00676-000-13-AS-2 Wage Rates.pdf

PDF 100 KB Posted

Attached to
Pidcock Creek Dam Repairs
Solicitation number
00676-000-13-AS-2
Issued by
Bucks County, West Milton CDP, Pennsylvania

About this file

This document is a Prevailing Wage Rate determination for a public works project in the Commonwealth of Pennsylvania. The project is classified as Highway construction and the Awarding Agency is the Pennsylvania Historical and Museum Commission. The prevailing wage rates are provided for various trades and labor classifications, with effective dates from 2009 through 2016. The rates cover an extensive list of occupations, including Asbestos & Insulation Workers, Boilermakers, Carpenters, Cement Masons, Ironworkers, Laborers, Operators, Painters, Plasterers, Plumbers, Roofers, Sheet Metal Workers, Steamfitters, and Truck Drivers, among others. The wage rates and associated fringe benefits are detailed for each classification, with periodic increases over the multi-year period. This document serves to establish the legally mandated minimum compensation levels for workers on the public works project.

The prevailing wage rates provided in this determination must be paid by contractors and subcontractors performing work on the project, regardless of whether the workers are union or non-union. Funding for the project may come from state, local, or other public sources, which would require compliance with the Pennsylvania Prevailing Wage Act. This ensures a standardized, equitable pay scale for all laborers working on the public infrastructure improvements covered under the contract.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3/19/2015Determination Date:

HighwayProject Classification:

15-01827Serial Number:

5/1/2015Contract Award Date:

Awarding Agency:

PIDCOCK CREEK DAM REPAIRSProject Name:

PREVAILING WAGES PROJECT RATES

Assigned Field Office:

Bucks County

Toll Free Phone Number:

215-560-1858Field Office Phone Number:

Philadelphia

Pennsylvania Historical and Museum Commission

Effective

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2011 $28.00$40.39 $68.39Asbestos & Insulation Workers

5/1/2012 $28.00$41.39 $69.39Asbestos & Insulation Workers

5/1/2013 $29.10$41.79 $70.89Asbestos & Insulation Workers

5/1/2014 $30.40$43.14 $73.54Asbestos & Insulation Workers

4/1/2013 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional, and Minor Repair Work)

1/1/2014 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional, and Minor Repair Work)

1/1/2011 $28.12$37.35 $65.47Boilermakers

1/1/2012 $29.85$37.62 $67.47Boilermakers

9/30/2012 $29.85$39.97 $69.82Boilermakers

1/1/2013 $31.13$38.69 $69.82Boilermakers

4/1/2013 $31.43$38.54 $69.97Boilermakers

1/1/2014 $32.81$39.06 $71.87Boilermakers

5/1/2014 $23.59$38.02 $61.61Bricklayer

5/1/2015 $23.59$39.67 $63.26Bricklayer

5/1/2014 $25.59$47.79 $73.38Carpenter - Chief of Party (Surveying &

Layout)

Page 1 of 14 03/23/2015

PREVAILING WAGES PROJECT RATES

Effective

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2015 $25.59$49.58 $75.17Carpenter - Chief of Party (Surveying &

Layout)

5/1/2016 $25.59$51.42 $77.01Carpenter - Chief of Party (Surveying &

Layout)

5/1/2014 $25.59$41.56 $67.15Carpenter - Instrument Person (Surveying

& Layout)

5/1/2015 $25.59$43.11 $68.70Carpenter - Instrument Person (Surveying

& Layout)

5/1/2016 $25.59$44.71 $70.30Carpenter - Instrument Person (Surveying

& Layout)

5/1/2014 $20.16$33.25 $53.41Carpenter - Rodman (Surveying & Layout)

5/1/2015 $20.16$34.49 $54.65Carpenter - Rodman (Surveying & Layout)

5/1/2016 $20.16$35.77 $55.93Carpenter - Rodman (Surveying & Layout)

5/1/2014 $25.49$37.20 $62.69Carpenters

5/1/2015 $25.49$38.45 $63.94Carpenters

5/1/2016 $25.49$39.80 $65.29Carpenters

5/1/2013 $28.56$33.05 $61.61Cement Masons

5/1/2014 $29.66$33.55 $63.21Cement Masons

5/1/2014 $30.62$40.55 $71.17DockBuilder/Pile Drivers (Building, Heavy

& Highway)

