Z
PNEUMATIC OPERATED
ACTUATOR WITH POSITIONER
M MOTOR ACTUATOR
SOLENOID ACTUATOR
PNEUMATIC ACTUATOR
PNEUMATIC ACTUATOR WITH
STROKE POSITIONER
INJECTION QUILL WITH
CORP STOP
PRESSURIZED
TANK/PROCESS
AS IDENTIFIED
ULTRASONIC LEVEL SENSOR
PIPE BREAK
PIPE CROSSING
VENT
TURBO
DIAPHRAGM SEAL
RUPTURE DISK
PROPELLER MIXER
M
PIPE MATERIAL CHANGE
CAMLOCK W/ MALE CAP
FLEXIBLE HOSE
S
S
TURBINE
CENTRIFUGAL
SUMP PUMP
PUMPOUT CONNECTION
DIAPHRAGM CHECK VALVE (DC)
FLOW STREAM IDENTIFICATION
PIPING TAGS
PV-1000
VALVE TAGS
AAV AUTOMATIC AIR VENT
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APP APPROXIMATE
CFM CUBIC FEET PER MINUTE
CW COLD WATER
DDC DIRECT DIGITAL CONTROL
DEMO DEMOLITION
DI DIGITAL INPUT
DN DOWN
DO DIGITAL OUTPUT
DU DIELECTRIC UNION
DV DRAIN VALVE
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
FAV FREE AREA VELOCITY
FPM FEET PER MINUTE
GEF GENERAL EXHAUST FAN
GMT GLYCOL MIXING TANK
HCC HEAT COIL/COOLING COIL
HP HEAT PUMP
HPHR HEAT PUMP HEATING RETURN
HPHS HEAT PUMP HEATING SUPPLY
HPLR HEAT PUMP LOAD RETURN
HPLS HEAT PUMP LOAD SUPPLY
HSR HEAT PUMP SOURCE RETURN
HSS HEAT PUMP SOURCE SUPPLY
HPT HEAT PUMP TANK
HRC HEAT RECOVERY OIL
HW HOT WATER
HWG HOT WATER GENERATOR
HWC HOT WATER CIRCULATING
HWT HOT WATER TANK
HX HEAT EXCHANGER
LAT LEAVING AIR TEMPERATURE
LCW LAB COLD WATER
LHW LAB HOT WATER
LHWC LAB HOT WATER CIRCULATING
LWT LEAVING WATER TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH THOUSAND BTUH
MIN MINIMUM
NC NORMALLY CLOSED
NO NORMALLY OPEN
OCT OZONE CONTACT TANK
OSA OUTSIDE AIR
OVI OZONE VENTURI INJECTOR
PFT PRESSURE FILTER TANK
PMP PUMP
PS PRESSURE SWITCH
PSI POUNDS PER SQUARE INCH
REQD REQUIRED
TV THERMOSTATIC VALVE
VFD VARIABLE FREQUENCY DRIVE
WSW WASTE SEAWATER
12-NFF-PVC
EQUIPMENT NUMBER
EQUIPMENT
IDENTIFICATION
VALVE NUMBER
VALVE TYPE
PIPE MATERIAL CODE
FLOW STREAM IDENTIFICATION
PIPE DIAMETER, INCHES
FITTING/
APPURTENANCE
BEND
TEE
WYE
REDUCER
CAP/
BLIND FLANGE
PLUG
BUTTERFLY
VALVE
BALL VALVE
CHECK VALVE
GATE VALVE
PLUG VALVE
AUTOMATIC
CONTROL VALVE
PINCH VALVE
FLANGED
SINGLE-LINE DOUBLE-LINE
EXISTING PROPOSEDPROPOSEDEXISTING
MECHANICAL JOINT
SINGLE-LINE DOUBLE-LINE
EXISTING PROPOSEDPROPOSEDEXISTING
GROOVE JOINT
SINGLE-LINE DOUBLE-LINE
EXISTING PROPOSEDPROPOSEDEXISTING
SOLVENT WELD
SINGLE-LINE DOUBLE-LINE
EXISTING PROPOSEDPROPOSEDEXISTING
D-001
PR
O
C
ES
S
LE
G
EN
D
CMZ
RJM
MCH
PI
STREAM
TO/FROM STREAM TO
AND FROM
PI
STREAM
TO/FROM STREAM TO
AND FROM
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:3
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
-0
P R
O C
ES
S
G
EN
ER
AL
N O
TE
S.
D W
G
M O
R R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
D-002
PR
O
C
ES
S G
EN
ER
AL
N
O
TE
S
CMZ
CMZ
MCH
/0 6/
AD
D
EN
D U
M
R
EV
IS
IO
N S
1. GENERAL NOTES
A. ALL PUMP, VALVE, PIPING, WETTED COMPONENTS, ETC. THAT MAY COME IN CONTACT WITH WATER
SHALL BE A MATERIAL SPECIFIED AND APPROVED BY THE OWNER
B. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE ELEVATION AND O.D. OF ALL EXISTING LINES AT THE POINT OF CONNECTION TO THE NEW SYSTEM PRIOR TO ORDERING MATERIALS THAT DEPEND
ON THIS INFORMATION.
C. ALL PIPE TO STRUCTURE CONNECTIONS AND PENETRATIONS (INCLUDING MANHOLES) SHALL HAVE A FLEXIBLE COUPLING OR FLEXIBLE JOINT NOT MORE THAN 18 INCHES OR ONE HALF OF THE PIPE
DIAMETER (WHICHEVER IS GREATER) FROM THE OUTSIDE WALL OF THE STRUCTURE. ALL
CONNECTIONS OF PRESSURIZED PIPING SHALL BE RESTRAINED.
D. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, INSTRUMENTS, ETC. NECESSARY FOR ALL REQUIRED TESTS. ALL WORK SHALL BE SUBJECTED TO INSPECTION BY LOCAL PLUMBING AND HEALTH INSPECTORS AND THE DESIGN AUTHORITY. AT LEAST FORTY-EIGHT (48) HOURS NOTICE SHALL BE
GIVEN IN ADVANCE OF MAKING THE REQUIRED TESTS.
3. PIPING GENERAL NOTES
A. SEE THE PIPE SCHEDULE IN THIS DRAWING FOR PIPE MATERIALS, TYPES AND WALL THICKNESSES.
B. IN EXPOSED AND SUBMERGED LOCATIONS ALL BOLTS, NUTS, AND OTHER CONNECTION HARDWARE SHALL BE TYPE 304 STAINLESS STEEL. BOLTS SHALL BE HEAVY HEX TYPE MEETING ASTM A193 GRADE
B8. NUTS SHALL BE ASTM A194 GRADE 8.
C. CLEAN PIPE OF ALL DEBRIS DURING INSTALLATION. DO NOT RELY ONLY ON FLUSHING TO CLEAN THE
PIPE. REMOVE GRINDINGS, FILINGS, SLAG, ETC. DURING INSTALLATION.
D. ELBOWS AND ANGLE POINTS ARE SHOWN ON THE DRAWINGS TO ACHIEVE THE DESIRED LOCATION
AND ALIGNMENT FOR THE PIPE. CONTRACTOR SHALL USE ELBOWS THAT ARE FABRICATED AND
MITERED IN COMPLIANCE WITH APPLICABLE PIPE STANDARDS. WHERE NECESSARY AND UPON REVIEW BY THE ENGINEER DEFLECTIONS OTHER THAN WHAT ARE SHOWN ON THE DRAWINGS MAY BE USED.
E. SOME PIPE TYPES MAY ALLOW FOR ANGLES TO BE MADE BY DEFLECTING OR BENDING THE PIPE.
CONTRACTOR SHALL NOT EXCEED MANUFACTURES MAXIMUM DEFLECTION OR MINIMUM RADIUS.
