002-2_TAO_Mast_Specification.docx
DOCX document 36 KB Posted
- Solicitation number
- 1305M224Q0132
About this file
This document is a Standard Specification for the fabrication of buoy masts used in the Tropical Atmosphere Ocean (TAO) array by the National Data Buoy Center (NDBC). It describes the requirements for the contractor to provide all necessary labor, material, equipment, facilities, and services to fabricate and deliver the buoy towers to NDBC. The masts must be fabricated from 6061-T6 Aluminum in accordance with AWS D1.2 welding standards, with a maximum height of 89.5 inches. The contractor must submit welding procedures, welder qualifications, and material certifications, and provide a first article for inspection prior to full fabrication. All deliverables must be shipped to the NDBC at Stennis Space Center, MS.
The related federal contract opportunity is Solicitation Number 1305M224Q0132 for "TAO BUOY MASTS FOR THE NATIONAL DATA BUOY CENTER AT STENNIS SPACE CENTER, MS." issued by the Department of Commerce National Oceanic and Atmospheric Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1305M224Q0132.pdf | ||
| 1352_213-70_EVALUATION_USING_SAP.docx | DOCX document | |
| TAO_Mast_Drawings.pdf | ||
| OFFEROR_INSTRUCTIONS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NDBC STANDARD SPECIFICATION FOR FABRICATION OF BUOY MAST USED IN THE TROPICAL ATMOSPHERE OCEAN (TAO) ARRAY
1.0 SCOPE
1.1 General. This specification describes the requirements for the fabrication of buoy mast used in the Tropical Atmosphere Ocean (TAO) array. The contractor shall provide all the necessary labor, material, equipment, facilities and services to fabricate and deliver the buoy towers to the National Data Buoy Center (NDBC).
1.2 Precedence. Any ambiguity or conflict between this specification and other applicable documents shall be resolved by the following order of precedence:
| a) The issued contract with any amendments or modifications |
| b) This specification |
| c) The drawings listed in paragraph 2.3 |
| d) Other applicable documents listed in paragraph 2.0 |
2.0 APPLICABLE DOCUMENTS
2.1 General. The documents listed in this section are referenced in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification, which are recommended for additional information or used as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements cited in sections 3 and 4 of this specification, whether or not the referenced documents are listed here.
2.2 Industry Publications. The following documents of the issues specified form a part of this specification to the extent referenced herein. Suffixes denoting the specific issue of each document will be omitted from future references to the document in this specification.
| STANDARD |
| DATE |
| TITLE |
| AWS D1.2/D1.2M |
| 11 Jun 2013 |
| Structural Welding Code - Aluminum |
2.3 Drawings. The following NDBC drawings form a part of this specification to the extent referenced herein and shall be referred to as "the drawings" throughout this specification:
| Drawing |
| Rev |
| Title |
| TAO-001101 |
| F |
| TAO Buoy Mast Assembly |
| TAO-001109 |
| C |
| TAO Upper Level Platform |
| TAO-001110 |
| C |
| TAO Shelf #3 Platform |
| TAO-001111 |
| C |
| TAO Shelf #2 Platform |
| TAO-001112 |
| C |
| TAO Shelf #1 Platform |
| TAO-001102 |
| F |
| TAO Buoy Hull Assembly (Reference Only) |
3.0 REQUIREMENTS
The mast shall be fabricated from of 6061-T6 Aluminum. All aluminum welding shall be in accordance with AWS Dl.2.
The overall height of the mast shall be less than or equal to 89.5 inches.
4.0 QUALITY ASSURANCE
4.1 Welding Procedures and Qualifications. The contractor shall submit welding procedures and welder qualifications that conform with AWS D 1.2 prior to fabrication of the mast.
4.2 Material Certifications. The contractor shall provide vendor supplied material certifications for all materials used in the construction of the mast
4.3 First Article. The contractor shall produce and deliver a first article of the mast for inspection prior to commencing fabrication of the remainder of the articles. This requirement may be waived at the contracting officer’s discretion if the contractor has successfully completed a TAO buoy mast contract in the past.
5.0 DELIVERABLES
All deliverables shall be shipped to the following address:
National Data Buoy Center Attn: Property Officer Building 3203 Stennis Space Center, MS 39529
File details come from the government source that posted it. Updated .