0019217 RFQ Addendum 1 Question Answer.pdf
PDF 316 KB Posted
- Attached to
- Engineering Design Services GDOT PI# 0019217 SR 12/US 278 FROM SR 81 TO HOSPITAL DRIVE - PHASE II ¿
- Solicitation number
- PE-70750-NONST-2024-000000020
- Issued by
- Lanier County, Georgia
About this file
This document is an addendum to a Request for Qualifications (RFQ) issued by the City of Covington, Georgia for engineering design services for the Georgia Department of Transportation (GDOT) Project ID 0019217 on SR 12/US 278 from SR 81 to Hospital Drive - Phase II. The RFQ seeks to identify qualified firms to provide consultant services for this project, which involves roadway design. The addendum provides clarification on specific required area classes, the scope of work regarding utility design, and other project details. Statements of Qualifications are due on April 26, 2024, and the City of Covington reserves the right to reject any or all submissions.
The scope of work includes various preliminary design tasks such as utility coordination, environmental permitting, and right-of-way acquisition. The contract does not include water and sewer relocation design, which will be handled separately. The project is funded through state and local sources, but the specific funding amounts and requirements are not provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0019217 RFQ (Final).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page: 1 of 2
ADDENDUM 1
Engineering Design Services
GDOT PI# 0019217
SR 12/US 278 FROM SR 81 TO HOSPITAL DRIVE -
PHASE II – LCI
NEWTON COUNTY
RFQ-2024-0019217
Qualifications Due: April 26, 2024
City of Covington, Georgia 2194 Emory Street, NW
Covington, Georgia 30014
Please include an acknowledgement of receipt of this Addendum in your submittal
Firm Name:
Name:
Title:
Signature:
Date:
Page: 2 of 2
ADDENDUM 1
2024-0019217
Engineering Design Services
Questions Received
Q1. Are 8.01 and 9.03 required? Neither is in the scope.
Q1 Answer: Required Area Classes 8.01 and 9.03 have been removed.
Q2. Exhibit I, Item 4.B. requires area class 5.04 – Aerial Photography. Please verify which sub-classes apply to the required 5.04 area class listed.
Q2 Answer: Sub-classes 5.04(a) and 5.04(c).
Q3. Page 16, D. Preliminary Design, Item No. 9 – Will the consultant be responsible for water and sewer relocation design, be given the option of adding it to the design scope, or just coordinate with the City/County through SUE?
Q3 Answer: Water and Sewer design is not a part of the scope of work. Utility submissions (1st and 2nd Utility Submissions for example) and utility coordination and estimates following the Georgia Department of Transportation’s Plan Development Process (PDP) is included in the scope of work.