F. PRESSURE TEST ALL PIPES. IF TEST PRESSURE IS NOT SPECIFIED ELSEWHERE IN THE CONTRACT
DOCUMENTS, THEN TEST TO 1.5 TIMES THE RATED PRESSURE. DO NOT EXCEED MANUFACTURE
MAXIMUM PRESSURE FOR PIPE, FITTINGS, VALVES OR EQUIPMENT. TEST PROCEDURE TO BE IN
ACCORDANCE WITH AWWA C600 AND AS APPROVED BY THE ENGINEER.
G. CONTRACTOR TO VERIFY FITTINGS AND CONNECTIONS BETWEEN DIFFERENT MATERIAL TYPES ARE
COMPATIBLE AND PROVIDE ADAPTERS WHERE NECESSARY.
2. SUBMITTALS
A. CONTRACTOR SHALL SUBMIT COMPLETE DESCRIPTIONS OF ALL MAJOR MATERIAL AND EQUIPMENT
ITEMS TO BE FURNISHED, INCLUDING BUT NOT LIMITED TO: PIPE, FITTINGS, SUPPORTS, VALVES, PROCESS EQUIPMENT, UV SYSTEM AND ELECTRICAL ITEMS SHOWN ON E DWGS.
B. AS APPROPRIATE, SUBMITTALS SHALL INCLUDE MATERIAL DIMENSIONS AND SPECIFICATIONS, DETAILED SHOP DRAWINGS, PRESSURE LOSS CURVES, FABRICATION DETAILS AND WARRANTIES.
ELECTRONIC SUBMITTALS IN PDF FORMAT ARE PREFERRED.
C. CONTRACTOR SHALL ALLOW UP TO (10) DAYS FOR SUBMITTAL REVIEW BY ENGINEER. NO ITEM
ORDERS SHALL BE FINALIZED BEFORE RECEIPT OF WRITTEN REVIEW FROM ENGINEER.
5. VALVES AND FITTINGS
A. BUTTERFLY VALVES IN EXPOSED LOCATIONS
1. BUTTERFLY VALVE TO BE ONE PIECE LUG DESIGN. 2" - 12" VALVES RATED FOR BUBBLE TIGHT SHUT
OFF TO 175 PSI. 14" - 20" VALVES 150 PSI.
2. VALVES 6" AND LARGE SHALL BE EQUIPPED WITH GEARED HANDWHEEL OPERATOR. VALVES 4" AND
SMALLER SHALL BE EQUIPPED WITH LEVER OPERATOR.
3. VALVES SHALL BE SERIES 30/31 WITH DUCTILE IRON BODY AND 316 STAINLESS STEEL TRIM AS
MANUFACTURED BY BRAY, OR EQUAL.
4. VALVES SHALL BE COATED ON INTERIOR AND EXTERIOR WITH A POLYAMIDE CURED EPOXY (6 MIL
DFT) COMPLYING WITH AWWA C550.
B. BALL VALVES
1. BALL VALVES SHALL BE MADE OF PVC UNLESS OTHERWISE INDICATED ON THE PLANS. BALL VALVES
SHALL HAVE TRUE UNION SOCKET ENDS.
2. THE BALLS SHALL HAVE FULL SIZE PORTS AND TEFLON SEATS. BODY SEALS, UNION O-RING SEALS, AND STEM SEALS SHALL BE IN ACCORDANCE WITH CORROSION RESISTANCE REQUIREMENTS OF
RESPECTIVE VALVE MANUFACTURER. THE VALVES SHALL BE SUITABLE FOR 150 PSI AT 73 DEGREES
F° FOR PVC.
3. VALVES SHALL BE MANUFACTURED BY ASAHI-AMERICA, SPEARS MFG CO., OR APPROVED EQUAL.
6. FLOW METERS
A. ELECTROMAGNETIC FLOW METERS
1. ELECTROMAGNETIC FLOW METER SHALL BE KROHNE OPTIFLUX 4000 OR EQUAL.
2. THE CONVERTER SHALL BE IFC300 OR EQUAL.
3. FURNISH WITH GROUNDING RINGS.
4. SCH 80 PVC PIPE
PIPING SYSTEMS
SYSTEM PIPE MATERIAL - CLASS PIPE JOINTS FITTINGS LINING / COATINGS
PVC-1 PVC-ASTM D1784 SCH80, TYPE 1, GRADE 1 SOLVENT WELD OR FLANGED SCH 80 PVC SOLVENT WELD OR
FLANGED
COVER PIPING WITH FIBERGLASS
INSULATION
PVC-2 PVC-ASTM D1784 SCH80, TYPE 1, GRADE 1 SOLVENT WELDED SCH 80 PVC SOLVENT WELD
A. FLANGES SHALL BE 150# CLASS, ANSI B16.1. GASKETS SHALL BE FULL FACE BUNA-N, 3.2 MM
THICKNESS WITH A 60 TO 70 SHORE HARDNESS. ASBESTOS GASKETS ARE UNACCEPTABLE.
B. INSTALL FLANGE CONNECTION AT BUTTERFLY VALVES, WAFER STYLE CHECK VALVES, PUMPS
EQUIPMENT SPECIAL COMPONENTS, AND WHERE SHOWN ON DRAWINGS.
C. HANGER SPACING SHALL BE BASED ON THE TABLES PROVIDED BY THE PVC PIPE MANUFACTURER.
D. POLYVINAL CHLORIDE PIPING SYSTEM SHALL BE INSTALLED UNDER THE SUPERVISION OF A JOURNEYMAN FOREMAN MECHANIC WELL EXPERIENCED IN THE INSTALLATION OF SUCH SYSTEMS.
E. THE CONTRACTOR SHALL SUPPLY AND INSTALL MANUAL AIR VENTS AT ALL HIGH POINTS IN THE
SUPPLY PIPING SYSTEMS.
F. WHERE REQUIRED IN THE PIPE SYSTEM TABLE, PROVIDE FIBERGLASS INSULATION TO MATCH THE EXISTING SCH 80 PVC PIPING INSIDE THE POST TREATMENT ROOM. THE FIBERGLASS INSULATION
SHALL MATCH THE EXISTING PIPING:
1. THICKNESS: 40 mm
2. MANUFACTURER: SCHULLER INTERNATION, CERTAINTEED, OR KNAUF.
3. INSULATION: ASTM C547; RIGID MOLDED, NONCOMBUSTIBLE.
a. 'K' ('Ksi') VALUE: ASTM C177, 0.035 AT 24 DEGREES C.
b. MAXIMUM SERVICE TEMPERATURE: 454 DEGREES C.
c. MAXIMUM MOISTURE ABSORPTION: 0.2 PERCENT BY VOLUME.
4. VAPOR BARRIER JACKET:
a. ASTM C921, WHITE KRAFT PAPER WITH GLASS FIBER YARN, BONDED TO ALUMINIZED FILM.
b. MOISTURE VAPOR TRANSMISSION: ASTM E96; 0.2 PERM-INCHES.
5. TIE WIRE: 1.22 mm STAINLESS STEEL WITH TWISTED ENDS ON MAXIMUM 300 mm CENTERS.
6. VAPOR BARRIER LAP ADHESIVE:
a. MANUFACTURERS: BENJAMIN FOSTER OR EQUAL.
b. ASTM C195; HYDRAULIC SETTING ON MINERAL WOOL.
7. INDOOR VAPOR BARRIER FINISH:
a. MANUFACTURERS: SCHULLER INTERNATIONAL, CERTAINTEED, OR KNAUF.
b. VINYL EMULSION TYPE ACRYLIC, COMPATIBLE WITH INSULATION, WHITE COLOR.