5/1/2014 $30.62$48.66 $79.28DockBuilder/Pile Drivers Divers (Building

Heavy & Highway)

5/1/2009 $21.34$31.09 $52.43Drapery Installers

5/1/2009 $21.37$32.79 $54.16Drywall Finisher

5/1/2010 $22.41$33.00 $55.41Drywall Finisher

5/1/2011 $23.45$33.11 $56.56Drywall Finisher

5/1/2012 $23.87$34.09 $57.96Drywall Finisher

5/1/2014 $25.63$35.23 $60.86Drywall Finisher

6/3/2013 $21.29$50.19 $71.48Electric Lineman

6/2/2014 $21.81$51.64 $73.45Electric Lineman

6/5/2015 $22.17$52.93 $75.10Electric Lineman

5/30/2016 $22.61$54.56 $77.17Electric Lineman

4/29/2013 $32.09$49.65 $81.74Electricians & Telecommunications

Installation Technician

4/29/2014 $32.72$51.02 $83.74Electricians & Telecommunications

Installation Technician

5/3/2015 $34.06$52.68 $86.74Electricians & Telecommunications

Installation Technician

5/2/2016 $35.22$54.52 $89.74Electricians & Telecommunications

Installation Technician

Page 2 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

1/1/2012 $23.84$49.30 $73.14Elevator Constructor

1/1/2013 $25.49$49.84 $75.33Elevator Constructor

1/1/2014 $27.09$50.69 $77.78Elevator Constructor

5/1/2013 $24.86$39.91 $64.77Floor Layer

5/1/2014 $26.11$40.21 $66.32Floor Layer

5/1/2009 $23.81$36.64 $60.45Glazier

5/1/2010 $24.53$36.67 $61.20Glazier

5/1/2011 $25.25$37.35 $62.60Glazier

5/1/2012 $25.75$38.35 $64.10Glazier

5/1/2014 $27.60$39.75 $67.35Glazier

7/1/2014 $30.64$44.64 $75.28Iron Workers (Bridge, Structural, Ornamental, Precast)

1/1/2015 $30.89$45.14 $76.03Iron Workers (Bridge, Structural, Ornamental, Precast)

7/1/2013 $19.25$37.00 $56.25Iron Workers (Riggers)

7/1/2014 $19.75$38.00 $57.75Iron Workers (Riggers)

7/1/2013 $19.25$39.63 $58.88Iron Workers - Reinforcing Steel Mesh -

Rebar

7/1/2014 $19.75$40.73 $60.48Iron Workers - Reinforcing Steel Mesh -

Rebar

5/1/2010 $22.30$23.85 $46.15Laborers (Class 01 - See notes)

5/1/2011 $22.30$24.75 $47.05Laborers (Class 01 - See notes)

5/1/2012 $23.00$25.15 $48.15Laborers (Class 01 - See notes)

5/1/2013 $23.40$25.85 $49.25Laborers (Class 01 - See notes)

5/1/2014 $24.55$26.00 $50.55Laborers (Class 01 - See notes)

5/1/2010 $21.73$25.97 $47.70Laborers (Class 02 - See notes)

5/1/2011 $21.73$26.87 $48.60Laborers (Class 02 - See notes)

5/1/2012 $22.85$26.45 $49.30Laborers (Class 02 - See notes)

5/1/2013 $23.45$26.95 $50.40Laborers (Class 02 - See notes)

5/1/2014 $24.40$27.25 $51.65Laborers (Class 02 - See notes)

5/1/2010 $22.28$24.37 $46.65Laborers (Class 03 - See notes)

5/1/2011 $22.28$25.17 $47.45Laborers (Class 03 - See notes)

5/1/2012 $23.23$25.45 $48.68Laborers (Class 03 - See notes)

5/1/2013 $23.83$25.92 $49.75Laborers (Class 03 - See notes)

Page 3 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2014 $24.78$26.27 $51.05Laborers (Class 03 - See notes)

5/1/2011 $21.65$25.27 $46.92Laborers (Class 04 - See notes)

5/1/2012 $23.23$25.45 $48.68Laborers (Class 04 - See notes)

5/1/2013 $23.83$25.92 $49.75Laborers (Class 04 - See notes)

