0040487951 SPECIFICATION.pdf
PDF 138 KB Posted
- Attached to
- MN-RICE LAKE NWR-SIDE SHIFT MOWER Federal contract opportunity
- Solicitation number
- 140F0420Q0209
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0420Q0209.pdf | ||
| 0040487951 52.212-3 Offeror Representations and Certifications¿Commercial Items (Aug 2020).docx | DOCX document | |
| 0040487951 Past Experience Reference Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Project:
PR Number:
Item: Seppi Offset SMO avs 200 Flail Mower
1 Product Features:
Name of Item: Three point mounted flail mower with side shift function Manufacturer: Seppi Model Number: SMO avs 200 or approved equal Salient Characteristics:
-Minimum of 96” wide mowing area
- Swinging Flail Knifes -50-120 HP Rated with 540 PTO -Mulching capability up to 2.5” diameter brush -Independent angle of mower head that ranges from -50° to +90° -Include a break away system to protect mower and tractor if/when an obstacle is struck.
-Have the ability to mow in the tractor footprint directly behind the rear wheels as well as in side shift configurations
- All adjustments to mowing angle, height, and side shift must be controlled through the tractor functions and operate from the cab.
Capabilities: (if applicable): Listed in Characteristics
Example:
Name of Item: Offset Flail Mower Manufacturer: Seppi Model Number: SMO avs 200 Salient Characteristics:
-Minimum of 96” wide
- Swinging Flail Knifes -50-120 HP Rated with 540 PTO -Mulching capability up to 2.5” diameter brush -Independent angle of mower head that ranges from -50° to +90° -Include a break away system to protect mower and tractor if/when an obstacle is struck.
-Have the ability to mow in the tractor footprint directly behind the rear wheels as well as in side shift configurations
- All adjustments to mowing angle, height, and side shift must be controlled through the tractor functions and operate from the cab.
Capabilities (if applicable): Mower to be used on 95 PTO HP tractor for road center and side mowing, included public use areas of varying terrain and slopes.
2. Delivery
Prices quoted must be FOB Destination
“F.o.b. destination” means --Free of expense to the Government delivered, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the contractor. The
Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee.
If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee.
Contractor responsibilities. The contractor shall -- (1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
3. Delivery Location:
Product shall be delivered to the following location:
Rice Lake NWR 36289 State HWY 65 McGregor, MN 55760 218-768-2402
4. Installation:
Prices quoted must include installation. All labor and parts associated with and required for installation are the sole responsibility of the contractor. No assistance or equipment will be provided by the government.
Installation shall be completed according to industry standards.
5. Technical Point of Contact (POC):
Clint DeMenge clint_demenge@fws.gov 218-821-5608
6. Delivery Instructions:
No later than three days prior to delivery, please contact the Point of Contact listed above, to arrange a specific time for delivery. Unloading the product is the sole responsibility of the delivery carrier. No labor or equipment will be provided by the government to unload the supplies.
mailto:clint_demenge@fws.gov
File details come from the government source that posted it. Updated .