PIPE SCHEDULE
PIPE ID FUNCTION SERVICE SIZE
PIPE SYSTEM
(UNLESS NOTED
OTHERWISE)
TEST
PRESSURE
(PSI)
WSW WASTE SEAWATER EXPOSED ALL PVC-1 100
SS SANITARY SEWER ALL 2" AND SMALLER PVC-2 100
7. UV DISINFECTION SYSTEM
A. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, AND LABOR REQUIRED TO INSTALL AND
TEST THE OWNER PROVIDED ATLANTIUM HYDRO-OPTIC UV LAMP SYSTEM.
B. UV LAMP SYSTEM DESCRIPTION:
1. MODEL: RZ163-11 INLINE HYDRO OPTIC DISINFECTION SYSTEM
2. BULBS QUANTITY (PER UNIT): 1
3. BULB: 1.7 Kw, 155 mm UV LAMP
4. CONNECTIONS: 6" FLANGE ANSI B16.5
5. MAXIMUM FLOWRATE: 450 GPM
6. MAXIMUM WORKING PRESSURE: 145 PSI
7. WEIGHT 137.02 LB
8. BALLAST MODULES
9. CONTROLLERS
C. POWER SUPPLY, CONTROLS, AND CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR PER
THE ELECTRICAL DRAWINGS.
D. CONTRACTOR SHALL COORDINATE WITH THE SUPPLIER FOR SYSTEM START UP AND TESTING. START
UP AND TESTING SERVICES ARE INCLUDED IN OWNER PROVIDED SYSTEM.
E. THE UV SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTALLATION
REQUIREMENTS AND GUIDELINES.
AX-100 UA AX-100
NOAA-1
AX-100
NOAA-2
EXISTING
6" HDPE
6" HDPE
PIPE
FROM
NOAA
P-100
40'x60
PRE-ENGINEERED
BUILDING
FILTRATE
DISCHARGE
BASIN
RECIRC
SPLITTER
VALVE
2-WAY
DISTRIBUTION
VALVE
RECIRC SPLITER VALVE
4" FORCEMAIN
pH MONITORING
STANDPIPE
OVERHEAD
DOOR
OVERHEAD
DOOR
pH MONITORING
STANDPIPE FOR FUTURE
USE OF UAF SYSTEM
DOOR
Mg(OH)₂
INJECTIONAIR TO PROCESS
AIR RETURN
FILTRATE TO TANK
TREATED
EFFLUENT
DISCHARGE TO
OUTFALL 02
EXISTING VENT AIR
PRIMARY TANK
(OUT OF SERVICE)
SECONDARY TANK
(OUT OF SERVICE)
RECIRC TANK
(DECOMMISSIONED)
SECONDARY
TANK
VENT TO EXTERIOR
OF BUILDING
4" ISOLATION
VALVE
ELECTRICAL
KNOCKOUT
SEE VENT NOTE
RECIRC TANK
(OUT OF SERVICE)
TANK 2
TANK 1
DUPLEX
PUMPING
SYSTEMS
8" ALPHA COUPLING
48" MANHOLE
HDPE FORCE MAIN
FROM UAF PUMP
STATION
MANHOLE ACCESS
PRIMARY
TANK
CARBON
FILTER NOT
SHOWN FOR
CLARITY
TREATED EFFLUENT
DISCHARGE TO OUTFALL 02
DESK
OVERHEAD CABINETS
TRANSFORMER
ESH
POWER BREAKER
PANEL (PP-1)
ORENCO
CONTROL PANEL
TO UV AND
FILTER SYSTEM
DB301
4x8
REDUCER
4" HDPE PIPE
Mg(OH)₂ DRUM
STORAGE AND
METERING
SHED
UV DISINFECTION AND
FILTRATION ROOM
MAGNESIUM HYDROXIDE
SLURRY AQUEOUS
SOLUTION
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:5
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
B1
D
EM
O
LI
TI
O
N P
LA
N
D
O M
ES
TI
C W
AS
TE
W
AT
ER
S
YS
TE
M .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SCALE:
2' 4' 8'
1/4" = 1'-0''DOMESTIC WWTP BUILDING DEMOLITION PLAN1
SCALE: 1/4"=1'-0"
N
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 CONTRACTOR SHALL COORDINATE OPERATION OF VALVES, EQUIPMENT,
AND SHUTDOWNS WITH THE PLANT OPERATORS.
01 DEMOLISH THE 50 MICRON AND 20 MICRON FILTERS, BACK BOARD,
SUPPORTS, AND CONNECTING HOSES; RE: 01/DB301.
DB101
D O
M
ES
TI
C
W
AS
TE
W
AT
ER
SY
ST
EM
D
EM
O
LI
TI
O N
P
LA
N
CMZ
AX-100 UA AX-100
NOAA-1
AX-100
NOAA-2
FROM
NOAA
40'x60
PRE-ENGINEERED
BUILDING
FILTRATE
DISCHARGE
BASIN
RECIRC
SPLITTER
VALVE
2-WAY
DISTRIBUTION
VALVE
RECIRC SPLITER VALVE
4" FORCEMAIN
pH MONITORING
STANDPIPE
OVERHEAD
DOOR
OVERHEAD
DOOR
pH MONITORING
STANDPIPE FOR FUTURE
USE OF UAF SYSTEM
DOOR
Mg(OH)₂
INJECTIONAIR TO PROCESS
AIR RETURN
FILTRATE TO TANK
TREATED
EFFLUENT
DISCHARGE TO
OUTFALL 02
EXISTING VENT AIR
PRIMARY TANK
(OUT OF SERVICE)
SECONDARY TANK
(OUT OF SERVICE)
RECIRC TANK
(DECOMMISSIONED)
SECONDARY
TANK
4" ISOLATION
VALVE
ELECTRICAL
KNOCKOUT
RECIRC TANK
(OUT OF SERVICE)
TANK 2
TANK 1
DUPLEX
PUMPING
SYSTEMS
48" MANHOLE
HDPE FORCE MAIN
FROM UAF PUMP
STATION
MANHOLE ACCESS
CARBON
FILTER NOT
SHOWN FOR
CLARITY
DB302
TREATED EFFLUENT
DISCHARGE TO OUTFALL 02
DESK
OVERHEAD CABINETS
TRANSFORMER
ESH
POWER BREAKER
PANEL (PP-1)
ORENCO
CONTROL PANEL
TO UV AND
FILTER SYSTEM
FILTER BACKWASH
RELOCATE MAGNESIUM
HYDROXIDE SLURRY AQUEOUS
TO METERING SHED IF
REQUIRED
4x8
REDUCER
4" HDPE PIPE
Mg(OH)₂ DRUM
STORAGE AND
METERING
SHED
UV DISINFECTION AND
FILTRATION ROOM
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:0
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
B1
D
EM
O
LI
TI
O
N P
LA
N
D
O M
ES
TI
C W
AS
TE
W
AT
ER
S
YS
TE
M .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SCALE:
2' 4' 8'
1/4" = 1'-0''
DOMESTIC WWTP BUILDING PLAN1
_ SCALE: 1/4"=1'-0"
N
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 CONTRACTOR SHALL COORDINATE OPERATION OF VALVES, EQUIPMENT,
AND SHUTDOWNS WITH THE PLANT OPERATORS.
05 REFER TO SHEET D-002 FOR PIPE, FITTING, AND VALVE SPECIFICATIONS.
01 NEW PIPE - 2" SCH 80 PIPE FOR FILTER BACKWASH LINE. PROVIDE FITTINGS,
SUPPORTS, AND UNIONS AS REQUIRED. ROUTE PIPING ALONG THE
INTERIOR OF THE UV DISINFECTION ROOM WALLS FROM THE FILTER
BACKWASH PORT TO THE FILTRATE DISCHARGE BASIN.