5/1/2014 $24.78$26.27 $51.05Laborers (Class 04 - See notes)

5/1/2011 $21.45$25.42 $46.87Laborers (Class 05 - See notes)

5/1/2012 $22.80$25.35 $48.15Laborers (Class 05 - See notes)

5/1/2013 $23.40$25.85 $49.25Laborers (Class 05 - See notes)

5/1/2014 $24.35$26.20 $50.55Laborers (Class 05 - See notes)

4/1/2009 $19.98$19.31 $39.29Landscape Laborer

5/1/2012 $21.03$18.71 $39.74Landscape Laborer

5/1/2013 $21.63$19.11 $40.74Landscape Laborer

5/1/2014 $22.18$19.76 $41.94Landscape Laborer

5/1/2009 $19.22$28.63 $47.85Marble Finisher

5/1/2010 $19.97$28.63 $48.60Marble Finisher

5/1/2011 $20.72$28.68 $49.40Marble Finisher

5/1/2012 $21.02$29.27 $50.29Marble Finisher

5/1/2013 $21.02$30.34 $51.36Marble Finisher

5/1/2014 $21.02$31.92 $52.94Marble Finisher

5/1/2015 $21.02$33.50 $54.52Marble Finisher

5/1/2010 $21.77$34.36 $56.13Marble Mason

5/1/2011 $22.58$34.35 $56.93Marble Mason

5/1/2012 $22.90$35.25 $58.15Marble Mason

5/1/2013 $22.90$36.65 $59.55Marble Mason

5/1/2014 $22.90$38.30 $61.20Marble Mason

5/1/2015 $22.90$39.95 $62.85Marble Mason

7/1/2012 $27.88$36.11 $63.99Millwright

7/1/2013 $28.74$36.61 $65.35Millwright

5/1/2014 $29.89$37.26 $67.15Millwright

5/1/2013 $25.55$40.81 $66.36Operators Class 01 - See Notes (Building, Heavy, Highway)

Page 4 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2014 $26.20$41.81 $68.01Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2015 $26.56$42.85 $69.41Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2016 $26.92$44.09 $71.01Operators Class 01 - See Notes (Building, Heavy, Highway)

5/1/2009 $21.96$43.04 $65.00Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2010 $22.96$43.04 $66.00Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2011 $24.31$43.04 $67.35Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2012 $25.38$43.42 $68.80Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2013 $26.45$43.80 $70.25Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2014 $27.08$44.82 $71.90Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2015 $27.44$45.86 $73.30Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2016 $27.80$47.10 $74.90Operators Class 01a - See Notes

(Building, Heavy, Highway)

5/1/2009 $21.00$39.79 $60.79Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2010 $22.00$39.79 $61.79Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2011 $23.35$39.79 $63.14Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2012 $24.41$40.18 $64.59Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2013 $25.48$40.56 $66.04Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2014 $26.12$41.57 $67.69Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2015 $26.48$42.61 $69.09Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2016 $26.85$43.84 $70.69Operators Class 02 - See Notes (Building, Heavy, Highway)

5/1/2009 $21.88$42.80 $64.68Operators Class 02a - See Notes

(Building, Heavy, Highway)

5/1/2010 $22.88$42.80 $65.68Operators Class 02a - See Notes

(Building, Heavy, Highway)

5/1/2011 $24.23$42.80 $67.03Operators Class 02a - See Notes

(Building, Heavy, Highway)

5/1/2012 $25.31$43.17 $68.48Operators Class 02a - See Notes

(Building, Heavy, Highway)

5/1/2013 $26.36$43.57 $69.93Operators Class 02a - See Notes

(Building, Heavy, Highway)

5/1/2014 $27.02$44.56 $71.58Operators Class 02a - See Notes

(Building, Heavy, Highway)

5/1/2015 $27.37$45.61 $72.98Operators Class 02a - See Notes

(Building, Heavy, Highway)

Page 5 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2016 $27.74$46.84 $74.58Operators Class 02a - See Notes

(Building, Heavy, Highway)

5/1/2009 $19.79$35.71 $55.50Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2010 $20.79$35.71 $56.50Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2011 $22.14$35.71 $57.85Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2012 $23.20$36.10 $59.30Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2013 $24.27$36.48 $60.75Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2014 $24.92$37.48 $62.40Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2015 $25.27$38.53 $63.80Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2016 $25.64$39.76 $65.40Operators Class 03 - See Notes (Building, Heavy, Highway)

