This is a Scope of Work document for the Texas Department of Criminal Justice (TDCJ) Montford Unit, detailing the replacement of a water softener system in the facility's boiler room. The project involves the removal of an existing water softener system by the Owner prior to vendor mobilization, followed by the vendor's installation of a new Model MCSMF-39-18NXT-TRI-1200-C5060 water softener system. The specified equipment includes a 1,200,000 grain side-mount water softener with metered control valve configuration, three composite (FRP) mineral tanks sized 48" x 72", and all necessary PVC piping for mechanical connections. The vendor is responsible for furnishing all labor, materials, tools, and equipment required for installation, startup, testing, and commissioning of the new system in accordance with manufacturer specifications. Project deliverables include completed installation of hardware, detailed startup and commissioning documentation with control valve programming, comprehensive operating parameters, documented operational verification, manufacturer warranty documentation, and basic operator training for designated facility staff.
The Scope of Work does not specify pricing terms, contract term length, renewal options, response dates, or due dates. No set-asides, incumbent information, or funding sources are identified in this document. The Owner is responsible for disconnecting and disposing of the existing system, ensuring site access and safety, providing stable utility access (water, power, and operational drains), and coordinating facility downtime during installation. Notably, the vendor explicitly will not supply brine tanks unless separately contracted. The document requires authorization and sign-off from both Owner and Vendor representatives to acknowledge acceptance of all stated duties, equipment provisions, exclusions, and deliverables.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK (SOW)
Project: Montford Unit Boiler Room Water Softener Replacement
1. Project Purpose & Summary
The purpose of this project is to remove the existing water softener system from the Montford Unit Boiler Room and install a new replacement water softener system. The Owner will disconnect, remove, and safely dispose of the existing system prior to vendor mobilization. The Vendor will subsequently furnish all labor, materials, tools, and equipment necessary to install, start up, test, and commission the new system in strict accordance with the project specifications.
2. Owner Responsibilities
• Disconnection & Disposal: Disconnect, remove, and properly dispose of the existing water softener system prior to Vendor mobilization.
• Site Access & Safety: Ensure the installation area within the boiler room is clear, accessible, and completely safe for Vendor personnel.
• Utilities: Provide stable utility access (including water, power, and operational drains) as required for the new system installation.
• Operations Coordination: Coordinate and manage any operational facility downtime required during the installation window.
3. Vendor Responsibilities & Scope of Supply
• Equipment Procurement & Installation: Furnish and install one (1) new water softener system, Model MCSMF-39-18NXT-TRI-1200-C5060, featuring:
- 1,200,000 grain side-mount water softener.
- Super, heavy-duty, 3-inch industrial metered water softener system.
- Metered control valve configuration.
- PVC piping as required for proper mechanical connection.
- Composite (FRP) mineral tanks sized 48" x 72" (Quantity: 3).
- Note: Brine tanks are explicitly not included and will not be supplied by the Vendor unless separately contracted.
• Site Verification: Verify all installation area conditions prior to work and immediately notify the Owner of any pre-existing issues that may affect proper installation.
• Plumbing & Integration: Complete all plumbing connections, control valve setup, meter configuration, and all facility system tie-ins in compliance with manufacturer specifications.
Scope of Work: Montford Boiler Room Water Softener Replacement
Page 1 of 2CONFIDENTIAL & PROPRIETARY
• Commissioning & Testing: Perform comprehensive system startup, commissioning, performance testing, and verification to ensure proper operation, targeted flow rates, metering accuracy, and automated regeneration controls.
• Training: Provide basic operator training to designated facility staff, covering an overarching system operation overview and routine maintenance expectations.
4. Project Deliverables
• Completed Installation: Successful installation of the specified water softener system hardware and physical components.
• Documentation: Detailed startup and commissioning documentation, including precise control valve programming and system configuration settings.
• Operating Metrics: Comprehensive list of recommended operating parameters alongside initial system regeneration settings.
• Operational Verification: Formally documented confirmation of successful operational testing under facility conditions.
• Literature & Warranties: Official manufacturer warranty documentation and all associated product literature.
• Operator Training: Provision of basic operator training for designated personnel upon immediate project completion.
5. Project Authorization & Sign-Off
By signing below, both parties acknowledge and accept the duties, equipment provisions, exclusions, and deliverables detailed within this Scope of Work document.
Owner Representative Authorization Vendor Representative Authorization
Signature: __________________________ Signature: __________________________
Name: ____________________________ Name: ____________________________
Title: _____________________________ Title: _____________________________
Date: _____________________________ Date: _____________________________
Scope of Work: Montford Boiler Room Water Softener Replacement