02 NEW SAND FILTER; REFER TO SHEET 01/DB302 FOR PIPING, VALVES, AND
FITTINGS.
DB102
PR
O
C
ES
S
PL
AN
D
O M
ES
TI
C W
AS
TE
W
AT
ER
SY
ST
EM
CMZ
SRO
03BV415 (E)
03AE416 (E)
03BV417 (E)
03UV422 (E)
03AE424 (E)
03PNL421 (E)
03BV420 (E)
03BV423 (E)
03PNL450 (E)
03UV432 (E)
03PNL431 (E)
03BV430 (E)
03BV433 (E)
03UV442 (E)
03AE444 (E)
03PNL441 (E)
03BV440 (E)
03BV443 (E)
03AE434 (E)
POWER OUTLET
AND SWITCH (TYP)
BIOFILTER
EFFLUENT (BFE)
POST DISINFECTION
EFFLUENT
03PNL451 (E)
03PI413 (D)
03BV414 (D)
03FE445 (E) 01
03BV410 (D)
03FLT411 (D)
03FLT412 (D)
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:2
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
B1
D
EM
O
LI
TI
O
N P
LA
N
D
O M
ES
TI
C W
AS
TE
W
AT
ER
S
YS
TE
M .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SCALE:
8" 1'-4" 2'-8"
3/4" = 1'-0''DOMESTIC WWTP EXISTING UV AND FILTRATION SYSTEM DEMOLITION SECTION1
- SCALE: 3/4"=1'-0"
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 CONTRACTOR SHALL COORDINATE OPERATION OF VALVES, EQUIPMENT,
AND SHUTDOWNS WITH THE PLANT OPERATORS.
01 EXISTING HOSE - 1" ID PVC
02 EXISTING PIPE - 2" SCH 40 PVC
03 EXISTING PIPE - 2" SCH 80 PVC
04 EXISTING FITTING - 2" 90° ELBOW SCH 40 PVC
05 EXISTING FITTING - 2" SCH 40 PVC TEE
06 DEMOLISH THE 50 MICRON AND 20 MICRON FILTERS, BACK BOARD,
SUPPORTS, AND CONNECTING HOSES.
EQUIPMENT KEYNOTES
03BV410 (D) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03FLT411 (D) 50 MICRON FILTER
03FLT412 (D) 20 MICRON FILTER
03PI413 (D) PRESSURE GAUGE 0-60 PSIG
03BV414 (D) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03FE445 (E) FLOW METER
03BV415 (E) BALL VALVE - 2'' SCH 40 PVC, HANDLE
03AE416 (E) PH AND TEMPERATURE ELEMENT
03BV417 (E) BALL VALVE - 2'' SCH 40 PVC, HANDLE
03BV420 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03PNL421 (E) VIQUA POWER SUPPLY
03UV422 (E) VIQUA UV DISINFECTION UNIT
03BV423 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03AE424 (E) UV TRANSMITTER
03BV430 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03PNL431 (E) VIQUA POWER SUPPLY
03UV432 (E) VIQUA UV DISINFECTION UNIT
03BV433 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03AE434 (E) UV TRANSMITTER
03BV440 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03PNL441 (E) VIQUA POWER SUPPLY
03UV442 (E) VIQUA UV DISINFECTION UNIT
03BV443 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03AE444 (E) UV TRANSMITTER
03PNL450 (E) UV SYSTEM PANEL
03PNL451 (E) ELECTRICAL PANEL
DB301
D
EM
O
LI
TI
O
N S
EC
TI
O N
D O
M
ES
TI
C
W
AS
TE
W
AT
ER
SY
ST
EM
F
IL
TE
R
CMZ
03BV415 (E)
03AE416 (E)
03BV417 (E)
03UV422 (E)
03AE424 (E)
03PNL421 (E)
03BV420 (E)
03BV423 (E)
03PNL450 (E)
03UV432 (E)
03PNL431 (E)
03BV430 (E)
03BV433 (E)
03UV442 (E)
03AE444 (E)
03PNL441 (E)
03BV440 (E)
03BV443 (E)
03AE434 (E)
POWER OUTLET
AND SWITCH (TYP)
BIOFILTER
EFFLUENT (BFE)
POST DISINFECTION
EFFLUENT
03PNL451 (E)
FILTER-TO-WASTE
AND FILTER
BACKWASH
NEW SAND FILTER
03SF400 (N)
03FE445 (E)
PIPING BEHIND FILTER
SHOWN FOR CLARITY
(TYP)03BV401-404 (N)
(TYP)
(TYP)
03CV405 (N)
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:3
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
B1
D
EM
O
LI
TI
O
N P
LA
N
D
O M
ES
TI
C W
AS
TE
W
AT
ER
S
YS
TE
M .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SCALE:
8" 1'-4" 2'-8"
3/4" = 1'-0''
DOMESTIC WWTP NEW SAND FILTER SECTION1
- SCALE: 3/4"=1'-0"
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 CONTRACTOR SHALL COORDINATE OPERATION OF VALVES, EQUIPMENT,
AND SHUTDOWNS WITH THE PLANT OPERATORS.
05 REFER TO SHEET D-002 FOR PIPE, FITTING, AND VALVE SPECIFICATIONS.
01 EXISTING HOSE - 1" ID PVC
02 EXISTING PIPE - 2" SCH 40 PVC
03 EXISTING PIPE - 2" SCH 80 PVC
04 EXISTING FITTING - 2" 90° ELBOW SCH 40 PVC
05 EXISTING FITTING - 2" SCH 40 PVC TEE
06 NEW PIPE - 2" SCH 80 PVC
07 NEW FITTING - 2" 90° ELBOW SCH 80 PVC
08 NEW FITTING - 2" SCH 80 PVC TEE
09 NEW FITTING - 2" SCH 80 UNION
10 INSTALL NEW 2" SCH 80 TEE WITH A PLUG FOR ALTERNATIVE FUTURE
WATER SUPPLY CONNECTION FOR BACKWASHING THE FILTER.
EQUIPMENT KEYNOTES
03SF400 (N) SAND FILTER, STA-RITE MODEL T-300BO-2 WITH #20 SILICA SAND,
SIZE RANGE 0.40-0.55 MM WITH A UNIFORMITY COEFFICIENT
LESS THAN 1.75 PER MANUFACTURER'S RECOMMENDATION AND
PER ENGINEER'S APPROVAL.