5/1/2009 $19.71$35.40 $55.11Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2010 $20.71$35.40 $56.11Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2011 $22.06$35.40 $57.46Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2012 $23.12$35.79 $58.91Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2013 $24.19$36.17 $60.36Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2014 $24.83$37.18 $62.01Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2015 $25.18$38.23 $63.41Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2016 $25.55$39.46 $65.01Operators Class 04 - See Notes (Building, Heavy, Highway)

5/1/2009 $19.20$33.68 $52.88Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2010 $20.20$33.68 $53.88Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2011 $21.55$33.68 $55.23Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2012 $22.61$34.07 $56.68Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2013 $23.68$34.45 $58.13Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2014 $24.32$35.46 $59.78Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2015 $24.68$36.50 $61.18Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2016 $25.04$37.74 $62.78Operators Class 05 - See Notes (Building, Heavy, Highway)

5/1/2009 $18.91$32.69 $51.60Operators Class 06 - See Notes (Building, Heavy, Highway)

Page 6 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2010 $19.91$32.69 $52.60Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2011 $21.26$32.69 $53.95Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2012 $22.32$33.08 $55.40Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2013 $23.39$33.46 $56.85Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2014 $24.03$34.47 $58.50Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2015 $24.39$35.51 $59.90Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2016 $24.75$36.75 $61.50Operators Class 06 - See Notes (Building, Heavy, Highway)

5/1/2009 $24.43$48.05 $72.48Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2010 $25.55$48.05 $73.60Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2011 $27.10$48.05 $75.15Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2012 $28.38$48.51 $76.89Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2013 $29.66$48.97 $78.63Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2014 $30.41$50.17 $80.58Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2015 $30.87$51.42 $82.29Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2016 $31.30$52.91 $84.21Operators Class 07 (A) - See Notes

(Building, Heavy, Highway)

5/1/2009 $24.35$47.75 $72.10Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2010 $25.47$47.75 $73.22Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2011 $27.02$47.75 $74.77Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2012 $28.30$48.21 $76.51Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2013 $29.58$48.67 $78.25Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2014 $30.32$49.88 $80.20Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2015 $30.78$51.13 $81.91Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2016 $31.22$52.61 $83.83Operators Class 07 (B) - See Notes

(Building, Heavy, Highway)

5/1/2009 $19.24$32.31 $51.55Painters Class 1 (see notes)

10/1/2009 $20.12$32.31 $52.43Painters Class 1 (see notes)

5/1/2010 $20.84$32.31 $53.15Painters Class 1 (see notes)

5/1/2011 $21.49$32.94 $54.43Painters Class 1 (see notes)

Page 7 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2012 $21.91$33.92 $55.83Painters Class 1 (see notes)

5/1/2014 $23.40$35.38 $58.78Painters Class 1 (see notes)

5/1/2009 $19.59$40.85 $60.44Painters Class 2 (see notes)

10/1/2009 $20.34$40.85 $61.19Painters Class 2 (see notes)

5/1/2010 $20.94$40.85 $61.79Painters Class 2 (see notes)

5/1/2011 $21.59$42.20 $63.79Painters Class 2 (see notes)

11/1/2011 $21.62$44.17 $65.79Painters Class 2 (see notes)

5/1/2012 $22.04$45.25 $67.29Painters Class 2 (see notes)

11/1/2012 $22.04$46.75 $68.79Painters Class 2 (see notes)

5/1/2014 $22.66$47.67 $70.33Painters Class 2 (see notes)

5/1/2009 $19.24$32.69 $51.93Painters Class 3 (see notes)

10/1/2009 $20.12$32.69 $52.81Painters Class 3 (see notes)

5/1/2010 $20.84$32.69 $53.53Painters Class 3 (see notes)

5/1/2011 $21.49$33.32 $54.81Painters Class 3 (see notes)

5/1/2012 $21.91$34.30 $56.21Painters Class 3 (see notes)

5/1/2014 $23.40$35.76 $59.16Painters Class 3 (see notes)