03BV401 (N) BALL VALVE - 2" SCH 80 PVC, HANDLE
03BV402 (N) BALL VALVE - 2" SCH 80 PVC, HANDLE
03BV403 (N) BALL VALVE - 2" SCH 80 PVC, HANDLE
03BV404 (N) BALL VALVE - 2" SCH 80 PVC, HANDLE
03CV405 (N) SWING CHECK VALVE - 2" SCH 40
03FE445 (E) FLOW METER
03BV415 (E) BALL VALVE - 2'' SCH 40 PVC, HANDLE
03AE416 (E) PH AND TEMPERATURE ELEMENT
03BV417 (E) BALL VALVE - 2'' SCH 40 PVC, HANDLE
03BV420 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03PNL421 (E) VIQUA POWER SUPPLY
03UV422 (E) VIQUA UV DISINFECTION UNIT
03BV423 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03AE424 (E) UV TRANSMITTER
03BV430 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03PNL431 (E) VIQUA POWER SUPPLY
03UV432 (E) VIQUA UV DISINFECTION UNIT
03BV433 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03AE434 (E) UV TRANSMITTER
03BV440 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03PNL441 (E) VIQUA POWER SUPPLY
03UV442 (E) VIQUA UV DISINFECTION UNIT
03BV443 (E) BALL VALVE - 1'' SCH 40 PVC, HANDLE
03AE444 (E) UV TRANSMITTER
03PNL450 (E) UV SYSTEM PANEL
03PNL451 (E) ELECTRICAL PANEL
DB302
SA
N
D F
IL
TE
R S
YS
TE
M
SE
C
TI
O N
D
O M
ES
TI
C W
AS
TE
W
AT
ER
S
YS
TE
M
CMZ
RJM
MCH
MKK
101-1
YIC
20X
FE
FUI/FQI
AE
EF 201
EF 201
BDP-101&102
RT-101
BF-101
MT-100
MX-101
MP-101
Mg(OH)₂
FEED PUMP
NOAA
SEWAGE
UAF
SEWAGE
INFLUENT
MIXING TANK
SAMPLE
SEPTIC TANK RECIRCULATION TANK W/
BIOFILTER DOSING PUMPS
PROCESS AIR
EXHAUST FAN AND
CARBON FILTER
DFE TO
OUTFALL
UV DISINFECTION
SYSTEM
CARBON
FILTER
ST-101
SEPTIC TANK
ST-201
RE
Mg(OH)₂ DRUM
KK
101-2
P-100 pH
BDP-201&202
RT-201
RECIRCULATION TANK W/
BIOFILTER DOSING PUMPS
AIT
pH
PROCESS AIR HEATER
HX 201
YIC
30X
120 VAC
pH
M
EFFLUENT TANK AND
PUMPING SYSTEM
UV-301 UV-302 UV-303
FLOAT
VALVE
FLOAT
VALVE
KK
100-1
BF-102
BF-201
ALTERNATING
2-WAY
VALVE
RS
RS
RS
RS
RS
STE
STE
BFE
BFI
BFE
BFI PAS
PAR
PASPAS
SAMPLE
NC
PAS
PAR
BFE
BFI
BFE
BFE
PAR
120 VAC
120 VAC
120 VAC
120 VAC
120 VAC
LEGEND
BDP- BIOFILTER DOSING PUMP
BFI- BIOFILTER INFLUENT
BFE- BIOFILTER EFFLUENT
CF- CARTRIDGE FILTER
COMP- SEPTIC TANK COMPARTMENT
D- DRAIN
DFE- DISINFECTANT FINAL EFFLUENT
EP- EFFLUENT PUMP
FC- FLUSHING CONNECTION
FE- FLOW ELEMENT
FI/FQ- FLOW RATE AND ACCUMULATED FLOW
INDICATOR
FT-FLOW TRANSMITTER
HX- AIR HEATING UNIT
KK- PROGRAMMABLE TIMER CONTORL UNIT
Mg(OH)₂ -MAGNESIUM HYDROXIDE
MP- CHEMICAL METERING PUMP
MT- MIXING TANK
NC- NORMALLY CLOSED VALVE
PAS- PROCESS AIR SUPPLY
PAR- PROCESS AIR RETURN
QUICK COUPLER FEMALE
QUICK COUPLER MALE
RE- UV LIGHT INTENSITY MONITOR
RS- RAW SEWAGE
RT- RECIRCULATION TANK
ST- SEPTIC TANK
STE- SEPTIC TANK EFFLUENT
UV- ULTRA VIOLET DISINFECTION
YIC- PROCESS INDICATING CONTROLLER
EP 201
a a
FC
HS
100-1
LS
100-1
PCP-101
120 VAC
HDA
PRIMARY SECONDARY
PRIMARY SECONDARY
03SF400 (N)
03BV401 (N)
03BV403 (N)
03BV402 (N)
03BV404(N)
03CV405 (N)
NC
FE
M pH
03BV415 (E)03BV417 (E)
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:0
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
P&
ID
S.
D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
DB601
PR
O
C
ES
S
FL
O W
D
IA
G R
AM
D
O M
ES
TI
C W
AS
TE
W
AT
ER
SY
ST
EM
CMZ
CMZ
CHILLER UNIT 1
CHILLER
UNIT 2
COLD WATER
HEADER AND
FIRE RISER
WSW
COLLECTION
TANK
WSW
COLLECTION
TANK
600mm OVERFLOW SW 600mm OVERFLOW SW
600mm OVERFLOW SW
203mm CW
DEMOLISHED
PRESSURE FILTER
TANKS HOUSE
KEEPING PADS
OZONE VENTURI
INJECTION ROOM OZONE
GENERATOR ROOM
FI
LT
ER
B
AC
KW
AS
H
T
AN
K ( N
O L
O N
G
ER
IN
U
SE
BASKET STRAINER
RECIRCULATION TEE
VALVE (E). FLOW GOING
UP IS RECIRCULATION TO
WASTE SEAWATER SUMP
OG-1
OG-2
OG-3
OCT-1 OCT-2 OCT-3 OCT-4
RO-101 RO-102HP-102
REVERSE
OSMOSIS (E)
HPT-101
HP
STORAGE
TANK (E)
PMP-119
PMP-120
HP LOAD PUMPS (E)
PMP-107PMP-106
PMP-108
WASTE SEAWATER PUMPS (E)
HP-101
HP SOURCE PUMPS
PMP-116
PMP-117
HX-101
HX-103
HX-102
HEATING HX (E)
HEATING HX (E)
HEATING HX (E)
COOLING HX (E)
HP BUILDING
PUMPS (E)
FP-101
FIRE PUMP (E)
PMP-121
PMP-122
PMP-118
COOLING
PUMP (E)
FIRE PUMP
CONTROLLER
LABORATORY BASEMENT
SEWAGE EJECTOR
FLT-101
04 04 04 04
C O
O
LE
D W
SW
WSW TO
OUTFALL
OG-1
OG-2
OG-3
OCT-1 OCT-2 OCT-3 OCT-4
ELL1
ELH1
EMDS
ATS1
NMDS
MCB
MTS1
PARTS BIN
PLC PANEL P6
T
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
4:
:1
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
C
PO
ST
T
R
EA
TM
EN
T R
O O
M .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SCALE:
2'-8" 5'-4" 10'-8"
3/16" = 1'-0''
POST TREATMENT ROOM PROCESS DEMOLITION PLAN1
_ SCALE: AS NOTED
N
SCALE:
0.5
METERS
1.0 2.0 3.0
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 REMOVE SUPPORTS TO PROCESS PIPING AND EQUIPMENT DEMOLISHED AS
PART OF THIS WORK.
05 DRAWINGS DO NOT INCLUDE ALL PROCESS PIPING FOR CLARITY; REFER TO
YEARS 2005 AND 2010 RECORD DRAWINGS FOR FURTHER INFORMATION.
01 DEMOLISH EXISTING VENTURI INJECTION SYSTEM; RE: DC501, DC502.
02 DEMOLISH EXSITING OZONE GENERATORS, OG-1, OG-2, AND OG-3; RE:
DC502. REMOVAL OF OZONE GENERATORS BY OTHERS. DE-ENERGIZE,
DISCONNECT AND REMOVE OZONE POWER CONDUCTORS BACK TO PANEL
ELL1. CONDUIT TO REMAIN. SEE SHEETS EC101 AND EC102.
03 DEMOLISH BOTH 6" SCH 80 PVC POST OZONATED WSW PROCESS PIPES
FROM OZONE VENTURI INJECTION SYSTEM TO OZONE CONTACT TANKS.
04 DEMOLISH ALL FOUR EXISTING OZONE CONTACT TANKS, VALVES, PIPING,
AND APPURTENANCES PER PLANS.
05 DEMOLISH 8" SCH 80 PVC TREATED SALT WATER "TSW'" PIPE UP THE
FLANGE INDICATED IN THE PLANS. RETAIN HANGERS FOR NEW 8" SCH 80
PVC FROM THE NEW UV SYSTEM TO BE INSTALLED; RE: DC102.
DC101
D
EM
O
LI
TI
O
N P
LA
N
PO
ST
T R
EA
TM
EN
T
R O
O M
CMZ
RJM
Sheet
UNIT 2
COLD WATER
HEADER AND
FIRE RISER
WSW
COLLECTION
TANK
WSW
COLLECTION
TANK
600mm OVERFLOW SW 600mm OVERFLOW SW
600mm OVERFLOW SW
203mm CW
DEMOLISHED
PRESSURE FILTER
TANKS HOUSE
KEEPING PADS
WSW FROM SUMP
DC301
FI
LT
ER
B
AC
KW
AS
H
T
AN
K ( N
O L
O N
G
ER
IN
U
SE
BASKET STRAINER
RECIRCULATION TEE
VALVE (E). FLOW GOING
UP IS RECIRCULATION TO
WASTE SEAWATER SUMP
RO-101 RO-102HP-102
REVERSE
OSMOSIS (E)
HPT-101
HP
STORAGE
TANK (E)
PMP-119
PMP-120
HP LOAD PUMPS (E)
PMP-107PMP-106
PMP-108
WASTE SEAWATER PUMPS (E)
HP-101
HP SOURCE PUMPS
PMP-116
PMP-117
HX-101
HX-103
HX-102
HEATING HX (E)
HEATING HX (E)
HEATING HX (E)
COOLING HX (E)
HP BUILDING
PUMPS (E)
FP-101
FIRE PUMP (E)
PMP-121
PMP-122
PMP-118
COOLING
PUMP (E)
FIRE PUMP
CONTROLLER
LABORATORY BASEMENT
SEWAGE EJECTOR
FLT-101
NEW UV DISINFECTION
SYSTEM
C O
O
LE
D W
SW
WSW TO
OUTFALL
ELL1
ELH1
EMDS
ATS1
NMDS
MCB
MTS1
PARTS BIN
PLC PANEL P6
T
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:4
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
C
PO
ST
T
R
EA
TM
EN
T R
O O
M .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SCALE:
2'-8" 5'-4" 10'-8"
3/16" = 1'-0''POST TREATMENT ROOM PROCESS PLAN1
_ SCALE: AS NOTED
N
SCALE:
0.5
METERS
1.0 2.0 3.0
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 REMOVE SUPPORTS TO PROCESS PIPING AND EQUIPMENT DEMOLISHED AS
PART OF THIS WORK.
05 DRAWINGS DO NOT INCLUDE ALL PROCESS PIPING FOR CLARITY; REFER TO
YEARS 2005 AND 2010 RECORD DRAWINGS FOR FURTHER INFORMATION.
06 REFER TO SHEET D-002 FOR PIPE, FITTING, AND VALVE SPECIFICATIONS.
01 INSTALL NEW UV DISINFECTION SYSTEM PER PLANS; RE: 01/DC301.
02 PIPE - INSTALL 8" SCH 80 PVC PIPE FOR THE POST UV DISINFECTION TSW.
SUPPORT PIPING PER MANUFACTURER REQUIREMENTS.
03 FITTING - INSTALL 8" SCH 80 45° BENDS.
04 FITTING - INSTALL 8" SCH 80 90° BENDS.
05 CONNECT NEW 8" SCH 80 PVC PIPE FOR THE TSW TO THE EXISTING FLANGE
CONNECTION. FURNISH A FREE FLOATING SCH 80 PVC FLANGE FOR THE
CONNECTION.
06 INSTALL THE NEW 8" SCH 80 PVC PIPE THROUGH THE EXISTING WALL
WESTERN-MOST WALL PENETRATION FROM THE OLD 6" OZONATED PIPE.
WIDEN THE HOLE AS REQUIRED FOR THE NEW 8" PIPE.
DC102
PO
ST
T R
EA
TM
EN
T
R O
O M
PL
AN
CMZ
RJM
MCH
Sheet
07 06 05
DOOR
COLUMN
BOTTOM EDGE OF RAFTERS
UV MAINTENANCE
CLEARANCE
BOUNDARY
1'-10 21/64"1'-10 21/64"1'-10 21/64"
5' -5
9/
2' -4
3/
1' -1
9/
2' -8
3/
2' -0
'-2
8' -0
/1
6"
/1 6"
3'-0 47/64"3'-0 47/64"2'-9 21/32"
CEILING
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
FLOOR
WALL
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:0
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
C
U
V D
IS
IN
FE
C
TI
O
N S
YS
TE
M S
EC
TI
O N
PO
ST
T
R
EA
TM
EN
T R
O O
M .D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 CONTRACTOR SHALL COORDINATE OPERATION OF VALVES, EQUIPMENT,
AND SHUTDOWNS WITH THE PLANT OPERATORS.
05 REFER TO SHEET D-002 FOR PIPE, FITTING, AND VALVE SPECIFICATIONS.
01 NEW PIPE - 2" SCH 80 PVC
02 NEW PIPE - 6" SCH 80 PVC
03 NEW PIPE - 8" SCH 80 PVC
04 NEW FITTING - 6" 90° ELBOW SCH 80 PVC
05 NEW FITTING - 8" 90° ELBOW SCH 80 PVC
06 NEW FITTING - 8"X6"X8" REDUCING TEE SCH 80 PVC
07 NEW FITTING - 8"X6" ECCENTRIC REDUCER SCH 80 PVC
08 NEW FITTING - 8"X2" BUSHING SCH 80 PVC
09 NEW FITTING - 6" SOCKET X FLANGE ADAPTER SCH 80 PVC
10 NEW FITTING - 8" SOCKET X FLANGE ADAPTER SCH 80 PVC
11 NEW FITTING - 8" 11.25° BEND SCH 80 PVC
12 EXISTING PIPE - 8" SCH 80 PVC, INSULATED
SCALE:
8" 1'-4" 2'-8"
3/4" = 1'-0''
UV DISINFECTION SYSTEM DETAIL SECTION1
DC102 SCALE: 1/4"=1'-0"
02FE302 (N)
02BFV300 (N)
02BV301 (N)
02UVD304 (N)
02BFV307 (N)
02BV305 (N)
02FE202 (N)
02BFV200 (N)
02BV201 (N)
02UVD204 (N)
02BFV207 (N)
02BV205 (N)
02FE102 (N)
02BFV100 (N)
02BV101 (N)
02UVD104 (N)
02BFV107 (N)
02BV105 (N)
02BFV400 (N)
EQUIPMENT KEYNOTES
02BFV100 (N) BUTTERFLY VALVE - 6'' SCH 80 PVC, LEVER HANDLE
02BV101 (N) BALL VALVE - 2'' SCH 80 PVC, LEVER HANDLE
02FE102 (N) MAGMETER - 6'' 316 SS
02UVD104 (N) RZ163-11 INLINE HYDRO OPTIC DISINFECTION SYSTEM W/ (1) 1.7
KW MP, COLOR ALL IN ONE SS CONTROLLER, 6” TC I/O 480V 3
PHASE
02BV105 (N) BALL VALVE - 2'' SCH 80 PVC, LEVER HANDLE
02BFV107 (N) BUTTERFLY VALVE - 6'' SCH 80 PVC, LEVER HANDLE
02BFV200 (N) BUTTERFLY VALVE - 6'' SCH 80 PVC, LEVER HANDLE
02BV201 (N) BALL VALVE - 2'' SCH 80 PVC, LEVER HANDLE
02FE202 (N) MAGMETER - 6'' 316 SS
02UVD204 (N) RZ163-11 INLINE HYDRO OPTIC DISINFECTION SYSTEM W/ (1) 1.7
KW MP, COLOR ALL IN ONE SS CONTROLLER, 6” TC I/O 480V 3
PHASE
02BV205 (N) BALL VALVE - 2'' SCH 80 PVC, LEVER HANDLE
02BFV207 (N) BUTTERFLY VALVE - 6'' SCH 80 PVC, LEVER HANDLE
02BFV300 (N) BUTTERFLY VALVE - 6'' SCH 80 PVC, LEVER HANDLE
02BV301 (N) BALL VALVE - 2'' SCH 80 PVC, LEVER HANDLE
02FE302 (N) MAGMETER - 6'' 316 SS
02UVD304 (N) RZ163-11 INLINE HYDRO OPTIC DISINFECTION SYSTEM W/ (1) 1.7
KW MP, COLOR ALL IN ONE SS CONTROLLER, 6” TC I/O 480V 3
PHASE
02BV305 (N) BALL VALVE - 2'' SCH 80 PVC, LEVER HANDLE
02BFV307 (N) BUTTERFLY VALVE - 6'' SCH 80 PVC, LEVER HANDLE
02BFV400 (N) BUTTERFLY VALVE - 8" SCH 80 PVC, LEVER HANDLE
02BV401 (N) BALL VALVE - 2" SCH 80 TRUE UNION
02BV401 (N)
DC301
U V
D
IS
IN
FE
C
TI
O N
SY
ST
EM
S
EC
TI
O N
PO
ST
T R
EA
TM
EN
T
R O
O M
CMZ
DC501
DC501
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:2
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
C
D
EM
O
LI
TI
O N
D
ET
AI
LS
O
ZO
N
E
SY
ST
EM
.D W
G
M O
R R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
DC501
D
EM
O
LI
TI
O
N D
ET
IA
LS
O
ZO
N
E
SY
ST
EM
CMZ
CMZ
MCH
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 REMOVE SUPPORTS TO PROCESS PIPING AND EQUIPMENT DEMOLISHED AS
PART OF THIS WORK.