5/1/2013 $27.05$34.70 $61.75Plasterers

5/1/2014 $29.85$46.18 $76.03Plumbers

5/1/2009 $20.85$35.05 $55.90Pointers, Caulkers, Cleaners

5/1/2010 $21.60$35.05 $56.65Pointers, Caulkers, Cleaners

5/1/2011 $22.45$35.10 $57.55Pointers, Caulkers, Cleaners

5/1/2012 $22.75$36.10 $58.85Pointers, Caulkers, Cleaners

5/1/2013 $22.75$37.50 $60.25Pointers, Caulkers, Cleaners

5/1/2014 $22.75$39.15 $61.90Pointers, Caulkers, Cleaners

5/1/2015 $22.75$40.80 $63.55Pointers, Caulkers, Cleaners

5/1/2013 $28.40$31.05 $59.45Roofers (Composition)

5/1/2014 $28.65$32.15 $60.80Roofers (Composition)

5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)

5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)

5/1/2014 $33.98$42.95 $76.93Sheet Metal Workers (Building, Heavy, Highway)

Page 8 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2015 $36.48$42.95 $79.43Sheet Metal Workers (Building, Heavy, Highway)

5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars

5/20/2011 $17.69$23.70 $41.39Sign Makers and Hangars

4/1/2013 $20.12$33.03 $53.15Sprinklerfitters

7/1/2013 $20.12$33.69 $53.81Sprinklerfitters

4/1/2014 $20.47$34.36 $54.83Sprinklerfitters

4/1/2015 $20.62$35.05 $55.67Sprinklerfitters

5/1/2013 $28.00$48.03 $76.03Steamfitters

5/1/2014 $29.13$49.58 $78.71Steamfitters

5/1/2010 $21.77$34.36 $56.13Stone Masons

5/1/2011 $22.58$34.35 $56.93Stone Masons

5/1/2012 $22.90$35.25 $58.15Stone Masons

5/1/2013 $22.90$36.65 $59.55Stone Masons

5/1/2014 $22.90$38.30 $61.20Stone Masons

5/1/2015 $22.90$39.95 $62.85Stone Masons

5/1/2009 $18.31$32.41 $50.72Terrazzo Finisher

5/1/2010 $19.06$32.41 $51.47Terrazzo Finisher

5/1/2011 $19.96$32.41 $52.37Terrazzo Finisher

5/1/2012 $20.26$33.06 $53.32Terrazzo Finisher

5/1/2013 $20.26$34.19 $54.45Terrazzo Finisher

5/1/2014 $20.26$35.86 $56.12Terrazzo Finisher

5/1/2015 $20.26$37.53 $57.79Terrazzo Finisher

5/1/2011 $19.96$32.66 $52.62Terrazzo Grinder

5/1/2012 $20.26$33.31 $53.57Terrazzo Grinder

5/1/2013 $20.26$34.44 $54.70Terrazzo Grinder

5/1/2014 $20.26$36.12 $56.38Terrazzo Grinder

5/1/2015 $20.26$37.80 $58.06Terrazzo Grinder

5/1/2008 $19.47$35.41 $54.88Terrazzo Layers

5/1/2009 $20.92$35.41 $56.33Terrazzo Mechanics

5/1/2010 $21.67$35.41 $57.08Terrazzo Mechanics

Page 9 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2011 $21.78$36.30 $58.08Terrazzo Mechanics

5/1/2012 $22.08$37.05 $59.13Terrazzo Mechanics

5/1/2013 $22.08$38.30 $60.38Terrazzo Mechanics

5/1/2014 $22.08$40.15 $62.23Terrazzo Mechanics

5/1/2015 $22.08$42.00 $64.08Terrazzo Mechanics

5/1/2009 $19.84$29.11 $48.95Tile Finisher

5/1/2010 $20.59$29.11 $49.70Tile Finisher

5/1/2011 $21.34$29.16 $50.50Tile Finisher

5/1/2012 $21.64$29.77 $51.41Tile Finisher

5/1/2013 $21.64$30.86 $52.50Tile Finisher

5/1/2014 $21.64$32.47 $54.11Tile Finisher

5/1/2015 $21.64$34.08 $55.72Tile Finisher

5/1/2009 $20.28$36.15 $56.43Tile Layers

5/1/2010 $21.03$36.15 $57.18Tile Layers

5/1/2011 $21.78$36.20 $57.98Tile Layers

5/1/2012 $22.08$36.95 $59.03Tile Layers

5/1/2013 $22.08$38.20 $60.28Tile Layers

5/1/2014 $22.08$40.05 $62.13Tile Layers

5/1/2015 $22.08$41.90 $63.98Tile Layers

5/1/2012 $14.16$27.54 $41.70Truckdriver class 1(see notes)

5/1/2014 $15.56$28.68 $44.24Truckdriver class 1(see notes)

5/1/2012 $14.16$27.64 $41.80Truckdriver class 2 (see notes)

5/1/2014 $15.56$28.78 $44.34Truckdriver class 2 (see notes)

5/1/2012 $14.16$27.89 $42.05Truckdriver class 3 (see notes)

5/1/2014 $15.56$29.03 $44.59Truckdriver class 3 (see notes)

Page 10 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

5/1/2014 $25.59$47.79 $73.38Carpenter - Chief of Party (Surveying &

Layout)

5/1/2015 $25.59$49.58 $75.17Carpenter - Chief of Party (Surveying &

Layout)

5/1/2016 $25.59$51.42 $77.01Carpenter - Chief of Party (Surveying &

Layout)

5/1/2014 $25.59$41.56 $67.15Carpenter - Instrument Person (Surveying

& Layout)

5/1/2015 $25.59$43.11 $68.70Carpenter - Instrument Person (Surveying

& Layout)

5/1/2016 $25.59$44.71 $70.30Carpenter - Instrument Person (Surveying

& Layout)

5/1/2014 $20.16$33.25 $53.41Carpenter - Rodman (Surveying & Layout)

5/1/2015 $20.16$34.49 $54.65Carpenter - Rodman (Surveying & Layout)

5/1/2016 $20.16$35.77 $55.93Carpenter - Rodman (Surveying & Layout)

5/1/2014 $25.59$41.56 $67.15Carpenters

5/1/2015 $25.59$43.11 $68.70Carpenters

5/1/2016 $25.59$44.71 $70.30Carpenters

5/1/2014 $29.16$32.25 $61.41Cement Masons

5/1/2015 $29.16$33.65 $62.81Cement Masons

5/1/2016 $29.16$35.15 $64.31Cement Masons

7/1/2010 $26.69$44.70 $71.39Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2011 $27.19$44.70 $71.89Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2012 $28.14$44.70 $72.84Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 01 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 01 - See notes)

5/1/2012 $22.95$26.00 $48.95Laborers (Class 01 - See notes)

5/1/2013 $23.55$26.60 $50.15Laborers (Class 01 - See notes)

5/1/2014 $24.50$26.90 $51.40Laborers (Class 01 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 02 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 02 - See notes)

5/1/2012 $22.95$26.20 $49.15Laborers (Class 02 - See notes)

5/1/2013 $23.55$26.80 $50.35Laborers (Class 02 - See notes)

5/1/2014 $24.50$27.10 $51.60Laborers (Class 02 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 03 - See notes)

Page 11 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

5/1/2011 $22.00$25.95 $47.95Laborers (Class 03 - See notes)

5/1/2012 $22.95$26.20 $49.15Laborers (Class 03 - See notes)

5/1/2013 $23.55$26.80 $50.35Laborers (Class 03 - See notes)

5/1/2014 $24.50$27.10 $51.60Laborers (Class 03 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 04 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 04 - See notes)

5/1/2012 $22.95$20.80 $43.75Laborers (Class 04 - See notes)

5/1/2013 $23.55$21.40 $44.95Laborers (Class 04 - See notes)

5/1/2014 $24.50$21.70 $46.20Laborers (Class 04 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 05 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 05 - See notes)

5/1/2012 $22.95$26.85 $49.80Laborers (Class 05 - See notes)

5/1/2013 $23.55$27.45 $51.00Laborers (Class 05 - See notes)

5/1/2014 $24.50$27.75 $52.25Laborers (Class 05 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 06 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 06 - See notes)

5/1/2012 $22.95$26.90 $49.85Laborers (Class 06 - See notes)

5/1/2013 $23.55$27.50 $51.05Laborers (Class 06 - See notes)

5/1/2014 $24.50$27.80 $52.30Laborers (Class 06 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 07 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 07 - See notes)

5/1/2012 $22.95$26.75 $49.70Laborers (Class 07 - See notes)

5/1/2013 $23.55$27.35 $50.90Laborers (Class 07 - See notes)

5/1/2014 $24.50$27.65 $52.15Laborers (Class 07 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 08 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 08 - See notes)

5/1/2012 $22.95$26.50 $49.45Laborers (Class 08 - See notes)

5/1/2013 $23.55$27.10 $50.65Laborers (Class 08 - See notes)

5/1/2014 $24.50$27.40 $51.90Laborers (Class 08 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 09 - See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 09 - See notes)

Page 12 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

5/1/2012 $22.95$26.35 $49.30Laborers (Class 09 - See notes)

5/1/2013 $23.55$26.95 $50.50Laborers (Class 09 - See notes)

5/1/2014 $24.50$27.25 $51.75Laborers (Class 09 - See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 10- See notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 10- See notes)

5/1/2012 $22.95$26.50 $49.45Laborers (Class 10- See notes)

5/1/2013 $23.55$27.10 $50.65Laborers (Class 10- See notes)

5/1/2014 $24.50$27.40 $51.90Laborers (Class 10- See notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 11 -See Notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 11 -See Notes)

5/1/2012 $22.95$26.40 $49.35Laborers (Class 11 -See Notes)

5/1/2013 $23.55$27.00 $50.55Laborers (Class 11 -See Notes)

5/1/2014 $24.50$27.30 $51.80Laborers (Class 11 -See Notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 12 -See Notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 12 -See Notes)

5/1/2012 $22.95$28.10 $51.05Laborers (Class 12 -See Notes)

5/1/2013 $23.55$28.70 $52.25Laborers (Class 12 -See Notes)

5/1/2014 $24.50$29.00 $53.50Laborers (Class 12 -See Notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 13 -See Notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 13 -See Notes)

5/1/2012 $22.95$30.13 $53.08Laborers (Class 13 -See Notes)

5/1/2013 $23.55$30.73 $54.28Laborers (Class 13 -See Notes)

5/1/2014 $24.50$31.03 $55.53Laborers (Class 13 -See Notes)

5/1/2010 $22.00$25.15 $47.15Laborers (Class 14 -See Notes)

5/1/2011 $22.00$25.95 $47.95Laborers (Class 14 -See Notes)

5/1/2012 $22.95$26.15 $49.10Laborers (Class 14 -See Notes)

5/1/2013 $23.55$26.75 $50.30Laborers (Class 14 -See Notes)

5/1/2014 $24.50$27.05 $51.55Laborers (Class 14 -See Notes)

5/1/2013 $15.38$27.10 $42.48Laborers Utility (PGW ONLY)

5/1/2013 $15.38$20.07 $35.45Laborers Utility (PGW ONLY)

(Flagperson)

Page 13 of 14 Serial Number: 15-01827

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

4/1/2010 $19.90$18.44 $38.34Landscape Laborer

5/1/2012 $20.30$18.84 $39.14Landscape Laborer

5/1/2013 $20.90$19.24 $40.14Landscape Laborer

5/1/2014 $21.45$19.89 $41.34Landscape Laborer

5/1/2013 $27.73$45.62 $73.35Steamfitters (Heavy and Highway - Gas

Distribution)

5/1/2014 $28.83$47.10 $75.93Steamfitters (Heavy and Highway - Gas

Distribution)

5/1/2013 $14.82$28.02 $42.84Truckdriver class 1(see notes)

5/1/2014 $15.56$28.53 $44.09Truckdriver class 1(see notes)

5/1/2013 $14.82$28.12 $42.94Truckdriver class 2 (see notes)

5/1/2014 $15.56$28.63 $44.19Truckdriver class 2 (see notes)

5/1/2013 $14.82$28.62 $43.44Truckdriver class 3 (see notes)

5/1/2014 $15.56$29.13 $44.69Truckdriver class 3 (see notes)

Notes:

If you can not find a classification under Heavy/Highway please refer to the Building classifications.

The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic region in which they are utilized.

For further information on construction types review the on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance" and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.

"Notes as Referenced in Predeterminations"

Page 14 of 14 Serial Number: 15-01827 http://www.portal.state.pa.us/portal/server.pt/community/prevailing_wage/10519/forms/553564

File details come from the government source that posted it. Updated .