01 DEMOLISH OZONE GENERATORS, OG-1, OG-2, AND OG-3.
02 DEMOLISH TUBING, PIPING, FITTINGS, AND VALVES FOR CONNECTING OZONE
DELIVERY LINE; THE COOLING WATER SUPPLY, RECIRCULATION AND
DISCHARGE LINES; AND THE PRESSURIZED AIR SUPPLY LINE.
03 DEMOLISH BOTH OZONE FEED LINES TO VENTURI INJECTORS INCLUDING ALL
TUBING, FITTINGS, AND VALVES.
04 DEMOLISH OZONE FEED LINE VALVES, ROTAMETERS, AND SS SUPPLY
TUBING.
05 DEMOLISH ORP CONTROLLERS. REMOVE ALL WIRING BACK TO SOURCE AND
CAP ABANDONED CONDUITS.
06 DEMOLISH THE COMPRESSED AIR SUPPLY LINE UP TO THE BALL VALVE.
RETAIN 3-INCHES OF PIPE ON THE DOWNS STREAM END AND INSTALL A PLUG.
RETAIN AND MOVE SUPPORT BRACKET TO SUPPORT PLUGGED END OF PIPE.
07 DEMOLISH OZONE GENERATOR COOLING RECIRCULATION SYSTEM.
DEMOLITION WORK INCLUDES THE STORAGE TANK AND PLATFORM, THE
RECIRCULATION PUMP, THE HEAT EXCHANGER, THE COOLING DISCHARGE,
RETURN, AND SUPPLY LINES.
EQUIPMENT KEYNOTES
OZONE GENERATORS DEMOLITION1
_ SCALE: N.T.S.
ORP CONTROLLER AND OZONE ROTAMETER DEMOLITION2
_ SCALE: N.T.S.
PRESSURIZED AIR SUPPLY DEMOLITION3
_ SCALE: N.T.S.
OZONE GENERATOR COOLING SYSTEM DEMOLITION4
_ SCALE: N.T.S.
APPROXIMATE
CUT LOCATION
GENERAL SHEET NOTES
SHEET KEYNOTES
01 CONTRACTOR SHALL PROTECT PIPES, FITTINGS, EQUIPMENT, AND
APPURTENANCES DURING CONSTRUCTION.
02 CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS IN THE
FIELD.
03 PIPING LOCATIONS ARE APPROXIMATE; CONTRACTOR TO FIELD VERIFY ALL
LOCATIONS AND FIELD MEASUREMENTS.
04 REMOVE SUPPORTS TO PROCESS PIPING AND EQUIPMENT DEMOLISHED AS
PART OF THIS WORK.
01 DEMOLISH THE RECIRCULATION SYSTEM COOLING DISCHARGE, RETURN,
AND SUPPLY LINES; RE: 04/DC501.
02 DEMOLISH BOTH POST OZONATED WSW LINES FROM THE VENTURI
INJECTORS THROUGH TO THE CONNECTION TO THE OZONE CONTACT
TANKS; RE: DC101.
03 DEMOLISH WSW FEED LINE TO THE OZONE GENERATOR RECIRCULATION
COOLING SYSTEM'S HEAT EXCHANGER.
04 DEMOLISH WSW PIPING UPSTREAM OF THE OZONE VENTURI INJECTORS TO
THE PIPE PENETRATION AS FIELD FITTING REQUIRES. FURNISH A COUPLING
TO CONNECT NEW SCH 80 PVC PIPE.
05 DEMOLISH BOTH SIDE CHANNEL OZONE INJECTION STREAMS AND
ASSOCIATED FITTINGS, VALVES, AND TUBING CONNECTING TO OZONE
SUPPLY ROTAMETERS; RE: 02/DC501.
06 DEMOLISH BOTH PARALLEL VENTURING OZONE INJECTION LINES INCLUDING
ALL FITTINGS, VALVES, AND APPURTENANCES.
07 RETAIN AND REUSE PIPE HANGER FOR NEW 8" SCH 80 PVC PIPE TO NEW UV
SYSTEM.
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:4
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
C
D
EM
O
LI
TI
O N
D
ET
AI
LS
O
ZO
N
E
SY
ST
EM
.D W
G
M O
R R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
DC502
D
EM
O
LI
TI
O
N D
ET
IA
LS
O
ZO
N
E
SY
ST
EM
CMZ
CMZ
MCH
EQUIPMENT KEYNOTES
N/A
WSW PROCESS PIPE CONNECTION POINT2
_ SCALE: N.T.S.
VENTURI INJECTOR PIPING DEMOLITION DETAIL1
_ SCALE: N.T.S.
VENTURI INJECTORS DEMOLITION DETAIL3
_ SCALE: N.T.S.
DC502
DC502
WSW
WSW
NC
(E) Waste Seawater Sump
(E) 8
WSW
(E) 6" recirculation
WSW
HX-102
(Heating)
HX-101
(Heating)
(E) PMP-106/107/108
(Waste Seawater Pumps)
Strainer
NC
520 GPM
520 GPM
M
02BFV100 (N)
02BV101 (N) 02BV105 (N)
02FE102 (N) 02UVD104 (N)
02AV106 (N)
02BFV107 (N)
M
8-WSW-PVC
02BFV200 (N)
02BV201 (N) 02BV205 (N)
02FE202 (N) 02UVD204 (N)
02BFV207 (N)
M
02BFV300 (N)
02BV401 (N) 02BV305 (N)
02FE302 (N) 02UVD304 (N)
02BFV307 (N)
8-WSW-PVC
02BFV400 (N)
6-WSW-PVC
6-WSW-PVC
6-WSW-PVC
(E) 8
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:1
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
P&
ID
S.
D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
SEAWATER PIPING DIAGRAM
SCALE: NONE
DC601
PR
O
C
ES
S
FL
O W
D
IA
G R
AM
PO
ST
T
R
EA
TM
EN
T R
O O
M
CMZ
CMZ
MCH
ADC602
HPSR
DC602
HPSS
B
CDC602
HPSR
DC602
HPSS
D
WSW
TO OUTFALL SUMP
I
PS
H H
R
HPLR
HPLR
H
PLR
HPLS
HPLS
H
PLS
SWCS
NC
HPSS
HPSR
H
PS
R
H
PS
S
PS
H H
R
HPLR
HPLR
H
PLR
HPLS
HPLS
H
PLS
SWCS
NC
HPSS
HPSR
H
PS
R
H
PS
S
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/3
/2
2:
:5
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
P&
ID
S.
D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
HEAT PUMP PIPING DIAGRAM
SCALE: NONE
ET-104
(E) GMT-101
(E) PMP-121
3/4
See Continuation on
DC601
8 4
(E) 3/4
Install valve and check valve
Penthouse
3/4
AS-103
HP-101
HP-102 HPT-101PMP-120
PMP-119
PMP-118
ET-105
3/4
See Continuation on
DC601
(Glycol Mixing Tank)
(Heat Pump)
(Heat Pump) (HP Heating Tank)(Load Pump)
(Load Pump)
(Cooling)
(E) 3/4" to heat recovery system
Reduced Pressure Backflow Preventer
Water Feeder Set @ 15 psig
3/4" cold water 3/4
PMP-117
(Source Pump)
4 4
4 4
HX-103
(Cooling)
High Capacity Air Vent
PMP-123
(Cooling HX)
PMP-116
(Source Pump)
340 GPM
340 GPM
340 GPM
340 GPM
200 GPM 240 GPM
215 GPM
215 GPM
DC602
PR
O
C
ES
S
FL
O W
D
IA
G R
AM
PO
ST
T
R
EA
M
TE
N T
R O
O M
CMZ
CMZ
CH
ADC601
HPSR
CDC601
HPSR
DC601
HPSS
B
DC601
HPSS
D
EDC601
SWCS
HDC603
HPS
DC603
SWCR
F
DC603
HHR
G
T
NC
LHW
LCW
HWC
LC
W
NC
VFDVFD
HS
HR
HS
T
NC
HW
CW
HWC
C W
NC
HPHR
HPHS
HS
HR
H S
H R
H
SH
R
HR
HS
HS
HR
HS
HR
H S
H R
H
PH
S
H
PH
R
HPHR
HPHS
HR
HS
SWCR
SWCS
HPHR
HPHS
DP
DP
NC
LHW
LCW
HWC
LC
W
NC
VFDVFD
HS
HR
HS
NC
HW
CW
HWC
C W
NC
HPHR
HPHS
HS
HR
H S
H R
H
SH
R
HR
HS
HS
HR
HS
HR
H S
H R
H
PH
S
H
PH
R
HPHR
HPHS
HR
HS
SWCR
SWCS
HPHR
HPHS
Checked By:
Drawn By:
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:3
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
P&
ID
S.
D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
BUILDING PIPING DIAGRAM
SCALE: NONE
(E) 1-1/2
(E) 3/4
(E) 1-1/2
1-1/2
(E) 3"
(E) 1-1/4
(E) 3/4
(E) 1-1/4
Office Building
Lab Building
1-1/2
1-1/2
1-1/2 (E) 3
(E) 1-1/2
(E) 4(E) 4
(E) 4
(E) 4
(E) 1 (E) 1
(E) 1(E) 1
(E) 1-1/4
(E) 1-1/4
1-1/4
1-1/4
1-1/4
1-1/4
(E) 3
(E) 4
(E) 4
3/4 3/4
(E) 3"
HCC-101
(AHU-101)
PMP-121/122
(Heat Pump
Building Pumps)
HCC-103
(AHU-103)
(E) PMP-103
(Lab VAV Reheat Pump)
(E) PMP-104
(Lab AHU Coil Pump)
(E) HWG-101
(Indirect HW Heater)
(E) ET-102
(E) PMP-115
HWT-101
(Electric HW Heater)
4 4 4 4
(E) 3/4
HWT-201
(Electric HW Heater)
(E) PMP-204
(E) PMP-202
(Office VAV Reheat
Coils)
(E) ET-201
(E) HWG-201
(Indirect HW Heater)
(E) PMP-201
(Office AHU Heating
Coils)
4 4
(E) B-101 (Boiler)
(E) B-102 (Boiler)
(E) ET-101
(E) AS-101
(E) 6 (E) 6 (E) 6 (E) 6
(E) 6
(E) 6
3 33 3
2-1/2
2-1/2
2-1/2
2-1/2
2-1/2
2-1/2
2-1/2
2-1/2
2-1/2
2-1/2
(E) 1-1/2
(E) 6
(E) 6
(E) 6
(E) 6
(E) 6 (E) 6
PMP-101/102
(Boiler Building Pumps)
(E) PMP-203
(E) PMP-105
150 GPM 150 GPM
14 GPM
94 GPM
97 GPM
116 GPM
5 GPM
42 GPM
DC603
PR
O
C
ES
S
FL
O W
D
IA
G R
AM
PO
ST
T
R
EA
TM
EN
T R
O O
M
CMZ
CMZ
MCH
EDC602
SWCS
HDC602
HPS
DC602
HHR
G
DC602
SWCR
F
Project No.:
Designed By:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/2
/2
1:
:5
PM
O
:\P R
O
JE
C
TS
\S
EA
TT
LE
\1
\2
-1
-2
\C
AD
\S
H
EE
TF
IL
ES
\D
C
PR
O C
ES
S
EQ
U
IP
M
EN
T
SC
H
ED
U
LE
.D
W G
M
O R
R
IS
, R
IC
H
AR
D
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch
C op yr ig ht : T et ra
T ec h
200-18865-22001
NO
AA
/N M
FS
TE
D
ST
EV
EN
S
M
AR
IN
E
RE
SE
AR
CH
IN
ST
IT
UE
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
SY
ST
EM
M
O
DI
FI
CA
TI
O
NS
SE
C
O N
D S
TR
EE
T, S
U
IT
E
JU
N
EA
U A
K, M
AI
N
7)
-6
FA
X:
(9
) 4
-3
PRELIMINARY
FOR AGENCY
REVIEW
(2010 EXISTING SEAWATER HEATING AND COOLING SYSTEM EQUIPMENT SCHEDULE)
SEAWATER LOOP
HX-101 Heating Heat Exchanger HX-102 Description: Plate heat exchanger; titanium plates
Warm Side: 520 gpm; 38F EWT; 32F LWT; seawater;
Max 1,200 gpm@10 psi drop
Cold Side: 680 gpm; 30F EWT; 35F LWT; 35% EG; Max 5 psi drop
HEAT PUMP LOOP
HP-101 Heat Pump HP-102 Description: Helical rotary screw heat pump
Capacity: 920 MBH; Variable output Evaporator: 35F EWT; 30F LWT; 35% ethylene glycol Condenser: 100F EWT; 120F LWT; 35% ethylene glycol Performance: COP=3.5 (100%), 3.2 (50%) Electrical: 460V/3 phase Manufacturer: Trane RTWD, 90 ton nominal
PMP-116 Heat Pump Source Pump PMP-117 Description: Base mounted centrifugal
Capacity: 340 gpm; 110' head; 77% efficiency; 35%…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .